CN210798156U - Bearing floor heating assembly - Google Patents

Bearing floor heating assembly Download PDF

Info

Publication number
CN210798156U
CN210798156U CN201920603516.3U CN201920603516U CN210798156U CN 210798156 U CN210798156 U CN 210798156U CN 201920603516 U CN201920603516 U CN 201920603516U CN 210798156 U CN210798156 U CN 210798156U
Authority
CN
China
Prior art keywords
stone
board
moulded
rib
plastic plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920603516.3U
Other languages
Chinese (zh)
Inventor
周东珊
王文广
丁欣欣
丁泽成
余文钊
步挺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Yasha Decoration Co Ltd
Original Assignee
Zhejiang Yasha Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Yasha Decoration Co Ltd filed Critical Zhejiang Yasha Decoration Co Ltd
Priority to CN201920603516.3U priority Critical patent/CN210798156U/en
Application granted granted Critical
Publication of CN210798156U publication Critical patent/CN210798156U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses an assembly warms up bearing. Assembly warms up bearing includes: the stone-plastic plate is arranged in a hollow mode, the back face of the stone-plastic plate is provided with a first supporting rib, the first supporting rib extends along the length direction of the stone-plastic plate, the front face of the stone-plastic plate is provided with a reinforcing rib, and the reinforcing rib is perpendicular to the first supporting rib; the heated board, the heated board is laid and is moulded the front of board at the stone, and the mounting groove that is used for setting up the ground heating pipeline is offered to one side that the board was moulded to stone dorsad on the heated board, and the mounting groove runs through the strengthening rib along the direction that is on a parallel with the board is moulded to the stone. The mounting method of the load-bearing floor heating assembly is used for mounting the load-bearing floor heating assembly. The utility model provides an assembly warms up bearing on the basis of pipeline warms up the stable support, reduces the heat loss of pipeline warms up, increases the heat preservation effect of pipeline to the floor warms up, reduces the layer height that occupies, reduces the dead weight, reduces the construction degree of difficulty, reduces the installation degree of difficulty.

Description

Bearing floor heating assembly
Technical Field
The utility model relates to an architectural decoration technical field especially relates to an assembly warms up bearing.
Background
The low-temperature ground heating radiation heating is a heating mode for preserving and heating the indoor space by using the ground in the building as a heat radiating device.
In the prior art, the weight of the floor heating pipeline is large, the floor heating pipeline is installed in an overhead mode, the problem of poor stability exists, cement mortar is generally paved on the ground where the floor heating pipeline is installed, then the floor heating pipeline is paved on the cement mortar, the floor heating pipeline is stably supported by means of strength of the solidified cement mortar, cement paste is cast on the floor heating pipeline so that the cement paste is paved on the floor heating pipeline to enable the cement paste to be self-leveled, and finally a floor is paved on the leveled cement paste. The inventor discovers that the floor heating pipe supported after leveling by cement also has certain problems in the process of realizing the invention and creation: firstly, the laid cement has poor heat preservation performance, the heat loss of the floor heating pipeline is improved, and the heat preservation effect of the floor heating pipeline on the floor is reduced; secondly, the paved cement raises the ground by about 80-110mm, so that the problems of large floor occupation height, large self weight and large construction difficulty exist; thirdly, cement is filled between the floor heating pipelines, and the floor heating pipelines are difficult to maintain or overhaul once being installed, so that certain potential safety hazards exist in the floor heating using process.
Therefore, it is necessary to solve the above-mentioned technical problems.
SUMMERY OF THE UTILITY MODEL
The utility model provides an assembly warms up bearing to solve the problem that exists among the prior art, on the basis of pipeline warms up in the stable stay, reduce the heat loss of pipeline warms up, increase the heat preservation effect of pipeline to the floor warms up, reduce the layer height that occupies, reduce the dead weight, reduce the construction degree of difficulty, reduce the installation degree of difficulty.
The utility model provides an assembly warms up bearing, include: the stone-plastic composite plate comprises a stone-plastic plate which is arranged in a hollow manner, wherein a first supporting rib is attached to the back surface of the stone-plastic plate, the first supporting rib extends along the length direction of the stone-plastic plate, a reinforcing rib is attached to the front surface of the stone-plastic plate, and the reinforcing rib is perpendicular to the first supporting rib; the heated board, the heated board is laid the front of board is moulded to the stone, dorsad on the heated board one side of board is moulded to the stone offers the mounting groove that is used for setting up the ground heating pipeline, the mounting groove is along being on a parallel with the direction that the board was moulded to the stone runs through the strengthening rib.
Optionally, the stone-plastic plate, the first support rib and the reinforcing rib are integrally extruded.
Optionally, the number of strengthening rib is a plurality of, and is a plurality of the strengthening rib is along the front of stone plastic plate is arranged and is set up, the heated board sets up two arbitrary neighbours the strengthening rib between, two sides that back on the back set up on the heat preservation respectively one-to-one ground butt on two the lateral wall on the strengthening rib.
Optionally, the reinforcing rib and the first supporting rib are both arranged in a hollow manner.
Optionally, the assembly warms up bearing still includes the regulation foot, it includes adjusting screw to adjust the foot, the stone is moulded the board and is seted up the perpendicular to the first screw hole of the board is moulded to the stone, adjusting screw's first end is followed the back spiro union of the board is moulded to the stone advances in the first screw hole, adjusting screw's second end is towards keeping away from the direction that the board was moulded to the stone extends.
Optionally, the adjusting leg further comprises a clamping seat, a second threaded hole matched with the adjusting screw is formed in the clamping seat, the first supporting rib is clamped on the clamping seat, and the first end of the adjusting screw penetrates through the second threaded hole and then is screwed into the first threaded hole.
Optionally, the number of the adjusting legs is multiple, the first support rib is provided with a plurality of first threaded holes along the length direction, and the adjusting legs are screwed in the first threaded holes in a one-to-one correspondence manner.
Optionally, the insulation board is a polyethylene foam insulation board or an extruded polystyrene insulation board.
Optionally, the stone-plastic plate further comprises a butt joint edge, wherein a second supporting rib is arranged on the butt joint edge and is positioned on the back of the stone-plastic plate; and after the two stone plastic plates are butted, the two thread half holes respectively positioned on the two butting edges are butted into a third thread hole matched with the adjusting screw rod.
The utility model provides an assembly warms up bearing, the board is moulded to stone that cavity set up can play the effect of keeping warm effectively and be favorable to reducing the dead weight, heated board for installing the pipeline of warming up can reduce calorific loss after installing on the board is moulded to stone, be favorable to keeping warm to ground, the strengthening rib and the first supporting rib that set up perpendicularly on the board is moulded to stone can increase the structural strength that the board is moulded to stone effectively, can increase the built on stilts structural stability who sets up the board is moulded to stone, on this basis, need not casting cement among the pipeline installation process warms up, the floor height that occupies has been reduced, in the practical application in-process, when the pipeline of warming up needs to overhaul or maintain, the application situation of pipeline is warmed up in both can directly perceived inspection to the floor dismantlement that will cover on the heated board, the potential safety hazard is.
Drawings
The preferred embodiments of the present invention will hereinafter be described in detail, with the aid of the annexed drawings, for aiding the understanding of the objects and advantages of the invention, wherein:
fig. 1 is the utility model discloses the structural schematic diagram of the bearing floor heating assembly that optional embodiment provided.
Fig. 2 is an assembly view of the stone-plastic plate with the adjusting foot according to an alternative embodiment of the present invention.
Fig. 3 is a schematic view of the back of the stone-plastic plate with the adjusting foot according to an alternative embodiment of the present invention.
Fig. 4 is a schematic structural view of the back of the stone-plastic plate with the adjusting foot according to an alternative embodiment of the present invention.
Fig. 5 is the utility model discloses the optional structure schematic diagram who provides of installing the stone of heated board moulds the board.
Fig. 6 is a partially enlarged view of a in fig. 5.
Detailed Description
The terms of orientation of up, down, left, right, front, back, top, bottom, and the like as referred to or as may be referred to in this specification are defined with respect to the configuration shown in the drawings, and the terms "inner" and "outer" refer to directions toward and away from the geometric center of a particular component and are relative terms, and thus may be changed accordingly depending on the position and the state of use of the particular component. Therefore, these and other directional terms should not be construed as limiting terms.
Fig. 1 is the utility model discloses the structural schematic diagram of the bearing floor heating assembly that optional embodiment provided, fig. 2 is the utility model discloses the assembly picture of board is moulded to the stone of installing the regulation foot that optional embodiment provides, fig. 3 is the utility model discloses the structure schematic diagram at the back of board is moulded to the stone of installing the regulation foot that optional embodiment provides, fig. 4 is the utility model discloses the structural schematic diagram at the back of board is moulded to the stone of installing the regulation foot that optional embodiment provides, fig. 5 is the utility model discloses the structural schematic diagram of the board is moulded to the stone of installing the heated board that optional embodiment provides, fig. 6 is the local enlarger of A in fig. 5. As shown in fig. 1 to fig. 6, the utility model provides a floor heating assembly for bearing, include: the stone plastic plate comprises a hollow stone plastic plate 1 and a heat insulation plate 2.
Referring to fig. 1 to 6, a first support rib 11 is attached to the back of the stone-plastic plate 1, the first support rib 11 extends along the length direction of the stone-plastic plate 1, a reinforcing rib 12 is attached to the front of the stone-plastic plate 1, and the reinforcing rib 12 is perpendicular to the first support rib 11; heated board 2 is laid the front of board 1 is moulded to stone, keep away from on heated board 2 one side of board 1 is moulded to stone is offered and is used for setting up the mounting groove 21 of ground heating pipeline, mounting groove 21 is along being on a parallel with board 1 is moulded to stone's direction runs through strengthening rib 12.
The utility model provides an assembly warms up bearing, board 1 is moulded to stone that cavity set up can play the effect of keeping warm effectively and be favorable to reducing the dead weight, heated board 2 for installing the pipeline that warms up can reduce calorific loss after installing on board 1 is moulded to stone, be favorable to keeping warm to ground, set up strengthening rib 12 and first supporting rib 11 on board 1 is moulded to stone perpendicularly and can increase the structural strength that board 1 is moulded to stone effectively, can increase the stone of built on stilts setting and mould board 1's structural stability, on this basis, need not casting cement among the pipeline installation process warms up, the floor height that occupies has been reduced, in the practical application process, when the pipeline that warms up needs to overhaul or maintain, the application situation that can directly perceivedly inspect the pipeline that warms up under the floor dismantlement that will cover on heated board 2, the potential safety hazard is reduced, time and labor.
Optionally, the stone-plastic plate 1, the first supporting rib 11 and the reinforcing rib 12 are integrally formed by extrusion, so that the difficulty of production can be reduced, and the production process is simplified.
As an optional implementation process, the number of the reinforcing ribs 12 is multiple, the plurality of reinforcing ribs 12 are arranged along the front surface of the stone-plastic plate 1, the heat-insulating plate 2 is arranged between any two adjacent reinforcing ribs 12, and two side surfaces of the heat-insulating plate, which are arranged oppositely, are respectively abutted against the side walls of the two reinforcing ribs 12 in a one-to-one correspondence manner. The reinforcing ribs 12 provided by the embodiment can stably support and limit the heat insulation board 2.
Preferably, the reinforcing rib 12 and the first supporting rib 11 are both hollow. The embodiment can further reduce the structural strength of the reinforcing ribs 12 and the first supporting ribs 11, and simultaneously improve the heat preservation effect.
As an optional implementation process, the floor heating assembly for bearing further comprises an adjusting foot 3, the adjusting foot 3 comprises an adjusting screw 31, the stone-plastic plate 1 is provided with a first threaded hole 16 perpendicular to the stone-plastic plate 1, a first end of the adjusting screw 31 is screwed into the first threaded hole 16 from the back of the stone-plastic plate 1, and a second end of the adjusting screw 31 extends in a direction away from the stone-plastic plate 1. The second end of adjusting screw 31 in this embodiment can the butt on ground basic unit, through changing the degree of depth that adjusting foot 3 extends into first screw hole 16, changes the distance between board 1 and the ground basic unit is moulded to the stone, moulds board 1 to the stone and carries out the leveling, labour saving and time saving.
As an alternative implementation, the first threaded hole 16 penetrates through the reinforcing rib 12, so that the adjustment depth of the adjustment screw 31 can be increased. Here, a hexagon socket can be opened on the end face of the first end of the adjusting screw 31, the hexagonal rod is back to from the reinforcing rib 12, one side of the stone plastic plate 1 enters the first threaded hole 16 and extends into the hexagon socket, the outer wall of the hexagonal rod is abutted against the inner wall of the hexagon socket, the depth of the adjusting screw 31 extending into the first threaded hole 16 can be changed by rotating the hexagonal rod, and the adjusting process is simplified.
Preferably, the adjusting foot 3 further includes a clamping seat 32, a second threaded hole adapted to the adjusting screw 31 is formed in the clamping seat 32, the first supporting rib 11 is clamped on the clamping seat 32, and a first end of the adjusting screw 31 is threaded into the first threaded hole 16 after passing through the second threaded hole. The joint seat 32 that this embodiment provided can support effectively and fix a position first supporting rib 11, prevents that first supporting rib 11 from sliding under self action of gravity, moulds board 1 to the stone and plays the positioning action effectively.
As an optional implementation process, the clamping seat 32 includes a first clamping plate, a second clamping plate, and a third clamping plate, which are connected in sequence, the first clamping plate and the third clamping plate are disposed oppositely, a strip-shaped clamping groove is defined by the first clamping plate, the second clamping plate, and the third clamping plate, the first support rib 11 is clamped in the clamping groove, and the second threaded hole is formed in the second clamping plate. The direct joint of first support muscle 11 is in the joint inslot of bar, labour saving and time saving, and adjusting screw 31 wears to establish extend into first screw hole 16 after the second screw hole again in, increased the structural stability of first support muscle 11 installation on joint seat 32.
On the basis of the above embodiment, the number of the adjusting legs 3 is plural, the first support rib 11 is provided with a plurality of first threaded holes 16 along the length direction, and the plurality of adjusting legs 3 are screwed in the plurality of first threaded holes 16 in a one-to-one correspondence manner. The stone-plastic plate 1 can be quickly and accurately leveled by adjusting the depth of the first ends of the adjusting screws 31 in the first threaded holes 16, and the structural stability of the stone-plastic plate 1 is increased.
On the basis of the above embodiment, a positioning base is installed at the second end of the adjusting screw 31, and the adjusting screw 31 abuts against the ground base layer through the positioning base. The positioning base provided by the embodiment can effectively increase the contact area between the adjusting screw 31 and the ground base layer, and improve the structural stability of the adjusting foot 3.
Optionally, the heat insulation board 2 is a polyethylene foam heat insulation board 2 or an extruded polystyrene heat insulation board 2, and has the technical effects of light weight and good heat insulation effect.
Preferably, the stone-plastic plate 1 further comprises a butt joint edge 13, a second support rib 14 is mounted on the butt joint edge 13, and the second support rib 14 is located on the back of the stone-plastic plate 1; the butt joint edges 13 are provided with threaded half holes along the direction perpendicular to the stone plastic plates 1, the threaded half holes penetrate through the second supporting ribs 14 along the direction perpendicular to the stone plastic plates 1, and after the two stone plastic plates 1 are in butt joint, the two threaded half holes in the two butt joint edges 13 are in butt joint to form third threaded holes matched with the adjusting screws 31. The second support rib 14 provided by the embodiment can effectively support the butt joint edge 13 of the stone-plastic plate 1, prevent the stone-plastic plate 1 from inclining, and increase the structural stability of the stone-plastic plate 1. Optionally, the abutting edge 13 is parallel to the extending direction of the first supporting rib 11 to increase the structural stability of the first supporting rib 11; and the height of the edges of the two butted stone-plastic plates 1 can be adjusted by screwing the adjusting screw rod 31 in the third threaded hole.
The utility model discloses an above arbitrary one of following method installation bearing floor heating assembly, including following step: preparing a stone-plastic plate 1, wherein the stone-plastic plate 1 is arranged in a hollow manner, a first supporting rib 11 is arranged on the back surface of the stone-plastic plate 1, the first supporting rib 11 extends along the length direction of the stone-plastic plate 1, a reinforcing rib 12 is arranged on the front surface of the stone-plastic plate 1, and the reinforcing rib 12 is perpendicular to the first supporting rib 11; install heated board 2 board 1 is moulded to stone, heated board 2 is laid the front of board 1 is moulded to stone, back on heated board 2 one side that board 1 was moulded to stone is offered and is used for setting up the mounting groove 21 of ground heating pipeline, mounting groove 21 is along being on a parallel with board 1 is moulded to stone's direction runs through strengthening rib 12.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the present invention.

Claims (9)

1. The utility model provides an assembly warms up bearing, its characterized in that includes:
the stone-plastic composite plate comprises a stone-plastic plate which is arranged in a hollow manner, wherein a first supporting rib is attached to the back surface of the stone-plastic plate, the first supporting rib extends along the length direction of the stone-plastic plate, a reinforcing rib is attached to the front surface of the stone-plastic plate, and the reinforcing rib is perpendicular to the first supporting rib;
the heated board, the heated board is laid the front of board is moulded to the stone, dorsad on the heated board one side of board is moulded to the stone offers the mounting groove that is used for setting up the ground heating pipeline, the mounting groove is along being on a parallel with the direction that the board was moulded to the stone runs through the strengthening rib.
2. The load-bearing floor heating assembly of claim 1, wherein the stone-plastic plate is integrally extruded with the first support rib and the reinforcing rib.
3. The load-bearing floor heating assembly of claim 2, wherein the number of the reinforcing ribs is multiple, the reinforcing ribs are arranged along the front surface of the stone-plastic plate, the heat-insulating plate is arranged between any two adjacent reinforcing ribs, and two side surfaces of the heat-insulating plate, which are arranged oppositely, are respectively abutted against the side walls of the two reinforcing ribs in a one-to-one correspondence manner.
4. The load-bearing floor heating assembly of claim 3, wherein the reinforcing ribs and the first support ribs are both hollow.
5. The assembly warms up bearing according to claim 4, characterized in that, the assembly warms up bearing still includes the regulation foot, it includes adjusting screw to adjust the foot, the stone is moulded the board and is seted up the perpendicular to the first screw hole of the stone is moulded the board, adjusting screw's first end is followed the back spiro union of stone is moulded the board and is advanced in the first screw hole, adjusting screw's second end is towards keeping away from the direction extension that the board was moulded to the stone.
6. The bearing floor heating assembly of claim 5, wherein the adjusting foot further comprises a clamping seat, a second threaded hole matched with the adjusting screw is formed in the clamping seat, the first supporting rib is clamped on the clamping seat, and the first end of the adjusting screw penetrates through the second threaded hole and then is screwed in the first threaded hole.
7. The load-bearing floor heating assembly of claim 6, wherein the number of the adjusting feet is multiple, the first support rib is provided with a plurality of first threaded holes along the length direction, and the adjusting feet are screwed in the first threaded holes in a one-to-one correspondence manner.
8. The load-bearing floor heating assembly of claim 7, wherein the insulation board is a polyethylene foam insulation board or an extruded polystyrene insulation board.
9. The load-bearing floor heating assembly of any one of claims 5-8, wherein the stone-plastic panel further comprises a butt edge, and a second support rib is mounted on the butt edge and positioned on the back of the stone-plastic panel; and after the two stone plastic plates are butted, the two thread half holes respectively positioned on the two butting edges are butted into a third thread hole matched with the adjusting screw rod.
CN201920603516.3U 2019-04-29 2019-04-29 Bearing floor heating assembly Active CN210798156U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920603516.3U CN210798156U (en) 2019-04-29 2019-04-29 Bearing floor heating assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920603516.3U CN210798156U (en) 2019-04-29 2019-04-29 Bearing floor heating assembly

Publications (1)

Publication Number Publication Date
CN210798156U true CN210798156U (en) 2020-06-19

Family

ID=71231093

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920603516.3U Active CN210798156U (en) 2019-04-29 2019-04-29 Bearing floor heating assembly

Country Status (1)

Country Link
CN (1) CN210798156U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110242003A (en) * 2019-04-29 2019-09-17 浙江亚厦装饰股份有限公司 Load-bearing floor heating assembly and installation method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110242003A (en) * 2019-04-29 2019-09-17 浙江亚厦装饰股份有限公司 Load-bearing floor heating assembly and installation method

Similar Documents

Publication Publication Date Title
CN210798156U (en) Bearing floor heating assembly
CN111877689A (en) Novel overhead ground heating module
CN112878622A (en) Fabricated overhead heat-insulating and sound-insulating brick system and construction method
CN112064833A (en) Assembled partition wall structure
CN104358325B (en) Assembly external wall heat insulation system and assembly method of assembly external wall heat insulation system
CN210857851U (en) Floor heating assembly
CN210288991U (en) Assembled height-adjustable aerial system and mold positioning and releasing device
CN110242002A (en) Floor heating assembly and installation method
CN110242003A (en) Load-bearing floor heating assembly and installation method
CN210857868U (en) Ground heating base plate
CN103225354B (en) A kind of acoustical absorption heat preserving wall
CN211899414U (en) Leveling support module and leveling support plate assembly
CN210857874U (en) Leveling module and leveling assembly
CN207988413U (en) Ground leveling component
CN111503707B (en) Floor heating module device
CN207974444U (en) Levelling foot and leveling component
CN211341589U (en) Leveling strip
CN210947543U (en) Assembled height-adjustable floor heating paving system
CN216340631U (en) Modular passing-through stone structure
CN211341588U (en) Leveling heat-insulation board assembly
CN111535543A (en) Overhead ground
CN210342339U (en) Composite light steel keel inner wall structure
CN110259039B (en) Leveling heat-insulating board assembly
CN111677231A (en) Novel load-bearing leveling plate and preparation method and paving method thereof
KR101875730B1 (en) Support equipment for building construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant