CN108104401A - Basic ground assembly and installation method - Google Patents

Basic ground assembly and installation method Download PDF

Info

Publication number
CN108104401A
CN108104401A CN201711481413.6A CN201711481413A CN108104401A CN 108104401 A CN108104401 A CN 108104401A CN 201711481413 A CN201711481413 A CN 201711481413A CN 108104401 A CN108104401 A CN 108104401A
Authority
CN
China
Prior art keywords
levelling
bar
basic ground
supporting surface
leveling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711481413.6A
Other languages
Chinese (zh)
Inventor
周东珊
余文钊
步挺
武鹏
许伟
周雪萍
李梦珺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Yasha Decoration Co Ltd
Original Assignee
Zhejiang Yasha Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Yasha Decoration Co Ltd filed Critical Zhejiang Yasha Decoration Co Ltd
Priority to CN201711481413.6A priority Critical patent/CN108104401A/en
Publication of CN108104401A publication Critical patent/CN108104401A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Floor Finish (AREA)

Abstract

The invention discloses a kind of basic ground assembly and installation methods.Basic ground assembly includes basic ground, the first supporting item and the second supporting item, and the first supporting item includes the first supporting surface, and the second supporting item includes the second supporting surface:Each levelling component includes levelling bar and leveling bar, and each levelling bar includes levelling face;The second end of leveling bar and the distance between levelling face are adjustable;The both ends of each levelling bar are overlapped on the first supporting surface and the second supporting surface, and multiple levelling bars are along the axially direction spread configuration perpendicular to levelling bar;It is multiple to look for co-planar and be each perpendicular to plumb line.The installation method of basic ground assembly is used to install basic ground assembly.Basic ground assembly and installation method provided by the invention reduce the difficulty of maintenance or the maintenance of floor heating pipeline, reduce the security risk of floor heating pipeline, reduce hand labor intensity, the flatness on ground is improved, shortens construction period, is conducive to standardize rapid construction.

Description

Basic ground assembly and installation method
Technical field
The present invention relates to building decoration technology field more particularly to a kind of basic ground assemblies and installation method.
Background technology
Be required to indoors in exterior decoration, before installation floor to entire ground carry out it is levelling so that the ground after installation floor Face keeps flatness.
In the prior art, the bottom surface for being equipped with floor heating generally first uses cement mortar screeding, then the cement after levelling Floor heating pipeline is laid on mortar, then in floor heating pipeline upper cement mortar to realize cement mortar bedding residence heating coil line and make water Mud Self-leveling is levelling, finally on the cement mortar after levelling laying floor complete ground laying.Inventor is realizing invention During find, the ground paving mode of above-mentioned installation floor heating has the following disadvantages:Firstth, floor heating pipeline is once after installation It is difficult to safeguard or overhaul, causing floor heating use, there are some potential safety problemss in the process;Secondth, after cement screeding needs manually Phase smoothes out ground, adds hand labor intensity;3rd, for the larger ground of area, using cement screeding Often there are certain fluctuatings in face, it is difficult to meet flatness requirement, and the time needed for the curing of ground is longer, extends construction week Phase is unfavorable for standardizing rapid construction.
Therefore, it is necessary to solve above-mentioned technical problem.
The content of the invention
The present invention provides a kind of basic ground assembly and installation method, to solve problems of the prior art, reduces The difficulty of maintenance or the maintenance of floor heating pipeline reduces the security risk of floor heating pipeline, reduces hand labor intensity, improves ground Flatness, shorten construction period, be conducive to standardize rapid construction.
The present invention provides a kind of basic ground assemblies, including basic ground, further include:It is opposite positioned at the basic ground First supporting item and the second supporting item on the both sides of setting, first supporting item include the first supporting surface, second support Part includes the second supporting surface:Multiple levelling components, each levelling component include levelling bar and leveling bar, each described to look for Flat bar includes levelling face;The first end of each leveling bar is connected with the levelling bar, and the of each leveling bar Two ends are connected in the basic ground, the leveling bar backwards to the levelling face, the second end of the leveling bar with it is described The distance between levelling face is adjustable;The both ends of the levelling bar are overlapped on first supporting surface and second supporting surface respectively On, multiple levelling bars are along the axially direction spread configuration perpendicular to the levelling bar;Co-planar is looked for described in multiple And it is each perpendicular to plumb line.
Optionally, the level height of first supporting surface is equal to the level height of second supporting surface.
Optionally, the basic ground assembly is further included in the basic ground and is oppositely arranged the first metope and Second metope, first supporting item are fixed on first metope, and second supporting item is fixed on second metope On.
Optionally, the basic ground assembly further includes the 3rd metope, and first metope and second metope pass through 3rd metope is connected;The 3rd supporting item is connected on 3rd metope, the 3rd supporting item includes the 3rd support Face, axially extending setting of the 3rd supporting surface along the levelling bar, the level height of the 3rd supporting surface are looked for described The level height of plane is identical.
Optionally, the levelling bar is connected with the leveling bar by connector, and the connector includes being sequentially connected The first limiting plate, bottom plate and the second limiting plate, first limiting plate is oppositely arranged with second limiting plate;It is described The first end of leveling bar is connected with the bottom plate, and the levelling bar is fed through first limiting plate, the bottom plate, Yi Jisuo State the limit space of the second limiting plate restriction.
Optionally, the leveling bar is screw rod, is offered on the bottom plate with female adjustment hole, the leveling bar First end be screwed onto in the adjustment hole.
Optionally, reinforcing prop is connected on the bottom plate, the adjustment hole adds along the reinforcing prop axially through described Qiang Zhu.
Optionally, the lift span for penetrating through the levelling bar is offered on the levelling bar, the reinforcing prop is worn into described In lift span.
Optionally, the end face of the first end of the leveling bar offers Hexagon hole, the Hexagon hole and the lifting Hole alignment is set.
Based on same inventive concept, the present invention also provides a kind of installation method of basic ground assembly, to the above Basic ground assembly installed, including:The both sides being oppositely arranged in basic ground are installed by the first supporting item and respectively Two supporting items;The both ends of the levelling bar in each levelling component is made to be overlapped on respectively on the first supporting surface and the second supporting surface;Often The second end of a leveling bar is connected in the basic ground;Multiple described levelling groups are installed in the basic ground Part makes multiple levelling bars along the axially direction spread configuration perpendicular to the levelling bar;Adjust each leveling bar The distance between second end and each levelling face, make multiple described to look for co-planar and perpendicular to plumb line;It will be each described The second end of leveling bar is each attached in the basic ground.
Basic ground assembly and installation method provided by the invention, levelling face is levelling by the realization of multiple leveling bars, in base Layer sets multiple levelling components and by multiple levelling face leveling on ground, and multiple levelling face upper berth installed floors after leveling simultaneously make Multiple floors are full of basic ground, it is ensured that multiple floors are located in same level, simplify leveling procedures, reduce labor Fatigue resistance accelerates speed of application, ensure that the flatness of the basic ground of large area;And floor heating pipeline can be laid on leveling Between the second end of bar and levelling bar, without casting cement, the construction period of maintenance cement is shortened, floor heating pipeline is reduced and exists Maintenance, the difficulty of maintenance during use.
Description of the drawings
Preferred embodiment in the present invention will be described in detail by attached drawing below, it will help understand the purpose of the present invention and excellent Point, wherein:
Fig. 1 is the structure diagram for the basic ground assembly that the preferred embodiment of the present invention provides.
Fig. 2 is the structure diagram for the basic ground that the preferred embodiment of the present invention provides.
Fig. 3 is the structure diagram for the levelling component that the preferred embodiment of the present invention provides.
Fig. 4 is the partial enlarged view of A in Fig. 3.
Fig. 5 is the structure diagram that the leveling bar that the preferred embodiment of the present invention provides is connected with connector.
Fig. 6 is the structure diagram for the leveling bar that the preferred embodiment of the present invention provides.
Fig. 7 is the structure diagram for the connector that the preferred embodiment of the present invention provides.
Fig. 8 is the front view of Fig. 7.
Fig. 9 is the positive structure diagram on floor.
Figure 10 is the structure diagram at the back side on floor.
Figure 11 is the flow chart of the installation method for the basic ground assembly that the preferred embodiment of the present invention provides.
Specific embodiment
It mentions in the present specification or up, down, left, right, before and after, front, the back side, top, the bottom that may mention etc. Orientation term is defined compared with each attached construction shown in figure, and word " interior " and " outer " refer respectively to direction or remote They are opposite concepts for direction from particular elements geometric center, and it is therefore possible to can be according to its residing different position, difference Use state and correspondingly changed.So also these or other orientation term should not be construed to restricted use Language.
Fig. 1 is the structure diagram for the basic ground assembly that the preferred embodiment of the present invention provides, and Fig. 2 is preferred real for the present invention The structure diagram of the basic ground of example offer is applied, Fig. 3 is the structural representation for the levelling component that the preferred embodiment of the present invention provides Figure, Fig. 4 are the partial enlarged view of A in Fig. 3.
As shown in Figures 1 to 4, the present invention provides a kind of basic ground assembly, including basic ground 2, positioned at the base First supporting item 21 and the second supporting item on the both sides that layer ground 2 is oppositely arranged and multiple levelling components.
It refer to Fig. 1 to Fig. 4, first supporting item 21 includes the first supporting surface 22, and second supporting item includes the Two supporting surfaces, each levelling component include levelling bar 7 and leveling bar 4, and each levelling bar 7 includes levelling face 71; The first end of each leveling bar 4 is connected with the levelling bar 7, and the second end of each leveling bar 4 is connected to In the basic ground 2, the leveling bar 4 is backwards to the levelling face 71, the second end of the leveling bar 4 and the levelling face 71 The distance between it is adjustable;The both ends of each levelling bar 7 are respectively overlapped on first supporting surface 22 and second described On support face, multiple levelling bars 7 are along the axially direction spread configuration perpendicular to the levelling bar 7;It is multiple described levelling Face 71 is coplanar and is each perpendicular to plumb line.By means of infrared surface level-meter, by adjust leveling bar 4 second end and levelling face 71 it Between distance, can realize that levelling face 71, perpendicular to perpendicular, has reached levelling 71 leveling of face in the level height of setting Purpose.After levelling 71 leveling of face, the second end of leveling bar 4 is fixed in basic ground 2, is laid in basic ground 2 multiple Levelling component, and the installation floor on levelling face 71, multiple floors be full of entire basic ground 2, ensure that rapid construction and Mat formation the flatness on ground behind floor.
It should be noted that the second end of the leveling bar 4 with the distance between the levelling face 71 is adjustable refers to adjusting The length of flat bar 4 can be adjusted, and leveling bar 4 can be fixed on the length value regulated:If leveling bar 4 is scalable setting And the bar with auto-lock function;Or the second end of leveling bar 4 and levelling 7 bolt of bar, it is revolved by the second end for driving leveling bar 4 Into or screw out levelling bar 7, to adjust the distance between the second end of leveling bar 4 and levelling face 71.
The basic ground assembly that alternative embodiment of the present invention provides, levelling face 71 realized by multiple leveling bars 4 it is levelling, Multiple levelling components in basic ground 2 are set and by multiple levelling 71 leveling of face, are mated formation on multiple levelling faces 71 after leveling Floor simultaneously makes multiple floors be full of basic ground 2, it is ensured that multiple floors are located in same level, simplify levelling mistake Journey reduces labor intensity, accelerates speed of application, ensure that the flatness of the basic ground 2 of large area;And floor heating pipeline can To be laid between the second end of leveling bar 4 and levelling bar 7, without casting cement, the construction period of maintenance cement is shortened, is dropped The maintenance in use of low floor heating pipeline, the difficulty of maintenance.
Optionally, when basic ground assembly is installed, can the first supporting surface 22 and the first be determined according to ground design height The height of two supporting surfaces is subsequently mounted the first supporting item 21 and the second supporting item to ensure the first supporting surface 22 and the second supporting surface It is respectively positioned in default height.The level height of first supporting surface 22 is equal to the level height of second supporting surface, has The levelling bar 7 being overlapped on respectively beneficial to both ends on the first supporting surface 22 and the second supporting surface keeps levelness, reduces levelling face 71 levelling difficulty.
Further, the basic ground assembly further includes the first wall in the basic ground 2 and being oppositely arranged 31 and second metope 32 of face, first supporting item 21 are fixed on first metope 31, and second supporting item is fixed on On second metope 32, when 2 assembly of basic ground is installed, first bullet can be carried out on the first metope 31 and the second metope 32 Line then installs the first supporting item 21 on the basis of the snap the line on the first metope 31, on the basis of the snap the line on the second metope 32 Second supporting item is installed, ensure that the level height of the first supporting surface 22 after installation and the second supporting surface meets the requirements, quickly It is convenient.
Optionally, the basic ground assembly further includes the 3rd metope 33, first metope 31 and second metope 32 are connected by the 3rd metope 33;The 3rd supporting item 25, the 3rd supporting item are connected on 3rd metope 33 25 include the 3rd supporting surface 26, axially extending setting of the 3rd supporting surface 26 along the levelling bar 7, the 3rd supporting surface 26 level height is identical with the level height in the levelling face 71.3rd supporting surface 26 is the receipts being connected on the 3rd metope 33 Side floor provides effectively support, ensure that the planarization for receiving side floor.
Optionally, the first supporting item 21 includes fixed plate connected vertically and connecting plate, and fixed plate is to be spirally connected or be bonded Mode be bonded and be fixed on the first metope 31, the first supporting surface 22 is located on connecting plate, and the first supporting surface 22 is perpendicular to metope It sets.The structure of second supporting item and, threeth support identical with the first supporting item 21 with the fixed form of the second metope 32 The structure of part 25 and identical with the first supporting item 21 with the fixed form of the 3rd metope 33, details are not described herein again.
It is preferred that the leveling bar 4 is square tube.Square tube is hollow structure, has the ability of good carrying and resistance to deformation, And material can be saved, reduce weight.
Optionally, when the distance between the first metope 31 and the second metope 32 are larger, levelling bar 7 generally passes through first point of bar 72 and second point of bar 73 be spliced, one end of first point of bar 72 and one end of second point of bar 73 are connected to each other by abaculus 74.Tool Body is:The first end of abaculus 74 is embedded in the inside of the one end being connected to each other on first point of bar 72 with second point of bar 73, institute The second end for stating abaculus 74 is embedded in the inside of the one end being connected to each other on second point of bar 73 with first point of bar 72.Abaculus 74 First point of bar 72 after docking and the firm quick connection of second point of bar 73 can be accelerated construction speed.
Further, the outer diameter of abaculus 74, the internal diameter of first point of bar 72, the internal diameter all same of second point of bar 73 can make abaculus 74 are fastened on the inside of first point of bar 72 and second point of bar 73.Further, can also be hammered into from the outside of first point of bar 72 Wear simultaneously into the first screw 75 in first point of bar 72 and abaculus 74, with further increase by first point of bar 72 and abaculus 74 it Between the stability that connects;It can also hammer into while be worn into second point of bar 73 and abaculus 74 from the outside of second point of bar 73 Two screws 76, further to increase the stability connected between second point of bar 73 and abaculus 74.For Fig. 3 into Fig. 4, abaculus 74 is embedding The inside of first point of bar 72 and second point of bar 73 is located at, therefore is shown in broken lines.
Fig. 5 is the structure diagram that the leveling bar that the preferred embodiment of the present invention provides is connected with connector, and Fig. 6 is this hair The structure diagram for the leveling bar that bright preferred embodiment provides, Fig. 7 are the structure for the connector that the preferred embodiment of the present invention provides Schematic diagram, Fig. 8 are the front view of Fig. 7.
Referring to Fig. 1 to Fig. 8, optionally, the levelling bar 7 is connected with the leveling bar 4 by connector 1, The connector 1 includes sequentially connected first limiting plate 11,12 and second limiting plate 13 of bottom plate, first limiting plate 11 are oppositely arranged with second limiting plate 13;The first end of the leveling bar 4 is connected with the bottom plate 12, the levelling bar 7 are fed through the limit space that first limiting plate 11, the bottom plate 12 and second limiting plate 13 limit.First limit Position 11 and second limiting plate 13 of plate can prevent levelling bar 7 from tumbling, and improve the stability that levelling bar 7 is connected with leveling bar 4.It is levelling Bar 7 is connected on bottom plate 12, and plate 12 plays a supporting role to levelling bar 7, is driven by the rising or decline of bottom plate 12 levelling Bar 7 shares movement, simple and convenient.
Optionally, the leveling bar 4 is screw rod, is offered on the bottom plate 12 with female adjustment hole 14, described The first end of leveling bar 4 is screwed onto in the adjustment hole 14.By driving the first end precession of leveling bar 4 or screwing out adjustment hole 14, to adjust the distance between the second end of leveling bar 4 and levelling face 71.
It is preferred that being connected with reinforcing prop 15 on the bottom plate 12, the adjustment hole 14 is passed through along the axial direction of the reinforcing prop 15 Lead to the reinforcing prop 15.Reinforcing prop 15 can increase bottom plate 12 along the axial direction of leveling bar 4 and the contact area of leveling bar 4, improve Leveling bar 4 is connected to the stability on bottom plate 12.Further, the axis of reinforcing prop 15 is perpendicular to bottom plate 12,4 edge of leveling bar It is extended into perpendicular to the direction of bottom plate 12 in adjustment hole 14, the leveling procedures in levelling face 71 can be simplified.
Further, the reinforcing prop 15 is fed through the bottom plate 12, is located at the bottom plate 12 on the reinforcing prop 15 Multiple ribs 16 are connected between the axial plane of outer surface one side and the bottom plate 12, ribs 16 improves reinforcing prop 15 and bottom The stability connected between plate 12.It should be noted that the outer surface of bottom plate 12 is referred on bottom plate 12 backwards to levelling face 71 Face.Optionally, the quantity of ribs 16 is multiple that multiple ribs 16 are uniformly distributed along the circumferential direction of reinforcing prop 15.
Optionally, the lift span 77 for penetrating through the levelling bar 7 is offered on the levelling bar 7, the reinforcing prop 15 is worn Into in the lift span 77.The open top of lift span 77 is located on levelling face 71, and the bottom opening of lift span 77 is positioned at levelling On bar 7 on the surface in levelling face 71.Lift span 77 provides accommodation space for reinforcing prop 15, ensure that and is carried on the back on levelling bar 7 To the surface in levelling face 71, fitting is connected on bottom plate 12, adds bonding strength, and the angle convenient for adjusting levelling face 71.
Further, the end face of the first end of the leveling bar 4 offers Hexagon hole 41, the Hexagon hole 41 and institute The alignment of lift span 77 is stated to set.The Hexagon hole 41 aligns setting with the lift span 77, refers to 41 direction of Hexagon hole Lift span 77 is located at the opening on the tube wall at levelling 71 place of face.Die nut can be from opening on the tube wall where levelling face 71 Mouth extends into Hexagon hole 41, and driving leveling bar 4 precession or back-out in adjustment hole 14 is high to adjust the level in levelling face 71 Degree simplifies adjusting process.
It is preferred that the second end of the leveling bar 4 is connected with support plate 5, the support plate 5 perpendicular to the leveling bar 4, Leveling bar 4 is connected to by support plate 5 in basic ground 2, and support plate 5 adds the contact between leveling bar 4 and basic ground 2 Area improves stability of the leveling bar 4 in basic ground 2.
Optionally, opened up in the support plate 5 with female mounting hole, the second end of the leveling bar 4 is screwed onto In the mounting hole, leveling bar 4 and 5 bolt of support plate, can after plant produced direct-assembling at the construction field (site), accelerate The construction efficiency at scene.
Further, be connected with support column 6 in the support plate 5, the mounting hole along the support column 6 axially through The support column 6, support column 6 can increase the area that is spirally connected between leveling bar 4 and support plate 5, and leveling bar 4 is played vertically The effect of support improves the stability of leveling bar 4.Optionally, it is also associated with adding between the outer surface of support column 6 and support plate 5 Strengthening tendons 61, multiple reinforcing ribs 61 are uniformly distributed along the circumferential direction of the support column 6.
Fig. 9 is the positive structure diagram on floor, and Figure 10 is the structure diagram at the back side on floor.
Fig. 1 to Figure 10 is refer to, by the distance between the second end for adjusting multiple leveling bars 4 and levelling face 71, is realized Multiple levelling faces 71 are coplanar and after plumb line, and floor 8 is mounted on levelling face 71, magic is set on levelling face 71 Patch, the hair side of velcro is backwards to levelling face 71.Velcro is set at the back side on floor 8, and the hook surface 81 of velcro is backwards to floor 8 The back side.Floor 8 is snapped onto on levelling face 71, the hair side of velcro and the hook surface 81 of velcro is made to be bonded correspondingly It realizes that floor 8 is mounted on the effect in levelling face 71, multiple floors 8 is mounted on correspondingly according to the method described above multiple levelling On face 71.At the position for receiving side, the edge of floor 8 towards the 3rd metope 33 is directly overlapped on the 3rd supporting surface 26.
Figure 11 is the flow chart of the installation method for the basic ground assembly that the preferred embodiment of the present invention provides.
Fig. 1 to Figure 11 is refer to, based on same inventive concept, the present invention also provides a kind of installations of basic ground assembly Method installs above-described basic ground assembly, including:S1, the both sides difference being oppositely arranged in basic ground 2 First supporting item 21 and the second supporting item are installed;S2 makes the both ends of the levelling bar 7 in each levelling component be overlapped on first respectively On 22 and second supporting surface of supporting surface;The second end of each leveling bar 4 is connected in the basic ground 2;S3, in institute It states and multiple levelling components is installed in basic ground 2, make multiple levelling bars 7 along the axial direction perpendicular to the levelling bar 7 Direction spread configuration;S4, the second end for adjusting each leveling bar 4 and each the distance between levelling face 71, make multiple The levelling face 71 is coplanar and perpendicular to plumb line;S5, by the second end of each leveling bar 4 with being each attached to the base On face 2.
When basic ground 2 is located at it is indoor when, SI further includes first being oppositely arranged after levelling according to ground design height Then snap the line on two the first metopes 31 and the second metope 32 installs the first supporting item 21 and second respectively according to snap the line position Support member.S2 is further included according to the suitably levelling bar 7 of room width assembled length, so that the end face at the both ends of levelling bar 7 is supported respectively It is connected on the first metope 31 and the second metope 32, improves the stationarity of levelling bar 7.
The installation method for the basic ground assembly that alternative embodiment of the present invention provides, levelling face 71 passes through multiple leveling bars 4 It realizes levelling, multiple levelling components is set in basic ground 2 and by multiple levelling 71 leveling of face, it is multiple levelling after leveling 71 upper berth installed floor 8 of face simultaneously makes multiple floors 8 be full of basic ground 2, it is ensured that and multiple floors 8 are located in same level, Leveling procedures are simplified, reduce labor intensity, accelerate speed of application, ensure that the flatness of the basic ground 2 of large area; And floor heating pipeline can be laid between the second end of leveling bar 4 and levelling bar 7, without casting cement, shorten maintenance cement Construction period, reduce the maintenance in use of floor heating pipeline, the difficulty of maintenance.
Finally it should be noted that:The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although The present invention is described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that:It still may be used To modify to the technical solution recorded in foregoing embodiments or carry out equivalent substitution to which part technical characteristic; And these modifications or replacement, the essence of appropriate technical solution is not made to depart from the scope of various embodiments of the present invention technical solution.

Claims (10)

1. a kind of basic ground assembly, including basic ground, which is characterized in that further include:
Positioned at first supporting item on the both sides that the basic ground is oppositely arranged and the second supporting item, first supporting item includes First supporting surface, second supporting item include the second supporting surface:
Multiple levelling components, each levelling component include levelling bar and leveling bar, and each levelling bar includes levelling Face;The first end of each leveling bar is connected with the levelling bar, and the second end of each leveling bar is connected to In the basic ground, the leveling bar is between the levelling face, the second end of the leveling bar and the levelling face Apart from adjustable;
The both ends of the levelling bar are overlapped on respectively on first supporting surface and second supporting surface, multiple levelling bars Along the axially direction spread configuration perpendicular to the levelling bar;It looks for co-planar described in multiple and is each perpendicular to plumb line.
2. basic ground assembly according to claim 1, which is characterized in that the level height of first supporting surface is equal to The level height of second supporting surface.
3. basic ground assembly according to claim 1, which is characterized in that the basic ground assembly is further included positioned at institute The first metope and the second metope stated in basic ground and be oppositely arranged, first supporting item are fixed on first metope On, second supporting item is fixed on second metope.
4. basic ground assembly according to claim 3, which is characterized in that the basic ground assembly further includes the 3rd wall Face, first metope and second metope are connected by the 3rd metope;The 3rd is connected on 3rd metope Supporting item, the 3rd supporting item include the 3rd supporting surface, axially extending setting of the 3rd supporting surface along the levelling bar, The level height of 3rd supporting surface is identical with the level height in the levelling face.
5. according to the basic ground assembly described in claim 1-4 any one, which is characterized in that the levelling bar and the tune Flat bar is connected by connector, and the connector includes sequentially connected first limiting plate, bottom plate and the second limiting plate, First limiting plate is oppositely arranged with second limiting plate;The first end of the leveling bar is connected with the bottom plate, institute It states levelling bar and is fed through the limit space that first limiting plate, the bottom plate and second limiting plate limit.
6. basic ground assembly according to claim 5, which is characterized in that the leveling bar is screw rod, on the bottom plate It offers with female adjustment hole, the first end of the leveling bar is screwed onto in the adjustment hole.
7. basic ground assembly according to claim 6, which is characterized in that reinforcing prop is connected on the bottom plate, it is described Adjustment hole is along the reinforcing prop axially through the reinforcing prop.
8. basic ground assembly according to claim 7, which is characterized in that offer on the levelling bar and looked for described in perforation The lift span of flat bar, the reinforcing prop are worn into the lift span.
9. basic ground assembly according to claim 8, which is characterized in that the end face of the first end of the leveling bar opens up There is a Hexagon hole, the Hexagon hole aligns setting with the lift span.
10. a kind of installation method of basic ground assembly, which is characterized in that base described in any one of claim 1-9 Ground assembly is installed, including:
The both sides being oppositely arranged in basic ground are installed by the first supporting item and the second supporting item respectively;
The both ends of the levelling bar in each levelling component is made to be overlapped on respectively on the first supporting surface and the second supporting surface;It is each described The second end of leveling bar is connected in the basic ground;
Multiple levelling components in the basic ground are installed, make multiple levelling bars along perpendicular to the levelling bar Axially direction spread configuration;
The distance between the second end of each leveling bar and each levelling face are adjusted, makes multiple described to look for co-planar and hang down Directly in plumb line;
The second end of each leveling bar is each attached in the basic ground.
CN201711481413.6A 2017-12-30 2017-12-30 Basic ground assembly and installation method Pending CN108104401A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711481413.6A CN108104401A (en) 2017-12-30 2017-12-30 Basic ground assembly and installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711481413.6A CN108104401A (en) 2017-12-30 2017-12-30 Basic ground assembly and installation method

Publications (1)

Publication Number Publication Date
CN108104401A true CN108104401A (en) 2018-06-01

Family

ID=62215127

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711481413.6A Pending CN108104401A (en) 2017-12-30 2017-12-30 Basic ground assembly and installation method

Country Status (1)

Country Link
CN (1) CN108104401A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107587699A (en) * 2017-09-21 2018-01-16 仲杏英 Dedusting orifice plate builds floor tile
CN109469273A (en) * 2018-11-26 2019-03-15 浙江亚厦装饰股份有限公司 Stair tread component and pedal assembly
CN110259039A (en) * 2019-06-05 2019-09-20 浙江亚厦装饰股份有限公司 Level insulation board assembly
CN110453827A (en) * 2019-08-27 2019-11-15 金螳螂精装科技(苏州)有限公司 A kind of levelling supporting element on assembled dragon scleroseptum wall ground
CN110468646A (en) * 2019-08-28 2019-11-19 菏泽城建新型工程材料有限公司 A kind of levelling technique of water-permeable brick laying
CN110565899A (en) * 2019-09-17 2019-12-13 苏州金螳螂建筑装饰股份有限公司 leveling structure and leveling method for epoxy gold grindstone terrace base layer
CN111502177A (en) * 2020-05-06 2020-08-07 浙江亚厦装饰股份有限公司 Installation method of leveling substrate assembly
CN112095985A (en) * 2020-10-14 2020-12-18 浙江亚厦装饰股份有限公司 Assembled ground system and installation method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1213034A (en) * 1997-09-30 1999-04-07 有限会社泰成电机工业 Structural component carriage, double floor component and construction method of double floor using the same
CN2458388Y (en) * 2000-12-26 2001-11-07 上海惠亚铝合金制品有限公司 Level regulator for supporting steel support of elevated floor
JP2002021301A (en) * 2000-07-03 2002-01-23 Tomiyoshi Honda Construction method for joist and joist unit use therefor
CN203669291U (en) * 2013-11-27 2014-06-25 深圳市深装总装饰工程工业有限公司 Movable raised floor installing structure
CN103938831A (en) * 2014-04-10 2014-07-23 天津达因建材有限公司 Rapid construction method for indoor ground system, and ground system
CN205577341U (en) * 2016-04-27 2016-09-14 北京旭力宏源科技有限公司 Locating part and floor support
CN206346443U (en) * 2016-12-14 2017-07-21 浙江亚厦装饰股份有限公司 A kind of new adjustable floor heating paving structure
CN207988409U (en) * 2017-12-30 2018-10-19 浙江亚厦装饰股份有限公司 Basic ground assembly

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1213034A (en) * 1997-09-30 1999-04-07 有限会社泰成电机工业 Structural component carriage, double floor component and construction method of double floor using the same
JP2002021301A (en) * 2000-07-03 2002-01-23 Tomiyoshi Honda Construction method for joist and joist unit use therefor
CN2458388Y (en) * 2000-12-26 2001-11-07 上海惠亚铝合金制品有限公司 Level regulator for supporting steel support of elevated floor
CN203669291U (en) * 2013-11-27 2014-06-25 深圳市深装总装饰工程工业有限公司 Movable raised floor installing structure
CN103938831A (en) * 2014-04-10 2014-07-23 天津达因建材有限公司 Rapid construction method for indoor ground system, and ground system
CN205577341U (en) * 2016-04-27 2016-09-14 北京旭力宏源科技有限公司 Locating part and floor support
CN206346443U (en) * 2016-12-14 2017-07-21 浙江亚厦装饰股份有限公司 A kind of new adjustable floor heating paving structure
CN207988409U (en) * 2017-12-30 2018-10-19 浙江亚厦装饰股份有限公司 Basic ground assembly

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107587699A (en) * 2017-09-21 2018-01-16 仲杏英 Dedusting orifice plate builds floor tile
CN109469273A (en) * 2018-11-26 2019-03-15 浙江亚厦装饰股份有限公司 Stair tread component and pedal assembly
CN110259039A (en) * 2019-06-05 2019-09-20 浙江亚厦装饰股份有限公司 Level insulation board assembly
CN110259039B (en) * 2019-06-05 2024-04-12 浙江亚厦装饰股份有限公司 Leveling heat-insulating board assembly
CN110453827A (en) * 2019-08-27 2019-11-15 金螳螂精装科技(苏州)有限公司 A kind of levelling supporting element on assembled dragon scleroseptum wall ground
CN110468646A (en) * 2019-08-28 2019-11-19 菏泽城建新型工程材料有限公司 A kind of levelling technique of water-permeable brick laying
CN110565899A (en) * 2019-09-17 2019-12-13 苏州金螳螂建筑装饰股份有限公司 leveling structure and leveling method for epoxy gold grindstone terrace base layer
CN110565899B (en) * 2019-09-17 2024-04-12 苏州金螳螂建筑装饰股份有限公司 Epoxy gold grindstone terrace base leveling structure and leveling method
CN111502177A (en) * 2020-05-06 2020-08-07 浙江亚厦装饰股份有限公司 Installation method of leveling substrate assembly
CN112095985A (en) * 2020-10-14 2020-12-18 浙江亚厦装饰股份有限公司 Assembled ground system and installation method

Similar Documents

Publication Publication Date Title
CN108104401A (en) Basic ground assembly and installation method
CN207988409U (en) Basic ground assembly
CN108104417A (en) Base's leveling component and leveling method
CN207974446U (en) Floor is aerial to be laid with component
CN108317578A (en) Ground heating system and installation method
CN107035095A (en) A kind of metope integration installation structure
CN108316606A (en) A kind of ground overhead system and its installation method
CN206512996U (en) A kind of leveling structure
US20180058082A1 (en) Ground anchor bracket for multiple wall braces
CN207974443U (en) Base's leveling component
CN108952075A (en) Assembled floor leveling structure and installation method
KR200384393Y1 (en) Jack support pipe for construction
CA2888544C (en) Primary and intermediate horizontal leveler
CN110242003A (en) Load-bearing floor heating assembly and installation method
CN207988413U (en) Ground leveling component
CN206279630U (en) A kind of fastener inserts
CN208803681U (en) Piping shaft and building structure
CN108086657B (en) Floor overhead leveling device and leveling method
CN110130531A (en) A kind of fabricated shear wall and ground beam connection structure and method
CN208329702U (en) A kind of prefabricated wall panels adjustable inclined support device
CN110242002A (en) Floor heating assembly and installation method
CN207999049U (en) Make somebody a mere figurehead leveling unit in floor
KR101703306B1 (en) Floor structure for reducing noise and construction method of thereof
CN107035035A (en) Curtain wall is found outside a kind of lightweight
CN210369894U (en) Adjustable falling plate template support system of assembled

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination