CN110158933A - Pier stud security protection operation platform and construction method - Google Patents

Pier stud security protection operation platform and construction method Download PDF

Info

Publication number
CN110158933A
CN110158933A CN201910441465.3A CN201910441465A CN110158933A CN 110158933 A CN110158933 A CN 110158933A CN 201910441465 A CN201910441465 A CN 201910441465A CN 110158933 A CN110158933 A CN 110158933A
Authority
CN
China
Prior art keywords
steel plate
ladder
ladder cage
security protection
pier stud
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910441465.3A
Other languages
Chinese (zh)
Inventor
刘金涛
许炳新
黄道军
单飞
李明超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Luqiao Liaoning Construction Group Co Ltd
China State Railway Investment Construction Group Co Ltd
Original Assignee
Luqiao Liaoning Construction Group Co Ltd
China State Railway Investment Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Luqiao Liaoning Construction Group Co Ltd, China State Railway Investment Construction Group Co Ltd filed Critical Luqiao Liaoning Construction Group Co Ltd
Priority to CN201910441465.3A priority Critical patent/CN110158933A/en
Publication of CN110158933A publication Critical patent/CN110158933A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/15Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/17Comprising essentially pre-assembled three-dimensional elements, e.g. cubic elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/10Steps or ladders specially adapted for scaffolds

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Ladders (AREA)

Abstract

The embodiment of the invention discloses a kind of pier stud security protection operation platforms, the ladder cage spliced including more piece along short transverse, two-way ladder is provided in ladder cage, the ladder cage of bottom end is provided with inlet and outlet one, the ladder cage of top one end is provided with inlet and outlet two, the supporting steel plate for being located at two positions of inlet and outlet is fixedly connected in the ladder cage of top one end, supporting steel plate forms construction platform, the periphery of supporting steel plate is fixedly connected with several columns, steel fabric sheet is successively fixedly installed between adjacent column, the top of column is fixedly connected with suspension centre, and suspension centre is connected with crane.Supporting steel plate is fixedly mounted in ladder cage as construction platform, structure is simple and convenient, reduce manpower and material resources needed for manually setting up the mode of bracket and riding track in the past, improve construction efficiency, and it is provided with suspension centre and crane on this basis, by lifting to supporting steel plate, the torsion that supporting steel plate receives is greatly reduced, to meet construction requirement.

Description

Pier stud security protection operation platform and construction method
Technical field
The present embodiments relate to technical field of building construction, and in particular to pier stud security protection operation platform and construction party Method.
Background technique
Existing bridge pier column concreting and the platform that vibrates are existed using bracket and riding track, operating personnel station is manually set up Carry out concreting on bracket, the bracket in work progress sets up that mode is complicated, safety is low, and the construction personnel of investment is very It is more, consume a large amount of time and manpower.Activity duration is long, and work surface is limited, and construction personnel carries out concreting above And when vibrating, by the limitation in space, it cannot be guaranteed that the uniform distribution and quality of vibrating of concrete.Personnel stand on scaffold board Safety accident is easy to happen when construction.
Summary of the invention
For this purpose, the embodiment of the present invention provides a kind of pier stud security protection operation platform and construction method, to solve existing skill The problem of in art due to being easy to happen Personal Risk caused by existing high pier stud construction risk.
To achieve the goals above, the embodiment of the present invention provides the following technical solutions:
Pier stud security protection operation platform is provided with double including the ladder cage that more piece is spliced along short transverse in the ladder cage To ladder, the ladder cage of bottom end is provided with inlet and outlet one, and the ladder cage of top one end is provided with inlet and outlet two, top one end Ladder cage on be fixedly connected with the supporting steel plate for being located at two positions of inlet and outlet, the supporting steel plate forms construction platform, the support The periphery of steel plate is fixedly connected with several columns, and steel fabric sheet is successively fixedly installed between the adjacent column, described vertical The top of column is fixedly connected with suspension centre, and the suspension centre is connected with crane.
The embodiment of the present invention is further characterized in that the supporting steel plate is the checkered steel plate of patterned.
The embodiment of the present invention is further characterized in that the column is hollow steel pipe post.
The embodiment of the present invention is further characterized in that the position connected in ladder cage described in more piece is equipped with connecting hole, connection hole It is provided with punching nail, more piece ladder cage is attached by punching nail.
The embodiment of the present invention is further characterized in that the supporting steel plate is formed by multichip connection and connected by I-steel.
The embodiment of the present invention is further characterized in that the column is welded on supporting steel plate.
The embodiment of the present invention is further characterized in that, a height of 3m of ladder cage described in every section, a length of 2m, wide 3m.
The present invention also provides the construction methods of pier stud security protection operation platform, include the following steps, a, be provided with into Column and steel fabric sheet are installed in the ladder cage of outlet two;B, it passes sequentially through punching nail and connects multiple ladder cages;C, by crane column It is lifted;D, operating personnel climbs up supporting steel plate by ladder cage and constructs.
The embodiment of the present invention has the advantages that the ladder that setting is two-way in ladder cage, facilitates climbing, the fixed peace in ladder cage Supporting steel plate is filled as construction platform, structure is simple and convenient, reduces people needed for manually setting up the mode of bracket and riding track in the past Power material resources improve construction efficiency, and only installed in ladder cage supporting steel plate as support, the torsion that supporting steel plate is subject to compared with Greatly, there are biggish risks, are provided with suspension centre and crane on this basis and are greatly reduced by lifting to supporting steel plate The torsion that supporting steel plate receives, to meet construction requirement.
Detailed description of the invention
It, below will be to embodiment party in order to illustrate more clearly of embodiments of the present invention or technical solution in the prior art Formula or attached drawing needed to be used in the description of the prior art are briefly described.It should be evident that the accompanying drawings in the following description is only It is merely exemplary, it for those of ordinary skill in the art, without creative efforts, can also basis The attached drawing of offer, which is extended, obtains other implementation attached drawings.
Structure depicted in this specification, ratio, size etc., only to cooperate the revealed content of specification, for Those skilled in the art understands and reads, and is not intended to limit the invention enforceable qualifications, therefore does not have technical Essential meaning, the modification of any structure, the change of proportionate relationship or the adjustment of size are not influencing the function of the invention that can be generated Under effect and the purpose that can reach, should all still it fall in the range of disclosed technology contents obtain and can cover.
Fig. 1 is the structural schematic diagram of pier stud security protection operation platform provided in an embodiment of the present invention;
Fig. 2 is the structural schematic diagram of the ladder cage of pier stud security protection operation platform provided in an embodiment of the present invention;
Fig. 3 is the connection schematic diagram of the supporting steel plate of pier stud security protection operation platform provided in an embodiment of the present invention.
In figure: 1, ladder cage;2, ladder;3, one is imported and exported;4, two are imported and exported;5, supporting steel plate;6, column;7, steel wire Piece;8, crane;9, I-steel.
Specific embodiment
Embodiments of the present invention are illustrated by particular specific embodiment below, those skilled in the art can be by this explanation Content disclosed by book is understood other advantages and efficacy of the present invention easily, it is clear that described embodiment is the present invention one Section Example, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art are not doing Every other embodiment obtained under the premise of creative work out, shall fall within the protection scope of the present invention.
In conjunction with Fig. 1-3, pier stud security protection operation platform, including the ladder cage 1 that more piece is spliced along short transverse, in ladder cage 1 It is provided with end to end two-way ladder 2, the ladder cage 1 of bottom end is provided with inlet and outlet 1, and the ladder cage 1 of top one end is arranged There are inlet and outlet 24, the supporting steel plate 5 for being located at 24 positions of inlet and outlet, supporting steel plate 5 are fixedly connected in the ladder cage 1 of top one end Construction platform is formed, the periphery of supporting steel plate 5 is fixedly connected with several columns 6 upwardly extended, successively consolidates between adjacent column 6 Dingan County is equipped with steel fabric sheet 7, and the top of column 6 is fixedly connected with suspension centre, and suspension centre is connected with crane 8.
The two-way ladder 2 of setting, facilitates climbing in ladder cage 1, and supporting steel plate 5 is fixedly mounted in ladder cage 1 and is used as construction platform, Structure is simple and convenient, reduces manpower and material resources needed for manually setting up the mode of bracket and riding track in the past, improves construction efficiency, And supporting steel plate 5 is only installed in ladder cage 1 as support, and the torsion that supporting steel plate 5 is subject to is larger, there are biggish risk, It is provided with suspension centre and crane 8 on this basis, suspension centre can be the hanging ring being fixedly connected on column 6, by supporting steel plate 5 It is lifted, greatly reduces the torsion that supporting steel plate 5 receives, to meet construction requirement.
Supporting steel plate 5 is the checkered steel plate of patterned, can have biggish frictional force, walk in work progress and more pacify Entirely.Column 6 is hollow steel pipe post 6, and lighter weight, structure is relatively firm.
The position connected in more piece ladder cage 1 is equipped with connecting hole, and connection hole is provided with punching nail, and more piece ladder cage 1 is by wearing Heart nail is attached, and installation is relatively stable, convenient and efficient.
Supporting steel plate 5 is formed by multichip connection and is connected by I-steel 9, and 9 bonding strength of I-steel is preferable, security performance It is good.
Column 6 is welded on supporting steel plate 5, securely, reliably.A height of 3m of every section ladder cage 1, a length of 2m, wide 3m, surrounding are used Steel wire closing, is of moderate size, is conducive to the construction operation of different height.
Construction method includes the following steps, column 6 and steel fabric sheet a, are installed in the ladder cage 1 for being provided with inlet and outlet 24 7;B, it passes sequentially through punching nail and connects multiple ladder cages 1;C, 8 column 6 of crane is lifted;D, operating personnel passes through ladder cage 1 Supporting steel plate 5 is climbed up to construct.
Although above having used general explanation and specific embodiment, the present invention is described in detail, at this On the basis of invention, it can be made some modifications or improvements, this will be apparent to those skilled in the art.Therefore, These modifications or improvements without departing from theon the basis of the spirit of the present invention are fallen within the scope of the claimed invention.

Claims (8)

1. pier stud security protection operation platform, it is characterised in that: the ladder cage (1) spliced including more piece along short transverse, the ladder It is provided with two-way ladder (2) in cage (1), the ladder cage (1) of bottom end is provided with inlet and outlet one (3), the ladder of top one end Cage (1) is provided with inlet and outlet two (4), and the support for being located at two (4) positions of inlet and outlet is fixedly connected in the ladder cage (1) of top one end Steel plate (5), the supporting steel plate (5) form construction platform, and the periphery of the supporting steel plate (5) is fixedly connected with several columns (6), It is successively fixedly installed with steel fabric sheet (7) between the adjacent column (6), the top of the column (6), which is fixedly connected with, hangs Point, the suspension centre are connected with crane (8).
2. pier stud security protection operation platform according to claim 1, it is characterised in that: the supporting steel plate (5) is band The checkered steel plate of decorative pattern.
3. pier stud security protection operation platform according to claim 1, it is characterised in that: the column (6) is hollow Steel pipe post (6).
4. pier stud security protection operation platform according to claim 1, it is characterised in that: ladder cage described in more piece connects on (1) The position connect is equipped with connecting hole, and connection hole is provided with punching nail, and more piece ladder cage (1) is attached by punching nail.
5. pier stud security protection operation platform according to claim 1, it is characterised in that: the supporting steel plate (5) is by more Piece is formed by connecting and is connected by I-steel (9).
6. pier stud security protection operation platform according to claim 1, it is characterised in that: the column (6) is welded on branch It supports on steel plate (5).
7. pier stud security protection operation platform according to claim 1, it is characterised in that: the height of ladder cage described in every section (1) For 3m, a length of 2m, wide 3m.
8. a kind of construction method of high pier stud security protection operation platform as described in claim 1, it is characterised in that: including following A, step installs column (6) and steel fabric sheet (7) in the ladder cage (1) for be provided with inlet and outlet two (4);B, punching is passed sequentially through Nail connects multiple ladder cages (1);C, crane (8) column (6) is lifted;D, operating personnel climbs up support by ladder cage (1) Steel plate (5) is constructed.
CN201910441465.3A 2019-05-24 2019-05-24 Pier stud security protection operation platform and construction method Pending CN110158933A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910441465.3A CN110158933A (en) 2019-05-24 2019-05-24 Pier stud security protection operation platform and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910441465.3A CN110158933A (en) 2019-05-24 2019-05-24 Pier stud security protection operation platform and construction method

Publications (1)

Publication Number Publication Date
CN110158933A true CN110158933A (en) 2019-08-23

Family

ID=67632803

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910441465.3A Pending CN110158933A (en) 2019-05-24 2019-05-24 Pier stud security protection operation platform and construction method

Country Status (1)

Country Link
CN (1) CN110158933A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113323356A (en) * 2021-04-23 2021-08-31 宁波工程学院 A hanging device for construction of building outer wall

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202529800U (en) * 2011-12-09 2012-11-14 上海立风能源科技有限公司 Automatic balance adjustment device for overhead working platform
CN207062771U (en) * 2017-05-31 2018-03-02 浙江交工集团股份有限公司 A kind of H types Pier Formwork platform integrated apparatus
CN208328705U (en) * 2018-04-23 2019-01-04 中建五局土木工程有限公司 Multi-joint pier operating platform
CN210263834U (en) * 2019-05-24 2020-04-07 中建铁路投资建设集团有限公司 Pier stud safety protection construction platform

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202529800U (en) * 2011-12-09 2012-11-14 上海立风能源科技有限公司 Automatic balance adjustment device for overhead working platform
CN207062771U (en) * 2017-05-31 2018-03-02 浙江交工集团股份有限公司 A kind of H types Pier Formwork platform integrated apparatus
CN208328705U (en) * 2018-04-23 2019-01-04 中建五局土木工程有限公司 Multi-joint pier operating platform
CN210263834U (en) * 2019-05-24 2020-04-07 中建铁路投资建设集团有限公司 Pier stud safety protection construction platform

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113323356A (en) * 2021-04-23 2021-08-31 宁波工程学院 A hanging device for construction of building outer wall

Similar Documents

Publication Publication Date Title
CN108979131A (en) A kind of high-building construction steel form and operation frame integral hoisting stage apparatus
CN102733615A (en) Unsymmetrical integral lifting construction method
CN201301173Y (en) Auxiliary lifting appliance for large-sized component
CN110158933A (en) Pier stud security protection operation platform and construction method
CN102767289A (en) Asymmetric and integrated lifting construction method for large scale grid structure
CN206665952U (en) A kind of novel hanging tool
CN205955160U (en) Antiskid lattice formula elevartor shaft removes operation platform
CN108222543A (en) A kind of telescopic stirrup support system and its application method
CN205873594U (en) Special construction elevator of cooling tower section of thick bamboo wall
CN210758362U (en) Maintenance device of prefabricated stand
CN209873572U (en) Interim navigation lifting station of adjustable vertical lift height
CN110158477A (en) Double embrace hoop method Coping Construction hanging basket and construction method
CN210263834U (en) Pier stud safety protection construction platform
CN206753087U (en) A kind of lighting roof operating platform structure
CN201915614U (en) Integral electric climbing frame suitable for shear wall structure
CN212740512U (en) Climb frame attached tower crane safety passage
CN205444935U (en) Special -shaped steel space frame construction and installation structure of complicated large -span department
CN208184280U (en) A kind of telescopic stirrup support system
CN207314895U (en) Building outer wall opening full-closed system
CN219952606U (en) Safety platform for beam slab prefabricated field
CN205558447U (en) Found pole appurtenance
CN207244453U (en) A kind of suspension bridge light anchorage mast apparatus
CN208415116U (en) A kind of suspension platform for stone bridge guardrail power construction
CN216974227U (en) Gantry stirrup platform of unloading
CN217175645U (en) Cable hanging flower basket device suitable for construction of building curtain wall with inner inverted inclined plane

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190823