CN110130550A - The dried hanging hang structure and its construction method of assembled hollow out earthenware brick curtain wall - Google Patents
The dried hanging hang structure and its construction method of assembled hollow out earthenware brick curtain wall Download PDFInfo
- Publication number
- CN110130550A CN110130550A CN201910469123.2A CN201910469123A CN110130550A CN 110130550 A CN110130550 A CN 110130550A CN 201910469123 A CN201910469123 A CN 201910469123A CN 110130550 A CN110130550 A CN 110130550A
- Authority
- CN
- China
- Prior art keywords
- hollow out
- out earthenware
- earthenware brick
- connecting rod
- curtain wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000011449 brick Substances 0.000 title claims abstract description 103
- 229910052571 earthenware Inorganic materials 0.000 title claims abstract description 95
- 238000010276 construction Methods 0.000 title claims abstract description 14
- 238000009434 installation Methods 0.000 claims description 15
- 229910000831 Steel Inorganic materials 0.000 claims description 9
- 239000010959 steel Substances 0.000 claims description 9
- 238000006073 displacement reaction Methods 0.000 claims description 6
- 239000004677 Nylon Substances 0.000 claims description 5
- 229920001778 nylon Polymers 0.000 claims description 5
- 238000005520 cutting process Methods 0.000 claims description 2
- 239000000463 material Substances 0.000 abstract description 6
- 239000002699 waste material Substances 0.000 abstract description 4
- 238000005336 cracking Methods 0.000 abstract description 3
- 229910001220 stainless steel Inorganic materials 0.000 description 5
- 239000010935 stainless steel Substances 0.000 description 5
- 238000000034 method Methods 0.000 description 4
- 238000005260 corrosion Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 210000000988 bone and bone Anatomy 0.000 description 2
- 239000004927 clay Substances 0.000 description 2
- 238000004140 cleaning Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005259 measurement Methods 0.000 description 2
- 125000006850 spacer group Chemical group 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 239000000919 ceramic Substances 0.000 description 1
- 150000001875 compounds Chemical class 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000011521 glass Substances 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 239000003755 preservative agent Substances 0.000 description 1
- 230000002335 preservative effect Effects 0.000 description 1
- 239000002994 raw material Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
- E04B2/90—Curtain walls comprising panels directly attached to the structure
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
- E04B2/96—Curtain walls comprising panels attached to the structure through mullions or transoms
- E04B2/965—Connections of mullions and transoms
Abstract
The present invention relates to the dried hanging hang structures and its construction method of a kind of assembled hollow out earthenware brick curtain wall, wherein, dried hanging hang structure includes the keel framework being arranged on main structure body exterior wall side wall and the hitch assembly being fixed in keel framework, and several hollow out earthenware bricks are connected by the hitch assembly: the hitch assembly includes several vertically arranged connecting rods;The hollow out earthenware brick is equipped with the connecting hole passed through for connecting rod, adjacent two hollow out earthenware bricks up and down by connecting rod pass through corresponding connecting hole connect, solve existing hollow out earthenware brick curtain wall dried hanging structure easily cause hollow out earthenware brick side wall cracking and breakage, operation difficulty is big, waste of material is serious, substantially increases the technical problems such as construction cost.
Description
Technical field
The present invention relates to the dry hanging technology field of curtain wall, in particular to a kind of dried hanging hang structure of assembled hollow out earthenware brick curtain wall
And its construction method.
Background technique
Curtain wall is the exterior wall enclosure of building, is the light weight wall that modern large-scale and skyscraper commonly has decorative effect
Body can be using multiple materials such as glass, metal, ceramics, earthenware bricks according to the demand of Art Design.
Hollow earthenware brick is also hollow out earthenware brick, using natural clay as primary raw material, has unique visual decorative effect, and
And since its thermal coefficient is low, practicability is stronger, energy high temperature resistant, anti-severe cold, corrosion-resistant, antiscour, are one of curtain wall material
Preferable selection.But at present hollow earthenware brick using less, also lack the dedicated hanging structure used for hollow earthenware brick
Research.The dried hanging method of other similar stone plates is the dragon being arranged on hollow earthenware brick and main structure body surface using pendant
Bone frame is fixedly connected, but this pendant needs to be fixed on the back side of plate mostly, and cavity is provided in hollow earthenware brick,
The finite thickness of side wall easily causes earthenware brick if hanging part is arranged using the side wall that the connectors such as back of the body bolt penetrate hollow earthenware brick
The cracking of side wall and breakage, operation difficulty is big, and waste of material is serious, substantially increases construction cost.
Summary of the invention
The purpose of the present invention is to provide the dried hanging hang structures and its construction method of a kind of assembled hollow out earthenware brick curtain wall, with solution
Certainly existing hollow out earthenware brick curtain wall dried hanging structure easily causes the cracking of hollow out earthenware brick side wall and damaged, operation difficulty is big, material
Waste is serious, substantially increases the technical problems such as construction cost.
To solve the above-mentioned problems, the present invention provides a kind of dried hanging hang structures of assembled hollow out earthenware brick curtain wall, including set
The hitch assembly setting the keel framework on main structure body exterior wall side wall and being fixed in keel framework, several hollow out earthenware bricks pass through
The hitch assembly connection:
The hitch assembly includes several vertically arranged connecting rods;
The hollow out earthenware brick is equipped with the connecting hole passed through for connecting rod, and adjacent two hollow out earthenware bricks up and down pass through connection
Bar is connected across corresponding connecting hole.
Preferably, the middle part hollow out of the hollow out earthenware brick, a connecting hole is respectively set in two sides, and the connecting rod vertically passes through
The connecting hole.
Preferably, passing through sleeve connection between the two neighbouring connecting rods.
Preferably, the connecting rod is stainless steel screw rod, the inner wall of the sleeve is equipped with the connection screw thread being adapted to screw rod.
Preferably, the brick fissure of displacement arranges several hollow out earthenware bricks in the vertical direction, make pottery in two layers neighbouring of hollow out
In brick, the one end that the both ends of a hollow out earthenware brick of lower layer pass through the two hollow out earthenware bricks on a connecting rod and upper layer respectively connects
It connects.
Preferably, the keel framework includes the vertical keel being installed on main structure body exterior wall side wall and lateral keel,
Connecting rod, two neighbouring connecting rods are installed according to the size of hollow out earthenware brick in the lateral keel.
Preferably, the vertical keel is steel square tube.
Preferably, the lateral keel is unequal angle.
Preferably, the connection hole of the two neighbouring hollow out earthenware bricks is equipped with opening nylon elastic cutting ferrule.
The present invention also provides a kind of construction methods of the dried hanging hang structure of assembled hollow out earthenware brick curtain wall, including following step
It is rapid:
One, the installation of keel framework
S1, surveying setting-out;
S2, vertical keel installation;
S3, lateral keel installation;
Two, first layer connecting rod is vertically installed;
Three, first layer hollow out earthenware brick is installed;
Four, second layer connecting rod is vertically installed
Second layer connecting rod is connect using sleeve with first layer connecting rod, after the completion of connection that second layer hollow out earthenware brick is upward
Dislocation is across successively successively installation upwards in this way.
Compared with prior art, there are following technical effects by the present invention:
The present invention uses hitch assembly, hollow out earthenware brick is hung in the keel framework of main structure body exterior wall side wall, structure
Simply, easy to operate, the connecting hole of hollow out earthenware brick is passed through by connecting rod, the hollow-out part of hollow out earthenware brick will not be damaged
Property damage, reduce difficulty of construction, avoid unnecessary waste of material.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, required use in being described below to embodiment
Attached drawing be briefly described, it is therefore apparent that drawings in the following description are only some embodiments of the invention, for ability
For field technique personnel, without creative efforts, it is also possible to obtain other drawings based on these drawings.It is attached
In figure:
Fig. 1 is the structural schematic diagram of hollow out earthenware brick in the dried hanging hang structure of assembled hollow out earthenware brick curtain wall of the present invention;
Fig. 2 is the side view of hollow out earthenware brick in the dried hanging hang structure of assembled hollow out earthenware brick curtain wall of the present invention;
Fig. 3 is the schematic diagram of the dried hanging hang structure of assembled hollow out earthenware brick curtain wall of the present invention;
Fig. 4 is the vertical cross-sectional of the dried hanging hang structure of assembled hollow out earthenware brick curtain wall of the present invention;
Fig. 5 is the transverse sectional view of the dried hanging hang structure of assembled hollow out earthenware brick curtain wall of the present invention.
Specific embodiment
It is carried out below with reference to dried hanging hang structure of the Fig. 1 to Fig. 5 to assembled hollow out earthenware brick curtain wall provided by the invention detailed
Description, the present embodiment implemented under the premise of the technical scheme of the present invention, gives detailed embodiment and specific
Operating process, but protection scope of the present invention is not limited to following embodiments, and those skilled in the art are not changing the present invention
In the range of spirit and content, can it be modified and be polished.
Fig. 1 to Fig. 5, a kind of dried hanging hang structure of assembled hollow out earthenware brick curtain wall are please referred to, including is arranged outside main structure body
Keel framework on wall side wall and the hitch assembly being fixed in keel framework, several hollow out earthenware bricks 1 pass through the hitch assembly
Connection:
The hitch assembly includes several vertically arranged connecting rods 2;
The hollow out earthenware brick 1 is equipped with the connecting hole 11 passed through for connecting rod 2, and adjacent two hollow out earthenware bricks 1 up and down are logical
Connecting rod 2 is crossed to connect across corresponding connecting hole 11.
In this present embodiment, connected between two neighbouring connecting rods 2 by sleeve 3.
In the present embodiment, connecting rod 2 is vertically arranged, and several hollow out earthenware bricks are vertically arranged, and connecting rod 2 vertically passes through
Corresponding connecting hole 11 strings together hollow out earthenware brick.Hollow out earthenware brick can be opposite joint arrangement, be also possible to fissure of displacement arrangement, the present invention
This is not particularly limited.Either opposite joint arrangement or fissure of displacement arrangement, the technical solution of mounting is the same, all passes through
Connecting rod 2 is connected in series each hollow out earthenware brick.Below in conjunction with attached drawing, the case where being arranged with the fissure of displacement, is described in detail.
The middle part hollow out 12 of the hollow out earthenware brick 1, the concrete shape of this hollow out 12 are set according to actual needs, the present invention couple
This with no restrictions, a connecting hole 11 vertically passed through for connecting rod 2 is respectively set in the two sides of hollow out earthenware brick 1.
The brick fissure of displacement arranges several hollow out earthenware bricks 1 in the vertical direction, in two layers neighbouring of hollow out earthenware brick 1,
The both ends of one hollow out earthenware brick 1 of lower layer pass through a connecting rod 2 respectively and connect with the one end of the two hollow out earthenware bricks 1 on upper layer.
The keel framework includes the vertical keel 4 being installed on main structure body exterior wall side wall and lateral keel 5, vertical dragon
Bone 4 is steel square tube, and lateral keel 5 is unequal angle, is installed and is connected according to the size of hollow out earthenware brick 1 in the lateral keel 5
Extension bar 2.
In the present embodiment, the connecting rod 2 is solid stainless steel screw rod, and the inner wall of the sleeve 3 is equipped with suitable with screw rod
The connection screw thread matched.3 position of sleeve is arranged at unequal angle as far as possible, in order to the fixed installation with angle steel.
Further, the outer diameter of sleeve 3 is slightly less than the aperture of the connecting hole 11 of hollow out earthenware brick 1, and sleeve 3 can stretch to connection
In hole 11.
In the present embodiment, opening nylon elastic card is equipped at the connecting hole 11 of the two neighbouring hollow out earthenware bricks 1
Set 6, to form brickwork joint and compensate the foozle of connecting hole 11, brickwork joint size is protected by way of increasing and adjusting nylon spacer
Card.
The working principle of the invention:
When building main body construction is complete, postposition buried plate is beaten by 4 spacing of vertical keel, it is accurate to make every effort to size, and with building
Lightning-protection system is reliably connected, and in dry hanging construction, 4 center line of setting-out vertical keel fixes vertical keel 4, is checked errorless laggard
Row welding and anti-corrosion position lateral keel 5 according to exterior wall lattice, vertical according to the installation of hollow out earthenware brick size in lateral keel 5
Stainless steel screw rod is connected with bolt collar 3, adjusts impaling hollow out earthenware brick, size adjusting, fastening bolt after size, it is clear to do surface
It is clean.
A kind of construction method of the dried hanging hang structure of assembled hollow out earthenware brick curtain wall of the present invention, including the following steps:
One, the installation of keel framework
S1, surveying setting-out;
Measurement is surveyed for facade and plane respectively, draws out Measurement results, and be compared with drawing, is calculated and is missed
Difference when being more than code requirement such as error, is coordinated relevant department and is made a joint checkup, carry out unwrapping wire after proposing handling suggestion.
First horizontal line of fetching water on the outside of top layer and bottom surrounding Vierendeel girder, draws horizontal line to be split, two level above and below connection
Lattice point, can position vertical keel center.
S2, vertical keel installation;
Postposition buried plate is installed using 250*200*10mm size by 1500mm lattice, confirms zero deflection, vertical keel
It uses 200*80*6mm steel to put pipe to be lifted with 1500mm lattice, while drawing horizontal line controlled level height and depth position,
There is deviation person to be adjusted keel position, be welded with simultaneously anti-corrosion after meeting the requirements.
S3, lateral keel installation;
Lateral keel uses the angle steel of L100*80*8mm, first installs a row in bottom and laterally leads to angle steel, then presses
1500mm height installs second lateral angle steel, installs upwards in turn.It is compound it is errorless after be symmetrically welded, with reduce welding produce
Raw deformation, finally does preservative treatment.
Two, first layer connecting rod is vertically installed;
Stainless steel screw rod uses diameter 12mm screw rod, first carries out screw rod in lateral keel by hollow out earthenware brick pitch-row size
Installation, is fixed temporarily after successively installing.
Three, first layer hollow out earthenware brick is installed;
Hollow out earthenware brick uses the special porous clay brick of 200*100*40mm, is first through first row hollow out earthenware brick by pitch-row pre-
First on mounted stainless steel screw rod, second row hollow out earthenware brick and first row hollow out earthenware brick arranged in dislocation, upper and lower first row brick
Pad shield is carried out using nylon spacer is adjusted with second row brick, is installed upwards in turn.
Four, second layer connecting rod is vertically installed
Second layer connecting rod is connect using sleeve with first layer connecting rod, after the completion of connection that second layer hollow out earthenware brick is upward
Dislocation is across successively successively installation upwards in this way.
Five, it adjusts, fasten, cleaning
Hollow out earthenware brick draws horizontal line controlled level height and depth position to be adjusted hollow out earthenware brick after the completion of installing, most
After carry out cleaning treatment.
Disclosed above is only the specific embodiment of the application, and however, this application is not limited to this, any this field
Technical staff can think variation, should all fall in the protection domain of the application.
Claims (10)
1. a kind of dried hanging hang structure of assembled hollow out earthenware brick curtain wall, which is characterized in that including being arranged in main structure body exterior wall side wall
On keel framework and the hitch assembly that is fixed in keel framework, several hollow out earthenware bricks connected by the hitch assembly:
The hitch assembly includes several vertically arranged connecting rods;
The hollow out earthenware brick is equipped with the connecting hole passed through for connecting rod, and adjacent two hollow out earthenware bricks up and down are worn by connecting rod
Cross corresponding connecting hole connection.
2. the dried hanging hang structure of assembled hollow out earthenware brick curtain wall as described in claim 1, which is characterized in that the hollow out earthenware brick
A connecting hole is respectively set in middle part hollow out, two sides, and the connecting rod vertically passes through the connecting hole.
3. the dried hanging hang structure of assembled hollow out earthenware brick curtain wall as described in claim 1, which is characterized in that two neighbouring institutes
It states and passes through sleeve connection between connecting rod.
4. the dried hanging hang structure of assembled hollow out earthenware brick curtain wall as claimed in claim 3, which is characterized in that the connecting rod is not
Become rusty steel screw rod, and the inner wall of the sleeve is equipped with the connection screw thread being adapted to screw rod.
5. the dried hanging hang structure of assembled hollow out earthenware brick curtain wall as described in claim 1, which is characterized in that several hollow out potteries
The brick fissure of displacement arranges brick in the vertical direction, in two layers neighbouring of hollow out earthenware brick, the both ends point of a hollow out earthenware brick of lower layer
It is not connected by the one end of the two hollow out earthenware bricks on a connecting rod and upper layer.
6. the dried hanging hang structure of assembled hollow out earthenware brick curtain wall as described in claim 1, which is characterized in that the keel framework packet
The vertical keel being installed on main structure body exterior wall side wall and lateral keel are included, according to hollow out earthenware brick in the lateral keel
Size installs connecting rod, two neighbouring connecting rods.
7. the dried hanging hang structure of assembled hollow out earthenware brick curtain wall as claimed in claim 6, which is characterized in that the vertical keel is
Steel square tube.
8. the dried hanging hang structure of assembled hollow out earthenware brick curtain wall as claimed in claim 6, which is characterized in that the lateral keel is
Unequal angle.
9. the dried hanging hang structure of assembled hollow out earthenware brick curtain wall as described in claim 1, which is characterized in that two neighbouring institutes
The connection hole for stating hollow out earthenware brick is equipped with opening nylon elastic cutting ferrule.
10. a kind of construction method of the dried hanging hang structure of assembled hollow out earthenware brick curtain wall, which is characterized in that including following step
It is rapid:
One, the installation of keel framework
S1, surveying setting-out;
S2, vertical keel installation;
S3, lateral keel installation;
Two, first layer connecting rod is vertically installed;
Three, first layer hollow out earthenware brick is installed;
Four, second layer connecting rod is vertically installed
Second layer connecting rod is connect using sleeve with first layer connecting rod, and second layer hollow out earthenware brick misplaces upwards after the completion of connection
It passes through, in this way successively successively installation upwards.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910469123.2A CN110130550A (en) | 2019-05-31 | 2019-05-31 | The dried hanging hang structure and its construction method of assembled hollow out earthenware brick curtain wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910469123.2A CN110130550A (en) | 2019-05-31 | 2019-05-31 | The dried hanging hang structure and its construction method of assembled hollow out earthenware brick curtain wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110130550A true CN110130550A (en) | 2019-08-16 |
Family
ID=67583450
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910469123.2A Pending CN110130550A (en) | 2019-05-31 | 2019-05-31 | The dried hanging hang structure and its construction method of assembled hollow out earthenware brick curtain wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110130550A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113152752A (en) * | 2021-05-17 | 2021-07-23 | 无锡辰浩装饰工程有限公司 | Curved surface ceramic brick curtain |
CN113789894A (en) * | 2021-10-14 | 2021-12-14 | 浙江开达装饰工程有限公司 | Assembly type hollow ceramic brick curtain wall and construction method thereof |
CN113882565A (en) * | 2021-11-08 | 2022-01-04 | 广州珠江装修工程有限公司 | Assembly type unit ceramic brick dry-hanging curtain wall system and construction method thereof |
CN114033075A (en) * | 2021-10-28 | 2022-02-11 | 北京城建设计发展集团股份有限公司 | Hollow ceramic brick curtain wall structure and construction process |
CN115262852A (en) * | 2022-07-26 | 2022-11-01 | 中建八局发展建设有限公司 | Clear water brick wall bearing structure |
CN115370052A (en) * | 2022-09-07 | 2022-11-22 | 北京凌云宏达幕墙工程有限公司 | Aluminum pipe small ceramic brick curtain wall system and construction method thereof |
CN116950335A (en) * | 2023-09-05 | 2023-10-27 | 珠海市晶艺玻璃工程有限公司 | Hollow decorative single element, hollow curtain wall decorative component, mounting component thereof and hollow curtain wall system |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20100116924A (en) * | 2009-04-23 | 2010-11-02 | (주)가이인터내셔날 | External panel unit for dry insulation curtain wall in a building |
CN102433949A (en) * | 2011-09-30 | 2012-05-02 | 无锡金城幕墙装饰工程有限公司 | Clay board curtain wall |
CN204609069U (en) * | 2015-05-18 | 2015-09-02 | 东亚装饰股份有限公司 | Unidirectional keel ceramic plate curtain wall structure |
RU2579030C1 (en) * | 2014-12-25 | 2016-03-27 | Олег Савельевич Кочетов | Kochetov(s earthquake-resistant brick wall panel |
CN107227813A (en) * | 2017-07-28 | 2017-10-03 | 北京六建集团有限责任公司 | A kind of steel structure keel builds the outer Curtain Wall of brick and its construction method by laying bricks or stones |
CN108457409A (en) * | 2018-05-16 | 2018-08-28 | 中建八局装饰工程有限公司 | A kind of string hangs the external decoration facade and its installation method of clay brick |
CN109057112A (en) * | 2018-09-25 | 2018-12-21 | 苏州金螳螂建筑装饰股份有限公司 | A kind of hotel choose the cladding installation system of the outer curtain wall clay glazed brick of high spatial |
CN208563701U (en) * | 2018-06-07 | 2019-03-01 | 金刚幕墙集团有限公司 | A kind of element type clay brick curtain wall system |
CN208763271U (en) * | 2018-09-17 | 2019-04-19 | 中建深圳装饰有限公司 | The dried hanging hang structure of hollow earthenware brick curtain wall |
CN210421554U (en) * | 2019-05-31 | 2020-04-28 | 中建东方装饰有限公司 | Dry hanging structure of assembled hollow ceramic brick curtain wall |
-
2019
- 2019-05-31 CN CN201910469123.2A patent/CN110130550A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20100116924A (en) * | 2009-04-23 | 2010-11-02 | (주)가이인터내셔날 | External panel unit for dry insulation curtain wall in a building |
CN102433949A (en) * | 2011-09-30 | 2012-05-02 | 无锡金城幕墙装饰工程有限公司 | Clay board curtain wall |
RU2579030C1 (en) * | 2014-12-25 | 2016-03-27 | Олег Савельевич Кочетов | Kochetov(s earthquake-resistant brick wall panel |
CN204609069U (en) * | 2015-05-18 | 2015-09-02 | 东亚装饰股份有限公司 | Unidirectional keel ceramic plate curtain wall structure |
CN107227813A (en) * | 2017-07-28 | 2017-10-03 | 北京六建集团有限责任公司 | A kind of steel structure keel builds the outer Curtain Wall of brick and its construction method by laying bricks or stones |
CN108457409A (en) * | 2018-05-16 | 2018-08-28 | 中建八局装饰工程有限公司 | A kind of string hangs the external decoration facade and its installation method of clay brick |
CN208563701U (en) * | 2018-06-07 | 2019-03-01 | 金刚幕墙集团有限公司 | A kind of element type clay brick curtain wall system |
CN208763271U (en) * | 2018-09-17 | 2019-04-19 | 中建深圳装饰有限公司 | The dried hanging hang structure of hollow earthenware brick curtain wall |
CN109057112A (en) * | 2018-09-25 | 2018-12-21 | 苏州金螳螂建筑装饰股份有限公司 | A kind of hotel choose the cladding installation system of the outer curtain wall clay glazed brick of high spatial |
CN210421554U (en) * | 2019-05-31 | 2020-04-28 | 中建东方装饰有限公司 | Dry hanging structure of assembled hollow ceramic brick curtain wall |
Non-Patent Citations (1)
Title |
---|
郑伟等: "古建筑风格酒店幕墙设计探讨成都大慈寺酒店幕墙工程陶砖等古建筑风格幕墙的构造和实现", 门窗, no. 3, pages 5 * |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113152752A (en) * | 2021-05-17 | 2021-07-23 | 无锡辰浩装饰工程有限公司 | Curved surface ceramic brick curtain |
CN113789894A (en) * | 2021-10-14 | 2021-12-14 | 浙江开达装饰工程有限公司 | Assembly type hollow ceramic brick curtain wall and construction method thereof |
CN114033075A (en) * | 2021-10-28 | 2022-02-11 | 北京城建设计发展集团股份有限公司 | Hollow ceramic brick curtain wall structure and construction process |
CN113882565A (en) * | 2021-11-08 | 2022-01-04 | 广州珠江装修工程有限公司 | Assembly type unit ceramic brick dry-hanging curtain wall system and construction method thereof |
CN115262852A (en) * | 2022-07-26 | 2022-11-01 | 中建八局发展建设有限公司 | Clear water brick wall bearing structure |
CN115262852B (en) * | 2022-07-26 | 2023-04-18 | 中建八局发展建设有限公司 | Clear water brick wall bearing structure |
CN115370052A (en) * | 2022-09-07 | 2022-11-22 | 北京凌云宏达幕墙工程有限公司 | Aluminum pipe small ceramic brick curtain wall system and construction method thereof |
CN115370052B (en) * | 2022-09-07 | 2023-09-22 | 北京凌云宏达幕墙工程有限公司 | Aluminum pipe small ceramic brick curtain wall system and construction method thereof |
CN116950335A (en) * | 2023-09-05 | 2023-10-27 | 珠海市晶艺玻璃工程有限公司 | Hollow decorative single element, hollow curtain wall decorative component, mounting component thereof and hollow curtain wall system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110130550A (en) | The dried hanging hang structure and its construction method of assembled hollow out earthenware brick curtain wall | |
CN202017346U (en) | Late poured band hanging formwork structure | |
CN107558723B (en) | Method for manufacturing and installing hanging bracket of hanging basket for inclined roof | |
CN216865610U (en) | String hanging device of assembled ceramic brick curtain wall | |
AU2016240086A1 (en) | Curtain wall brick external wall | |
CN214531391U (en) | Outer facade curtain decorative structure of old building | |
CN210421554U (en) | Dry hanging structure of assembled hollow ceramic brick curtain wall | |
CN115306137B (en) | Operation platform structure for installing suspended ceiling at bottom of high-altitude corridor and construction method thereof | |
CN203961077U (en) | The cladding system of open clay plate curtain wall | |
CN110080443A (en) | A kind of stone material masonry construction and its technique | |
CN113882565B (en) | Assembly type unit ceramic brick dry-hanging curtain wall system and construction method thereof | |
CN213014358U (en) | Pipeline suspension structure | |
CN205875486U (en) | Give a new lease of life to light -duty board curtain wall construction structure of stone architectural concrete | |
CN208763271U (en) | The dried hanging hang structure of hollow earthenware brick curtain wall | |
CN207513060U (en) | A kind of cylinder stone material dry suspending wall construction | |
CN106049793B (en) | A kind of clay brick stainless steel perforated support system | |
CN208578156U (en) | Fast assembling-disassembling can plug-type heat preservation steel structure | |
CN110593440B (en) | Construction method of prefabricated wall structure | |
CN105952084B (en) | A kind of GRC component and its mounting structure and method | |
CN214364215U (en) | Assembled integration wallboard suitable for steel construction outer envelope system | |
CN202611139U (en) | Supporting device for glass awning | |
CN214246198U (en) | Assembled integration wallboard suitable for steel construction outer envelope system | |
CN211597020U (en) | Indoor drainage well of light gauge steel structure | |
CN110821005A (en) | Pottery tile dry hanging type curtain wall structure unit | |
CN212957197U (en) | Suspended ceiling corner double-layer gypsum board anti-stress cracking structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |