CN210421554U - Dry hanging structure of assembled hollow ceramic brick curtain wall - Google Patents

Dry hanging structure of assembled hollow ceramic brick curtain wall Download PDF

Info

Publication number
CN210421554U
CN210421554U CN201920811371.6U CN201920811371U CN210421554U CN 210421554 U CN210421554 U CN 210421554U CN 201920811371 U CN201920811371 U CN 201920811371U CN 210421554 U CN210421554 U CN 210421554U
Authority
CN
China
Prior art keywords
hollow ceramic
ceramic brick
hollow
curtain wall
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920811371.6U
Other languages
Chinese (zh)
Inventor
高茂
卢洪涛
李清明
宋凯锋
卢尧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Oriental Decoration Co Ltd
Original Assignee
China State Construction Oriental Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Oriental Decoration Co Ltd filed Critical China State Construction Oriental Decoration Co Ltd
Priority to CN201920811371.6U priority Critical patent/CN210421554U/en
Application granted granted Critical
Publication of CN210421554U publication Critical patent/CN210421554U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model relates to a structure is hung futilely of assembled fretwork ceramic brick curtain, including setting up the fossil fragments skeleton on structure main part outer wall lateral wall and fixing the subassembly that articulates on the fossil fragments skeleton, a plurality of fretwork ceramic bricks pass through articulate the subassembly and connect: the hanging assembly comprises a plurality of connecting rods which are vertically arranged; the hollow ceramic brick is provided with a connecting hole for the connecting rod to pass through, and the upper hollow ceramic brick and the lower hollow ceramic brick which are adjacent are connected by the connecting rod passing through the corresponding connecting hole, so that the technical problems that the side wall of the hollow ceramic brick is easy to crack and damage, the operation difficulty is high, the material waste is serious, the construction cost is greatly improved and the like in the conventional hollow ceramic brick curtain wall dry hanging structure are solved.

Description

Dry hanging structure of assembled hollow ceramic brick curtain wall
Technical Field
The utility model relates to a technical field is hung futilely of curtain, in particular to structure is hung futilely of assembled fretwork ceramic brick curtain.
Background
The curtain wall is an outer wall enclosure of a building, is a light wall with decorative effect commonly used by modern large and high-rise buildings, and can be made of various materials such as glass, metal, ceramic bricks and the like according to the requirements of decorative design.
The hollow ceramic brick, also called hollow ceramic brick, uses natural pottery clay as main raw material, has unique visual decoration effect, and is a better choice for curtain wall materials because of low heat conductivity coefficient, stronger practicability, high temperature resistance, severe cold resistance, corrosion resistance and scouring resistance. However, the application of the hollow ceramic brick is less at present, and the research of a special hanging structure for the hollow ceramic brick is lacked. The dry hanging method of other similar stone plates is characterized in that the hollow ceramic bricks and the structure main body are fixedly connected through keel frames arranged on the surfaces by using hanging pieces, but most of the hanging pieces need to be fixed on the back of the plates, cavities are arranged in the hollow ceramic bricks, the thickness of the side walls is limited, if connecting pieces such as back bolts penetrate through the side walls of the hollow ceramic bricks, hanging pieces are arranged, cracking and damage of the side walls of the ceramic bricks are easily caused, the operation difficulty is high, material waste is serious, and the construction cost is greatly improved.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a structure is hung futilely of assembled fretwork ceramic brick curtain to solve current fretwork ceramic brick curtain and hang the structure futilely and very easily cause the fracture and the damage of fretwork ceramic brick lateral wall, the operation degree of difficulty is big, the material is extravagant serious, improved technical problem such as construction cost greatly.
In order to solve the problem, the utility model provides a structure is hung futilely of assembled fretwork ceramic brick curtain, including setting up the fossil fragments skeleton on the structure main part outer wall lateral wall and fixing the subassembly that articulates on the fossil fragments skeleton, a plurality of fretwork ceramic bricks pass through articulate the subassembly and connect:
the hanging assembly comprises a plurality of connecting rods which are vertically arranged;
the hollow ceramic bricks are provided with connecting holes through which connecting rods can pass, and the upper hollow ceramic brick and the lower hollow ceramic brick which are adjacent to each other are connected through the corresponding connecting holes through the connecting rods.
Preferably, the middle of the hollow ceramic brick is hollow, two sides of the hollow ceramic brick are respectively provided with a connecting hole, and the connecting rod vertically penetrates through the connecting holes.
Preferably, the two connecting rods which are adjacent up and down are connected through a sleeve.
Preferably, the connecting rod is a stainless steel screw rod, and the inner wall of the sleeve is provided with a connecting thread matched with the screw rod.
Preferably, a plurality of the hollow ceramic bricks are arranged in a staggered manner in the vertical direction, and two ends of one hollow ceramic brick at the lower layer are respectively connected with one end of the two hollow ceramic bricks at the upper layer through one connecting rod in the two layers of the hollow ceramic bricks adjacent to each other from top to bottom.
The preferred, the fossil fragments skeleton is including setting firmly vertical fossil fragments and the horizontal fossil fragments on the structure main part outer wall horizontal fossil fragments are gone up according to the size installation connecting rod of fretwork ceramic brick, two upper and lower adjacent connecting rods.
Preferably, the vertical keel is a steel square tube.
Preferably, the transverse keel is inequilateral angle steel.
Preferably, the connecting holes of the two vertically adjacent hollow ceramic bricks are provided with open nylon elastic clamping sleeves.
Compared with the prior art, the utility model discloses there are following technological effect:
the utility model discloses a articulate the subassembly, hang fretwork ceramic brick and establish on the fossil fragments skeleton of structure main part outer wall lateral wall, simple structure, convenient operation passes the connecting hole of fretwork ceramic brick through the connecting rod, can not cause destructive damage to the fretwork part of fretwork ceramic brick, has reduced the construction degree of difficulty, has avoided the unnecessary material extravagant.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly described below, and it is obvious that the drawings in the description below are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to these drawings without creative efforts. In the drawings:
FIG. 1 is a schematic structural view of a hollow ceramic tile in a dry hanging structure of the assembled hollow ceramic tile curtain wall of the present invention;
FIG. 2 is a side view of the hollow ceramic tile in the dry hanging structure of the assembled hollow ceramic tile curtain wall of the present invention;
FIG. 3 is a schematic view of the dry hanging structure of the assembled hollow ceramic brick curtain wall of the present invention;
FIG. 4 is a vertical cross-sectional view of the dry hanging structure of the assembled hollow ceramic brick curtain wall of the present invention;
fig. 5 is the transverse section of the dry hanging structure of the assembly type hollow ceramic brick curtain wall.
Detailed Description
The following will combine fig. 1 to 5 to describe the dry hanging structure of the assembled hollow-out ceramic brick curtain wall in detail, and this embodiment is implemented on the premise of the technical solution of the present invention, and a detailed implementation manner and a specific operation process are given, but the protection scope of the present invention is not limited to the following embodiments, and those skilled in the art can modify and color-moisten it within the scope that does not change the spirit and content of the present invention.
Referring to fig. 1 to 5, a dry hanging structure of an assembled hollow ceramic brick curtain wall comprises a keel frame arranged on the side wall of an outer wall of a structural body and a hanging component fixed on the keel frame, wherein a plurality of hollow ceramic bricks 1 are connected through the hanging component:
the hanging assembly comprises a plurality of connecting rods 2 which are vertically arranged;
the hollow ceramic bricks 1 are provided with connecting holes 11 through which the connecting rods 2 can pass, and the upper hollow ceramic brick 1 and the lower hollow ceramic brick 1 which are adjacent are connected through the connecting rods 2 which pass through the corresponding connecting holes 11.
In this embodiment, two adjacent connecting rods 2 are connected by a sleeve 3.
In this embodiment, connecting rod 2 is vertical setting, and a plurality of fretwork ceramic bricks are vertical to be arranged, and connecting rod 2 is vertical to pass corresponding connecting hole 11 and to get up fretwork ceramic brick cluster. The hollow ceramic bricks can be arranged in butt joint mode or staggered joint mode, and the utility model discloses do not do specific restriction to this. No matter the hollow ceramic bricks are arranged in butt joint or staggered joint, the hanging technical scheme is the same, and all the hollow ceramic bricks are connected in series through the connecting rods 2. The following description will be made in detail with reference to the accompanying drawings in a staggered arrangement.
The middle part fretwork 12 of fretwork ceramic tile 1, the concrete shape of this fretwork 12 is set for according to the actual demand, the utility model discloses do not do the restriction to this, the both sides of fretwork ceramic tile 1 set up a connecting hole 11 that can supply the connecting rod 2 to vertically pass respectively.
A plurality of the hollow ceramic bricks 1 are arranged in a staggered joint manner in the vertical direction, and in the two layers of hollow ceramic bricks 1 which are adjacent from top to bottom, two ends of one hollow ceramic brick 1 at the lower layer are respectively connected with one end part of the two hollow ceramic bricks 1 at the upper layer through one connecting rod 2.
The keel framework comprises a vertical keel 4 and a transverse keel 5 which are fixedly arranged on the side wall of the outer wall of the structural main body, the vertical keel 4 is a square steel tube, the transverse keel 5 is an unequal angle steel, and the connecting rod 2 is installed on the transverse keel 5 according to the size of the hollow ceramic brick 1.
In this embodiment, the connecting rod 2 is a solid stainless steel screw, and the inner wall of the sleeve 3 is provided with a connecting thread adapted to the screw. The sleeve 3 is arranged at the position of the unequal angle steel as far as possible so as to be convenient for fixed installation with the angle steel.
Further, the outer diameter of the sleeve 3 is slightly smaller than the aperture of the connecting hole 11 of the hollow ceramic brick 1, and the sleeve 3 can stretch into the connecting hole 11.
In this embodiment, two adjacent from top to bottom the connecting hole 11 department of fretwork ceramic tile 1 is equipped with opening nylon elastic clamping sleeve 6 to form the brickwork joint and compensate the manufacturing error of connecting hole 11, the brickwork joint size is guaranteed through the mode of increasing the regulation nylon gasket.
The utility model discloses a theory of operation:
when the main body of the building is constructed, the rear embedded plates are arranged according to the space between the vertical keels 4, the size is required to be accurate, the rear embedded plates are reliably connected with a building lightning protection system, the vertical keels 4 are fixed by the central line of the vertical keels 4 during dry hanging construction, welding and corrosion prevention are carried out after rechecking is correct, the horizontal keels 5 are positioned according to outer wall lattices, the vertical stainless steel screw rods are arranged on the horizontal keels 5 according to the size of the hollow ceramic bricks and are connected through bolt sleeves 3, the hollow ceramic bricks are hung after size adjustment, the size is adjusted, fastening bolts are fastened, and the surface is cleaned.
The utility model relates to a construction method of structure is hung futilely of assembled fretwork ceramic brick curtain, including following several steps:
first, installation of keel framework
S1, measuring and paying off;
and measuring, namely performing actual measurement on the vertical face and the plane respectively, drawing a measurement result, comparing the measurement result with a drawing, calculating an error, coordinating related departments to perform interviewing if the error exceeds a standard requirement, and paying off after a processing idea is provided.
The horizontal lines are firstly drawn on the outer sides of the frame beams around the top layer and the bottom layer, the horizontal lines are pulled for division, the upper horizontal grid point and the lower horizontal grid point are connected, and the central position of the vertical keel can be positioned.
S2, mounting a vertical keel;
the rear embedded plate is installed according to 1500mm grids by adopting the size of 250 x 200 x 10mm, no deviation is confirmed, the vertical keel is hoisted by adopting 200 x 80 x 6mm steel discharge pipes according to 1500mm grids, meanwhile, the horizontal line is pulled to control the horizontal height and the depth position, the keel position is adjusted by the person with deviation, and the welding and the corrosion prevention are carried out after the requirements are met.
S3, installing a transverse keel;
the transverse keel is made of L100X 80X 8mm angle steel, a row of transverse leading angle steel is installed on the bottom layer, then a second transverse angle steel is installed according to the height of 1500mm, and the transverse leading angle steel and the second transverse leading angle steel are installed upwards in sequence. After compounding, symmetrical welding is carried out to reduce deformation generated by welding, and finally, anticorrosion treatment is carried out.
Secondly, vertically installing a first layer of connecting rods;
the stainless steel screw rod adopts a screw rod with the diameter of 12mm, the screw rod is firstly installed on the transverse keel according to the hole pitch size of the hollow ceramic bricks, and the screw rod is temporarily fixed after being sequentially installed.
Thirdly, mounting a first layer of hollow ceramic bricks;
the hollow ceramic bricks are made of 200 x 100 x 40mm special porous ceramic bricks, a first row of hollow ceramic bricks are firstly penetrated on a stainless steel screw rod which is installed in advance according to hole distance, a second row of hollow ceramic bricks and the first row of hollow ceramic bricks are installed in a staggered mode, the first row of bricks and the second row of bricks are installed upwards in sequence by adopting adjusting nylon gaskets for protection.
Fourthly, vertically installing a second layer connecting rod
The second layer connecting rod is connected with the first layer connecting rod through a sleeve, the second layer hollow ceramic bricks are passed through in an upward staggered mode after connection is completed, and the second layer hollow ceramic bricks are installed upwards layer by layer in sequence according to the mode.
Fifthly, adjusting, fastening and cleaning
And after the hollow ceramic bricks are penetrated, the horizontal height and the depth position of the horizontal line control of the hollow ceramic bricks are adjusted, and finally cleaning treatment is carried out.
The disclosure above is only one specific embodiment of the present application, but the present application is not limited thereto, and any variations that can be made by those skilled in the art are intended to fall within the scope of the present application.

Claims (9)

1. The utility model provides a structure is hung futilely of assembled fretwork ceramic brick curtain, a serial communication port, including setting up the fossil fragments skeleton on the structure main part outer wall lateral wall and fixing the subassembly that articulates on the fossil fragments skeleton, a plurality of fretwork ceramic bricks pass through articulate the subassembly and connect:
the hanging assembly comprises a plurality of connecting rods which are vertically arranged;
the hollow ceramic bricks are provided with connecting holes for the connecting rods to pass through, and the upper hollow ceramic brick and the lower hollow ceramic brick which are adjacent are connected by the connecting rods passing through the corresponding connecting holes.
2. The dry hanging structure of the assembled type hollow ceramic brick curtain wall according to claim 1, wherein the hollow ceramic brick is hollow in the middle, two sides of the hollow ceramic brick are respectively provided with a connecting hole, and the connecting rod vertically penetrates through the connecting holes.
3. The dry-hanging structure of the fabricated hollow-out ceramic brick curtain wall as claimed in claim 1, wherein two of the connecting rods adjacent to each other up and down are connected by a sleeve.
4. The dry hanging structure of the assembled type hollow ceramic brick curtain wall as claimed in claim 3, wherein the connecting rod is a stainless steel screw rod, and the inner wall of the sleeve is provided with a connecting thread adapted to the screw rod.
5. The dry-hanging structure of an assembled type hollow ceramic tile curtain wall as claimed in claim 1, wherein a plurality of the hollow ceramic tiles are arranged in a staggered manner in a vertical direction, and in two adjacent layers of hollow ceramic tiles, two ends of one hollow ceramic tile in a lower layer are respectively connected with one end of the two hollow ceramic tiles in an upper layer through one connecting rod.
6. The dry hanging structure of the assembled type hollow ceramic brick curtain wall as claimed in claim 1, wherein the keel frame comprises a vertical keel and a horizontal keel which are fixedly arranged on the side wall of the outer wall of the structural body, and connecting rods are arranged on the horizontal keel according to the size of the hollow ceramic brick, and the two connecting rods are vertically adjacent.
7. The dry hanging structure of the assembled type hollow ceramic brick curtain wall as claimed in claim 6, wherein the vertical keel is a steel square tube.
8. The dry hanging structure of the fabricated hollow ceramic brick curtain wall as claimed in claim 6, wherein the transverse keel is a non-equilateral angle steel.
9. The dry hanging structure of the assembled hollow-out ceramic brick curtain wall as claimed in claim 1, wherein the connecting holes of two adjacent hollow-out ceramic bricks are provided with open nylon elastic cutting sleeves.
CN201920811371.6U 2019-05-31 2019-05-31 Dry hanging structure of assembled hollow ceramic brick curtain wall Active CN210421554U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920811371.6U CN210421554U (en) 2019-05-31 2019-05-31 Dry hanging structure of assembled hollow ceramic brick curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920811371.6U CN210421554U (en) 2019-05-31 2019-05-31 Dry hanging structure of assembled hollow ceramic brick curtain wall

Publications (1)

Publication Number Publication Date
CN210421554U true CN210421554U (en) 2020-04-28

Family

ID=70373582

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920811371.6U Active CN210421554U (en) 2019-05-31 2019-05-31 Dry hanging structure of assembled hollow ceramic brick curtain wall

Country Status (1)

Country Link
CN (1) CN210421554U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130550A (en) * 2019-05-31 2019-08-16 中建东方装饰有限公司 The dried hanging hang structure and its construction method of assembled hollow out earthenware brick curtain wall

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130550A (en) * 2019-05-31 2019-08-16 中建东方装饰有限公司 The dried hanging hang structure and its construction method of assembled hollow out earthenware brick curtain wall

Similar Documents

Publication Publication Date Title
CN110130550A (en) The dried hanging hang structure and its construction method of assembled hollow out earthenware brick curtain wall
CN107460988B (en) Active anti-cracking structure of gypsum board suspended ceiling and construction method
CN210421554U (en) Dry hanging structure of assembled hollow ceramic brick curtain wall
CN203905233U (en) Open type dry hanging clay plate curtain wall installation construction structure
CN216405860U (en) Dry-hanging type hollow ceramic brick curtain wall system
CN107892926B (en) Energy-saving coke oven door lining brick
CN110629913B (en) Curtain wall structure adopting red brick decoration panel and construction method thereof
CN209817232U (en) Adjustable light steel keel suspended ceiling
CN210067166U (en) Slotted honeycomb aluminum plate curtain wall structure
CN218028352U (en) Dry-hanging ceramic brick curtain wall system
CN203961077U (en) The cladding system of open clay plate curtain wall
CN106939699B (en) Construction method for galvanized steel sheet waterproof layer on inner side of open type ceramic plate curtain wall
CN208763271U (en) The dried hanging hang structure of hollow earthenware brick curtain wall
CN214006227U (en) Hollow brick infilled wall
CN107859337A (en) Steel-structure factory building FPB Light trabses cracking structure constructions
CN209837440U (en) Connecting component for special-shaped GRG suspended ceiling
CN209837564U (en) Novel wall ceramic tile dry-hanging bracket
CN203160503U (en) Invertedly concave connecting structure of indoor ceiling and wall body
CN113882565A (en) Assembly type unit ceramic brick dry-hanging curtain wall system and construction method thereof
CN109594731B (en) Unit type face brick system
CN212715574U (en) Outer facade stone material mounting structure
CN205777234U (en) A kind of decorating outer wall of building insulation hanging slab
CN106049793B (en) A kind of clay brick stainless steel perforated support system
CN217461068U (en) Unit type pottery clay brick curtain wall
CN218406204U (en) Prefabricated hanging plate for building exterior wall