CN107859337A - Steel-structure factory building FPB Light trabses cracking structure constructions - Google Patents

Steel-structure factory building FPB Light trabses cracking structure constructions Download PDF

Info

Publication number
CN107859337A
CN107859337A CN201710994434.1A CN201710994434A CN107859337A CN 107859337 A CN107859337 A CN 107859337A CN 201710994434 A CN201710994434 A CN 201710994434A CN 107859337 A CN107859337 A CN 107859337A
Authority
CN
China
Prior art keywords
fpb
plates
steel
plate
crossbeam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710994434.1A
Other languages
Chinese (zh)
Inventor
吴建挺
陆其荣
孙向红
王健
赵勇
赵杭波
朱巍
祝德江
杨佳佳
郭于玮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Zhancheng Construction Group Co Ltd
Original Assignee
Zhejiang Zhancheng Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Zhancheng Construction Group Co Ltd filed Critical Zhejiang Zhancheng Construction Group Co Ltd
Priority to CN201710994434.1A priority Critical patent/CN107859337A/en
Publication of CN107859337A publication Critical patent/CN107859337A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention belongs to steel construction exterior wall technical field, and in particular to steel-structure factory building FPB Light trabses cracking structure constructions.For it is existing by FPB plate shapes into the deficiency that easily ftractures of metope, the present invention adopts the following technical scheme that:Steel-structure factory building FPB Light trabses cracking structure constructions, comprise the following steps:S1. girder steel and main body steel column are welded;S2. unwrapping wire, typesetting;S3., locating part with "u"-shaped groove is installed;S4., FPB plates are installed;S5. joint treatment;S6. plate face is fitted up.The construction of the present invention, by setting the locating part with "u"-shaped groove, FPB plates are installed in "u"-shaped groove, locating part produces spacing, the deformation of limitation FPB plates to FPB plates in fore-and-aft direction, effective to reduce metope cracking.

Description

Steel-structure factory building FPB Light trabses cracking structure constructions
Technical field
The invention belongs to steel construction exterior wall technical field, and in particular to steel-structure factory building FPB Light trabses cracking structures are applied Work engineering method.
Background technology
As national economic development develops, to the requirement more and more higher of building energy conservation and green construction, FPB Light trabses with The advantages of its is of fine quality, energy-saving and environmental protection, application is more and more extensive.Composite lightweight wall plate (abbreviation FPB plates) is a kind of new wall Material, using fiber reinforcement silicate board as panel, centre is filled a vacancy composite foam, cement, mortar and the special enhancing core such as particle for it Material, formed by frequency changer pressurization.
, in use can be by the change of positive and negative blast, structure overall deformation and raw material using the factory building of FPB plates The influence itself expanded with heat and contract with cold, the stress direction of each block of FPB plate and of different sizes, each block of FPB plate all individually shrinks and expanded, These shrink and expansion occurs repeatedly with gradient of temperature.To in year, majority is by FPB within three months after the completion of the construction Plate shape into metope all there is different degrees of cracking, seam crossing of the cracking phenomena between FPB plates, door and window junction are particularly Substantially, even if cracking-proof processing has been done on metope surface, there is the problem of crack is also a time.By FPB plate shapes into Metope cracking be common problem in a whole country.
The content of the invention
The present invention for it is existing by FPB plate shapes into the deficiency that easily ftractures of metope, there is provided a kind of steel-structure factory building FPB Light trabses cracking structure construction, using this construction, it can effectively reduce metope cracking.
To achieve the above object, the present invention adopts the following technical scheme that:Steel-structure factory building FPB Light trabses cracking structures are applied Work engineering method, comprises the following steps:
S1., crossbeam is installed;
S2. unwrapping wire, typesetting;
S3., locating part with "u"-shaped groove and FPB plates are installed;
S4. joint treatment;
S5. plate face is fitted up.
The construction of the present invention, by setting the locating part with "u"-shaped groove, FPB plates are installed in "u"-shaped groove, limited Position part produces spacing, the deformation of limitation FPB plates, effectively reduction metope cracking to FPB plates in fore-and-aft direction.
As an improvement, in step S1, column is first welded on the outside of the main body steel column, the beam welding on column, or Person, in step S1, the crossbeam directly welds with main body steel column.Column can be welded in the outside of main body steel column by wall purlin support, The outer surface of crossbeam and column can be coplanar, and crossbeam and column can be zinc-plated square tube, and steel column, crossbeam are according to welding for steel structure technology The requirement of code is welded.Crossbeam and column are set simultaneously, compared to crossbeam is only set, more smooth outer surface can be obtained, And welding processing is more prone to.
Preferably, in step S2, unwrapping wire, typesetting are included in the welding position that locating part is marked on crossbeam, each welding position Level interval between putting is 1-2m.Can be equidistant between each welding position.Between each welding position during the too small such as less than 1m of level interval, weldering Fitting material usage and processing used time are more, and effect of prestressed lifting is not notable.Level interval is excessive between each welding position During such as larger than 2m, effect of prestressed is remarkably decreased less obvious.Level interval between each welding position is controlled between 1-2m, can be taken into account Material, processing and effect of prestressed.Level interval resultant effect in 1.5m or so is optimal.
Preferably, locating part is welded by " L " shape sheet metal and " I " shape sheet metal, step S3 includes installation " L " shape The step S3.1 of sheet metal, after FPB plate installations install " I " shape sheet metal step S3.2.Locating part is by the thin steel of " L " shape Plate and " I " shape sheet metal are welded, and successively weld, and the installation of FPB plates is more light.If locating part is before FPB plates are installed It has been integral, the more difficult installation of FPB plates, last block FPB plates especially in region.
Preferably, step S3.1 is included " L " shape sheet metal and beam welding, step S3.2 is included in the installation of FPB plates After the completion of " L " the shape sheet metal on " I " shape sheet metal and crossbeam is welded.
Preferably, step S3.1 also includes welding " L " shape sheet metal and column, step S3.2 is additionally included in FPB plates " L " the shape sheet metal on " I " shape sheet metal and column is welded after installation.Locating part is respectively provided with crossbeam and column, Preferably spacing, raising FPB metope globalities can be carried out to FPB plates.
Preferably, step S3 includes step S3.3:When installing first block of FPB plate, a people pushes on one side, by FPB plates Contact closely, and levered up with plumb perpendicular perpendicularity, another people in lower mouth with wide opening crow bar, side top margin with " L " shape sheet metal Sled, makes the gap between FPB plates jam-packed and column, to extrude mortar;Check precision after installing first block of FPB plate, make gap≤ 5mm, perpendicularity≤2mm, used after qualified at the top of timber wedge wedging FPB plates, the mortar of extrusion is struck off into polishing, Ran Houkai with scraper Begin second block of FPB plate of installation.Two people cooperate, and will can be in close contact between first block of FPB plate and " L " shape sheet metal and locating part, and Ensure that first block of FPB plate and mortar in column seam are full.
As an improvement, step S3 includes step S3.4:Before installing second block of FPB plate, first in the side of first block of FPB plate Reinforcing bar is squeezed into, is then plastered in the side of first block of FPB plate, reality is all smeared using eight words method of plastering;Step S3 includes step S3.5:When second block of FPB plate is installed, beats second block of FPB plate and be allowed to draw close to first block of FPB plate, and reinforcing bar is inserted into the In two blocks of FPB plates, used after qualified at the top of second block of FPB plate of timber wedge wedging.During assembled second block of FPB plate, by a people with it is hand steered firmly Reinforcing bar, the another side that another people beats second block of FPB plate with crow bar is allowed to draw close to first block of FPB plate, and is inserted into reinforcing bar In second block of FPB plate, with the top of second block of FPB plate of timber wedge wedging after being close to;One block of FPB plate is often installed all to be looked for guiding ruler It is flat;Follow-up FPB plates are installed successively according to the method.Adjacent FPB plates are connected by reinforcing bar, make the two formation more firm Solid entirety.The side of first block of FPB plate can squeeze into two reinforcing bars, the half of reinforcing bar up and down and submerge in first block of FPB plate.
As an improvement, in step S3, handling is carried out using hoisting machine;Before lifting, in the top of FPB plate installation sites, outside Simple crane is set up on most upper one of the horizontal cross bar of foundation hand cradle, hoisting machine is lighter, can change freely with installation site It is mobile;During lifting, FPB plates are pinioned with steel wire rope on the ground, the hook of hoisting machine lifts by crane after hooking steel wire rope, whole FPB plates Vertical transport is kept during handling;FPB plates are stopped after reaching above predetermined crossbeam, and FPB plates are placed on above crossbeam.Using this FPB plates are hung to installation site by kind mode, and operation is easily quick.
Preferably, in step S3, before FPB plates are installed, first by FPB plates and crossbeam, the contact surface polymer of column Mortar is smeared, and is smeared and is all smeared reality using eight words method of plastering.
Preferably, in step S4, after the FPB plates installation correction well in the same area, FPB is filled with polymer mortar Seam between plate and lower and upper cross-member, timber wedge extraction is filled and led up with mortar after conserving a period of time, after mortar hardening, to adjacent The plate stitch of FPB plates, jointing is re-started with polymer mortar, unnecessary mortar strikes off in time;To FPB plates breakage and hole portion Position, with polymer mortar filling-in;To the gap between FPB plates and lower and upper cross-member, polymer mortar filling, unnecessary mortar is scraped in time It is flat;A period of time is conserved after seam.Although two blocks of adjacent FPB plates are just attached with reinforcing bar when mounted, and plate There is polymer mortar bonding in seam, but after mortar hardening, piece surface can form groove or gap, also have some FPB plates to exist Breakage is had during mounting and adjusting, it is therefore desirable to carry out secondary joint treatment.During repairing, entered again with polymer mortar Row jointing, unnecessary mortar strike off in time, for FPB plates breakage and hole position, with polymer mortar filling-in, conserve seven days. Due to the production of FPB plates and alignment error, upper and lower gap is typically in the range of 30-80mm, the gap usable polymers mortar filling, Unnecessary mortar strikes off in time, conserves seven days.After mortar hardening, to the plate stitch of adjacent FPB plates, hook is re-started with polymer mortar Seam, unnecessary mortar strike off in time;To FPB plates breakage and hole position, with polymer mortar filling-in;To FPB plates and horizontal stroke up and down Gap between beam, polymer mortar filling, unnecessary mortar strike off in time;A period of time is conserved after seam.
Preferably, after first layer FPB plates install, maintenance a period of time, second layer FPB is installed after waiting mortar hardening Plate, second layer FPB plates are identical with first layer FPB method of plate installation.
Preferably, step S5 includes exterior wall finishing and internal wall finishing;Exterior wall finishing:After FPB wall installations, outside Metope completely spreads steel wire;When spreading steel wire, steel wire is fixed on FPB plates with staple, staple squeezes into wall with nailing gun In plate, then ash cake is made with water-proof putty on metope, steel wire is embedded in ash cake, paved;Carried out after ash cake hardening whole The Puttying construction of wall face;It is finally construction outer wall coating, completes decoration of exterior wall construction.
Preferably, in step S6, during inner wall decoration, first glass fiber mesh is completely spread in metope;When spreading glass fiber mesh, use Putty makes ash cake, and web is embedded in ash cake, paved;The Puttying construction of whole metope is carried out after ash cake hardening;Finally It is construction interior wall coating, completes inner wall decoration construction.
Preferably, door and window node is handled:Reserved door-window opening wallboard is constructed according to drawing requirement, doorframe, window frame and wall Welded between plate body steel column with ironware, doorframe and wallboard gap binding agent putty plug are real, strike off.The installation of FPB plates is latter Not punch eye in all, in order to avoid make to be shaken between plate and ftracture because the mortar hardening time is insufficient.
Preferably, hydroelectric line is installed:Because FPB plates itself are relatively thin, heavier utensil and case must not be installed on wall Body, such as:Distribution box, Fire Hose etc., but the small electronic devices such as electric switch, socket, wall lamp and pipeline can be installed.Water is installed During electric equipment, first slotted with cutting machine in metope, then carry out tick slot of punchinging with chisel, but must not pick logical, unavailable weight is violent Hit, in order to avoid shake bad wallboard.Pipelining completion pastes fiberglass gridding band filling-in with polymer mortar at fluting, prevents Cracking.
Beneficial effects of the present invention have:By setting the locating part with "u"-shaped groove, by locating part by before and after FPB plates Direction progress is spacing, can prevent or reduce deformation caused by each FPB plates stress, temperature change etc., effectively reduce metope cracking; The locating part of setting can not influence other constructing operations;The advantages of with FPB Light trabses.Further, in adjacent FPB plates Between reinforcing bar is set, further improve metope effect of prestressed.
Brief description of the drawings
Fig. 1 is that the FPB plates of the embodiment of the present invention are vertically connect to elevational schematic view.
Fig. 2 is the schematic cross-section after the crossbeam of the embodiment of the present invention, locating part connect with FPB plates.
Fig. 3 is the structural representation of the locating part of the embodiment of the present invention.
Fig. 4 is the Longitudinal cross section schematic after main body steel column, the column of the embodiment of the present invention connect with crossbeam.
Fig. 5 is the cross-sectional view after main body steel column, the column of the embodiment of the present invention connect with crossbeam.
Fig. 6 is the step block diagram of the embodiment of the present invention.
Fig. 7 is the step block diagram of the step S3 of embodiment of the present invention installation locating part.
Fig. 8 is the step block diagram of the step S3 of embodiment of the present invention installation FPB plates.
Fig. 9 is the more specifically step block diagram of the embodiment of the present invention.
In figure, 1, main body steel column;
2nd, column;
3rd, crossbeam;
4th, locating part, 40, "u"-shaped groove, 41, " L " shape sheet metal, 42, " I " shape sheet metal;
5th, FPB plates;
6th, reinforcing bar;
7th, wall purlin support;
8th, bonding mortar;
9th, weld.
Embodiment
With reference to the accompanying drawing of the embodiment of the present invention, the technical scheme of the embodiment of the present invention is explained and illustrated, but Following embodiments are only the preferred embodiments of the present invention, and not all.Based on the embodiment in embodiment, people in the art The other embodiment that member is obtained on the premise of creative work is not made, belongs to protection scope of the present invention.
As shown in Figures 1 to 9, steel-structure factory building FPB Light trabses cracking structure construction, comprises the following steps:
S1., crossbeam is installed;
S2. unwrapping wire, typesetting;
S3., locating part with "u"-shaped groove is installed;
S4., FPB plates are installed;
S5. joint treatment;
S6. plate face is fitted up.
It is be bonded only by polymer bonding mortar between each FPB plates and between FPB plates and crossbeam 3 in compared with prior art, FPB plates be easily deformed causing FPB plate shapes into metope cracking, the present invention sets the locating part with "u"-shaped groove on crossbeam, FPB plates are installed in "u"-shaped groove, by locating part that the fore-and-aft direction progress of FPB plates is spacing, can be prevented or be reduced each FPB plates Deformation caused by stress, temperature change etc., effectively reduce metope cracking.Every piece of FPB can be at least provided with upper and lower a pair of locating parts To prevent its deformation.
This engineering method is applied to the steel that the newly-built of the target call of building energy conservation 50% and 65%, enlarging and Existing reinforced concrete bridge transformation require The non-bearing exterior wall construction of structure civil buildings.This engineering method has the following advantages that:1st, FPB Light trabses have light, heat conduction system Number is small, water absorption rate is low, sound insulation, water-fast, ageing-resistant, low temperature resistant, in construction can according to, can follow closely, can dig, water, wire pipe pre-embedding and door Window device and node processing are convenient, the advantages that energy-conserving and environment-protective.2nd, Light trabses thickness ratio tradition is laid bricks thin, can substantially save building Space.Meanwhile wallboard is more in light weight than traditional building block, the cost of building structure can be saved.3rd, the installation of FPB Light trabses is simple, fits It is wide with scope.Compared with masonry structure, without lacing wire, structural column and lintel in construction, artificial and construction cost is saved. 4th, steel structure frame completes that FPB Light trabses installations can be carried out, and can be constructed simultaneously with roof boarding, hydroelectric line suspension bracket, Shorten the construction period.
Embodiment one
As shown in Figures 1 to 4, the FPB Light trabses cracking structures of the embodiment of the present invention one, including more crossbeams 3 and polylith erect Vertical FPB plates 5, the bottom surface of the crossbeam 3 and/or top surface are provided with multiple locating parts 4, and the locating part 4 has "u"-shaped groove 40, the groove width of the "u"-shaped groove 40 and the thickness matching of FPB plates 5, the FPB plates 5 are located in "u"-shaped groove 40.
The upper surface of FPB plates 5, lower surface, medial surface, lateral surface are horizontal.FPB plates 5 can be divided into a positive plate and a cloudy plate. Stand and see to FPB plates, the left surface of positive plate and flush outside factory building, there is flange among the right flank of positive plate, flange and positive plate are contour; The right flank of cloudy plate flushes, and has the groove coordinated with flange among the left surface of cloudy plate.Made by the cooperation of flange and groove Obtain and realize good location between positive plate and cloudy plate.FPB plates 5 also include the third cuboid plate, and the third cuboid plate is used to install In the rightmost of the same area.
Referring to Fig. 3, the locating part 4 is welded by " L " shape sheet metal 41 and " I " shape sheet metal 42, and " L " shape is thin Steel plate 41 welds with crossbeam 3.Although locating part 4 can use the modes such as casting or punching press to be integrally formed, in installation FPB The front limit part 4 of plate 5 install more difficult by one, FPB plates 5.Only first " L " shape sheet metal 41 is welded before FPB plates 5 are installed It is connected on crossbeam 3, by FPB plates 5 against after " L " shape sheet metal 41, then " I " shape sheet metal 42 and " L " shape sheet metal 41 is welded, So that FPB plates 5 are easy for installation.The contact surface annular solder of " L " shape sheet metal 41 and crossbeam 3, to ensure locating part 4 and crossbeam 3 It is fixedly secured.The vertical outer face of " I " shape sheet metal 42 flushes with the vertical outer face of L " shape sheet metals, " I " shape sheet metal 42 Horizontal inner face contacted with the horizontal inner face of " L " shape sheet metal 41, convenient " I " shape sheet metal 42 and " L " shape sheet metal 41 Between welding.
Referring to Fig. 1, reinforcing bar 6 is provided between the FPB plates 5, the reinforcing bar 6 inserts the side of FPB plates 5.By inserting FPB The reinforcing bar 6 of the side of plate 5 connects adjacent FPB plates 5, and polylith FPB plates 5 are linked to be entirety, can effectively reduce each piece of FPB various changes Shape, reduce metope cracking.Reinforcing bar 6 inserts the side of FPB plates 5 rather than is arranged at the front or the back side of FPB plates 5, the side of installation of reinforcing bar 6 Just, and the interior outside of FPB plates 5 is smooth, does not interfere with front or the construction at the back side of FPB plates 5.Between locating part 4 on crossbeam 3 Horizontal range is 1.5m, vertical to be no less than 3 pairs.
The both ends of the crossbeam 3 are provided with locating part 4, and four corners progress of the metope to being formed by FPB plates 5 is spacing, makes Obtain metope and form more firm overall, raising effect of prestressed.
The cracking structure is additionally provided with horizontal locating part 4, and the opening of "u"-shaped groove 40 left and right of Horizontal limiting part 4 is relative.Crossbeam The "u"-shaped groove 40 of locating part 4 on 3 is open relative up and down.In addition to locating part 4 is set on crossbeam 3, also sets up "u"-shaped groove 40 and open Mouthful or so relative locating part 4, the FPB plates 5 of metope left and right ends are carried out spacing, can further improve effect of prestressed.
Upper and lower two reinforcing bars 6 are provided between adjacent FPB plates 5, crack resistence effect can be improved.The stock size of FPB plates 5: Length 2440mm, width 760mm, thickness 60,90,120,150,180,240mm.Due to the length of FPB plates 5 be vertical height compared with Greatly, only a piece reinforcing bar 6 of setting, its effect of prestressed are weaker.If setting three or more reinforcing bars 6, materials'use is more, the engineering time Increase, and effect of prestressed lifting and unobvious.Therefore two reinforcing bars 6 can be in material cost, effect of prestressed and difficulty of construction etc. Obtain preferably balanced.
The opposed vertical face of reinforcing bar 6 tilts, and its right part is higher than left part, and reinforcing bar 6 is knocked in the side of FPB plates 5 and is more prone to.Just Often during construction, workmen is located at the outside of FPB plates 5, installs FPB plates 5 from left to right, the right part of reinforcing bar 6 is higher than left part, is easy to construct Reinforcing bar 6 is knocked in the right flank of FPB plates 5 by personnel from upper right side.The equal length of reinforcing bar 6 between adjacent FPB plates 5, the present embodiment In, reinforcing bar 6 is grown for 40cm, respectively squeezes into adjacent FPB plates 520cm.
Form angle α between the reinforcing bar 6 and FPB plates 5,15 °≤α≤75 °.Such as less than 15 ° of angle too small is not suitable for striking Play operation;Excessive such as larger than 75 ° of angle, its effect of prestressed is weaker;Angle can take into account each side between 15 ° to 75 °.This reality Apply in example, angle is 30 °, and through experiment, angle effect of prestressed at 30 ° or so reaches optimal.
Generally, by some pieces of FPB plate shapes into one piece of metope, if dry wall surface forms whole building exterior wall with other parts.This In embodiment, one piece of metope, the rectangular shape of metope are formed by seven blocks of FPB plates 5.In other embodiments, by changing crossbeam 3 Geomery and its angle with horizontal plane, metope can also be in other shapes.
When distance is excessive between main body steel column 1 so that the distance between column 2 is excessive, and the metope that FPB plates 5 are formed holds It is yielding, now, extra interval square tube can be set between two columns 2, interval square tube causes each piece of metope to be unlikely to Greatly, effect of prestressed is effectively ensured, interval square tube plays a part of web beam 3 simultaneously.
Referring to Fig. 2, the crossbeam 3 flushes with the interior outside of locating part 4.Crossbeam 3 and the fore-and-aft direction of locating part 4 are width Equal, locating part 4 keeps surfaces externally and internally smooth, so as to suitable other constructing operations with respect to crossbeam 3 neither evagination nor indent. Specifically, in the present embodiment, crossbeam 3 is zinc-plated square tube, and the specification of square tube is 150*90*8mm." L " shape sheet metal of locating part 4 41 use thickness to be process for 3mm sheet metal, and the width in its face being bonded with crossbeam 3 is 90mm, and its length is 60mm, its Highly it is 60mm.The length of " I " shape sheet metal 42 is 60mm, is highly 57mm, thickness 3mm.
Referring to Fig. 6 to Fig. 9, steel-structure factory building FPB Light trabses cracking structure constructions of the invention, including following step Suddenly:
S1., crossbeam is installed;
S2. unwrapping wire, typesetting;
S3., locating part with "u"-shaped groove and FPB plates are installed;
S4. joint treatment;
S5. plate face is fitted up.
Referring to Fig. 7, step S3, which includes S3.1 and S3.2, S3.1, to be included welding " L " shape sheet metal and crossbeam, column, step Rapid S3.2 welds " L " the shape sheet metal on " I " shape sheet metal and crossbeam, column after being included in FPB plate installations.
Also include step S3.3-S3.5 referring to Fig. 8, step S3.Step S3.3:When installing first block of FPB plate, a people is one Side is pushed, and FPB plates are contacted closely with " L " shape sheet metal, and is prized with plumb perpendicular perpendicularity, another people in lower mouth with wide opening Rod levers up, and side top margin sled, makes the gap between FPB plates jam-packed and column, is advisable with extruding mortar;After installing first block of FPB plate Precision is checked, is advisable with gap≤5mm, perpendicularity≤2mm, is used after qualified at the top of timber wedge wedging FPB plates, will be extruded with scraper Mortar strike off polishing, then start install second block of FPB plate.Step 3.4:Before installing second block of FPB plate, first at first piece Reinforcing bar is squeezed into the side of FPB plates, is then plastered in the side of first block of FPB plate.Step S3.5:When second block of FPB plate is installed, strike Break second block of FPB plate to be allowed to draw close to first block of FPB plate, and reinforcing bar is inserted into second block of FPB plate, timber wedge wedge is used after qualified At the top of tight second block of FPB plate.Follow-up FPB plates mounting means is the same as second block of FPB plate.
To last block FPB plates in the same area, i.e. the 7th block of FPB plate of rightmost in Fig. 1, when mounted, due to steel The presence of muscle 6, it is impossible to directly buckle into, it is necessary to which the first relatively other FPB plates of the 7th block of FPB plate tilt, reinforcing bar 6 submerges the 7th piece of FPB The 7th block of FPB plate is struck to other FPB plates again after plate and flushed.
Referring to Fig. 1, between the FPB plates 5, bonding mortar 8 is provided between FPB plates 5 and crossbeam 3.Using polymer bonding sand Slurry 8 fills up the gap between the gap between FPB plates 5 and FPB plates 5 and crossbeam 3, ensures that metope forms firm entirety.Accordingly Construction meet relevant criterion.Before FPB is installed first with trowel the bottom surface with the contact position crossbeam 3 of FPB plates 5, top surface, Side is smeared with the supporting polymer mortar got ready, and reality is all smeared using eight words method of plastering when plastering.After overcure, Piece surface between FPB plates 5 can form groove or gap, also have some FPB plates 5 to have breakage in mounting and adjusting Occur, it is therefore desirable to carry out secondary joint treatment.During repairing, jointing is re-started with polymer mortar, unnecessary mortar is scraped in time It is flat, for the breakage of FPB plates 5 and hole position, with polymer mortar filling-in, conserve seven days.Because FPB plates 5 produce and install Error, the gap between FPB plates 5 and crossbeam 3 is typically in the range of 30-80mm, and the gap usable polymers mortar filling is unnecessary Mortar strikes off in time, conserves seven days.
The outside of the FPB plates 5 laying steel wire, the inner side of the FPB plates 5 laying glass fiber mesh, the steel wire and glass The seam between seam, FPB plates 5 and crossbeam 3 between glass web covering FPB.Steel wire and glass fiber mesh are completely spread.By setting Steel wire and glass fiber mesh are put, further improves metope anticracking, insulation, waterproof and other effects.Steel wire and glass fibre net laying After the completion of if can directly on wall Puttying and coating, complete decoration construction.This kind of wall need not carry out wall plastering.Bonding Do not show in mortar 8, steel wire and glass fiber mesh figure.
The processing of door and window node.Reserved door-window opening wallboard is constructed according to drawing requirement, doorframe, window frame and wall board body steel column it Between welded with ironware, doorframe and wallboard gap binding agent putty plug are real, strike off, and the installation of FPB plates must not be beaten in latter week Hole digs eye, in order to avoid shaken and ftractureed between making plate because of mortar hardening time deficiency.
Hydroelectric line is installed.Because FPB plates itself are relatively thin, so heavier utensil and casing must not be installed on wall, such as: Distribution box, Fire Hose etc..But the small electronic devices such as electric switch, socket, wall lamp and pipeline can be installed.Hydroelectric facility is installed When, first slotted with cutting machine in metope, then carry out tick slot of punchinging with chisel, but must not pick logical, unavailable weight is fiercelyed attack, in order to avoid Shake bad wallboard.Pipelining completion pastes fiberglass gridding band filling-in with polymer mortar at fluting, prevents from ftractureing.
Embodiment two
The difference of embodiment two and embodiment one is that embodiment two defines the mounting means of crossbeam 3.
As shown in figure 4, the cracking structure also includes main body steel column 1, by welding on the outside of wall purlin support 7 and main body steel column 1 Column 2, the column 2 and crossbeam 3 are zinc-plated square tube, and the column 2 welds with crossbeam 3.Crossbeam 3 passes through in main body steel column 1 Upper welding column 2 carrys out fixed cross beam 3.Column 2 flushes with the outer surface of crossbeam 3, and the width of column 2 can be more than the width of crossbeam 3.Wall purlin support 7 are made using 8mm steel plates, and the spacing of upper and lower wall purlin support 7 is 1000mm.
The junction of the column 2 and crossbeam 3 is provided with locating part 4, i.e., on four corners of the metope formed by FPB plates 5 Locating part 4 is set so that the metope formed by some blocks of FPB plates 5 forms more firm overall, raising effect of prestressed.
The column 2 is provided with locating part 4, and the opening of "u"-shaped groove 40 left and right of the locating part 4 on column 2 is relative.Crossbeam 3 On locating part 4 "u"-shaped groove 40 be open it is relative up and down.In addition to locating part 4 is set on crossbeam 3, locating part 4 on column 2 The opening of "u"-shaped groove 40 left and right is relative, the FPB plates 5 of metope left and right ends is carried out spacing, can further improve effect of prestressed.
Referring to Fig. 2 to Fig. 5, wall purlin support 7 and main body steel column 1, wall purlin support 7 and column 2, column 2 and crossbeam 3, crossbeam 3 with The 9 equal full weld of weld of " L " shape sheet metal 41, " L " shape sheet metal 41 and " I " shape sheet metal 42.
Embodiment two is identical with the other structures and effect of embodiment one, will not be described here.
The foregoing is only a specific embodiment of the invention, but protection scope of the present invention is not limited thereto, and is familiar with The those skilled in the art should be understood that the present invention includes but is not limited to accompanying drawing and interior described in embodiment above Hold.The modification of any function and structure principle without departing from the present invention is intended to be included in the scope of claims.

Claims (10)

1. steel-structure factory building FPB Light trabses cracking structure constructions, it is characterised in that:Comprise the following steps:
S1., crossbeam is installed;
S2. unwrapping wire, typesetting;
S3., locating part with "u"-shaped groove and FPB plates are installed;
S4. joint treatment;
S5. plate face is fitted up.
2. steel-structure factory building FPB Light trabses cracking structure construction according to claim 1, it is characterised in that:Step In rapid S1, column is first welded on the outside of the main body steel column, the beam welding is on column;
Or in step S1, the crossbeam directly welds with main body steel column.
3. steel-structure factory building FPB Light trabses cracking structure construction according to claim 2, it is characterised in that:Step In rapid S2, unwrapping wire, typesetting are included in the welding position that locating part is marked on crossbeam, and the level interval between each welding position is 1- 2m。
4. steel-structure factory building FPB Light trabses cracking structure construction according to claim 2, it is characterised in that:Institute State locating part to be welded by " L " shape sheet metal and " I " shape sheet metal, the step of step S3 includes installation " L " shape sheet metal S3.1, after FPB plate installations install " I " shape sheet metal step S3.2.
5. steel-structure factory building FPB Light trabses cracking structure construction according to claim 4, it is characterised in that:Step Rapid S3.1 is included " L " shape sheet metal and beam welding, and step S3.2 is included in " I " shape sheet metal after FPB plate installations Welded with " L " the shape sheet metal on crossbeam;
Or step S3.1 also includes welding " L " shape sheet metal and crossbeam, column, step S3.2 is additionally included in the installation of FPB plates After the completion of " L " the shape sheet metal on " I " shape sheet metal and crossbeam, column is welded.
6. steel-structure factory building FPB Light trabses cracking structure construction according to claim 2, it is characterised in that:Step Rapid S3 includes step S3.3:When installing first block of FPB plate, a people is pushed on one side, and FPB plates are contacted tightly with " L " shape sheet metal It is close, and levered up with plumb perpendicular perpendicularity, another people in lower mouth with wide opening crow bar, side top margin sled, make FPB plates jam-packed and column Between gap, to extrude mortar;Precision is checked after installing first block of FPB plate, so that gap≤5mm, perpendicularity≤2mm, are closed The mortar of extrusion is struck off into polishing with scraper with the top of timber wedge wedging FPB plates after lattice, then starts that second block of FPB plate is installed.
7. steel-structure factory building FPB Light trabses cracking structure construction according to claim 2, it is characterised in that:Step Rapid S3 includes step S3.4:Before second block of FPB plate is installed, reinforcing bar first is squeezed into the side of first block of FPB plate, then first Plaster the side of block FPB plates;
Step S3 includes step S3.5:When second block of FPB plate is installed, beats second block of FPB plate and be allowed to lean on to first block of FPB plate Hold together, and reinforcing bar is inserted into second block of FPB plate, used after qualified at the top of second block of FPB plate of timber wedge wedging, install follow-up successively FPB plates.
8. steel-structure factory building FPB Light trabses cracking structure construction according to claim 2, it is characterised in that:Step In rapid S3, handling is carried out using hoisting machine;Before lifting, in the top of FPB plate installation sites, exterior wall scaffold is most upper horizontal together Simple crane is set up on cross bar, hoisting machine is lighter, can be moved freely as installation site changes;During lifting, on the ground FPB plates are pinioned with steel wire rope, and the hook of hoisting machine is lifted by crane after hooking steel wire rope, and vertical fortune is kept during whole FPB plates handling It is defeated;FPB plates are stopped after reaching above predetermined crossbeam, and FPB plates are placed on above crossbeam.
9. steel-structure factory building FPB Light trabses cracking structure construction according to claim 2, it is characterised in that:Step In rapid S4, after the FPB plates installation correction well in the same area, filled with polymer mortar between FPB plates and lower and upper cross-member Seam, timber wedge extraction is filled and led up with mortar after conserving a period of time, after mortar hardening, to the plate stitch of adjacent FPB plates, uses polymer Mortar re-starts jointing, and unnecessary mortar strikes off in time;To FPB plates breakage and hole position, with polymer mortar filling-in;It is right Gap between FPB plates and lower and upper cross-member, polymer mortar filling, unnecessary mortar strike off in time;A period of time is conserved after seam.
10. steel-structure factory building FPB Light trabses cracking structure construction according to claim 2, it is characterised in that:Step Rapid S5 includes exterior wall finishing and internal wall finishing;Exterior wall finishing:After FPB wall installations, steel wire is completely spread in wall face;Spread steel During silk screen, steel wire is fixed on FPB plates with staple, staple is squeezed into wallboard with nailing gun, then with anti-on metope Water putty makes ash cake, and steel wire is embedded in ash cake, paved;The Puttying construction of whole wall face is carried out after ash cake hardening; It is finally construction outer wall coating, completes decoration of exterior wall construction;
Internal wall finishing:Glass fiber mesh is completely first spread in metope, when spreading glass fiber mesh, ash cake is made with putty, web is buried Enter in ash cake, pave, the Puttying construction of whole metope is carried out after ash cake hardening, is finally construction interior wall coating, completes interior wall Decoration construction.
CN201710994434.1A 2017-10-23 2017-10-23 Steel-structure factory building FPB Light trabses cracking structure constructions Pending CN107859337A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710994434.1A CN107859337A (en) 2017-10-23 2017-10-23 Steel-structure factory building FPB Light trabses cracking structure constructions

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710994434.1A CN107859337A (en) 2017-10-23 2017-10-23 Steel-structure factory building FPB Light trabses cracking structure constructions

Publications (1)

Publication Number Publication Date
CN107859337A true CN107859337A (en) 2018-03-30

Family

ID=61696174

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710994434.1A Pending CN107859337A (en) 2017-10-23 2017-10-23 Steel-structure factory building FPB Light trabses cracking structure constructions

Country Status (1)

Country Link
CN (1) CN107859337A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115341681A (en) * 2022-07-12 2022-11-15 中国二十冶集团有限公司 Construction method for preventing ALC wallboard splicing cracks
CN115627863A (en) * 2022-12-22 2023-01-20 河北茂诺网络技术有限公司 Green steel construction building with self-adaptation compartment wall

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005188102A (en) * 2003-12-25 2005-07-14 Shimizu Corp Structure of building and construction method
CN102251606A (en) * 2011-04-26 2011-11-23 北京城建五建设工程有限公司 Outer partition wall built by adopting light concrete partition wall boards and construction method thereof
CN102777045A (en) * 2012-08-09 2012-11-14 龙信建设集团有限公司 Construction method for assembling light energy-saving composite wallboards on separation wall
CN102777041A (en) * 2012-07-27 2012-11-14 中山建华墙体材料有限公司 Installation technology of inner separation wall body

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005188102A (en) * 2003-12-25 2005-07-14 Shimizu Corp Structure of building and construction method
CN102251606A (en) * 2011-04-26 2011-11-23 北京城建五建设工程有限公司 Outer partition wall built by adopting light concrete partition wall boards and construction method thereof
CN102777041A (en) * 2012-07-27 2012-11-14 中山建华墙体材料有限公司 Installation technology of inner separation wall body
CN102777045A (en) * 2012-08-09 2012-11-14 龙信建设集团有限公司 Construction method for assembling light energy-saving composite wallboards on separation wall

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
无: "https://wenku.baidu.com/view/554435296137ee06eef9183f.html", 《HTTPS://WENKU.BAIDU.COM/VIEW/554435296137EE06EEF9183F.HTML》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115341681A (en) * 2022-07-12 2022-11-15 中国二十冶集团有限公司 Construction method for preventing ALC wallboard splicing cracks
CN115627863A (en) * 2022-12-22 2023-01-20 河北茂诺网络技术有限公司 Green steel construction building with self-adaptation compartment wall

Similar Documents

Publication Publication Date Title
CN103374986B (en) A kind of multifunction combined light weight concrete construction curtain wall and preparation method thereof
CN207538350U (en) A kind of assembled cantilever stair
CN105507476B (en) Construction method of multi-arch roof
CN103410317A (en) Construction method for site assembly and casting integral wall body by adopting wall body prefabricated part
CN211286074U (en) Self-heat-insulation system for prefabricated light high-strength foam concrete filled wallboard outer wall
CN104405062A (en) Integrated column-equipped heat preservation wallboard, production and building techniques and matched equipment
CN104947846B (en) A kind of prefabricated integral frame light filling lining and preparation method thereof
CN107401217A (en) A kind of beamless hollow floor chamber concrete-filled steel tube shear wall combined structure system and method
CN209942029U (en) Light prefabricated assembled external wall panel
CN105672664A (en) Integral heat insulation wallboard building system
CN111042392A (en) Construction method of SDHH type disassembly-free formwork foam concrete partition wall
CN108286341B (en) Anti-cracking steel mesh template structure at joint of different substrate materials and construction method using same
CN112324017A (en) Light concrete reinforcing steel bar net frame composite heat-insulation wall plate and mounting method thereof
CN118309278A (en) Novel assembled ancient building and construction process
CN107859337A (en) Steel-structure factory building FPB Light trabses cracking structure constructions
CN210117716U (en) Trapezoidal foundation ditch lateral wall concrete typical forms of elevartor shaft
CN110593440B (en) Construction method of prefabricated wall structure
CN112459307A (en) Construction method of prefabricated heat-preservation-structure integrated wall external formwork
CN209854976U (en) Assembled heat preservation brickwork wall
CN218374567U (en) Can fix a position ALC wallboard reinforced structure that can exempt from to plaster
CN204753834U (en) Partition plate of scissors stair and connection structure of floor roof beam
CN111851827A (en) Assembly type prefabricated steel bar truss disassembly-free template system and manufacturing method thereof
CN101538904B (en) Gypsum powder poured integral wall and manufacturing method thereof
CN116104224A (en) External wall heat insulation integrated gap spliced construction node and construction method
CN206070598U (en) A kind of poured band of outer wall of basement outboard template and its fixed structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180330

RJ01 Rejection of invention patent application after publication