CN107227813A CN201710629734.XA CN201710629734A CN107227813A CN 107227813 A CN107227813 A CN 107227813A CN 201710629734 A CN201710629734 A CN 201710629734A CN 107227813 A CN107227813 A CN 107227813A
Authority
CN
China
Prior art keywords
brick
curtain wall
stones
laying bricks
keel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710629734.XA
Other languages
Chinese (zh)
Other versions
CN107227813B (en
Inventor
王学民
邹立鹏
陈禄阳
张勇
孔祥鹏
李柯
朱嘉惠
蒋鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING LIUJIAN CONSTRUCTION GROUP Co Ltd
Original Assignee
BEIJING LIUJIAN CONSTRUCTION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING LIUJIAN CONSTRUCTION GROUP Co Ltd filed Critical BEIJING LIUJIAN CONSTRUCTION GROUP Co Ltd
Priority to CN201710629734.XA priority Critical patent/CN107227813B/en
Publication of CN107227813A publication Critical patent/CN107227813A/en
Application granted granted Critical
Publication of CN107227813B publication Critical patent/CN107227813B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/96Curtain walls comprising panels attached to the structure through mullions or transoms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/96Curtain walls comprising panels attached to the structure through mullions or transoms
    • E04B2/965Connections of mullions and transoms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Load-Bearing And Curtain Walls (AREA)
  • Floor Finish (AREA)
  • Finishing Walls (AREA)

Abstract

The present invention provides a kind of steel structure keel and builds the outer Curtain Wall of brick and its construction method by laying bricks or stones, and the curtain skeleton of Curtain Wall therein includes the cross-brace angle steel and primary and secondary skeletal frame of elongated setting;Curtain wall is clear water brick curtain wall, and the part that its bottom is located at below bottom cross-brace angle steel is built by laying bricks or stones on agent structure plate or agent structure bracket, and remainder is laid on cross-brace angle steel;Curtain wall sets low inside and high outside apron flashing close to bottom position;Interleaved sets horizontal restraint bar-mat reinforcement in curtain wall;Form air blanketing between curtain wall and agent structure exterior wall, the part of the bottom of air blanketing under apron flashing is real with cement mortar grouting.Brick setting of the present invention is combined with curtain skeleton system, effectively solves to build ratio of height to thickness and Stability Analysis of Structures sex chromosome mosaicism by laying bricks or stones;Air blanketing plays insulation and logical wind action, so as to reach the purpose of building energy conservation;Set multi layer waterproof to construct, reduce the clear water brick curtain wall accumulation of salt in the surface soil and agent structure external wall seepage phenomenon.

Description

A kind of steel structure keel builds the outer Curtain Wall of brick and its construction method by laying bricks or stones
Technical field
The present invention relates to building curtain wall technical field of construction, and in particular to a kind of steel structure keel builds the outer Curtain Wall of brick by laying bricks or stones And its construction method, it is adaptable to multi-rise building curtain wall.
Background technology
As science and technology produces rapid advancement, China's Architectural plurality development, increasing European style building is contemporary Compatriots are received, wherein the common brick style Buildings of the Dark Ages, and thickness is relatively large, build height by laying bricks or stones due to building by laying bricks or stones for its exterior wall It is short, if according to its traditional brick-building art, being difficult to meet modern European Architecture and each side such as space, height, energy-conservation having been wanted Ask, the outer curtain wall building construction method of clear water brick is solved reduces the texture that European allusion is built by laying bricks or stones with modern construction technique, both full The long-term structural stability under violent typhoon in foot south China area, in terms of again serving modern architecture to space, energy-conservation Demand, a kind of its decoration of exterior wall construction method for being combined traditional brick-building art with curtain wall support system ensureing outer While wall decorative effect, the stability and building energy conservation of whole external wall system have been taken into account again, are more preferably applied to typhoon and are taken place frequently ground Area, multi-rise building and the European classical architecture style of use etc. are needed using clear water brick masonry curtain wall as decoration of exterior wall Architectural engineering, it can also be used to other outer curtain wall masonry projects of aspect clear water brick.
But at present, the use of clear water brick curtain wall is typically limited to only low-rise building, for multi-rise building, because it is in knot Require higher in terms of structure and intensity, the structure and construction technology of existing clear water brick curtain wall, which are difficult to meet, to be required.
The content of the invention
Curtain Wall and its construction method outside brick are built by laying bricks or stones it is an object of the invention to provide a kind of steel structure keel, using biography The brick building technology of clear water of system is combined as decoration of exterior wall with curtain skeleton system, ensures the stabilization of whole external wall system with this Property, and reach the effect of building energy conservation.
To achieve the above object, the present invention uses following construction technical schemes:
A kind of steel structure keel builds the outer Curtain Wall of brick by laying bricks or stones, outside agent structure exterior wall, including curtain skeleton and curtain wall, its It is characterised by:
The curtain skeleton includes support keel and fixed keel, and the support keel includes about one group spaced transverse direction Support angle steel, the cross-brace angle steel is elongated to be set, and it is connected by the slugging outside adaptor one and agent structure within the walls Connect;The fixed keel include close to the vertically arranged main joist of inner side main body structure outer and are laterally located between main joist Secondary joist, the main joist is connected by adaptor two with the slugging outside agent structure within the walls, and the secondary joist is by turning Fitting three and main joist bolt connection are welded to connect;
The curtain wall is clear water brick curtain wall, and the part that its bottom is located at below bottom cross-brace angle steel is built by laying bricks or stones in agent structure On plate or agent structure bracket, remainder is laid on cross-brace angle steel;Curtain wall sets interior high outer close to bottom position Low apron flashing, the medial extremity of the apron flashing is fixed on agent structure exterior wall, and outside is stretched between two layers of clear water brick;It is located at Osculum is arranged at intervals in one layer of clear water brick layer on the apron flashing;Also interleaved sets horizontal restraint steel in the curtain wall Muscle net, the horizontal restraint bar-mat reinforcement passes through tension member and fixed keel bolt connection;
Form air blanketing between the curtain wall and agent structure exterior wall, the portion of the bottom of the air blanketing under apron flashing Divide real with cement mortar grouting.
As the preferred technical solution of the present invention, the distance that neighbouring two layers of the cross-brace angle steel is not more than 3m; The main joist uses coating steel pipe, adjacent two main joist spacing 500mm;The secondary joist uses aluminum corner brace, neighbouring two Level keel spacing is that eight skin bricks are thick.
It is further preferred that the adaptor one, adaptor two or adaptor three are L-shaped angle steel or corner brace;The level It is prefabricated stainless steel workpiece to constrain bar-mat reinforcement and its tension member, and both use bayonet connection.
It is further preferred that the apron flashing is located on the skin brick of bottom three, every two pieces of brick perps of the 4th skin brick do not crouch Slurry forms osculum.
It is further preferred that being pasted with waterproof ventilated membrane on the apron flashing.
It is further preferred that the horizontal restraint net is laid together at interval of four skin bricks are elongated up and down in curtain wall, level The maximum spacing of two, direction tension member is 500mm, and adjacent levels are staggered.
It is further preferred that the thickness range of the air blanketing is not less than 120mm.
It is further preferred that when curtain wall length is more than 12m, the stretching using mortar joint one of up/down perforation of setting in curtain wall Contracting seam, the expansion joint setting is on rear side of rain pipe, and perps and flush joint at expansion joint, which do not crouch, to be starched, using silicone weatherproof sealant Plus jointing agent filling.
In addition, the present invention also provides the building method that above-mentioned steel structure keel builds the outer Curtain Wall of brick by laying bricks or stones, it is characterised in that Comprise the following steps:
Step one:Material prepares:Preparation and processing including clear water brick, cement mortar and keel;
Step 2:The installation of cross-brace angle steel:Its laterally elongated setting, passes through the embedded part of adaptor one and agent structure exterior wall Fixed, spacing is not more than 3m between its levels;
Step 3:The installation of main joist:Main joist is vertically arranged at intervals, and is welded and connected by adaptor two with agent structure exterior wall Connect, such as cross-brace angle steel during installation, then main joist is interrupted;
Step 4:Secondary joist is installed:Secondary joist is horizontally installed between main joist, and the bolt connection of adaptor three is passed through with main joist Or be welded to connect;
Step 5:Brick is selected in color separation on request:Brick wall should first carry out color separation and select brick if any color separation requirement;
Step 6:Bottom curtain wall construction:Build by laying bricks or stones in agent structure plate the part that curtain wall is located at below bottom cross-brace angle steel Or on agent structure bracket, after three skin brick masonries, the air blanketing cement mortar grouting formed between agent structure exterior wall It is real, form low inside and high outside drainage slope;
Step 7: the installation of apron flashing:Laid on the cement mortar slope for filling real and paste waterproof and breathable on apron flashing, apron flashing With agent structure exterior wall fixation on the inside of film, apron flashing, outside is laid to the 3rd skin brick;
Step 8: the setting of osculum:When a skin brick on apron flashing is the 4th skin brick, every two pieces of brick perps do not crouch and starched, Form osculum;
Step 9: follow-up large area brick masonry:In addition to bottom brick masonry is on structural slab, other bricks are built by laying bricks or stones at cross-brace angle On steel, one of horizontal restraint bar-mat reinforcement of every elongated laying of four skins brick in clear water brick curtain wall, horizontal restraint bar-mat reinforcement passes through staggeredly The tension member of arrangement and fixed keel bolt connection, angle position using cutting, bend by the way of ensure its continuity;
Step 10:Lime mortar-chalked joint:With block, with seam is drawn when building by laying bricks or stones, it is 8-10mm or so to draw a seam depth, and the depth is consistent, finally With lime mortar-chalked joint agent jointing;
Step 11:Waterproofing protection agent brushing:The outer curtain of brick is built in the brushing waterproofing protection agent outside curtain wall, so far, steel structure keel by laying bricks or stones Wall system builds completion by laying bricks or stones.
Wherein, when the length of curtain wall is more than 12m, after step 9, set in curtain wall using mortar joint above and below together The expansion joint of insertion, the expansion joint position is arranged on rear side of rain pipe, and the perps and flush joint at expansion joint, which do not crouch, to be starched, using silicon Ketone weather proofing sealant adds jointing agent to fill.
The present invention compared with prior art, has the following technical effect that:
1st, clear water brick masonry of the present invention with agent structure exterior wall(Reinforced concrete shear wall or secondary masonry wall)The dragon of connection Diaphysis is fastened, and brick setting is combined with curtain skeleton system, can effectively solve to build ratio of height to thickness and Stability Analysis of Structures sex chromosome mosaicism by laying bricks or stones;
2nd, air blanketing is formed between clear water brick curtain wall and agent structure exterior wall of the present invention, plays insulation and the work of ventilation With so as to reach the purpose of building energy conservation;
3rd, the present invention sets multiple tracks on the outside of clear water brick curtain wall, on the outside of agent structure exterior wall and at curtain skeleton system interdependent node Water proof structure, reduces the clear water brick curtain wall accumulation of salt in the surface soil and agent structure external wall seepage phenomenon.
Brief description of the drawings
By the detailed description made in conjunction with the following drawings, above-mentioned and/or other aspects of the invention and advantage will become Become apparent from and be easier to understand, these accompanying drawings are schematical, are not intended to limit the present invention, wherein:
Fig. 1 is cross-brace angle steel scheme of installation of the present invention;
Fig. 2 is main joist scheme of installation of the present invention;
Fig. 3 is osculum set location elevational schematic view of the present invention;
Fig. 4 is apron flashing scheme of installation of the present invention;
Fig. 5 is that the position at expansion joint of the present invention sets schematic diagram;
Fig. 6 is the connection diagram of horizontal restraint net of the present invention and tension member and primary and secondary skeletal frame;
Fig. 7 is the cross-sectional view of A-A in Fig. 6;
Fig. 8 is the point position arrangement schematic diagram of tension member of the present invention.
Reference:1- agent structures exterior wall, 1.1- embedded parts, 2- curtain skeletons, 2.1- cross-braces angle steel, 2.2- switchings Part one, 2.3- main joists, 2.4- secondary joists, 2.5- adaptors two, 2.6- adaptors three, 3- curtain walls, 3.1- clear water brick, 3.2- rows Water hole, 3.3- expansion joints, 4- apron flashings, 5- air blanketings, 6- cement mortar, 7- horizontal restraints bar-mat reinforcement, 8- tension members, 9- rain Water pipe.
Embodiment
Hereinafter, a kind of steel structure keel that the present invention is described with reference to the accompanying drawings builds the outer Curtain Wall of brick and its construction by laying bricks or stones The embodiment of method.The embodiment recorded herein is the specific embodiment of the present invention, the structure for illustrating the present invention Think, be explanatory and exemplary, should not be construed as the limitation to embodiment of the present invention and the scope of the invention.Except remembering herein The implementation exception of load, those skilled in the art can also be used based on the application claims and specification disclosure of that Obvious other technical schemes, these technical schemes include making any aobvious and easy using the embodiment to recording herein The technical scheme for the substitutions and modifications seen.The accompanying drawing of this specification is schematic diagram, aids in illustrating the design of the present invention, schematically Represent the shape and its correlation of each several part.It note that clearly to show each part of the embodiment of the present invention Structure, do not drawn according to identical ratio between each accompanying drawing.Identical reference marker is used to represent identical part.Below The principle and feature of the present invention are described with reference to accompanying drawing, the given examples are served only to explain the present invention, are not intended to limit this The scope of invention.
Such as Fig. 1-8, steel structure keel of the invention builds the outer Curtain Wall of brick by laying bricks or stones, outside agent structure exterior wall 1, including Curtain skeleton 2 and curtain wall 3, it is characterised in that:Curtain skeleton 2 includes support keel and fixed keel, and support keel includes one group Spaced cross-brace angle steel 2.1 up and down, cross-brace angle steel 2.1 is elongated to be set, and neighbouring two layers of distance is little In 3m;It is welded to connect by adaptor 1 with the embedded part 1.1 outside agent structure within the walls, as shown in Figure 1;Fixed keel bag Include close to the vertically arranged main joist 2.3 of inner side main body structure outer 1 and the secondary joist 2.4 being laterally located between main joist 2.3, Main joist 2.3 is welded to connect by adaptor 2 2.5 with the embedded part 1.1 outside agent structure within the walls, and secondary joist 2.4 passes through adaptor 3 2.6 with the bolt connection of main joist 2.3 or being welded to connect, as shown in Fig. 2, Fig. 6 and Fig. 7;Main joist 2.3 uses coating steel pipe, The adjacent spacing 500mm of two main joists 2.3;Secondary joist 2.4 uses aluminum corner brace, and the neighbouring spacing of two layers of secondary joist 2.4 is eight skins Brick is thick, and adaptor 1, adaptor 2 2.5 or adaptor 3 2.6 are L-shaped angle steel or corner brace.
Curtain wall 3 is clear water brick curtain wall, and its bottom is built by laying bricks or stones in main body positioned at part of the bottom cross-brace angle steel below 2.1 On structural slab or agent structure bracket, remainder is laid on cross-brace angle steel 2.1;Curtain wall is set close to bottom position Waterproof ventilated membrane is pasted with low inside and high outside apron flashing 4, apron flashing 4, the medial extremity of apron flashing 4 is fixed on agent structure exterior wall On 1, outside is stretched between two layers of clear water brick 3.1, such as Fig. 4;It is arranged at intervals in 3.1 layers of one layer of clear water brick on apron flashing 4 Osculum 3.2;Also be arranged at intervals horizontal restraint bar-mat reinforcement 7 in curtain wall 3, horizontal restraint bar-mat reinforcement 7 in curtain wall 3 up and down at interval of Together, the maximum spacing of two tension members 8 of horizontal direction is 500mm to the elongated laying of four skin bricks, and adjacent levels are staggered, water Flat constraint bar-mat reinforcement 7 passes through tension member 8 and fixed keel bolt connection, such as Fig. 6~Fig. 8.Horizontal restraint bar-mat reinforcement 7 and its drawknot Part 8 is prefabricated stainless steel workpiece, and both use bayonet connection;Apron flashing 4 is located on the skin brick of bottom three, the 4th skin brick The not sleeping slurry of every two pieces of brick perps forms osculum 3.2, as shown in Figure 3.
Such as Fig. 4, air blanketing 5 is formed between curtain wall 3 and agent structure exterior wall 1, the thickness range of air blanketing 5 is not less than 120mm.Part cement mortar 6 of the bottom of air blanketing 5 under apron flashing 4 fills real.
In addition, such as Fig. 5, when the length of curtain wall 3 is more than 12m, the stretching using mortar joint one of up/down perforation of setting in curtain wall 3 Contracting seam 3.3, the perps and flush joint that expansion joint 3.3 is arranged at the rear side of rain pipe 9, expansion joint 3.3, which do not crouch, to be starched, using silicone weather resistant Fluid sealant adds jointing agent to fill.
During construction, following steps are specifically included:
Step one:Material prepares:Clear water brick 3.1, cement mortar 6, galvanized steel, aluminium alloy extrusions, stainless steel including sintering The preparation and processing of the materials such as material, waterproof ventilated membrane, bolt, welding rod, insulation spacer, anticorrosive paint, silicone weatherproof sealant.
Step 2:Cross-brace angle steel 2.1 is installed:Pass through embedded part 1.1 on agent structure exterior wall 1(Built-in fitting is rearmounted Embedded part)Cross-brace angle steel 2.1 is installed, elongated to set, the interlayer spacing of cross-brace angle steel is not more than 3m;Cross-brace angle steel 2.1 are connected with the embedded part 1.1 of agent structure exterior wall 1 by L-type adaptor, and adaptor, using being welded to connect, turns with structure embedded part Fitting is also used with cross-brace angle steel 2.1 and is welded to connect;
Step 3:Main joist 2.3 is installed:Brick key keel of curtain wall 2.3 is vertical, using coating steel pipe, main joist spacing 500mm, Main joist 2.3 is connected with agent structure exterior wall 1 by L-type connector, and L-type connector is used with embedded part 1.1 and is welded to connect, L-type Connector is used clamping bolts or welded connection with main joist 2.3, such as cross-brace angle 2.1 when main joist 2.3 is installed, is then led Keel are interrupted;
Step 4:Secondary joist 2.4 is installed:Brick secondary joist of curtain wall 2.4 is horizontal, using aluminum corner brace, secondary joist spacing 560mm(Eight skins Brick is thick), it is arranged between main joist, secondary joist 2.4 is attached with main joist 2.3 by corner brace connector, and connected mode is adopted It is connected with or is welded to connect;
Step 5:Bottom brick masonry, the installation of apron flashing 4 and the setting of osculum 3.2:Brick wall, should be advanced if any color separation requirement Brick is selected in row color separation, is chosen and is carried out building by laying bricks or stones for bottom brick after brick first, and brick is from the agent structure plate at basement roof(Or body junction Structure bracket)Build by laying bricks or stones upwards, after the skin brick masonry of bottom three, the air blanketing 5 formed between agent structure exterior wall 1(Thickness >= 120mm)Fill real with cement mortar 6, and form low inside and high outside drainage slope, stainless steel is laid in the cement mortar 6 for filling real Waterproof ventilated membrane is pasted on the apron flashing 4 of material, apron flashing 4 again fixed thereto, the inner side of apron flashing 4 is consolidated with agent structure exterior wall 1 Fixed firm, outside is laid to the 3rd skin brick;Osculum 3.2 is set when building the 4th skin brick by laying bricks or stones, and osculum 3.2 uses every two pieces The mode of the not sleeping slurry of brick perps;
Step 6:Large area brick masonry:In addition to bottom brick masonry is on structural slab, other bricks are built by laying bricks or stones in cross-brace angle steel 2 On.Build plain brick wall by laying bricks or stones and be not provided with collar tie beam and constructional column, horizontal restraint bar-mat reinforcement 7, horizontal restraint bar-mat reinforcement 7 and its drawing are only set Tie part 8 and use prefabricated stainless steel workpiece, horizontal restraint bar-mat reinforcement 7 uses bayonet connection, horizontal restraint reinforcing bar with its tension member 8 The every elongated laying of four skins brick in brick wall of net 7 together, is attached, preferably connection side with primary and secondary skeletal frame by horizontal tension member 8 Formula is bolt connection, and the maximum horizontal spacing of tension member 8 is 500mm, is evenly arranged on main joist 2.3 and secondary joist 2.4, on Lower floor interlocks, wherein, horizontal restraint bar-mat reinforcement 7 is in angle position in use, should ensure that it connects by the way of cutting, bending Continuous property;
Step 7:Expansion joint 3.3(Temperature joint)Processing:When masonry panel length is more than 12m, it need to be set using mortar joint on together The expansion joint 3.3 of lower insertion, the position of expansion joint 3.3, which is tried one's best, to be arranged on rear side of rain pipe and the shorter position of wall facade, is stretched Perps and flush joint at seam, which do not crouch, to be starched, using the processing mode of fluid sealant plus jointing agent;
Step 8:Lime mortar-chalked joint:Should be with block, with seam is drawn when building by laying bricks or stones, it is 8-10mm or so to draw a seam depth, and the depth is consistent, most Use lime mortar-chalked joint agent jointing again afterwards;
Step 9:Waterproofing protection agent brushing:After clear water metope is cleaned out, and ensure that brick wall is dried and fine situation Under, brushing Waterproof protective agent makes whole brick wall impermeable, reduces accumulation of salt in the surface soil hidden danger.So far, steel structure keel is built by laying bricks or stones outside brick Curtain Wall builds completion by laying bricks or stones.
The foregoing is only presently preferred embodiments of the present invention, be not intended to limit the invention, it is all the present invention spirit and Within principle, any modification, equivalent substitution and improvements made etc. should be included in the scope of the protection.

Claims (10)

1. a kind of steel structure keel builds the outer Curtain Wall of brick by laying bricks or stones, located at agent structure exterior wall(1)Outside, including curtain skeleton(2) And curtain wall(3), it is characterised in that:
The curtain skeleton(2)Including support keel and fixed keel, the support keel is spaced including about one group Cross-brace angle steel(2.1), the cross-brace angle steel(2.1)Elongated to set, it passes through adaptor one(2.2)With agent structure Outer embedded part within the walls(1.1)It is welded to connect;The fixed keel are included close to inner side main body structure outer(1)Vertically arranged master Keel(2.3)Main joist is located at horizontal(2.3)Between secondary joist(2.4), the main joist(2.3)Pass through adaptor two (2.5)With the embedded part outside agent structure within the walls(1.1)It is welded to connect, the secondary joist(2.4)Pass through adaptor three(2.6)With master Keel(2.3)Bolt connection is welded to connect;
The curtain wall(3)For clear water brick curtain wall, its bottom is located at bottom cross-brace angle steel(2.1)Following part build by laying bricks or stones in On agent structure plate or agent structure bracket, remainder is laid on cross-brace angle steel(2.1)On;Curtain wall is close to bottom Position sets low inside and high outside apron flashing(4), the apron flashing(4)Medial extremity be fixed on agent structure exterior wall(1)On, outside is stretched Enter two layers of clear water brick(3.1)Between;Located at the apron flashing(4)On one layer of clear water brick(3.1)Osculum is arranged at intervals in layer (3.2);The curtain wall(3)Interior also interleaved sets horizontal restraint bar-mat reinforcement(7), the horizontal restraint bar-mat reinforcement(7)Pass through Tension member(8)With fixed keel bolt connection;
The curtain wall(3)With agent structure exterior wall(1)Between form air blanketing(5), the air blanketing(5)Bottom draping over one's shoulders Water plate(4)Under part cement mortar(6)Fill real.
2. a kind of steel structure keel according to claim 1 builds the outer Curtain Wall of brick by laying bricks or stones, it is characterised in that:The laterally branch Support angle steel(2.1)Neighbouring two layers of distance is not more than 3m;The main joist(2.3)Using coating steel pipe, adjacent two masters Keel(2.3)Spacing 500mm;The secondary joist(2.4)Using aluminum corner brace, neighbouring two layers of secondary joist(2.4)Spacing is eight skins Brick is thick.
3. a kind of steel structure keel according to claim 1 builds the outer Curtain Wall of brick by laying bricks or stones, it is characterised in that:The adaptor One(2.2), adaptor two(2.5)Or adaptor three(2.6)For L-shaped angle steel or corner brace;The horizontal restraint bar-mat reinforcement(7)And its Tension member(8)It is prefabricated stainless steel workpiece, both use bayonet connection.
4. a kind of steel structure keel according to claim 1 builds the outer Curtain Wall of brick by laying bricks or stones, it is characterised in that:The apron flashing (4)It is located on the skin brick of bottom three, the not sleeping slurry of every two pieces of brick perps of the 4th skin brick forms osculum(3.2).
5. a kind of steel structure keel according to claim 1 builds the outer Curtain Wall of brick by laying bricks or stones, it is characterised in that:The apron flashing (4)On be pasted with waterproof ventilated membrane.
6. a kind of steel structure keel according to claim 1 builds the outer Curtain Wall of brick by laying bricks or stones, it is characterised in that:The level is about Beam net is in curtain wall(3)It is interior to be laid together at interval of four skin bricks are elongated up and down, two tension members of horizontal direction(8)Maximum spacing be 500mm, adjacent levels are staggered.
7. a kind of steel structure keel according to claim 1 builds the outer Curtain Wall of brick by laying bricks or stones, it is characterised in that:The air folder Layer(5)Thickness range be not less than 120mm.
8. a kind of steel structure keel according to claim 1~7 any one builds Curtain Wall outside brick by laying bricks or stones, its feature exists In:Work as curtain wall(3)When length is more than 12m, in curtain wall(3)Interior utilization mortar joint sets the expansion joint of one of up/down perforation(3.3), institute State expansion joint(3.3)It is arranged on rain pipe(9)Rear side, expansion joint(3.3)The perps and flush joint at place do not crouch and starched, using silicone weather resistant Fluid sealant adds jointing agent to fill.
9. the steel structure keel described in a kind of claim 8 builds the building method of the outer Curtain Wall of brick by laying bricks or stones, it is characterised in that including Following steps:
Step one:Material prepares:Including clear water brick(3.1), cement mortar(6)And the preparation and processing of keel;
Step 2:Cross-brace angle steel(2.1)Installation:Its laterally elongated setting, passes through adaptor one(2.2)With agent structure Exterior wall(1)Embedded part(1.1)Fixed, spacing is not more than 3m between its levels;
Step 3:Main joist(2.3)Installation:Main joist(2.3)It is vertical to be arranged at intervals, with agent structure exterior wall(1)By turning Fitting two(2.5)It is welded to connect, such as cross-brace angle steel during installation(1), then main joist(2.3)Interrupt;
Step 4:Secondary joist(2.4)Install:Secondary joist(2.4)It is horizontally installed between main joist, with main joist(2.3)Pass through Adaptor three(2.6)Bolt connection or welding;
Step 5:Brick is selected in color separation on request:Brick wall should first carry out color separation and select brick if any color separation requirement;
Step 6:Bottom curtain wall construction:Curtain wall is located at bottom cross-brace angle steel(2.1)Build by laying bricks or stones in body junction following part On structure plate or agent structure bracket, after three skin brick masonries, with agent structure exterior wall(1)Between the air blanketing that is formed(5)With Cement mortar(6)Fill real, form low inside and high outside drainage slope;
Step 7: apron flashing(4)Installation:Filling real cement mortar(6)Apron flashing is laid on slope(4), apron flashing(4)On Paste on the inside of waterproof ventilated membrane, apron flashing and agent structure exterior wall(1)Lay to the 3rd skin brick in fixation, outside;
Step 8: osculum(3.2)Setting:In apron flashing(4)On skin brick when being the 4th skin brick, every two pieces of brick perps Do not crouch slurry, forms osculum;
Step 9: follow-up large area brick masonry:In addition to bottom brick masonry is on structural slab, other bricks are built by laying bricks or stones at cross-brace angle Steel(2.1)On, one of horizontal restraint bar-mat reinforcement of every elongated laying of four skins brick in clear water brick curtain wall(7), horizontal restraint bar-mat reinforcement (7)Pass through the tension member of interlaced arrangement(8)With fixed keel bolt connection, angle position using cutting, bend by the way of come Ensure its continuity;
Step 10:Lime mortar-chalked joint:With block, with seam is drawn when building by laying bricks or stones, it is 8-10mm or so to draw a seam depth, and the depth is consistent, finally With lime mortar-chalked joint agent jointing;
Step 11:Waterproofing protection agent brushing:In curtain wall(1)Outer brushing waterproofing protection agent, so far, steel structure keel is built by laying bricks or stones outside brick Curtain Wall builds completion by laying bricks or stones.
10. steel structure keel according to claim 9 builds the building method of the outer Curtain Wall of brick by laying bricks or stones, it is characterised in that:When Curtain wall(1)Length more than 12m when, after step 9, in curtain wall using mortar joint set one of up/down perforation expansion joint (3.3), the expansion joint(3.3)Position is arranged on rain pipe(9)Perps and flush joint at rear side, expansion joint, which do not crouch, to be starched, and is used Silicone weatherproof sealant adds jointing agent to fill.
CN201710629734.XA 2017-07-28 2017-07-28 Steel structure keel masonry brick outer curtain wall system and construction method thereof Active CN107227813B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710629734.XA CN107227813B (en) 2017-07-28 2017-07-28 Steel structure keel masonry brick outer curtain wall system and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710629734.XA CN107227813B (en) 2017-07-28 2017-07-28 Steel structure keel masonry brick outer curtain wall system and construction method thereof

Publications (2)

Publication Number Publication Date
CN107227813A true CN107227813A (en) 2017-10-03
CN107227813B CN107227813B (en) 2023-04-07

Family

ID=59956193

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710629734.XA Active CN107227813B (en) 2017-07-28 2017-07-28 Steel structure keel masonry brick outer curtain wall system and construction method thereof

Country Status (1)

Country Link
CN (1) CN107227813B (en)

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107905415A (en) * 2017-10-27 2018-04-13 上海市建筑装饰工程集团有限公司 The construction method of concrete brick curtain wall
CN108343181A (en) * 2018-01-13 2018-07-31 银广厦集团有限公司 A kind of novel clay brick exterior wall and construction method
CN108385882A (en) * 2018-01-25 2018-08-10 广州珠江工程建设监理有限公司 A kind of bridging method of large size keel drawknot stone material
CN109162418A (en) * 2018-10-25 2019-01-08 宁波建工建乐工程有限公司 Porous brick external decoration wall cladding system
CN109763591A (en) * 2019-01-08 2019-05-17 深圳市瑞图工程咨询有限公司 Brick external wall decoration structure and its construction method
CN109881815A (en) * 2019-04-10 2019-06-14 苏州金螳螂建筑装饰股份有限公司 Three color brick walls of one kind build mounting structure and its construction method
CN110005103A (en) * 2019-04-28 2019-07-12 天津三建建筑工程有限公司 A kind of metallic framework system is set to the construction method of the brick curtain wall of clear water
CN110130550A (en) * 2019-05-31 2019-08-16 中建东方装饰有限公司 The dried hanging hang structure and its construction method of assembled hollow out earthenware brick curtain wall
CN110295699A (en) * 2019-08-01 2019-10-01 北京城建六建设集团有限公司 A kind of imitation wood line aluminum facade structure and its construction method
CN110453808A (en) * 2019-09-11 2019-11-15 金螳螂精装科技(苏州)有限公司 A kind of scale of construction blues brick wall masonry construction and method
CN110512780A (en) * 2019-09-05 2019-11-29 上海市房地产科学研究院(上海市住宅修缮工程质量检测中心) A kind of masonry formula earthenware brick facade system and its construction technology
CN110512779A (en) * 2019-09-05 2019-11-29 上海市房地产科学研究院(上海市住宅修缮工程质量检测中心) A kind of steel skeleton and its construction technology
CN111236467A (en) * 2020-01-08 2020-06-05 鸿厦建设有限公司 Construction method for one-step forming of steel structure and masonry
CN111719794A (en) * 2020-07-14 2020-09-29 安徽人禾建筑节能科技有限公司 Unit type heat-preservation and decoration integrated plate outer wall system of metal panel
CN111894185A (en) * 2020-07-30 2020-11-06 中国建筑一局(集团)有限公司 Ceramic brick outer vertical surface masonry curtain wall and construction method thereof
CN112302220A (en) * 2020-10-10 2021-02-02 龙信建设集团有限公司 Construction method for combining external decoration clean water brick curtain wall with hanging and building
CN112726898A (en) * 2020-12-24 2021-04-30 上海建工集团股份有限公司 Water-proof heat-insulating system for exposed brick exterior wall and construction method
CN113585489A (en) * 2021-08-25 2021-11-02 中建八局南方建设有限公司 Connecting structure of ceramic brick curtain wall and construction method thereof
CN113775090A (en) * 2021-07-22 2021-12-10 中铁四局集团有限公司 Archaized plain brick curtain wall supporting structure and method
CN114876111A (en) * 2022-05-13 2022-08-09 苏州金螳螂幕墙有限公司 Mounting method of assembled masonry stone curtain wall

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0470814A1 (en) * 1990-08-07 1992-02-12 Kajima Corporation Tile-supporting tool, tiled wall structure and tiled curtain wall
CN202658762U (en) * 2012-06-18 2013-01-09 中国建筑第六工程局有限公司 Rinsing sandwich compound heat-insulating wall structure
CN104727466A (en) * 2014-05-16 2015-06-24 蒋卫国 Bolt type and steel bar type curtain wall brick outer wall
CN205475922U (en) * 2016-01-29 2016-08-17 北京地平线装饰材料有限责任公司 A plain brick wall for high -rise building outer wall decoration usefulness
CN106592812A (en) * 2016-12-09 2017-04-26 广西建工集团第五建筑工程有限责任公司 Construction method for in-situ processing and polishing bricks and constructing plain brick wall
CN207092318U (en) * 2017-07-28 2018-03-13 北京六建集团有限责任公司 A kind of steel structure keel builds the outer Curtain Wall of brick by laying bricks or stones

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0470814A1 (en) * 1990-08-07 1992-02-12 Kajima Corporation Tile-supporting tool, tiled wall structure and tiled curtain wall
CN202658762U (en) * 2012-06-18 2013-01-09 中国建筑第六工程局有限公司 Rinsing sandwich compound heat-insulating wall structure
CN104727466A (en) * 2014-05-16 2015-06-24 蒋卫国 Bolt type and steel bar type curtain wall brick outer wall
CN205475922U (en) * 2016-01-29 2016-08-17 北京地平线装饰材料有限责任公司 A plain brick wall for high -rise building outer wall decoration usefulness
CN106592812A (en) * 2016-12-09 2017-04-26 广西建工集团第五建筑工程有限责任公司 Construction method for in-situ processing and polishing bricks and constructing plain brick wall
CN207092318U (en) * 2017-07-28 2018-03-13 北京六建集团有限责任公司 A kind of steel structure keel builds the outer Curtain Wall of brick by laying bricks or stones

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107905415A (en) * 2017-10-27 2018-04-13 上海市建筑装饰工程集团有限公司 The construction method of concrete brick curtain wall
CN108343181A (en) * 2018-01-13 2018-07-31 银广厦集团有限公司 A kind of novel clay brick exterior wall and construction method
CN108385882A (en) * 2018-01-25 2018-08-10 广州珠江工程建设监理有限公司 A kind of bridging method of large size keel drawknot stone material
CN109162418A (en) * 2018-10-25 2019-01-08 宁波建工建乐工程有限公司 Porous brick external decoration wall cladding system
CN109763591A (en) * 2019-01-08 2019-05-17 深圳市瑞图工程咨询有限公司 Brick external wall decoration structure and its construction method
CN109881815A (en) * 2019-04-10 2019-06-14 苏州金螳螂建筑装饰股份有限公司 Three color brick walls of one kind build mounting structure and its construction method
CN110005103A (en) * 2019-04-28 2019-07-12 天津三建建筑工程有限公司 A kind of metallic framework system is set to the construction method of the brick curtain wall of clear water
CN110130550A (en) * 2019-05-31 2019-08-16 中建东方装饰有限公司 The dried hanging hang structure and its construction method of assembled hollow out earthenware brick curtain wall
CN110295699A (en) * 2019-08-01 2019-10-01 北京城建六建设集团有限公司 A kind of imitation wood line aluminum facade structure and its construction method
CN110512780A (en) * 2019-09-05 2019-11-29 上海市房地产科学研究院(上海市住宅修缮工程质量检测中心) A kind of masonry formula earthenware brick facade system and its construction technology
CN110512779A (en) * 2019-09-05 2019-11-29 上海市房地产科学研究院(上海市住宅修缮工程质量检测中心) A kind of steel skeleton and its construction technology
CN110453808A (en) * 2019-09-11 2019-11-15 金螳螂精装科技(苏州)有限公司 A kind of scale of construction blues brick wall masonry construction and method
CN111236467A (en) * 2020-01-08 2020-06-05 鸿厦建设有限公司 Construction method for one-step forming of steel structure and masonry
CN111719794A (en) * 2020-07-14 2020-09-29 安徽人禾建筑节能科技有限公司 Unit type heat-preservation and decoration integrated plate outer wall system of metal panel
CN111894185A (en) * 2020-07-30 2020-11-06 中国建筑一局(集团)有限公司 Ceramic brick outer vertical surface masonry curtain wall and construction method thereof
CN112302220A (en) * 2020-10-10 2021-02-02 龙信建设集团有限公司 Construction method for combining external decoration clean water brick curtain wall with hanging and building
CN112726898A (en) * 2020-12-24 2021-04-30 上海建工集团股份有限公司 Water-proof heat-insulating system for exposed brick exterior wall and construction method
CN113775090A (en) * 2021-07-22 2021-12-10 中铁四局集团有限公司 Archaized plain brick curtain wall supporting structure and method
CN113585489A (en) * 2021-08-25 2021-11-02 中建八局南方建设有限公司 Connecting structure of ceramic brick curtain wall and construction method thereof
CN114876111A (en) * 2022-05-13 2022-08-09 苏州金螳螂幕墙有限公司 Mounting method of assembled masonry stone curtain wall

Also Published As

Publication number Publication date
CN107227813B (en) 2023-04-07

Similar Documents

Publication Publication Date Title
CN107227813A (en) A kind of steel structure keel builds the outer Curtain Wall of brick and its construction method by laying bricks or stones
CN104018598B (en) A kind of external wall structure and construction installation method
CN104358341B (en) Building brickwork and masonry construction method of building brickwork
CN201687102U (en) Assembled integral type shear wall structure system
CN101845857B (en) Metal mesh built-in insulating outer wall and construction method thereof
CN109322392B (en) Light steel house and construction method thereof
WO2010105496A1 (en) External heat preservation composite wall of exterior wall with support
CN107190884A (en) A kind of new many high-rise hot-rolled steel section composite light-weight steel shear wall combined structure systems
CN110295681A (en) The high-strength foam concrete filled-in panel external wall self-insulation system of precast light
CN207092318U (en) A kind of steel structure keel builds the outer Curtain Wall of brick by laying bricks or stones
CN206128404U (en) Take whole composite roof board that keeps warm of eaves mouth
CN101962982B (en) Process for mounting splicing type low-carbon heat insulating energy-saving plate
CN209799019U (en) connecting node structure of silicon-magnesium wallboard and steel structure of steel structure house
CN113463796A (en) Composite wall body of light steel keel with special-shaped cross section structure and construction method
CN111101594A (en) Cold-formed thin-wall light steel structure building
CN214531542U (en) Green building roof waterproof construction
CN207568062U (en) Partial precast sandwich type wall panel and its wall body structure and building
CN215054296U (en) High strength fire prevention heat preservation partition wall structure
CN217175304U (en) Tubular well plugging structure
CN115928909A (en) Short-limb shear wall assembled light steel combined truss bearing steel wire mesh frame mortar-perlite-polyphenyl composite enclosure wall and manufacturing method thereof
CN101886470A (en) Construction method of exposed concrete ribbed beams
CN211690738U (en) Cold-formed thin-wall light steel structure building
CN103225373A (en) Roof eaves board
CN109779008B (en) Anti-seismic anti-cracking steel structure house and construction method thereof
CN205242631U (en) Building building structure can be dismantled in full assembly

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant