CN214531542U - Green building roof waterproof construction - Google Patents
Green building roof waterproof construction Download PDFInfo
- Publication number
- CN214531542U CN214531542U CN202120232061.6U CN202120232061U CN214531542U CN 214531542 U CN214531542 U CN 214531542U CN 202120232061 U CN202120232061 U CN 202120232061U CN 214531542 U CN214531542 U CN 214531542U
- Authority
- CN
- China
- Prior art keywords
- layer
- waterproof
- parapet
- structural
- green building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/24—Structural elements or technologies for improving thermal insulation
- Y02A30/254—Roof garden systems; Roof coverings with high solar reflectance
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B80/00—Architectural or constructional elements improving the thermal performance of buildings
- Y02B80/32—Roof garden systems
Landscapes
- Building Environments (AREA)
Abstract
The utility model belongs to the technical field of the green building technique and specifically relates to a green building roofing waterproof construction is related to, it includes the structural layer and fixes the parapet on the structural layer, indoor one side is kept away from to the structural layer is equipped with the waterproof layer, the waterproof layer includes waterproof coating layer and the waterproof roll material layer that sets gradually along the direction of keeping away from the structural layer, the one end that the waterproof layer is close to the parapet is equipped with the extension with parapet fixed connection. The present application has the following effects: the extension part is then used as the waterproof construction of parapet and structural layer junction to make the junction of parapet and structural layer be difficult for producing the infiltration, and under the normal conditions, mainly play a role by waterproof roll material layer, if waterproof roll material layer has the defect such as local puncture in production and processing or work progress, still can play water-proof effects through waterproof coating layer, thereby make the water-proof effects of waterproof layer more reliable.
Description
Technical Field
The application relates to the technical field of green buildings, in particular to a green building roof waterproof structure.
Background
The green building refers to a building which reduces manufacturing waste and water and energy consumption by effectively utilizing renewable resources and intelligent ecosystem design. The building has the advantages of sustainability, high efficiency, high comfort, indoor environment health and the like, and brings positive influence to the life cycle of the whole building.
The Chinese patent with application number of 201610819718.2 discloses a construction method of a green roof of a high-rise building, wherein the constructed green roof of the high-rise building comprises a roof structure layer, a slope layer, a leveling layer, a waterproof root-resisting layer, a protective layer, a water storage and drainage layer, a filter layer, a matrix layer, a vegetation layer and a rainwater collection and utilization system.
In view of the above-mentioned related technologies, the inventor believes that the water-proofing of the green building roof should not only involve the water-proofing of the structural layer, but also should be performed at the joint of the parapet and the structural layer, and if the water-proofing effect at the joint of the parapet and the structural layer is not good, the green building roof may still generate water seepage.
SUMMERY OF THE UTILITY MODEL
In order to improve the water-proof effects of parapet and structural layer junction, this application provides a green building roofing waterproof construction.
The application provides a green building roofing waterproof construction adopts following technical scheme:
the utility model provides a green building roofing waterproof construction, includes the structural layer and fixes the parapet on the structural layer, indoor one side is kept away from to the structural layer is equipped with the waterproof layer, the waterproof layer includes waterproof coating layer and the waterproof roll material layer that sets gradually along the direction of keeping away from the structural layer, the one end that the waterproof layer is close to the parapet is equipped with the extension with parapet fixed connection.
Through adopting above-mentioned technical scheme, the extension is then used as the waterproof construction of parapet and structural layer junction to make the junction of parapet and structural layer be difficult for producing the infiltration, and under the normal conditions, mainly play a role by waterproof roll material layer, if waterproof roll material layer has the defect such as local being punctured in production and processing or work progress, still can play waterproof effect through waterproof coating layer, thereby make the water-proof effects of waterproof layer more reliable.
Optionally, an open slot is formed in one side, close to the structural layer, of the parapet, one end, far away from the waterproof layer, of the extension portion is arranged in the open slot, and a filling layer is filled in the open slot.
Through adopting above-mentioned technical scheme, the tip of extension has been avoided exposing outside to open slot and filling layer to make and be difficult for producing the gap between extension and the parapet, and then make the life of extension can prolong.
Optionally, the extension portion and the groove wall of the open groove are fixedly connected through a fastener.
Through adopting above-mentioned technical scheme, the fastener is used for strengthening the connection effect between extension and the parapet, and then makes the tip of extension be difficult to produce phenomenons such as upwarp more.
Optionally, a protective layer is arranged on one side of the waterproof layer, which is far away from the structural layer, and the protective layer and the filling layer are of an integral structure.
Through adopting above-mentioned technical scheme, the protective layer is used as the peripheral protective structure of waterproof layer to make the waterproof layer be difficult for becoming invalid because of impaired and the water-proof effects who causes the waterproof layer.
Optionally, be equipped with the coiled material enhancement layer between water proof coating layer and the waterproof coiled material layer, the coiled material enhancement layer is located the junction of parapet and structural layer.
Through adopting above-mentioned technical scheme, the coiled material enhancement layer makes the waterproof layer thicken in the junction of parapet and structural layer, and then strengthens the prevention of seepage water effect of parapet and structural layer junction.
Optionally, the parapet is provided with a cantilever plate above the open slot.
Through adopting above-mentioned technical scheme, the board of encorbelmenting is as the structure of taking shelter from the rain and protective structure of filling layer to make the filling layer be difficult for receiving wearing and tearing, thereby reach extension waterproof layer life's purpose.
Optionally, one end of the cantilever plate, which is far away from the parapet wall, is provided with water drops.
Through adopting above-mentioned technical scheme, the drip makes the rainwater be difficult for oozing to filling layer department along the board one side that hangs near the structural layer of encorbelmenting to make the filling layer be difficult for weing.
Optionally, a leveling layer is arranged between the waterproof coating layer and the structural layer.
Through adopting above-mentioned technical scheme, the screed-coat is used for making level to the structure layer to make waterproof coating layer's construction plane more level and smooth, thereby make waterproof coating layer's shaping effect better.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the extension part is used as a waterproof structure at the joint of the parapet wall and the structural layer, so that water seepage is not easily generated at the joint of the parapet wall and the structural layer, and in general, the extension part mainly plays a role of a waterproof roll material layer;
2. through setting up the board of encorbelmenting, the board of encorbelmenting is as the structure of taking shelter from the rain and protective structure of filling layer to make the filling layer be difficult for receiving wearing and tearing, thereby reach extension waterproof layer life's purpose.
Drawings
Fig. 1 is a schematic structural diagram of the whole green building roof waterproof structure in the embodiment of the application.
Description of reference numerals: 1. a structural layer; 2. a parapet wall; 21. an open slot; 3. a waterproof layer; 31. a waterproof coating layer; 32. a waterproof roll layer; 4. leveling layer; 5. an extension portion; 51. a fastener; 6. a coil reinforcing layer; 61. a vertical section; 62. a horizontal segment; 7. a filling layer; 8. a protective layer; 9. a cantilever plate; 91. reserving anchor bars; 92. dripping water.
Detailed Description
The present application is described in further detail below with reference to fig. 1.
The embodiment of the application discloses green building roofing waterproof construction. Referring to fig. 1, the green building roof waterproof structure includes a structural layer 1, a parapet wall 2 and a waterproof layer 3.
The structure layer 1 is the original roof of a green building. The structural layer 1 is a reinforced concrete structure and has high structural strength and bearing strength. Parapet 2 may be a lining structure secured to structural layer 1. The parapet wall 2 is arranged at the outer edge of the structural layer 1, and the parapet wall 2 is perpendicular to the structural layer 1. The waterproof layer 3 is arranged on one side of the structural layer 1 far away from the indoor space. The waterproof layer 3 is used for waterproofing the structural layer 1, so that the structural layer 1 is not easy to generate water seepage.
The waterproof layer 3 includes a waterproof paint layer 31 and a waterproof roll layer 32. The waterproof paint layer 31 and the waterproof roll layer 32 are sequentially arranged along the direction far away from the structural layer 1. The waterproof coating layer 31 is mainly formed by coating asphalt polyurethane waterproof coating, and has strong toughness, strong adaptability to base layer expansion or cracking and high tensile strength. The waterproof roll layer 32 is mainly formed by laying a self-adhesive waterproof roll. Usually, the waterproofing of the structural layer 1 is mainly performed by the waterproofing roll layer 32, and if the waterproofing roll layer 32 has defects such as being locally punctured in the production process or the construction process, the structural layer 1 can still perform the waterproofing function through the waterproofing coating layer 31, so that the waterproofing effect of the waterproofing layer 3 is more reliable.
And a leveling layer 4 is arranged between the waterproof coating layer 31 and the structural layer 1. The leveling layer 4 is mainly formed by laying fine aggregate concrete. Because the screed 4 still needs to bear load, the compressive strength grade of the screed 4 should be higher, so that the screed 4 can be made of C25 fine-stone concrete. Leveling layer 4 is used for making level to structural layer 1 to make waterproof coating layer 31's construction plane more level and smooth, thereby make waterproof coating layer 31's shaping effect better.
One end of the waterproof layer 3 close to the parapet wall 2 is provided with an extension part 5 fixedly connected with the parapet wall 2. The extension 5 conforms to the structure of the waterproof layer 3. When the waterproof coating layer 31 is used for coating construction, the asphalt polyurethane waterproof coating is extended and coated on the parapet wall 2, then the waterproof roll material layer 32 is used for laying construction, the self-adhesive waterproof roll material is extended, adhered and fixed on the parapet wall 2, and the extension part 5 can be machined and molded. The extension part 5 is used as a waterproof structure at the joint of the parapet wall 2 and the structural layer 1, so that water seepage is not easily generated at the joint of the parapet wall 2 and the structural layer 1.
A coil reinforcing layer 6 is arranged between the waterproof paint layer 31 and the waterproof coil layer 32. The coiled material reinforcing layer 6 is laid by the self-adhesive waterproof coiled material and is formed, and the coiled material reinforcing layer 6 is located the junction of parapet 2 and structural layer 1, and the coiled material reinforcing layer 6 includes vertical section 61 that is located the parapet 2 and is located the horizontal segment 62 on structural layer 1 promptly. The coiled material reinforced layer 6 makes waterproof layer 3 thicken at the junction of parapet 2 and structural layer 1, and then strengthens the prevention of seepage water effect of parapet 2 and structural layer 1 junction.
The parapet wall 2 is provided with an open slot 21 at one side close to the structural layer 1. The open slot 21 is a rectangular slot which is reserved for forming when the parapet wall 2 is lined. One end of the extending part 5, which is far away from the waterproof layer 3, is embedded in the open slot 21, namely, the extending part extends and is constructed on the side wall of the open slot 21 when the waterproof coating layer 31 is coated and constructed and the waterproof coil layer 32 is laid and constructed. And the open groove 21 is embedded with a filling layer 7. The filling layer 7 is mainly composed of cement mortar. After the extension portion 5 is embedded in the open groove 21, cement mortar is coated in the open groove 21 to form the filling layer 7. The open slot 21 and the filling layer 7 prevent the end of the extension part 5 from being exposed, so that a gap is not easily generated between the extension part 5 and the parapet wall 2, and the service life of the extension part 5 is prolonged.
The extending part 5 is fixedly connected with the groove wall of the open groove 21 through a fastener 51. The fastener 51 may be a concrete nail. After the construction of the extension part 5 is completed, the fastener 51 is firstly penetrated through the extension part 5 and is nailed into the groove wall of the open groove 21, and then the coating construction of the filling layer 7 is carried out. The fastening member 51 serves to enhance the coupling effect between the extension portion 5 and the parapet wall 2, thereby making it more difficult for the end of the extension portion 5 to be warped or the like.
And a protective layer 8 is arranged on one side of the waterproof layer 3, which is far away from the structural layer 1. The protective layer 8 is coated with cement mortar. After the waterproof layer 3 is constructed, the protective layer 8 can be coated on the waterproof layer 3. The protective layer 8 serves as a peripheral protective structure of the waterproof layer 3, so that the waterproof layer 3 is not easily damaged and the waterproof effect of the waterproof layer 3 is not deteriorated. When the protective layer 8 is constructed, the protective layer 8 is extended and coated on the parapet wall 2, and the filling layer 7 is embedded and filled in the open slot 21, namely the protective layer 8 and the filling layer 7 are of an integral structure.
The parapet 2 is provided with a cantilever plate 9 above the open slot 21. The cantilever plate 9 is of a prefabricated reinforced concrete structure, and a reserved anchor bar 91 is reserved at one end, close to the parapet wall 2, of the cantilever plate 9. When the parapet 2 is built, the reserved anchor bars 91 of the cantilever plate 9 are inserted into the parapet 2, and joints of the cantilever plate 9 and the parapet 2 are caulked through cement mortar. The cantilever plate 9 is used as a rain sheltering structure and a protection structure of the filling layer 7, so that the filling layer 7 is not easily abraded, and the purpose of prolonging the service life of the waterproof layer 3 is achieved.
The end of the cantilever plate 9 remote from the parapet wall 2 is provided with a drip 92. The water drops 92 are located on one side of the hanging board 9 close to the structural layer 1, and the water drops 92 and the hanging board 9 are of an integral structure. The longitudinal section of the drip 92 is pointed. The dripping 92 makes rainwater difficult to seep to the filling layer 7 along one side of the cantilever plate 9 close to the structural layer 1, so that the filling layer 7 is difficult to damp.
The implementation principle of the green building roof waterproof structure in the embodiment of the application is as follows: during construction, firstly, the construction of the structural layer 1 is completed, then the construction of the parapet 2 is carried out on the structural layer 1, after the parapet 2 is constructed to the position of the open slot 21, the asphalt polyurethane waterproof coating is coated on the structural layer 1 to form a waterproof coating layer 31, the waterproof coating layer 31 extends to the slot wall of the open slot 21, then the self-adhesive waterproof coiled material is paved at the joint of the parapet 2 and the structural layer 1 to form a coiled material reinforcing layer 6, then the self-adhesive waterproof coiled material is paved above the waterproof coating layer 31 and the coiled material reinforcing layer 6 to form a waterproof coiled material layer 32, and the waterproof coiled material layer 32 extends to the slot wall of the open slot 21, so that the waterproof coating layer 31 and the waterproof coiled material layer 32 form an extension part 5 at the position of the open slot 21, and meanwhile, the extension part 5 is embedded in the open slot 21. The fastener 51 is then inserted through the extension 5 and driven into the wall of the open groove 21, then the waterproof roll layer 32 is coated with cement mortar to form the protective layer 8, and the protective layer 8 is extended and coated into the open groove 21 to form the infill layer 7. The prefabricated cantilever panels 9 are then fixed to the parapet wall 2 and the parapet wall 2 is laid.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.
Claims (8)
1. The utility model provides a green building roofing waterproof construction, includes structural layer (1) and fixes parapet (2) on structural layer (1), indoor one side is kept away from in structural layer (1) is equipped with waterproof layer (3), its characterized in that: waterproof layer (3) include waterproof coating layer (31) and waterproof roll material layer (32) that set gradually along the direction of keeping away from structural layer (1), waterproof layer (3) are close to parapet (2) one end be equipped with parapet (2) fixed connection's extension (5).
2. The green building roofing waterproofing structure according to claim 1, wherein: one side that parapet (2) are close to structural layer (1) is equipped with open slot (21), the one end that waterproof layer (3) were kept away from in open slot (21) is established in extension (5), embedded filling layer (7) of being filled with in open slot (21).
3. The green building roofing waterproofing structure according to claim 2, wherein: the extension part (5) is fixedly connected with the groove wall of the open groove (21) through a fastener (51).
4. The green building roofing waterproofing structure according to claim 2, wherein: and a protective layer (8) is arranged on one side, away from the structural layer (1), of the waterproof layer (3), and the protective layer (8) and the filling layer (7) are of an integral structure.
5. The green building roofing waterproofing structure according to claim 1, wherein: be equipped with coiled material enhancement layer (6) between waterproof coating layer (31) and waterproof coil material layer (32), coiled material enhancement layer (6) are located the junction of parapet (2) and structural layer (1).
6. The green building roofing waterproofing structure according to claim 1, wherein: the parapet (2) is provided with a cantilever plate (9) above the open slot (21).
7. The green building roofing waterproofing structure according to claim 6, wherein: one end of the cantilever plate (9) far away from the parapet wall (2) is provided with water dripping (92).
8. The green building roofing waterproofing structure according to claim 1, wherein: and a leveling layer (4) is arranged between the waterproof coating layer (31) and the structural layer (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120232061.6U CN214531542U (en) | 2021-01-27 | 2021-01-27 | Green building roof waterproof construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120232061.6U CN214531542U (en) | 2021-01-27 | 2021-01-27 | Green building roof waterproof construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214531542U true CN214531542U (en) | 2021-10-29 |
Family
ID=78312493
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120232061.6U Active CN214531542U (en) | 2021-01-27 | 2021-01-27 | Green building roof waterproof construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214531542U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114482424A (en) * | 2022-03-15 | 2022-05-13 | 南通新华建筑集团有限公司 | Secondary pouring construction method for parapet wall with hidden rabbet |
-
2021
- 2021-01-27 CN CN202120232061.6U patent/CN214531542U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114482424A (en) * | 2022-03-15 | 2022-05-13 | 南通新华建筑集团有限公司 | Secondary pouring construction method for parapet wall with hidden rabbet |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107190844B (en) | The waterproof and water drainage system and construction method of a kind of basement bottom board and exterior wall | |
CN104018598B (en) | A kind of external wall structure and construction installation method | |
CN107227813A (en) | A kind of steel structure keel builds the outer Curtain Wall of brick and its construction method by laying bricks or stones | |
CN110080530B (en) | Anchoring construction method for glazed tile slope roof in severe cold region | |
CN107338967A (en) | A kind of new technology and new material of aging blocks outdoor tile facing renewal and reform | |
CN110821053A (en) | Roofing system structure | |
CN202787603U (en) | Light-weight heat preservation house roof plate or floor plate | |
CN214531542U (en) | Green building roof waterproof construction | |
CN207260455U (en) | A kind of anti-aging roof structure of waterproof heat insulation | |
CN214462155U (en) | Indoor floor waterproof structure | |
CN213268014U (en) | Corrugated cover plate mounting structure for advanced construction of roof post-cast strip | |
CN210597802U (en) | Flat change slope roofing node structure | |
CN212153924U (en) | Parapet waterproof repairing structure | |
CN212336545U (en) | Oblique roofing tile hanging anti-leakage structure | |
CN103225373A (en) | Roof eaves board | |
CN209412856U (en) | A kind of assembled integral basement structure meeting stability against floating requirement | |
CN202644861U (en) | Anti-cracking and anti-permeability type roof flashing composite layer | |
CN110847515A (en) | Pitched roof structure and manufacturing method thereof | |
CN111287311A (en) | Construction method of cold-formed thin-wall light steel structure building | |
CN201087508Y (en) | Double-roof roofing | |
CN220377734U (en) | Concrete cap structure | |
CN202787741U (en) | Roof eaves board | |
CN217128762U (en) | Waterproof connection structure of roofing brick parapet bottom | |
CN220621185U (en) | Single-layer residential roof cornice reinforcement mortar belt reinforcement | |
CN218437838U (en) | Roofing drain pipe seepage prevention structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |