CN110080540B - 一种大跨度钢结构滑移装置及其施工方法 - Google Patents
一种大跨度钢结构滑移装置及其施工方法 Download PDFInfo
- Publication number
- CN110080540B CN110080540B CN201910476191.1A CN201910476191A CN110080540B CN 110080540 B CN110080540 B CN 110080540B CN 201910476191 A CN201910476191 A CN 201910476191A CN 110080540 B CN110080540 B CN 110080540B
- Authority
- CN
- China
- Prior art keywords
- steel structure
- adjusting
- plate
- support frame
- bracket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 76
- 239000010959 steel Substances 0.000 title claims abstract description 76
- 238000010276 construction Methods 0.000 title claims abstract description 34
- 238000009434 installation Methods 0.000 claims abstract description 7
- 239000000463 material Substances 0.000 abstract description 4
- 238000009435 building construction Methods 0.000 abstract description 2
- 239000002699 waste material Substances 0.000 abstract description 2
- 230000001105 regulatory effect Effects 0.000 abstract 2
- 238000010030 laminating Methods 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 3
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000005303 weighing Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/162—Handles to carry construction blocks
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910476191.1A CN110080540B (zh) | 2019-06-03 | 2019-06-03 | 一种大跨度钢结构滑移装置及其施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910476191.1A CN110080540B (zh) | 2019-06-03 | 2019-06-03 | 一种大跨度钢结构滑移装置及其施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110080540A CN110080540A (zh) | 2019-08-02 |
CN110080540B true CN110080540B (zh) | 2024-05-14 |
Family
ID=67423165
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910476191.1A Active CN110080540B (zh) | 2019-06-03 | 2019-06-03 | 一种大跨度钢结构滑移装置及其施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110080540B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113123606A (zh) * | 2021-03-30 | 2021-07-16 | 中国建筑第八工程局有限公司 | 安装倾斜柱用的辅助支撑装置及其施工方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5993137A (en) * | 1997-02-10 | 1999-11-30 | Harr; Robert E | Adjustable hoist for use with vehicle |
CN104675125A (zh) * | 2015-03-05 | 2015-06-03 | 中国建筑第二工程局有限公司 | 带倾角的大跨度屋面高支架支撑系统及其滑移施工方法 |
CN105442705A (zh) * | 2016-01-05 | 2016-03-30 | 江苏沪宁钢机股份有限公司 | 一种大跨度钢桁架结构及其安装方法 |
CN109057365A (zh) * | 2018-08-31 | 2018-12-21 | 中冶建工集团有限公司 | 一种大跨度管桁架屋架高空滑移安装方法 |
CN210127654U (zh) * | 2019-06-03 | 2020-03-06 | 天元建设集团有限公司 | 一种大跨度钢结构滑移装置 |
-
2019
- 2019-06-03 CN CN201910476191.1A patent/CN110080540B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5993137A (en) * | 1997-02-10 | 1999-11-30 | Harr; Robert E | Adjustable hoist for use with vehicle |
CN104675125A (zh) * | 2015-03-05 | 2015-06-03 | 中国建筑第二工程局有限公司 | 带倾角的大跨度屋面高支架支撑系统及其滑移施工方法 |
CN105442705A (zh) * | 2016-01-05 | 2016-03-30 | 江苏沪宁钢机股份有限公司 | 一种大跨度钢桁架结构及其安装方法 |
CN109057365A (zh) * | 2018-08-31 | 2018-12-21 | 中冶建工集团有限公司 | 一种大跨度管桁架屋架高空滑移安装方法 |
CN210127654U (zh) * | 2019-06-03 | 2020-03-06 | 天元建设集团有限公司 | 一种大跨度钢结构滑移装置 |
Also Published As
Publication number | Publication date |
---|---|
CN110080540A (zh) | 2019-08-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208650862U (zh) | 一种隧道施工用防坍塌支护装置 | |
CN110722318A (zh) | 一种精准可调钢桁架拼装胎架及拼装方法 | |
CN210127654U (zh) | 一种大跨度钢结构滑移装置 | |
CN111119497B (zh) | 超大箱型钢柱安装体系及施工方法 | |
CN110080540B (zh) | 一种大跨度钢结构滑移装置及其施工方法 | |
CN207792414U (zh) | 片状式旧楼加装电梯的钢结构井架 | |
JP2001146718A (ja) | 橋梁床版張出部移動支保工構造 | |
CN214005430U (zh) | 一种桥梁立柱翻转架 | |
CN212384891U (zh) | 一种精准可调钢桁架拼装胎架 | |
CN111173313A (zh) | 一种大跨度钢结构门厅施工用支撑装置 | |
CN111236613A (zh) | 一种建筑施工用防护平台及其使用方法 | |
CN204024104U (zh) | 快装模数化盘梯 | |
CN212224669U (zh) | 超大箱型钢柱安装体系 | |
CN213417598U (zh) | 一种桥梁施工用移动式挂篮 | |
CN211848937U (zh) | 一种带有防护结构的桥面装饰施工用挂笼 | |
CN210561782U (zh) | 一种桥墩支座更换用辅助施工装置 | |
CN110886225A (zh) | 索塔斜拉索安装体系的施工方法 | |
CN211874002U (zh) | 一种led舞台 | |
CN215160352U (zh) | 一种单双梁两用吊架 | |
CN216893561U (zh) | 一种管桁架高空拼装上弦支撑 | |
CN211547104U (zh) | 一种悬挂式单轨交通用立柱 | |
CN218343513U (zh) | 城轨车辆车门检修平台 | |
CN212426684U (zh) | 一种钢拱桥拱座预埋支架及预埋结构 | |
CN220827706U (zh) | 载人用施工平台 | |
CN215052024U (zh) | 斜拉桥钢塔少支架支撑结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Country or region after: China Address after: No.63, Yinqueshan Road, Lanshan District, Linyi City, Shandong Province Applicant after: TIANYUAN CONSTRUCTION GROUP Co.,Ltd. Applicant after: Veterans (Shandong) Construction Group Co.,Ltd. Address before: No.63, Yinqueshan Road, Lanshan District, Linyi City, Shandong Province Applicant before: TIANYUAN CONSTRUCTION GROUP Co.,Ltd. Country or region before: China Applicant before: SHANDONG HONGDA REAL ESTATE Co.,Ltd. |
|
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: An Baiping Inventor after: Guo Yushun Inventor after: Zhang Cheng Inventor after: Wen Fuming Inventor before: Wen Fuming Inventor before: An Baiping Inventor before: Guo Yushun Inventor before: Zhang Cheng |
|
GR01 | Patent grant | ||
GR01 | Patent grant |