CN110073852A - Soil property gradient slope arbor plantation hole structure and the method for planting arbor - Google Patents

Soil property gradient slope arbor plantation hole structure and the method for planting arbor Download PDF

Info

Publication number
CN110073852A
CN110073852A CN201910475576.6A CN201910475576A CN110073852A CN 110073852 A CN110073852 A CN 110073852A CN 201910475576 A CN201910475576 A CN 201910475576A CN 110073852 A CN110073852 A CN 110073852A
Authority
CN
China
Prior art keywords
plantation hole
hole
plantation
arbor
soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910475576.6A
Other languages
Chinese (zh)
Other versions
CN110073852B (en
Inventor
赵通阳
王鹏
陈智敏
牛贺道
冯光伟
丁玉
侯晓辉
邰肇悦
吴彦峰
范磊
郭亚男
韩亚萍
石琳
宋文超
邢宝龙
陈伟玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Water and Power Engineering Consulting Co Ltd
Original Assignee
Henan Water and Power Engineering Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Water and Power Engineering Consulting Co Ltd filed Critical Henan Water and Power Engineering Consulting Co Ltd
Priority to CN201910475576.6A priority Critical patent/CN110073852B/en
Publication of CN110073852A publication Critical patent/CN110073852A/en
Application granted granted Critical
Publication of CN110073852B publication Critical patent/CN110073852B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G17/00Cultivation of hops, vines, fruit trees, or like trees
    • A01G17/005Cultivation methods
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
    • A01G9/029Receptacles for seedlings
    • A01G9/0299Handling or transporting of soil blocks or seedlings

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Environmental Sciences (AREA)
  • Soil Sciences (AREA)
  • Botany (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The invention discloses a kind of soil property gradient slope arbor plantation hole structures, including the plantation hole dug vertical on soil property gradient slope, more spacer bars are squeezed at the upper edge interval of plantation hole, the length of spacer bar is deep 1~3 times in plantation hole hole, is provided with steel orifice plate being placed in welding between the spacer bar in plantation hole;In the lower edge of plantation hole and two sides along PVC orifice plate is provided with, geotextile layer is equipped on the inside of PVC orifice plate.The invention also discloses the methods in soil property gradient slope plantation arbor.The present invention uses and digs a kind of firm plantation hole on soil property gradient slope, then plant arbor greening, it is combined with the grass planting of general planting, shrub etc., enriches the diversity of soil property gradient slope slope plants and the level of planting technique, improve the whole ecoscape effect of both sides of the road.Implantation methods science of the present invention, can be effectively pre- anti-erosion, is not only suitable for having carried out the side slope of hard protection, is also applied for the side slope newly excavated and embankment side slope.

Description

Soil property gradient slope arbor plantation hole structure and the method for planting arbor
Technical field
The present invention relates to soil property gradient slope planting technology fields, more particularly, to a kind of soil property gradient slope arbor plantation hole knot Structure, the invention further relates to the methods in soil property gradient slope plantation arbor.
Background technique
The projects such as dam road on highway both sides, hydropower complex, under the premise of meeting requirement of engineering and safety, for section About construction investment, the side slope of general two sides is all relatively steep, and slope ratio is in 1:1.5 or so;Engineering upper slope protection mostly uses stone masonry, six Rib sash, concrete interlock block, green grass add the slope protection forms such as grass planting using concrete frame lattice beam, therefore existing engineering The slope vegetation of soil property gradient slope is single, lacks level, appearance or stiff, ecological difference or only to sow shape The careless slope and fragmentary small shrub that formula is formed, landscape effect is dull, can not be effectively pre- anti-erosion, it is necessary to carry out more section It learns, reasonably afforest and beautify.
Summary of the invention
It is good that it is an object of that present invention to provide a kind of stability, scientific and rational soil property gradient slope arbor plantation hole structure, this Invention also provides the method in soil property gradient slope plantation arbor.
To achieve the above object, the present invention can take following technical proposals:
Soil property gradient slope arbor plantation hole structure of the present invention, including the plantation hole dug vertical on soil property gradient slope, More spacer bars are squeezed at the upper edge interval of the plantation hole, the length of the spacer bar is that plantation hole hole is deep 1~3 times, steel orifice plate is provided with being placed in welding between the spacer bar in plantation hole;In the lower edge and two sides of plantation hole Edge is provided with PVC orifice plate, is equipped with geotextile layer on the inside of the PVC orifice plate.
The spacer bar bottom is taper, is flushed at the top of spacer bar with the plantation hole.
The plantation hole major diameter 1~1.5m, 0.8~1m of minor axis cheat deep 0.8~1.2m.
The percent opening of the steel orifice plate is 10%~15%, aperture 0.3cm~0.5cm, and length is wide with plantation hole upper edge Degree is cheated deep with plantation hole.
The percent opening of the PVC orifice plate is 15%~20%, aperture 0.2cm~0.3cm, highly 2/3 for plantation hole hole depth; The specification of the geotextile layer is 200g/m2~350g/m2
Method of the present invention in soil property gradient slope plantation arbor, comprising the following steps:
Step 1: equidistant, vertical direction squeezes into more spacer bars at the predetermined plantation arbor position of soil property gradient slope, supports Reinforcing bar length is that 1~3 times of plantation hole hole is deep, is flushed at the top of spacer bar with slope surface;
Step 2: plantation hole is excavated in spacer bar lower part, plantation hole 1~1.5m of major diameter, 0.8~1m of minor axis, hole deep 0.8~ 1.2m;
Step 3: being picked at spacer bar rear portion and dig a small soil box, be embedded in steel orifice plate, and solid using welding manner and spacer bar It is set to one, the percent opening 10%~15% of steel orifice plate, aperture 0.3cm~0.5cm, for length with plantation hole upper edge, width is same Plantation hole hole is deep;
Step 4: the lower edge of plantation hole and two sides edge are provided with PVC orifice plate, the percent opening 15%~20% of PVC orifice plate, hole The 2/3 of a height of plantation hole hole depth of the plate of plate thickness 0.3cm~0.5cm, the PVC orifice plate of diameter 0.2cm~0.3cm, PVC orifice plate;The hole PVC One layer of geotextiles are laid on the inside of plate, geotextiles specification is 200g/m2~350g/m2
Step 5: pure soil or improvement soil being backfilling into plantation hole, and are compacted the base soil layer of formation 5~20cm thickness;
Step 6: the root of the arbor of diameter of a cross-section of a tree trunk 1.3 meters above the ground 5cm~10cm being vertically put into the center of plantation pit foundation soil layer, and by pure soil Earth or improvement soil are backfilling into the plantation hole above base soil layer, form the plant soil layer of 30~80cm;
Step 7: pure soil or improvement soil being backfilling into the plantation hole planted above soil layer, form blinding layer, and make blinding The root of arbor is completely covered by layer;
Step 8: watering into plantation hole.
To avoid arbor from lodging or inclination, after the completion of step 7, arbor is helped with the support frame that at least one is obliquely installed Gu the lower end support of support frame is on the ground, the upper end of support frame and the trunk portion of arbor are connected.
The advantage of the invention is that dig firm plantation hole on soil property gradient slope, arbor greening is then transplanted, and it is normal Grass planting, the shrub etc. for advising plantation combine, and enrich the diversity of soil property gradient slope slope plants and the level of planting technique, mention The whole ecoscape effect of both sides of the road is risen.Plantation hole upper edge uses spacer bar and steel orifice plate support reinforcement, can Form stable side slope surface plantation hole;Plantation hole lower edge and slope surface two sides are blocked along using PVC orifice plate and geotextiles, can It prevents erosion;Steel orifice plate and PVC orifice plate are conducive to the water and soil exchange inside and outside plantation hole.Implantation methods science of the present invention, can It is effectively pre- anti-erosion, it is not only suitable for having carried out the side slope of hard protection, is also applied for the side slope newly excavated and embankment side Slope.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of plantation hole of the present invention.
Fig. 2 is the sectional view along A-A of Fig. 1.
Specific embodiment
As shown in Figure 1, 2, soil property gradient slope arbor plantation hole structure of the present invention, including the lead on soil property gradient slope The plantation hole 1 directly dug squeezes into 5 spacer bars 2 at the upper edge interval of plantation hole 1, and the length of spacer bar 2 is plantation hole 2.5 times of 1 hole depth, welding is provided with steel orifice plate 3 between the spacer bar 2 being placed in plantation hole 1;Under plantation hole 1 Edge and two sides are equipped with geotextile layer 5 along PVC orifice plate 4 is provided on the inside of PVC orifice plate 4;2 bottom of spacer bar is cone Shape, 2 top of spacer bar are flushed with plantation hole 1;Plantation hole 1 major diameter 1.2m, minor axis 1m cheat depth 1m;The percent opening of steel orifice plate 3 It is 10%~15%, aperture 0.3cm~0.5cm, length cheats depth with plantation hole 1 with 1 upper edge of plantation hole, width;PVC orifice plate 4 Percent opening is 15%~20%, and aperture 0.2cm~0.3cm highly cheats deep 2/3 for plantation hole 1;The specification of geotextile layer 5 is 200g/m2~350g/m2
Specifically, 1 upper edge of plantation hole is straight line edge, lower edge and two sides along composition arc outer edge, supporting steel Muscle 2 be diameter 25mm plain bar, plain bar lower part be made into it is pointed, to squeeze into, spacer bar 2 and 3 phase of steel orifice plate Welding carries out support reinforcement to plantation hole 1;4 radian of PVC orifice plate matches with arc outer edge in plantation hole 1, PVC orifice plate 4 Both ends are respectively placed in the both ends of steel orifice plate 3, and geotextile layer 5 is laid on the inside of PVC orifice plate 4, can prevent erosion;Steel The hole opened up on orifice plate 3 and PVC orifice plate 4 is conducive to the water and soil exchange inside and outside plantation hole 1.
Method of the present invention in soil property gradient slope plantation arbor, comprising the following steps:
Step 1: equidistant, vertical direction squeezes into the branch that 5 diameters are 25mm at predetermined plantation 6 position of arbor of soil property gradient slope Reinforcing bar 2 is supportted, 2 length of spacer bar is that 2.5 times of plantation holes 1 cheat depth, and 2 top of spacer bar is flushed with slope surface;
Step 2: excavating plantation hole 1 in 2 lower part of spacer bar, plantation hole 1 major diameter 1.2m, minor axis 1.0m cheat depth 1.0m;
Step 3: being picked at 2 rear portion of spacer bar and dig a small soil box, be embedded in the steel orifice plate 3 of 3mm thickness, and use welding manner and branch Support reinforcing bar 2 is fixed as one, and the percent opening 10%~15% of steel orifice plate 3, aperture 0.3cm~0.5cm, length is the same as in plantation hole 1 Edge, width cheat depth with plantation hole 1;
Step 4: in the lower edge of plantation hole 1 and two sides along being provided with PVC orifice plate 4, the percent opening 15%~20% of PVC orifice plate 4, The a height of plantation hole 1 of plate of plate thickness 0.3cm~0.5cm, the PVC orifice plate 4 of aperture 0.2cm~0.3cm, PVC orifice plate 4 cheats deep 2/3; One layer of geotextiles 5 are laid on the inside of PVC orifice plate 4,5 specification of geotextiles is 200g/m2~350g/m2
Step 5: pure soil or improvement soil being backfilling into plantation hole 1, and are compacted the base soil layer of formation 5~20cm thickness;
Step 6: the root of the arbor 6 of diameter of a cross-section of a tree trunk 1.3 meters above the ground 5cm~10cm being vertically put into the center of 1 base soil layer of plantation hole, and will be pure Soil or improvement soil are backfilling into the plantation hole 1 above base soil layer, form the plant soil layer of 30~80cm;
Step 7: pure soil or improvement soil being backfilling into the plantation hole 1 planted above soil layer, form blinding layer, and make blinding The root of arbor 6 is completely covered by layer;
Step 8: the support frame being obliquely installed at least one helps arbor admittedly, and the lower end support of support frame on the ground, supports The upper end of frame and the trunk portion of arbor connect, and can effectively avoid arbor lodging or inclination;Finally, according to a conventional method to plantation hole 1 The plantation of arbor is completed in interior watering.
For the survival rate for improving arbor, above-mentioned plantation work can be carried out in annual March and April under normal circumstances.

Claims (7)

1. a kind of soil property gradient slope arbor plantation hole structure, it is characterised in that: including the kind dug vertical on soil property gradient slope Hole is planted, squeezes into more spacer bars at the upper edge interval of the plantation hole, the length of the spacer bar is the plantation hole 1~3 times of hole depth is provided with steel orifice plate being placed in welding between the spacer bar in plantation hole;In the lower edge of plantation hole And two sides are equipped with geotextile layer on the inside of the PVC orifice plate along PVC orifice plate is provided with.
2. soil property gradient slope arbor plantation hole structure according to claim 1, it is characterised in that: the spacer bar bottom For taper, spacer bar top is flushed with the plantation hole.
3. soil property gradient slope arbor plantation hole structure according to claim 1, it is characterised in that: the plantation hole major diameter 1 ~1.5m, 0.8~1m of minor axis cheat deep 0.8~1.2m.
4. soil property gradient slope arbor plantation hole structure according to claim 1, it is characterised in that: the steel orifice plate is opened Porosity is 10%~15%, aperture 0.3cm~0.5cm, and length is cheated deep with plantation hole upper edge, width with plantation hole.
5. soil property gradient slope arbor plantation hole structure according to claim 1, it is characterised in that: the PVC orifice plate is opened Porosity is 15%~20%, aperture 0.2cm~0.3cm, highly 2/3 for plantation hole hole depth;The specification of the geotextile layer is 200g/m2~350g/m2
6. a kind of method in soil property gradient slope plantation arbor, which comprises the following steps:
Step 1: equidistant, vertical direction squeezes into more spacer bars at the predetermined plantation arbor position of soil property gradient slope, supports Reinforcing bar length is that 1~3 times of plantation hole hole is deep, is flushed at the top of spacer bar with slope surface;
Step 2: plantation hole is excavated in spacer bar lower part, plantation hole 1~1.5m of major diameter, 0.8~1m of minor axis, hole deep 0.8~ 1.2m;
Step 3: being picked at spacer bar rear portion and dig a small soil box, be embedded in steel orifice plate, and solid using welding manner and spacer bar It is set to one, the percent opening 10%~15% of steel orifice plate, aperture 0.3cm~0.5cm, for length with plantation hole upper edge, width is same Plantation hole hole is deep;
Step 4: the lower edge of plantation hole and two sides edge are provided with PVC orifice plate, the percent opening 15%~20% of PVC orifice plate, hole The 2/3 of a height of plantation hole hole depth of the plate of plate thickness 0.3cm~0.5cm, the PVC orifice plate of diameter 0.2cm~0.3cm, PVC orifice plate;The hole PVC One layer of geotextiles are laid on the inside of plate, geotextiles specification is 200g/m2~350g/m2
Step 5: pure soil or improvement soil being backfilling into plantation hole, and are compacted the base soil layer of formation 5~20cm thickness;
Step 6: the root of the arbor of diameter of a cross-section of a tree trunk 1.3 meters above the ground 5cm~10cm being vertically put into the center of plantation pit foundation soil layer, and by pure soil Earth or improvement soil are backfilling into the plantation hole above base soil layer, form the plant soil layer of 30~80cm;
Step 7: pure soil or improvement soil being backfilling into the plantation hole planted above soil layer, form blinding layer, and make blinding The root of arbor is completely covered by layer;
Step 8: watering into plantation hole.
7. the method according to claim 6 in soil property gradient slope plantation arbor, it is characterised in that:
After the completion of step 7, the support frame being obliquely installed at least one helps arbor admittedly, and the lower end of support frame is supported on ground On, the upper end of support frame and the trunk portion of arbor connect.
CN201910475576.6A 2019-06-03 2019-06-03 Soil steep slope arbor planting pit structure and arbor planting method Active CN110073852B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910475576.6A CN110073852B (en) 2019-06-03 2019-06-03 Soil steep slope arbor planting pit structure and arbor planting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910475576.6A CN110073852B (en) 2019-06-03 2019-06-03 Soil steep slope arbor planting pit structure and arbor planting method

Publications (2)

Publication Number Publication Date
CN110073852A true CN110073852A (en) 2019-08-02
CN110073852B CN110073852B (en) 2024-02-09

Family

ID=67423175

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910475576.6A Active CN110073852B (en) 2019-06-03 2019-06-03 Soil steep slope arbor planting pit structure and arbor planting method

Country Status (1)

Country Link
CN (1) CN110073852B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115380756A (en) * 2022-08-29 2022-11-25 北京正和恒基滨水生态环境治理股份有限公司 Method for improving survival rate of nursery stock in mountain afforestation and mountain afforestation side slope

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105484275A (en) * 2016-01-12 2016-04-13 中国电建集团贵阳勘测设计研究院有限公司 Reinforcing and anchoring ecological restoration system for high and steep waste slag side slope of wind power plant in mountainous area
CN205296182U (en) * 2016-01-07 2016-06-08 西安公路研究院 A punishment device that is used for non - excavation formula excavation side slope hole groove disease
CN205591233U (en) * 2016-03-06 2016-09-21 广西建工集团第五建筑工程有限责任公司 High -steep soil nail grass planting slope protection structure system
CN206706751U (en) * 2017-04-21 2017-12-05 深圳文科园林股份有限公司 A kind of solid native component of precipitous rock side slope restoration of the ecosystem
CN107604930A (en) * 2017-10-17 2018-01-19 三峡大学 A kind of method that slope retaining and greening are carried out using specific hole kind shrub

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205296182U (en) * 2016-01-07 2016-06-08 西安公路研究院 A punishment device that is used for non - excavation formula excavation side slope hole groove disease
CN105484275A (en) * 2016-01-12 2016-04-13 中国电建集团贵阳勘测设计研究院有限公司 Reinforcing and anchoring ecological restoration system for high and steep waste slag side slope of wind power plant in mountainous area
CN205591233U (en) * 2016-03-06 2016-09-21 广西建工集团第五建筑工程有限责任公司 High -steep soil nail grass planting slope protection structure system
CN206706751U (en) * 2017-04-21 2017-12-05 深圳文科园林股份有限公司 A kind of solid native component of precipitous rock side slope restoration of the ecosystem
CN107604930A (en) * 2017-10-17 2018-01-19 三峡大学 A kind of method that slope retaining and greening are carried out using specific hole kind shrub

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115380756A (en) * 2022-08-29 2022-11-25 北京正和恒基滨水生态环境治理股份有限公司 Method for improving survival rate of nursery stock in mountain afforestation and mountain afforestation side slope

Also Published As

Publication number Publication date
CN110073852B (en) 2024-02-09

Similar Documents

Publication Publication Date Title
CN203795439U (en) Ecological revetment structure used for soil fixing and moisturizing of high-liquid-limit soil slope
CN106759104B (en) Ecological slope protection structure and construction method
CN202247911U (en) Slope support structure used for ecological management of slope
CN108221861A (en) A kind of ecological slope protection structure to prevent erosion and its construction method
CN105756073B (en) A kind of ion type rareearth mine ecological slope protection building block and its ecological revetment system
CN210827501U (en) Greening structure of stock ground rock slope
CN108343083A (en) A kind of ecology earth-retaining construction
CN117926849A (en) Construction method and application of high-strength gravity retaining wall
CN103362135B (en) Fang Beng hilllock, protect water and soil net grass bank protection
CN109594567A (en) A kind of shotcrete protection rock slope ecological safeguard structure arrangement and its method
CN105340408A (en) Afforestation and soil preparation method for rocky barren mountains in semi-arid regions
CN102677651B (en) Method for ecological restoration of mountain
CN107165176A (en) A kind of method for strengthening the native check dam in the slope collapse exit or entrance of a clitch or check dam sediment trapping retaining
CN212993244U (en) Vegetation body for green barrier establishment
CN105672198A (en) Land and farmland reclamation structure of reservoir inundation and immersion region and construction method for land and farmland reclamation structure
CN110073852A (en) Soil property gradient slope arbor plantation hole structure and the method for planting arbor
CN206189345U (en) Dry rubble ecological landscape bank protection is filled on concrete check ridge
CN209277095U (en) A kind of cast-in-place counterfort virescence concrete structure
CN107950345A (en) Terraced fields establishment of economic forest method in alluvial plain under the conditions of a kind of loess hilly landform area abrupt slope
CN210151706U (en) Prevent soil erosion and water loss's afforestation equipment
CN110725277A (en) Anti-scouring ecological treatment method for river bank hydro-fluctuation belt
CN216739734U (en) Prefabricated panel of reinforced earth retaining wall and greening reinforced earth retaining wall
CN210017128U (en) Soil steep slope arbor planting pit structure
CN205501928U (en) Structure of restoreing abandoned land to cultivation is distinguished in reservoir inundation submergence with making
CN214832388U (en) River course shore protection structure of reinforcing river bank steadiness

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant