CN205296182U - A punishment device that is used for non - excavation formula excavation side slope hole groove disease - Google Patents
A punishment device that is used for non - excavation formula excavation side slope hole groove disease Download PDFInfo
- Publication number
- CN205296182U CN205296182U CN201620010654.7U CN201620010654U CN205296182U CN 205296182 U CN205296182 U CN 205296182U CN 201620010654 U CN201620010654 U CN 201620010654U CN 205296182 U CN205296182 U CN 205296182U
- Authority
- CN
- China
- Prior art keywords
- spacer bar
- pit
- bag
- excavation
- punishment device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
The utility model provides a punishment device that is used for non - excavation formula excavation side slope hole groove disease which characterized in that, including establishing the spacer bar net piece in hole tank bottom portion, implant in the soil body of hole tank bottom portion the bottom of spacer bar net piece, set up sign indicating number step bag on spacer bar net piece, every 4 -5 layer sets up the support that hole tank bottom portion was implanted to the one deck spacer bar from lower to upper, the spacer bar of lower floor adopts HRB335 level phi 20@20cm reinforcing bar net piece, set up the drain pipe, draw forth the internal moisture in slope domatic, implant spacer bar net piece in hole tank bottom portion, the longitudinal reinforcement should stretch into to be stablized the soil body and is not less than 1 meter, sign indicating number step bag on spacer bar net piece, according to the scope of hole groove disease, every 4 -5 layer earth bag sets up the one deck spacer bar, have that simple structure, cost are low, convenient to use's characteristics.
Description
Technical field
This utility model belongs to side slope Treating technology field, particularly to a kind of punishment device for non-excavation type execavated rockmass pit disease.
Background technology
Execavated rockmass in use, Chang Yinwei rain drop erosion, climate change and other reasons, cause the diseases such as domatic peeling, form the pit that destructiveness is different. Punishment to execavated rockmass pit, generally has following two mode: when pit scope is less, or when the degree of depth is shallower, do not affect the stability of side slope, now disregard at present; When pit scope is relatively big, or when the degree of depth is deeper, then again brush slope, after reaching certain ratio of slope, carry out domatic grass planting or the protection of other masonries.
First kind of way problematically, which is a kind of comparatively passive Treatment Scheme, when pit is disregarded, disease can develop further under severe natural environment, thus causing that even more serious disease occurs. Protecting according to after again brushing slope, often due to brush slope scope is relatively big, the mode of heavy excavation causes the destruction to original soil body and protection method, also necessarily causes higher cost. If side slope produces pit disease again behind brush slope, deal with extremely inconvenience.
Summary of the invention
For overcoming above-mentioned the deficiencies in the prior art, the purpose of this utility model is to provide a kind of punishment device for non-excavation type execavated rockmass pit disease, has the advantages that simple in construction, cost are low, easy to use.
For achieving the above object, the technical solution adopted in the utility model is: a kind of punishment device for non-excavation type execavated rockmass pit disease, includes the spacer bar mesh sheet being located at bottom pit, and the bottom of spacer bar mesh sheet is implanted in the soil body bottom pit; Spacer bar mesh sheet arranges code and builds bag; From lower to upper one layer of spacer bar is set every 4-5 layer and implants the support bottom pit; Undermost spacer bar adopts HRB335 level �� 2020cm reinforced mesh.
The described code outside pit that is located at builds bag employing plant biological bag.
Described code is built bag and is adopted rubble bag or earth bag.
It is be more than or equal to 1 meter that the length of pit soil body part is implanted in the bottom of described spacer bar mesh sheet.
The spacer bar of described centrally located layer position adopts HRB335 level �� 1220cm.
Arranging drain pipe in described pit, drain pipe is divided into draining section, the section of intercepting water, outdrill section; Drain pipe adopts HDPE corrugated tube with holes.
The beneficial effects of the utility model are:
This method adopts no-dig technique mode that the pit that excavation is domatic is punished, earth bag is built by code after slope stability district implants spacer bar mesh sheet, effectively it is filled with domatic pit region, and by arranging drain pipe, the slope internal water of pit is drawn domatic, then carry out breaking dibbling grass after domatic outermost code builds plant biological bag, recover domatic greening, thus ensureing domatic attractive in appearance and stable. This method is simple and easy to do, it is to avoid to domatic excavation, effectively increases slope stability, has recovered slope greening, substantially increases work effectiveness; Have the advantages that simple in construction, cost are low, easy to use.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the scheme of installation (unit: mm) of this utility model drain pipe.
Fig. 3 is the osculum on this utility model drain pipe and arrangement of boring holes figure (unit: mm); Wherein Fig. 3 (a) is osculum schematic diagram; Fig. 3 (b) is osculum arrangement of boring holes figure.
Detailed description of the invention
Below in conjunction with accompanying drawing, structural principle of the present utility model and operation principle are described in further detail.
Referring to Fig. 1, a kind of punishment device for non-excavation type execavated rockmass pit disease, including the spacer bar mesh sheet 1 being located at bottom pit, the bottom of spacer bar mesh sheet 1 is implanted in the soil body bottom pit; Spacer bar mesh sheet arranges code and builds bag 2; From lower to upper one layer of spacer bar is set every 4-5 layer and implants the support 3 bottom pit; Undermost spacer bar adopts HRB335 level �� 2020cm reinforced mesh.
The described code outside pit that is located at builds bag employing plant biological bag.
Described code is built bag and is adopted rubble bag or earth bag.
Code is built earth bag and is adopted straw bag, gunnysack, Glass Fibre Bag or the packed mound code of non-woven fabrics. Bag should load the good pellet of the water penetration such as coarse sand or boulder and cobble. Soil loading amount is the 1/2-2/3 of earth bag capacity, and bag mouth should be sewed up. The soil containing the foreign material such as tree root, fragment of brick or organic matter is not allowed in earth material.
The bottom of described spacer bar mesh sheet 1 is implanted the length of pit soil body part and is not less than 1 meter.
Described drain pipe pierces portion in the body of slope according to soil property, hydrologic regime, and caliber is 100mm. The spacer bar of described centrally located layer position adopts HRB335 level �� 1220cm. Bore diameter is 110mm, and drain pipe adopts HDPE corrugated tube with holes.
Referring to Fig. 3, arranging drain pipe 5 in described pit, drain pipe is divided into draining section, the section of intercepting water, outdrill section; Drain pipe adopts HDPE corrugated tube with holes. In described drain pipe draining section, 1-3m does not punch, punching, diameter 10mm, longitudinal pitch 150mm in the section of intercepting water. The described HDPE corrugated tube with holes permeable geotextiles of outsourcing, geotextiles adopts the standard of 400g/m.
Operation principle of the present utility model is:
After being cleared up at pit interface, implanting spacer bar mesh sheet bottom pit, longitudinal reinforcement should stretch into the stable soil body and be not less than 1 meter. Then in spacer bar mesh sheet, code builds earth bag, if side slope is stone matter, can build rubble bag by code in spacer bar mesh sheet. Scope according to pit disease, can arrange one layer of spacer bar every 4-5 layer earth bag. When rock side-slope adopts rubble bag, one layer of spacer bar is set every layer 2-3 rubble bag;And by arranging drain pipe, pit slope internal water is drawn domatic; The outermost earth bag of pit adopts plant biological bag, adopts modes such as breaking dibbling grass, recovers slope greening.
Operating process of the present utility model is:
1) when execavated rockmass is rock side-slope:
Finishing side slope �� measurement, unwrapping wire �� pore-forming �� joint bar �� slip casting �� code build rubble bag (plant biological bag) �� maintenance
2) when execavated rockmass is soil-slope:
Finishing side slope �� measurement, unwrapping wire �� pore-forming �� joint bar �� code build earth bag (plant biological bag) �� maintenance
Drain pipe adopts quincunx setting, spacing 1.0m, can do suitable adjustment according to pit damage envelope and slope body soil property, hydrologic regime; Bottom spacer bar adopts HRB335 level �� 2020cm reinforced mesh, position, intermediate layer reinforced mesh �� 1220cm, during soil-slope boring, forbids to pour water, it is possible to directly squeeze into reinforcing bar. Rock side slope can adopt the method that slip casting anchors. Grouting pressure adopts 0.4MPa, ratio of mud 0.45-0.5 neat slurry, and cement adopts P.O.32.5.
Claims (6)
1. the punishment device for non-excavation type execavated rockmass pit disease, it is characterised in that include the spacer bar mesh sheet (1) being located at bottom pit, the bottom of spacer bar mesh sheet (1) is implanted in the soil body bottom pit; Spacer bar mesh sheet arranges code and builds bag (2); From lower to upper one layer of spacer bar is set every 4-5 layer and implants the support (3) bottom pit; Undermost spacer bar adopts HRB335 level �� 2020cm reinforced mesh.
2. a kind of punishment device for non-excavation type execavated rockmass pit disease according to claim 1, it is characterised in that the described code outside pit that is located at builds bag employing plant biological bag (4).
3. a kind of punishment device for non-excavation type execavated rockmass pit disease according to claim 1, it is characterised in that described code is built bag and adopted rubble bag or earth bag.
4. a kind of punishment device for non-excavation type execavated rockmass pit disease according to claim 1, it is characterised in that the length of pit soil body part is implanted be more than or equal to 1 meter in the bottom of described spacer bar mesh sheet (1).
5. a kind of punishment device for non-excavation type execavated rockmass pit disease according to claim 1, it is characterised in that the spacer bar of described centrally located layer position adopts HRB335 level �� 1220cm.
6. a kind of punishment device for non-excavation type execavated rockmass pit disease according to claim 1, it is characterised in that arranging drain pipe (5) in described pit, drain pipe is divided into draining section, the section of intercepting water, outdrill section; Drain pipe adopts HDPE corrugated tube with holes.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620010654.7U CN205296182U (en) | 2016-01-07 | 2016-01-07 | A punishment device that is used for non - excavation formula excavation side slope hole groove disease |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620010654.7U CN205296182U (en) | 2016-01-07 | 2016-01-07 | A punishment device that is used for non - excavation formula excavation side slope hole groove disease |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205296182U true CN205296182U (en) | 2016-06-08 |
Family
ID=56486194
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620010654.7U Expired - Fee Related CN205296182U (en) | 2016-01-07 | 2016-01-07 | A punishment device that is used for non - excavation formula excavation side slope hole groove disease |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205296182U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106436727A (en) * | 2016-09-27 | 2017-02-22 | 中铁五局集团有限公司 | Extreme geological tunnel portal construction method |
CN109083161A (en) * | 2018-08-02 | 2018-12-25 | 浙江交工集团股份有限公司 | Wide ecological slope protection structure and its construction method are spelled suitable for long and narrow space |
CN110073852A (en) * | 2019-06-03 | 2019-08-02 | 河南省水利勘测设计研究有限公司 | Soil property gradient slope arbor plantation hole structure and the method for planting arbor |
-
2016
- 2016-01-07 CN CN201620010654.7U patent/CN205296182U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106436727A (en) * | 2016-09-27 | 2017-02-22 | 中铁五局集团有限公司 | Extreme geological tunnel portal construction method |
CN109083161A (en) * | 2018-08-02 | 2018-12-25 | 浙江交工集团股份有限公司 | Wide ecological slope protection structure and its construction method are spelled suitable for long and narrow space |
CN110073852A (en) * | 2019-06-03 | 2019-08-02 | 河南省水利勘测设计研究有限公司 | Soil property gradient slope arbor plantation hole structure and the method for planting arbor |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105862887B (en) | A kind of ion type rareearth mine ecological slope protection structure | |
CN103074898B (en) | Multi-row pile foundation pit support structure and construction method thereof | |
CN101451355B (en) | Water retention method of back fill course | |
CN106193066B (en) | A kind of Loess landslide administering method based on restoration of the ecosystem | |
CN106703044B (en) | One kind stream modeling shape rinse fill soft stratum slope combination supporting method | |
CN205296182U (en) | A punishment device that is used for non - excavation formula excavation side slope hole groove disease | |
CN102561370A (en) | Protective structure for reinforcing high-liquid-limit soil slope | |
CN104396494A (en) | Method for greening original soil of heavy saline-alkali land | |
CN109024458A (en) | A kind of coal mine subsidence land landscape revetment and the construction method of water-bed antiseepage | |
CN202509511U (en) | Protective structure for reinforcing high liquid limit soil side slope | |
CN106120822B (en) | A kind of method for protecting support and device that prevent mud stone from coming down | |
CN103334450B (en) | Construction method of pile precast slab retaining wall with drainage ditch | |
CN106703053A (en) | Construction method for reinforced soil drainage composite revetment structure | |
CN205530299U (en) | Ecological slope protection structure in ion type rare earth mine mountain | |
CN202658600U (en) | Ecological composite anti-slide pile | |
CN102943480B (en) | Loess foundation pit supporting method | |
CN204825785U (en) | Stain farm ditch is arranged in water logging control of adopting geotextile ecological bag to build shore protection by laying bricks or stones | |
CN206143783U (en) | Prevent supporting device on mud stone landslide | |
CN216194456U (en) | Reinforcing structure of hydro-fluctuation belt bank slope | |
CN203594009U (en) | Novel farmland drainage ditch | |
CN205917646U (en) | Hydraulic engineering is with having retaining wall device that anti - filter constructs | |
CN105926577B (en) | Vacuum preloading seepage consolidation method | |
CN212612893U (en) | Landfill repair system | |
CN205012318U (en) | Soft soil foundation treatment device | |
CN205000346U (en) | Slope frame for slope reinforcement and water drainage |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160608 Termination date: 20170107 |
|
CF01 | Termination of patent right due to non-payment of annual fee |