CN205296182U - A punishment device that is used for non - excavation formula excavation side slope hole groove disease - Google Patents

A punishment device that is used for non - excavation formula excavation side slope hole groove disease Download PDF

Info

Publication number
CN205296182U
CN205296182U CN201620010654.7U CN201620010654U CN205296182U CN 205296182 U CN205296182 U CN 205296182U CN 201620010654 U CN201620010654 U CN 201620010654U CN 205296182 U CN205296182 U CN 205296182U
Authority
CN
China
Prior art keywords
spacer bar
pit
bag
excavation
punishment device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620010654.7U
Other languages
Chinese (zh)
Inventor
刘洪辉
王维荣
梁广
赵海森
王瑛
张泳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian Highway Research Institute
Original Assignee
Xian Highway Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian Highway Research Institute filed Critical Xian Highway Research Institute
Priority to CN201620010654.7U priority Critical patent/CN205296182U/en
Application granted granted Critical
Publication of CN205296182U publication Critical patent/CN205296182U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The utility model provides a punishment device that is used for non - excavation formula excavation side slope hole groove disease which characterized in that, including establishing the spacer bar net piece in hole tank bottom portion, implant in the soil body of hole tank bottom portion the bottom of spacer bar net piece, set up sign indicating number step bag on spacer bar net piece, every 4 -5 layer sets up the support that hole tank bottom portion was implanted to the one deck spacer bar from lower to upper, the spacer bar of lower floor adopts HRB335 level phi 20@20cm reinforcing bar net piece, set up the drain pipe, draw forth the internal moisture in slope domatic, implant spacer bar net piece in hole tank bottom portion, the longitudinal reinforcement should stretch into to be stablized the soil body and is not less than 1 meter, sign indicating number step bag on spacer bar net piece, according to the scope of hole groove disease, every 4 -5 layer earth bag sets up the one deck spacer bar, have that simple structure, cost are low, convenient to use's characteristics.

Description

A kind of punishment device for non-excavation type execavated rockmass pit disease
Technical field
This utility model belongs to side slope Treating technology field, particularly to a kind of punishment device for non-excavation type execavated rockmass pit disease.
Background technology
Execavated rockmass in use, Chang Yinwei rain drop erosion, climate change and other reasons, cause the diseases such as domatic peeling, form the pit that destructiveness is different. Punishment to execavated rockmass pit, generally has following two mode: when pit scope is less, or when the degree of depth is shallower, do not affect the stability of side slope, now disregard at present; When pit scope is relatively big, or when the degree of depth is deeper, then again brush slope, after reaching certain ratio of slope, carry out domatic grass planting or the protection of other masonries.
First kind of way problematically, which is a kind of comparatively passive Treatment Scheme, when pit is disregarded, disease can develop further under severe natural environment, thus causing that even more serious disease occurs. Protecting according to after again brushing slope, often due to brush slope scope is relatively big, the mode of heavy excavation causes the destruction to original soil body and protection method, also necessarily causes higher cost. If side slope produces pit disease again behind brush slope, deal with extremely inconvenience.
Summary of the invention
For overcoming above-mentioned the deficiencies in the prior art, the purpose of this utility model is to provide a kind of punishment device for non-excavation type execavated rockmass pit disease, has the advantages that simple in construction, cost are low, easy to use.
For achieving the above object, the technical solution adopted in the utility model is: a kind of punishment device for non-excavation type execavated rockmass pit disease, includes the spacer bar mesh sheet being located at bottom pit, and the bottom of spacer bar mesh sheet is implanted in the soil body bottom pit; Spacer bar mesh sheet arranges code and builds bag; From lower to upper one layer of spacer bar is set every 4-5 layer and implants the support bottom pit; Undermost spacer bar adopts HRB335 level �� 2020cm reinforced mesh.
The described code outside pit that is located at builds bag employing plant biological bag.
Described code is built bag and is adopted rubble bag or earth bag.
It is be more than or equal to 1 meter that the length of pit soil body part is implanted in the bottom of described spacer bar mesh sheet.
The spacer bar of described centrally located layer position adopts HRB335 level �� 1220cm.
Arranging drain pipe in described pit, drain pipe is divided into draining section, the section of intercepting water, outdrill section; Drain pipe adopts HDPE corrugated tube with holes.
The beneficial effects of the utility model are:
This method adopts no-dig technique mode that the pit that excavation is domatic is punished, earth bag is built by code after slope stability district implants spacer bar mesh sheet, effectively it is filled with domatic pit region, and by arranging drain pipe, the slope internal water of pit is drawn domatic, then carry out breaking dibbling grass after domatic outermost code builds plant biological bag, recover domatic greening, thus ensureing domatic attractive in appearance and stable. This method is simple and easy to do, it is to avoid to domatic excavation, effectively increases slope stability, has recovered slope greening, substantially increases work effectiveness; Have the advantages that simple in construction, cost are low, easy to use.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the scheme of installation (unit: mm) of this utility model drain pipe.
Fig. 3 is the osculum on this utility model drain pipe and arrangement of boring holes figure (unit: mm); Wherein Fig. 3 (a) is osculum schematic diagram; Fig. 3 (b) is osculum arrangement of boring holes figure.
Detailed description of the invention
Below in conjunction with accompanying drawing, structural principle of the present utility model and operation principle are described in further detail.
Referring to Fig. 1, a kind of punishment device for non-excavation type execavated rockmass pit disease, including the spacer bar mesh sheet 1 being located at bottom pit, the bottom of spacer bar mesh sheet 1 is implanted in the soil body bottom pit; Spacer bar mesh sheet arranges code and builds bag 2; From lower to upper one layer of spacer bar is set every 4-5 layer and implants the support 3 bottom pit; Undermost spacer bar adopts HRB335 level �� 2020cm reinforced mesh.
The described code outside pit that is located at builds bag employing plant biological bag.
Described code is built bag and is adopted rubble bag or earth bag.
Code is built earth bag and is adopted straw bag, gunnysack, Glass Fibre Bag or the packed mound code of non-woven fabrics. Bag should load the good pellet of the water penetration such as coarse sand or boulder and cobble. Soil loading amount is the 1/2-2/3 of earth bag capacity, and bag mouth should be sewed up. The soil containing the foreign material such as tree root, fragment of brick or organic matter is not allowed in earth material.
The bottom of described spacer bar mesh sheet 1 is implanted the length of pit soil body part and is not less than 1 meter.
Described drain pipe pierces portion in the body of slope according to soil property, hydrologic regime, and caliber is 100mm. The spacer bar of described centrally located layer position adopts HRB335 level �� 1220cm. Bore diameter is 110mm, and drain pipe adopts HDPE corrugated tube with holes.
Referring to Fig. 3, arranging drain pipe 5 in described pit, drain pipe is divided into draining section, the section of intercepting water, outdrill section; Drain pipe adopts HDPE corrugated tube with holes. In described drain pipe draining section, 1-3m does not punch, punching, diameter 10mm, longitudinal pitch 150mm in the section of intercepting water. The described HDPE corrugated tube with holes permeable geotextiles of outsourcing, geotextiles adopts the standard of 400g/m.
Operation principle of the present utility model is:
After being cleared up at pit interface, implanting spacer bar mesh sheet bottom pit, longitudinal reinforcement should stretch into the stable soil body and be not less than 1 meter. Then in spacer bar mesh sheet, code builds earth bag, if side slope is stone matter, can build rubble bag by code in spacer bar mesh sheet. Scope according to pit disease, can arrange one layer of spacer bar every 4-5 layer earth bag. When rock side-slope adopts rubble bag, one layer of spacer bar is set every layer 2-3 rubble bag;And by arranging drain pipe, pit slope internal water is drawn domatic; The outermost earth bag of pit adopts plant biological bag, adopts modes such as breaking dibbling grass, recovers slope greening.
Operating process of the present utility model is:
1) when execavated rockmass is rock side-slope:
Finishing side slope �� measurement, unwrapping wire �� pore-forming �� joint bar �� slip casting �� code build rubble bag (plant biological bag) �� maintenance
2) when execavated rockmass is soil-slope:
Finishing side slope �� measurement, unwrapping wire �� pore-forming �� joint bar �� code build earth bag (plant biological bag) �� maintenance
Drain pipe adopts quincunx setting, spacing 1.0m, can do suitable adjustment according to pit damage envelope and slope body soil property, hydrologic regime; Bottom spacer bar adopts HRB335 level �� 2020cm reinforced mesh, position, intermediate layer reinforced mesh �� 1220cm, during soil-slope boring, forbids to pour water, it is possible to directly squeeze into reinforcing bar. Rock side slope can adopt the method that slip casting anchors. Grouting pressure adopts 0.4MPa, ratio of mud 0.45-0.5 neat slurry, and cement adopts P.O.32.5.

Claims (6)

1. the punishment device for non-excavation type execavated rockmass pit disease, it is characterised in that include the spacer bar mesh sheet (1) being located at bottom pit, the bottom of spacer bar mesh sheet (1) is implanted in the soil body bottom pit; Spacer bar mesh sheet arranges code and builds bag (2); From lower to upper one layer of spacer bar is set every 4-5 layer and implants the support (3) bottom pit; Undermost spacer bar adopts HRB335 level �� 2020cm reinforced mesh.
2. a kind of punishment device for non-excavation type execavated rockmass pit disease according to claim 1, it is characterised in that the described code outside pit that is located at builds bag employing plant biological bag (4).
3. a kind of punishment device for non-excavation type execavated rockmass pit disease according to claim 1, it is characterised in that described code is built bag and adopted rubble bag or earth bag.
4. a kind of punishment device for non-excavation type execavated rockmass pit disease according to claim 1, it is characterised in that the length of pit soil body part is implanted be more than or equal to 1 meter in the bottom of described spacer bar mesh sheet (1).
5. a kind of punishment device for non-excavation type execavated rockmass pit disease according to claim 1, it is characterised in that the spacer bar of described centrally located layer position adopts HRB335 level �� 1220cm.
6. a kind of punishment device for non-excavation type execavated rockmass pit disease according to claim 1, it is characterised in that arranging drain pipe (5) in described pit, drain pipe is divided into draining section, the section of intercepting water, outdrill section; Drain pipe adopts HDPE corrugated tube with holes.
CN201620010654.7U 2016-01-07 2016-01-07 A punishment device that is used for non - excavation formula excavation side slope hole groove disease Expired - Fee Related CN205296182U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620010654.7U CN205296182U (en) 2016-01-07 2016-01-07 A punishment device that is used for non - excavation formula excavation side slope hole groove disease

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620010654.7U CN205296182U (en) 2016-01-07 2016-01-07 A punishment device that is used for non - excavation formula excavation side slope hole groove disease

Publications (1)

Publication Number Publication Date
CN205296182U true CN205296182U (en) 2016-06-08

Family

ID=56486194

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620010654.7U Expired - Fee Related CN205296182U (en) 2016-01-07 2016-01-07 A punishment device that is used for non - excavation formula excavation side slope hole groove disease

Country Status (1)

Country Link
CN (1) CN205296182U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106436727A (en) * 2016-09-27 2017-02-22 中铁五局集团有限公司 Extreme geological tunnel portal construction method
CN109083161A (en) * 2018-08-02 2018-12-25 浙江交工集团股份有限公司 Wide ecological slope protection structure and its construction method are spelled suitable for long and narrow space
CN110073852A (en) * 2019-06-03 2019-08-02 河南省水利勘测设计研究有限公司 Soil property gradient slope arbor plantation hole structure and the method for planting arbor

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106436727A (en) * 2016-09-27 2017-02-22 中铁五局集团有限公司 Extreme geological tunnel portal construction method
CN109083161A (en) * 2018-08-02 2018-12-25 浙江交工集团股份有限公司 Wide ecological slope protection structure and its construction method are spelled suitable for long and narrow space
CN110073852A (en) * 2019-06-03 2019-08-02 河南省水利勘测设计研究有限公司 Soil property gradient slope arbor plantation hole structure and the method for planting arbor

Similar Documents

Publication Publication Date Title
CN105862887B (en) A kind of ion type rareearth mine ecological slope protection structure
CN103074898B (en) Multi-row pile foundation pit support structure and construction method thereof
CN101451355B (en) Water retention method of back fill course
CN106193066B (en) A kind of Loess landslide administering method based on restoration of the ecosystem
CN106703044B (en) One kind stream modeling shape rinse fill soft stratum slope combination supporting method
CN205296182U (en) A punishment device that is used for non - excavation formula excavation side slope hole groove disease
CN102561370A (en) Protective structure for reinforcing high-liquid-limit soil slope
CN104396494A (en) Method for greening original soil of heavy saline-alkali land
CN109024458A (en) A kind of coal mine subsidence land landscape revetment and the construction method of water-bed antiseepage
CN202509511U (en) Protective structure for reinforcing high liquid limit soil side slope
CN106120822B (en) A kind of method for protecting support and device that prevent mud stone from coming down
CN103334450B (en) Construction method of pile precast slab retaining wall with drainage ditch
CN106703053A (en) Construction method for reinforced soil drainage composite revetment structure
CN205530299U (en) Ecological slope protection structure in ion type rare earth mine mountain
CN202658600U (en) Ecological composite anti-slide pile
CN102943480B (en) Loess foundation pit supporting method
CN204825785U (en) Stain farm ditch is arranged in water logging control of adopting geotextile ecological bag to build shore protection by laying bricks or stones
CN206143783U (en) Prevent supporting device on mud stone landslide
CN216194456U (en) Reinforcing structure of hydro-fluctuation belt bank slope
CN203594009U (en) Novel farmland drainage ditch
CN205917646U (en) Hydraulic engineering is with having retaining wall device that anti - filter constructs
CN105926577B (en) Vacuum preloading seepage consolidation method
CN212612893U (en) Landfill repair system
CN205012318U (en) Soft soil foundation treatment device
CN205000346U (en) Slope frame for slope reinforcement and water drainage

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160608

Termination date: 20170107

CF01 Termination of patent right due to non-payment of annual fee