CN110070288A - A kind of on-line monitoring for spinning machine and production management system and method - Google Patents

A kind of on-line monitoring for spinning machine and production management system and method Download PDF

Info

Publication number
CN110070288A
CN110070288A CN201910319627.6A CN201910319627A CN110070288A CN 110070288 A CN110070288 A CN 110070288A CN 201910319627 A CN201910319627 A CN 201910319627A CN 110070288 A CN110070288 A CN 110070288A
Authority
CN
China
Prior art keywords
spinning machine
data
real
production
line monitoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910319627.6A
Other languages
Chinese (zh)
Inventor
吕伟
陈伟伟
韩少恒
陈鑫
陈怡然
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Electric Group Corp
Original Assignee
Shanghai Electric Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Electric Group Corp filed Critical Shanghai Electric Group Corp
Priority to CN201910319627.6A priority Critical patent/CN110070288A/en
Publication of CN110070288A publication Critical patent/CN110070288A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06395Quality analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Educational Administration (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Development Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • General Factory Administration (AREA)

Abstract

The present invention relates to intelligent O&M technical field more particularly to a kind of on-line monitoring for spinning machine and production management system and methods, are used to obtain the real-time production data of spinning machine including an intelligent terminal;One data resolution module is to receive real-time production data, and creation data after being parsed to real-time production data;One remote monitoring module to monitor parsing after creation data;The remote monitoring platform of one spinning machine, spinning machine remote monitoring platform connects the remote monitoring platform that intelligent terminal sends real-time production data to spinning machine by the Internet transport protocol, calculating is parsed and counted to real time data.Above-mentioned technical proposal the utility model has the advantages that realizing to the real time monitoring of spinning machine operation conditions and supporting the production management and personal management at spinning scene, realize the remote data storage, real time monitoring and production management of the more factories in spinning industry strange land, the intelligent O&M for being conducive to improve spinning machine industry is horizontal, improves product quality.

Description

A kind of on-line monitoring for spinning machine and production management system and method
Technical field
The present invention relates to intelligent O&M technical field more particularly to a kind of on-line monitorings and production management for spinning machine System and method.
Background technique
Textile clothing industry is in the national economic development in China always in occupation of critical role, cotton yarn, cotton, lint, silk Fabric, chemical fibre, clothes Isoquant rank first in the world, and Clothing Export also remains No. 1 in the world for many years.Spinning The working condition of core equipment of the machine as textile industry, spinning machine has a major impact the economical operation of cotton mill.
In recent years, textile manufacturing online monitoring system in the market gradually increases.There is the full-range production process prison of spinning Control system from scutching cotton to winder, it can be achieved that produce the data acquisition and processing (DAP) of overall process;Also have just for the single typical case such as spun yarn The monitoring processing system of production process.But the intelligent level of textile industry is integrally relatively low, and China still has 90% or more at present Spinning equipment not yet installs the online monitoring systems such as production, the energy, quality.As the proposition of industrial 4.0 concepts, two change fusion It promotes and the increased pressure of cost of labor, the importance of process of textile production monitoring system is increasingly prominent.
Therefore need it is a kind of be able to solve the horizontal universal lower problem of spinning machine industry intelligence O&M, pass through intelligent end End and spinning machine remote monitoring platform two large divisions realize remote data storage, the real time monitoring of the more factories in spinning industry strange land And production management.
Summary of the invention
In view of the problems of the existing technology and drawback, it is proposed that a kind of on-line monitoring and production management for spinning machine System.
Specific technical solution is as follows:
A kind of on-line monitoring and production management system for spinning machine, including:
One intelligent terminal, the intelligent terminal are used to obtain the real-time production data of the spinning machine;
One data resolution module, the data resolution module to receive the real-time production data, and to it is described in real time Creation data after creation data is parsed;
One remote monitoring module, the remote monitoring module is to monitor creation data after the parsing;
The remote monitoring platform of one spinning machine, the spinning machine remote monitoring platform connect the intelligent terminal;
It is long-range to the spinning machine that the intelligent terminal by the Internet transport protocol sends the real-time production data Monitor supervision platform, the real time data being parsed and be counted calculating, realize remote data storage and real time monitoring and Production management.
Further, the remote monitoring platform of the spinning machine includes:
One data processing module, the data processing module is to carry out data processing to creation data after the parsing;
One data memory module, the data memory module connect the data processing module, described real-time to store Creation data after creation data and the parsing.
Further, the remote monitoring module includes:
One real time monitoring unit, the real time monitoring unit are used to be handled to obtain according to creation data after the parsing described The real-time production target of spinning machine, to monitor in real time to the real-time production target, the real time monitoring unit will be described Real-time production target, which is sent in the data memory module, to be saved;
One alarm unit, the alarm unit be used for by creation data after the parsing and preset standard production data into Row compares, and exports corresponding warning message according to comparison result;
One statement analysis unit, to analyze the historical data of the real-time production target and generate a statistical report form;
One production configuration unit, is managed the configurations information of the spinning machine to be supplied to operator, After the operator changes the configurations information, the remote monitoring platform passes through the configurations information described Intelligent terminal is sent to the spinning machine.
It further, include multiple in creation data after the parsing each other with the subdata of corresponding relationship.
Further, the remote monitoring module further include:
One decision-making treatment unit, according to creation data after the parsing, to the corresponding relationship between each subdata It is analyzed, and generates Adjusted Option based on the analysis results and export, so that operator is adjusted the spinning machine.
Further, the Adjusted Option includes:
The adjustment suggestion that the configurations information of the spinning machine is adjusted;And/or
The reparation suggestion that the failure problems of the spinning machine are repaired.
Further, the warning message includes: spindle weak twist;And/or
Spindle broken end.
Further, the on-line monitoring of the spinning machine and production management system be suitable for multiple plant areas on-line monitoring and Production management.
A kind of on-line monitoring for spinning machine and production management method, applied to described in any of the above one for spinning The on-line monitoring and production management system of yarn machine, specifically includes the following steps:
Step S1, the on-line monitoring obtain the real-time production data of the spinning machine with production management system;
Step S2, the on-line monitoring export the real-time production number by the Internet transport protocol with production management system According to;
Step S3, the on-line monitoring and production management system parse after obtaining parsing the real-time production data Creation data;
Step S4, the on-line monitoring and production management system are monitored creation data after the parsing.
It further, further include being carried out to creation data after the real-time production data and the parsing in the step S2 Storage.
Further, the step S3 is specifically included:
Step S31, the on-line monitoring and production management system handle to obtain described according to creation data after the parsing The real-time production target of spinning machine, to be monitored in real time to the real-time production target;
Step S32, the on-line monitoring analyze historical data and the life of the real-time production target with production management system At statistical report form.
Further, the step S3 further include:
The on-line monitoring and production management system are according to creation data after the parsing, between each subdata Corresponding relationship analyzed, and generate Adjusted Option and export based on the analysis results, so that operator is to the spinning machine It is adjusted.
Further, the Adjusted Option includes:
The adjustment suggestion that the configurations information of the spinning machine is adjusted;And/or
The reparation suggestion that the failure problems of the spinning machine are repaired.
Further, the step S3 further include:
The on-line monitoring and production management system by creation data after the parsing and preset standard production data into Row compares, and exports corresponding warning message according to comparison result.
Further, the warning message includes: spindle weak twist;And/or
Spindle broken end.
Further, the on-line monitoring of the spinning machine and production management method be suitable for multiple plant areas on-line monitoring and Production management.
Above-mentioned technical proposal the utility model has the advantages that
The real-time production data that spinning machine control system acquisition is obtained by intelligent terminal, by the Internet transport protocol Spinning machine remote monitoring platform is reached, data are parsed and counted calculating using the data resolution module on platform, remotely Monitoring software reads the data after parsing, realizes to the real time monitoring of spinning machine operation conditions, historical statement analysis, intelligent decision Etc. functions, monitoring software simultaneously support spinning scene production management and personal management, realize the more factories in spinning industry strange land Remote data storage, real time monitoring and production management, the intelligent O&M for being conducive to improve spinning machine industry is horizontal, formulates unification Industry O&M standard improves product quality.
Detailed description of the invention
Fig. 1 is a kind of on-line monitoring for spinning machine provided by the invention and production management system figure;
Fig. 2 is a kind of on-line monitoring for spinning machine provided by the invention and production management system practical application figure;
Fig. 3 is the flow chart of a kind of on-line monitoring for spinning machine provided by the invention and production management method;
Fig. 4 is a kind of on-line monitoring and production management system for spinning machine provided by the invention to producing number after parsing According to the flow chart handled.
1, spinning machine;2, intelligent terminal;3, remote monitoring platform;31, data processing module;32, data memory module;4, Data resolution module;5, remote monitoring module;51, unit is monitored in real time;52, alarm unit;53, statement analysis unit;54, raw Produce configuration unit;55, decision-making treatment unit.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art without creative labor it is obtained it is all its His embodiment, shall fall within the protection scope of the present invention.
It should be noted that in the absence of conflict, the feature in embodiment and embodiment in the present invention can phase Mutually combination.
The present invention will be further explained below with reference to the attached drawings and specific examples, but not as the limitation of the invention.
A kind of on-line monitoring and production management system for spinning machine, as shown in Figure 1, including:
One intelligent terminal 2, intelligent terminal 2 are used to obtain the real-time production data of spinning machine 1;
One data resolution module 4, data resolution module 4 to receive real-time production data, and to real-time production data into Creation data after row is parsed;
One remote monitoring module 5, remote monitoring module 5 to monitor parsing after creation data;
The remote monitoring platform 3 of one spinning machine, spinning machine remote monitoring platform 3 connect intelligent terminal 2;
Intelligent terminal 2 sends the remote monitoring platform 3 of real-time production data to spinning machine by the Internet transport protocol, uses Calculating is parsed and counted to real time data, remote data storage and real time monitoring and production management are realized.
In above-mentioned technical proposal, the real-time production data of spinning machine 1 is obtained by intelligent terminal 2, parses mould using data Block 4 receives the real-time production data, and creation data after being parsed to real-time production data, while with remote Creation data after the monitoring parsing of range monitoring module 5, is carried out data transmission by the Internet transport protocol, realizes real-time production data Storage and spinning machine work real time monitoring, the intelligent O&M for improving entire spinning machine industry is horizontal, is spinning industry system Unified industry O&M standard is determined, has further standardized spinning machine production management, improved the quality of product.
As preferred embodiment, the remote monitoring platform 3 of spinning machine includes:
One data processing module 31, data processing module 31 is to carry out data processing to creation data after parsing;
One data memory module 32, data memory module 32 connect data processing module 31, to store production number in real time According to creation data after the parsing.
In above-mentioned technical proposal, by data processing module 31 will to after parsing creation data carry out data processing, It realizes treated data call, and produces number after storing real-time production data and the parsing using data memory module 32 According to realizing on-line monitoring and the production management of spinning machine, the intelligent O&M for improving entire spinning industry is horizontal, has pushed spinning The further development of yarn industry.
As preferred embodiment, remote monitoring module 5 includes:
One real time monitoring unit 51, real time monitoring unit 51 according to creation data after parsing for handling to obtain spinning machine Real-time production target, to monitor in real time to real-time production target, real-time production target is sent to by real time monitoring unit 51 It is saved in data memory module 32;
One alarm unit 52, alarm unit 52 compare for creation data after parsing with preset standard production data It is right, and corresponding warning message is exported according to comparison result;
One statement analysis unit 53, to analyze the historical data of real-time production target and generate a statistical report form;
One production configuration unit 54, is managed the configurations information of spinning machine to be supplied to operator, grasps After making personnel's change configurations information, configurations information is sent to spinning machine by intelligent terminal 2 by remote monitoring platform 3 1。
In above-mentioned technical proposal, is realized by real time monitoring unit 51 and the real-time production target of spinning machine 1 is carried out in real time Monitoring, creation data after parsing is compared with preset standard production data using alarm unit 52, and is tied according to comparing Fruit exports corresponding warning message, is analyzed by historical data of the statement analysis unit 53 to the real-time production target of spinning machine Processing generates statistical report form and realizes equipment operation condition management, realizes 1 basis production letter of spinning machine by production configuration unit 54 The configuration of breath realizes the remote data storage, real time monitoring and production management of the more factories in spinning industry strange land, is conducive to improve and spin The intelligent O&M level of yarn machine industry increases production efficiency.
Further, spinning machine real time monitoring unit 51 by parsing after creation data realize to workshop level, device level, Spindle grade data are monitored in real time, the production targets such as production efficiency, ingot speed, real-time yield of monitoring site, and interface is not by Same color indicates the different conditions of spinning machine, spindle, the warning messages such as page real-time prompting spindle broken end, spindle weak twist.
Wherein, spinning machine statement analysis unit 53 carries out data analysis by the historical data to record, generates to vehicle Between, equipment, teams and groups, personnel production status statistical report form, by report it can be seen that the machining status comparison of every machine, no With the comparison of worker's production efficiency, personnel performance's management and equipment operation condition management are realized.
Wherein, spinning machine production configuration unit 54 can the personnel of progress arrange an order according to class and grade management, manufacturing parameter setting, personal management, The personnel of each shift in some cycles can be set in device parameter configuration and the setting of some basic informations, personnel's management of arranging an order according to class and grade It arranges and each operative employee needs responsible spinning machine within oneself working time.
It include multiple subdatas each other with corresponding relationship in creation data after parsing as preferred embodiment, Remote monitoring module 5 further include:
One decision-making treatment unit 55, according to creation data after parsing, to the corresponding relationship between each subdata into Row analysis, and generate Adjusted Option based on the analysis results and export, so that operator is adjusted the spinning machine.
In above-mentioned technical proposal, by creation data after parsing it is multiple each other with corresponding relationship subdatas into Row analysis is adjusted suggestion with decision-making treatment unit 55, realizes the adjustment to spinning machine 1.Specifically, being breaked end by spindle It is analyzed with the corresponding relationship of ingot speed, provides the setting of spindle ingot speed and suggest, improved the quality of production to reduce the broken end number of spindle, pass through The corresponding relationship analysis of workshop appliance arrangement and spindle broken end, calculates the optimal sequence and route for repairing current broken end spindle, mentions Response speed of the high execute-in-place work to broken end spindle.
As preferred embodiment, Adjusted Option includes:
The adjustment suggestion that the configurations information of spinning machine is adjusted;And/or
The reparation suggestion that the failure problems of spinning machine are repaired.
In above-mentioned technical proposal, the Adjusted Option provided by decision-making treatment unit, in a sense instead of artificial The operation problem for handling spinning machine, has liberated manpower, has improved the production level of textile mills, further, improved entire spinning The intelligent O&M of yarn industry is horizontal.
As preferred embodiment, warning message includes: spindle weak twist, spindle broken end.
In above-mentioned technical proposal, by the monitoring to spindle weak twist and spindle broken end in warning message, spinning machine is realized On-line monitoring and production management, improve the production level of textile mills, have formulated unified industry O&M standard for spinning industry.
As preferred embodiment, the on-line monitoring and production management system of spinning machine are suitable for the online prison of multiple plant areas Control and production management, as shown in Fig. 2, by the corresponding spinning machine 1 of an intelligent terminal 2, while sharing a long-range control Platform 3 realizes remote data storage, real time monitoring and the production management of the more factories in textile industry strange land.
A kind of on-line monitoring for spinning machine and production management method, applied to any of the above one for spinning machine On-line monitoring and production management system, as shown in figure 3, specifically includes the following steps:
Step S1, on-line monitoring obtain the real-time production data of spinning machine with production management system;
Step S2, on-line monitoring export real-time production data by the Internet transport protocol with production management system;
Step S3, on-line monitoring and production management system produce number after being parsed to real-time production data According to;
Step S4, on-line monitoring and production management system are monitored creation data after parsing.
In above-mentioned technical proposal, by obtaining the real-time production data of spinning machine, and real-time production data is parsed Creation data after being parsed realizes the monitoring to creation data after real-time production data and parsing, while passing through internet Transport protocol carries out data transmission, and realizes the real time monitoring of storage and the spinning machine work of real-time production data, improves entire The intelligent O&M of spinning machine industry is horizontal, has formulated unified industry O&M standard for spinning industry, has further standardized spinning Yarn machine production management, improves the quality of product.
It further include depositing to creation data after real-time production data and parsing as preferred embodiment, in step S2 Storage.
As preferred embodiment, as shown in figure 4, step S3 is specifically included:
Step S31, on-line monitoring and production management system handle to obtain the real-time of spinning machine according to creation data after parsing Production target, to be monitored in real time to real-time production target;
Step S32, on-line monitoring analyze the historical data of real-time production target with production management system and generate statistics report Table.
As preferred embodiment, step S3 further include:
On-line monitoring and production management system according to creation data after parsing, to the corresponding relationship between each subdata into Row analysis, and generate Adjusted Option based on the analysis results and export, so that operator is adjusted spinning machine.
As preferred embodiment, Adjusted Option includes:
The adjustment suggestion that the configurations information of spinning machine is adjusted;And/or
The reparation suggestion that the failure problems of spinning machine are repaired.
As preferred embodiment, step S3 further include:
Creation data after parsing is compared with preset standard production data with production management system for on-line monitoring, and Corresponding warning message is exported according to comparison result.
As preferred embodiment, warning message includes: spindle weak twist;And/or
Spindle broken end.
As preferred embodiment, the on-line monitoring and production management method of spinning machine are suitable for the online prison of multiple plant areas Control and production management.
The foregoing is merely preferred embodiments of the present invention, are not intended to limit embodiments of the present invention and protection model It encloses, to those skilled in the art, should can appreciate that all with made by description of the invention and diagramatic content Equivalent replacement and obviously change obtained scheme, should all be included within the scope of the present invention.

Claims (16)

1. a kind of on-line monitoring and production management system for spinning machine characterized by comprising
One intelligent terminal, the intelligent terminal are used to obtain the real-time production data of the spinning machine;
One data resolution module, the data resolution module is to receive the real-time production data, and to the real-time production Creation data after data are parsed;
One remote monitoring module, the remote monitoring module is to monitor creation data after the parsing;
The remote monitoring platform of one spinning machine, the spinning machine remote monitoring platform connect the intelligent terminal;
The intelligent terminal sends the long-range monitoring of the real-time production data to the spinning machine by the Internet transport protocol Platform realizes remote data storage and real time monitoring and production the real time data is parsed and be counted calculating Management.
2. a kind of on-line monitoring and production management system for spinning machine according to claim 1, which is characterized in that institute The remote monitoring platform for stating spinning machine includes:
One data processing module, the data processing module is to carry out data processing to creation data after the parsing;
One data memory module, the data memory module connects the data processing module, to store the real-time production Creation data after data and the parsing.
3. a kind of on-line monitoring and production management system for spinning machine according to claim 1, which is characterized in that institute Stating remote monitoring module includes:
One real time monitoring unit, the real time monitoring unit according to creation data after the parsing for handling to obtain the spinning The real-time production target of machine, to monitor in real time to the real-time production target, the real time monitoring unit will be described real-time Production target is sent in the data memory module and saves;
One alarm unit, the alarm unit is for comparing creation data after the parsing and preset standard production data It is right, and corresponding warning message is exported according to comparison result;
One statement analysis unit, to analyze the historical data of the real-time production target and generate a statistical report form;
One production configuration unit, is managed the configurations information of the spinning machine to be supplied to operator, described After operator changes the configurations information, the configurations information is passed through the intelligence by the remote monitoring platform Terminal is sent to the spinning machine.
4. a kind of on-line monitoring and production management system for spinning machine according to claim 1, which is characterized in that institute State after parsing includes multiple in creation data each other with the subdatas of corresponding relationship.
5. a kind of on-line monitoring and production management system for spinning machine according to claim 1, which is characterized in that institute State remote monitoring module further include:
One decision-making treatment unit carries out the corresponding relationship between each subdata according to creation data after the parsing Analysis, and generate Adjusted Option based on the analysis results and export, so that operator is adjusted the spinning machine.
6. a kind of on-line monitoring and production management system for spinning machine according to claim 5, which is characterized in that institute Stating Adjusted Option includes:
The adjustment suggestion that the configurations information of the spinning machine is adjusted;And/or
The reparation suggestion that the failure problems of the spinning machine are repaired.
7. a kind of on-line monitoring and production management system for spinning machine according to claim 3, which is characterized in that institute Stating warning message includes: spindle weak twist;And/or
Spindle broken end.
8. a kind of on-line monitoring and production management system for spinning machine according to claim 1, which is characterized in that institute The on-line monitoring and production management system of stating spinning machine are suitable for the on-line monitoring and production management of multiple plant areas.
9. a kind of on-line monitoring for spinning machine and production management method, which is characterized in that be applied to as in claim 1-8 The on-line monitoring and production management system of spinning machine are used for described in any one, specifically includes the following steps:
Step S1, the on-line monitoring obtain the real-time production data of the spinning machine with production management system;
Step S2, the on-line monitoring export the real-time production data by the Internet transport protocol with production management system;
Step S3, the on-line monitoring and production management system produce after being parsed to the real-time production data Data;
Step S4, the on-line monitoring and production management system are monitored creation data after the parsing.
10. a kind of on-line monitoring for spinning machine according to claim 9 and production management method, which is characterized in that It further include being stored to creation data after the real-time production data and the parsing in the step S2.
11. a kind of on-line monitoring for spinning machine according to claim 9 and production management method, which is characterized in that The step S3 is specifically included:
Step S31, the on-line monitoring and production management system handle to obtain the spinning according to creation data after the parsing The real-time production target of machine, to be monitored in real time to the real-time production target;
Step S32, the on-line monitoring analyze the historical data of the real-time production target and generate system with production management system Count report.
12. a kind of on-line monitoring for spinning machine according to claim 11 and production management method, which is characterized in that The step S3 further include:
The on-line monitoring and production management system are according to creation data after the parsing, to pair between each subdata It should be related to and be analyzed, and generate Adjusted Option based on the analysis results and export, so that operator carries out the spinning machine Adjustment.
13. a kind of on-line monitoring for spinning machine according to claim 12 and production management method, which is characterized in that The Adjusted Option includes:
The adjustment suggestion that the configurations information of the spinning machine is adjusted;And/or
The reparation suggestion that the failure problems of the spinning machine are repaired.
14. a kind of on-line monitoring for spinning machine according to claim 11 and production management method, which is characterized in that The step S3 further include:
The on-line monitoring and production management system compare creation data after the parsing and preset standard production data It is right, and corresponding warning message is exported according to comparison result.
15. a kind of on-line monitoring and production management system for spinning machine according to claim 14, which is characterized in that The warning message includes: spindle weak twist;And/or
Spindle broken end.
16. a kind of on-line monitoring for spinning machine according to claim 9 and production management method, which is characterized in that The on-line monitoring and production management method of the spinning machine are suitable for the on-line monitoring and production management of multiple plant areas.
CN201910319627.6A 2019-04-19 2019-04-19 A kind of on-line monitoring for spinning machine and production management system and method Pending CN110070288A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910319627.6A CN110070288A (en) 2019-04-19 2019-04-19 A kind of on-line monitoring for spinning machine and production management system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910319627.6A CN110070288A (en) 2019-04-19 2019-04-19 A kind of on-line monitoring for spinning machine and production management system and method

Publications (1)

Publication Number Publication Date
CN110070288A true CN110070288A (en) 2019-07-30

Family

ID=67368195

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910319627.6A Pending CN110070288A (en) 2019-04-19 2019-04-19 A kind of on-line monitoring for spinning machine and production management system and method

Country Status (1)

Country Link
CN (1) CN110070288A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102841586A (en) * 2012-09-04 2012-12-26 昆山铁牛衬衫厂 Monitoring system for spinning production
CN104049615A (en) * 2014-06-25 2014-09-17 湛江中湛纺织有限公司 Textile production automated management system and management method thereof
CN105734737A (en) * 2016-03-01 2016-07-06 西安同锐自动化控制技术有限公司 Single spindle on-line monitoring system of spinning frame and using method thereof
WO2017072683A1 (en) * 2015-10-30 2017-05-04 Camozzi Digital S.R.L. Optimisation method of the working process for a textile production line and system
CN107422714A (en) * 2017-09-22 2017-12-01 山东华兴纺织集团有限公司 Ring ingot intelligence spinning management system and management method
CN108998867A (en) * 2018-08-17 2018-12-14 江南大学 A kind of Quality Pure Cotton Yarn Production production method joined using thickness
CN109246223A (en) * 2018-09-25 2019-01-18 海宁纺织机械有限公司 A kind of textile machine novel maintenance system and its implementation
CN109610056A (en) * 2018-12-10 2019-04-12 江南大学 A kind of ring throstle Internet of Things production control and management system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102841586A (en) * 2012-09-04 2012-12-26 昆山铁牛衬衫厂 Monitoring system for spinning production
CN104049615A (en) * 2014-06-25 2014-09-17 湛江中湛纺织有限公司 Textile production automated management system and management method thereof
WO2017072683A1 (en) * 2015-10-30 2017-05-04 Camozzi Digital S.R.L. Optimisation method of the working process for a textile production line and system
CN105734737A (en) * 2016-03-01 2016-07-06 西安同锐自动化控制技术有限公司 Single spindle on-line monitoring system of spinning frame and using method thereof
CN107422714A (en) * 2017-09-22 2017-12-01 山东华兴纺织集团有限公司 Ring ingot intelligence spinning management system and management method
CN108998867A (en) * 2018-08-17 2018-12-14 江南大学 A kind of Quality Pure Cotton Yarn Production production method joined using thickness
CN109246223A (en) * 2018-09-25 2019-01-18 海宁纺织机械有限公司 A kind of textile machine novel maintenance system and its implementation
CN109610056A (en) * 2018-12-10 2019-04-12 江南大学 A kind of ring throstle Internet of Things production control and management system

Non-Patent Citations (7)

* Cited by examiner, † Cited by third party
Title
孙坤等: "经编织机生产过程实时监测软件系统的开发", 《纺织科技进展》 *
张勤刚等: "基于物联网和工业云的纺织机械远程运维系统运用", 《机电信息》 *
朱朝华等: "棉纺设备网络监控和管理系统的应用", 《棉纺织技术》 *
王春娥等: "自动化智能化新技术在纺织企业的应用", 《棉纺织技术》 *
管锦文: "棉纺数字化车间及其智能化特点", 《棉纺织技术》 *
贾坤等: "纺织机械远程运维平台构建应用", 《纺织器材》 *
钮志云等: "纺织生产过程监控与管理系统在倍捻机织机上的应用", 《科技信息》 *

Similar Documents

Publication Publication Date Title
CN109610056A (en) A kind of ring throstle Internet of Things production control and management system
CN102841586A (en) Monitoring system for spinning production
CN109558852A (en) A kind of spinning machine fault monitoring system based on image recognition technology
CN110784398B (en) Data acquisition system and data analysis method for industrial Internet of things processing equipment
CN105678558A (en) Tracing system and tracing method for quality of spun yarns
CN111556141B (en) Intelligent gateway data acquisition system and method based on Json data sheet
CN106202550A (en) A kind of cloud management platform of sewing device digital control system
CN109531266A (en) A kind of machine tool data acquisition management platform
CN110262416A (en) A kind of industrial equipment maintenance system and its working method based on Internet of Things
CN110502719A (en) Edge calculations model management system and method
CN107675308A (en) A kind of single ingot monitor control system based on PLC
CN214067660U (en) Monitoring system based on Internet of things
CN110070288A (en) A kind of on-line monitoring for spinning machine and production management system and method
CN107272571B (en) A kind of big data platform system working method based on MHCIMS
CN102201927A (en) Alarm information processing method and device
CN210924626U (en) Intelligent bobbin quality tracking system based on production network
CN204874877U (en) Spinning equipment controlling means
CN208298007U (en) A kind of large circle machine Wireless Networking control system
CN202815502U (en) A data acquisition system of a filter stick molding device of a Siemens PLC control system in cigarette manufacturing industry
CN207468804U (en) A kind of single ingot monitor control system based on PLC controller
CN212655921U (en) Rough yarn stopping and feeding automatic control device based on PLC
CN108445859A (en) A kind of large circle machine Wireless Networking control system and its application method
CN106533786A (en) Workshop work order management system based on message push
CN109213744A (en) A kind of intelligent O&M technology based on big data
CN203376626U (en) A textile fabric production monitoring system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190730

RJ01 Rejection of invention patent application after publication