CN110005135A - 多层模块化房屋支撑柱连接结构及连接方法 - Google Patents
多层模块化房屋支撑柱连接结构及连接方法 Download PDFInfo
- Publication number
- CN110005135A CN110005135A CN201910331049.8A CN201910331049A CN110005135A CN 110005135 A CN110005135 A CN 110005135A CN 201910331049 A CN201910331049 A CN 201910331049A CN 110005135 A CN110005135 A CN 110005135A
- Authority
- CN
- China
- Prior art keywords
- hollow steel
- steel column
- reinforcing bar
- column
- docking
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/30—Columns; Pillars; Struts
- E04C3/34—Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/16—Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
- E04C5/162—Connectors or means for connecting parts for reinforcements
- E04C5/163—Connectors or means for connecting parts for reinforcements the reinforcements running in one single direction
- E04C5/165—Coaxial connection by means of sleeves
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
Abstract
本发明涉及一种多层模块化房屋支撑柱连接结构及连接方法,它包括房屋若干楼层数个单元模块以及上下左右四个单元模块相邻接的四个角部所形成的共同邻接部,在该共同邻接部范围设有垂直设置的空心钢柱和在空心钢柱内设置的钢筋。在空心钢柱的中间设置从地面向上延伸的钢筋,在钢筋端部拧入双头螺纹连接器,待第一楼层的单元模块安装后,将另一根钢筋插入空心钢柱中,并拧在固定于下面一根钢筋的双头螺纹连接器的另一端上;然后在空心钢柱内部注入非收缩混凝土,空心钢柱形成增强型复合支撑柱。本发明通过双头螺纹连接器的使用,取消了原有的焊接工序或螺栓与螺母连接工序,简化施工过程,提高施工效率,降低成本。
Description
技术领域
本发明属于装配式建筑结构领域,特别涉及一种多层模块化房屋支撑柱的连接结构及连接方法。
背景技术
随着社会的发展,对装配式建筑的应用愈加广泛,房屋建造就像用机器制造那样,制造出成套成批的装配式建筑,生产厂先在工厂内预制好房屋构件,运到工地装配起来形成一栋栋高楼大厦。
然而目前在装配模块化房屋时,模块化房屋支撑柱的连接技术存在有一些不足之处:
1、构件吊装对接困难,费时费工,钢筋连接的钢套筒在竖向结构构件内,钢套筒与下方结构构件预留的竖向钢筋施工对接安装时,施工人员无法准确判断钢套筒的具体位置,需要借助镜子等工具辅助判断钢套筒位置。
2、灌浆时,钢套筒需事先制作灌浆用的注浆口和出浆口,增加了连接成本,增加了湿法作业。
3、支撑柱之间连接现场需焊接或螺栓连接,连接节点稳定性较差、抵抗强度弱。
有鉴于此,该领域技术人员致力于研发一种多层模块化房屋支撑柱连接的结构,以解决现有技术所存在的问题。
发明内容
本发明的任务是提供一种多层模块化房屋支撑柱连接结构及连接方法,该结构形成的支撑柱连接具有安全性和高稳定性,能够实现快速方便的拼装,同时支撑柱连接强度也得到提高,通过双头螺纹连接器的使用,取消了现场连接支撑柱的焊接工序或螺栓与螺母连接工序,取消了开设可能会影响内部质量的注浆口和出浆口,减少了现场湿法操作,解决了上述现有技术所存在的问题。
本发明的技术解决方案如下:
一种多层模块化房屋支撑柱连接结构,它包括房屋若干楼层数个单元模块,它还包括上下左右四个单元模块相邻接的四个角部所形成的共同邻接部,在该共同邻接部范围设有垂直设置的空心钢柱和在空心钢柱内设置的钢筋;
所述空心钢柱包括第一空心钢柱和第二空心钢柱,在第一空心钢柱端部与第二空心钢柱端部相接处的左侧焊接第一对接钢空心板,在第一空心钢柱端部与第二空心钢柱端部相接处的右侧焊接第二对接钢空心板,第一对接钢空心板和第二对接钢空心板的头部分别安装对接导向环,以实现快速准确拼装定位对接;
所述钢筋包括第一钢筋和第二钢筋,在第一钢筋端部和第二钢筋端部相接处装有双头螺纹连接器以实现快速连接;
所述空心钢柱两侧固定连接结构板;
所述空心钢柱内部注入非收缩混凝土,随着内置钢筋的空心钢柱从下到上的延长连接和连续加固,空心钢柱形成了增强型复合支撑柱。
所述结构板表面设置装饰地板。
所述多层模块化房屋支撑柱连接结构的连接方法,在多层模块化房屋的数个单元模块之间设置垂直的空心钢柱,将第一对接钢空心板和第二对接钢空心板分别焊接在第一空心钢柱和第二空心钢柱相接端部的两侧,将对接导向环分别安装在第一对接钢空心板和第二对接钢空心板的头部,以实现快速准确拼装定位对接;
在空心钢柱的中间设置从地面向上延伸的钢筋,在钢筋端部拧入双头螺纹连接器,待第一楼层的单元模块安装后,施工人员站在固定于空心钢柱两侧的结构板上,将另一根钢筋插入空心钢柱中,并拧在固定于下面一根钢筋的双头螺纹连接器的另一端上;
然后将非收缩混凝土灌注或泵入空心钢柱中填充空隙,空心钢柱经延长连接和加固,同时内置了钢筋和非收缩混凝土,使空心钢柱形成可承载更多载荷并具有更高强度的复合支撑柱。
本发明是一种多层模块化房屋支撑柱连接结构及连接方法,该结构形成的支撑柱连接具有安全性和高稳定性,能够实现快速方便的拼装,同时支撑柱连接强度也得到提高。通过双头螺纹连接器的使用,取消了现场连接支撑柱的焊接工序或螺栓与螺母连接工序,取消了开设可能会影响内部质量的注浆口和出浆口,减少了现场湿法操作,简化了施工过程,节省劳动力,提高施工效率,从而缩短了施工周期,降低施工成本。而且,多层支撑柱的纵筋一体设置,使连接质量更可靠,成本大幅度降低。
本发明的多层模块化房屋支撑柱连接结构的实施提高了支撑柱的强度和质量,提高了多层模块化房屋的整体稳定性和结构受力性能。
附图说明
图1是本发明的一种多层模块化房屋通过支撑柱连接的单元模块叠加示意图。
图2是图1中H部位的放大结构示意图。
图3是图2中的a-a剖面图。
附图标记:
1为装饰地板,2为第一对接钢空心板,3为双头螺纹连接器,4为非收缩混凝土,5为第一钢筋,6为第一空心钢柱,7为对接导向环,8为第二对接钢空心板,9为结构板,10为第二空心钢柱,11为第二钢筋。
具体实施方式
下面结合附图和实施例对本发明作详细描述。
参看图1至图3,本发明提供一种多层模块化房屋支撑柱连接结构,安装在多楼层的模块化房屋的单元模块A内部,每四个单元模块均设置支撑柱,该支撑柱具体安装在上下左右四个单元模块相邻接的四个角部所形成的共同邻接部位置。在该共同邻接部范围设有垂直设置的空心钢柱和钢筋,钢筋设置在空心钢柱的中间。
如图2中所示,空心钢柱有第一空心钢柱6和第二空心钢柱10,在第一空心钢柱6端部与第二空心钢柱10端部相接处的左侧焊接第一对接钢空心板2,在第一空心钢柱6端部与第二空心钢柱10端部相接处的右侧焊接第二对接钢空心板8。第一对接钢空心板2和第二对接钢空心板8的头部分别安装对接导向环7,以实现快速准确拼装定位对接,减少安装时间,加快模块构件的拼装速度,节省大量的用工成本。
如图2和图3中所示,位于空心钢柱中间的钢筋有第一钢筋5和第二钢筋11,在第一钢筋5端部和第二钢筋11端部相接处安装双头螺纹连接器3,以利于将两根钢筋快速连接。
在空心钢柱两侧固定连接结构板9。在结构板9表面安装装饰地板1。
在空心钢柱内部注入非收缩混凝土4,随着内置钢筋的空心钢柱从下到上的延长连接和连续加固,空心钢柱形成了增强型复合支撑柱。
如图1至图3所示,本发明还提供一种多层模块化房屋支撑柱连接结构的连接方法,在多层模块化房屋的数个单元模块A之间设置垂直的空心钢柱,将第一对接钢空心板2和第二对接钢空心板8分别焊接在第一空心钢柱6和第二空心钢柱10相接端部的两侧,将对接导向环7分别安装在第一对接钢空心板2和第二对接钢空心板8的头部,以实现快速准确拼装定位对接。
在空心钢柱的中间设置从地面向上延伸的合适长度的钢筋,在钢筋端部拧入双头螺纹连接器3,待第一楼层的单元模块A安装后,施工人员站在固定于空心钢柱两侧的结构板9上,将另一根钢筋插入空心钢柱中,并拧在固定于下面一根钢筋的双头螺纹连接器3的另一端上。
然后将非收缩混凝土4灌注或泵入空心钢柱中填充空隙,空心钢柱从下到上经延长连接和加固,同时空心钢柱填充了钢筋和非收缩混凝土灌浆,增加了支撑强度,有助于整体结构支撑的坚固性,使空心钢柱形成可承载更多载荷并具有更高强度的复合支撑柱。
本发明中的装饰地板和支撑柱可以预先制作。
综上所述,应用本发明的多层模块化房屋支撑柱连接结构及连接方法,具有安全性和高稳定性,能够实现快速方便的拼装,同时支撑柱连接强度也得到提高。多层支撑柱的纵筋一体设置,使连接质量更可靠,成本大幅度降低。本发明的多层模块化房屋支撑柱连接结构的实施提高了支撑柱的强度和质量,提高了多层模块化房屋的整体稳定性和结构受力性能。
当然,本技术领域内的一般技术人员应当认识到,上述实施例仅是用来说明本发明,而并非用作对本发明的限定,只要在本发明的实质精神范围内,对上述实施例的变化、变型等都将落在本发明权利要求的范围内。
Claims (3)
1.一种多层模块化房屋支撑柱连接结构,它包括房屋若干楼层数个单元模块,其特征在于:它还包括上下左右四个单元模块相邻接的四个角部所形成的共同邻接部,在该共同邻接部范围设有垂直设置的空心钢柱和在空心钢柱内设置的钢筋;
所述空心钢柱包括第一空心钢柱(6)和第二空心钢柱(10),在第一空心钢柱(6)端部与第二空心钢柱(10)端部相接处的左侧焊接第一对接钢空心板(2),在第一空心钢柱(6)端部与第二空心钢柱(10)端部相接处的右侧焊接第二对接钢空心板(8),第一对接钢空心板(2)和第二对接钢空心板(8)的头部分别安装对接导向环(7),以实现快速准确拼装定位对接;
所述钢筋包括第一钢筋(5)和第二钢筋(11),在第一钢筋(5)端部和第二钢筋(11)端部相接处装有双头螺纹连接器(3)以实现快速连接;
所述空心钢柱两侧固定连接结构板(9);
所述空心钢柱内部注入非收缩混凝土(4),随着内置钢筋的空心钢柱从下到上的延长连接和连续加固,空心钢柱形成了增强型复合支撑柱。
2.按照权利要求1所述的多层模块化房屋支撑柱连接结构,其特征在于:所述结构板(9)表面设置装饰地板(1)。
3.按照权利要求1所述的多层模块化房屋支撑柱连接结构的连接方法,其特征在于:在多层模块化房屋的数个单元模块之间设置垂直的空心钢柱,将第一对接钢空心板(2)和第二对接钢空心板(8)分别焊接在第一空心钢柱(6)和第二空心钢柱(10)相接端部的两侧,将对接导向环(7)分别安装在第一对接钢空心板(2)和第二对接钢空心板(8)的头部,以实现快速准确拼装定位对接;
在空心钢柱的中间设置从地面向上延伸的钢筋,在钢筋端部拧入双头螺纹连接器(3),待第一楼层的单元模块安装后,施工人员站在固定于空心钢柱两侧的结构板(9)上,将另一根钢筋插入空心钢柱中,并拧在固定于下面一根钢筋的双头螺纹连接器(3)的另一端上;
然后将非收缩混凝土(4)灌注或泵入空心钢柱中填充空隙,空心钢柱经延长连接和加固,同时内置了钢筋和非收缩混凝土,使空心钢柱形成可承载更多载荷并具有更高强度的复合支撑柱。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910331049.8A CN110005135B (zh) | 2019-04-30 | 2019-04-30 | 多层模块化房屋支撑柱连接结构及连接方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910331049.8A CN110005135B (zh) | 2019-04-30 | 2019-04-30 | 多层模块化房屋支撑柱连接结构及连接方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110005135A true CN110005135A (zh) | 2019-07-12 |
CN110005135B CN110005135B (zh) | 2023-06-06 |
Family
ID=67173883
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910331049.8A Active CN110005135B (zh) | 2019-04-30 | 2019-04-30 | 多层模块化房屋支撑柱连接结构及连接方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110005135B (zh) |
Citations (25)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5195293A (en) * | 1990-03-15 | 1993-03-23 | Digirolamo Edward R | Structural system for supporting a building utilizing light weight steel framing for walls and hollow core concrete slabs for floors and method of making same |
JPH09203117A (ja) * | 1996-01-30 | 1997-08-05 | Maeda Corp | 遠心成型コンクリート充填鋼管柱の接合方法 |
CN2630360Y (zh) * | 2003-08-08 | 2004-08-04 | 北京城建二建设工程有限公司 | 钢柱对接临时柱箍 |
JP2005200994A (ja) * | 2004-01-19 | 2005-07-28 | Artes Corp | 閉鎖断面部材の接合構造 |
CN1896383A (zh) * | 2005-07-14 | 2007-01-17 | 胡柏英 | 一种预钻孔嵌岩钢管混凝土组合桩及其施工方法 |
JP2008025125A (ja) * | 2006-07-18 | 2008-02-07 | Okumura Corp | 柱ユニットおよび柱ユニットを用いた建物の施工方法 |
US20100071305A1 (en) * | 2006-08-30 | 2010-03-25 | Collins William M | Stackable column assemblies and methods of construction |
CN101906893A (zh) * | 2010-07-21 | 2010-12-08 | 彭成中 | 建筑物隔震方法与续接装置 |
KR20110066350A (ko) * | 2009-12-11 | 2011-06-17 | 심종석 | 행거형 거푸집을 이용한 콘크리트 부분충전장치 및 이를 이용한 부분 충전방식의 각형강관 기둥과 보의 접합장치와 그 시공방법 |
CN102493554A (zh) * | 2011-12-13 | 2012-06-13 | 北京城建中南土木工程集团有限公司 | 钢格构柱对接安装装置及施工方法 |
CN203334547U (zh) * | 2013-05-29 | 2013-12-11 | 中建钢构江苏有限公司 | 钢管混凝土柱现场对接结构 |
KR20140059332A (ko) * | 2012-11-07 | 2014-05-16 | 재단법인 포항산업과학연구원 | 철근 콘크리트 복합기둥, 철근연결장치 및 철근 콘크리트 복합기둥 시공방법 |
CN103866761A (zh) * | 2014-03-21 | 2014-06-18 | 李全民 | 端板重复利用预制混凝土桩的机械连接桩头及其制造方法 |
CN105735466A (zh) * | 2016-03-30 | 2016-07-06 | 上海建工二建集团有限公司 | 预制墙柱一段式钢筋连接结构及方法 |
CN205975959U (zh) * | 2016-07-27 | 2017-02-22 | 浙江越宫钢结构有限公司 | 一种采用双板连接的超高层建筑的柱形连接节点 |
CN106592755A (zh) * | 2017-01-17 | 2017-04-26 | 北京工业大学 | 一种模块化多高层整体装配式钢结构房屋结构体系 |
CN107542085A (zh) * | 2017-09-12 | 2018-01-05 | 南京友西科技股份有限公司 | 一种混凝土管桩接头的加固方法 |
CN107989187A (zh) * | 2018-01-05 | 2018-05-04 | 上海欧本钢结构有限公司 | 一种预制钢筋混凝土柱机械连接节点及其施工方法 |
CN207538204U (zh) * | 2017-09-27 | 2018-06-26 | 杭萧钢构(广东)有限公司 | 一种可插入式箱型钢柱对接节点 |
CN108301563A (zh) * | 2018-03-22 | 2018-07-20 | 中建二局第三建筑工程有限公司 | 一种地下室劲性柱结构及其施工方法 |
CN108301561A (zh) * | 2018-01-02 | 2018-07-20 | 重庆大学 | 一种装配式钢管混凝土柱身的连接结构 |
CN108316290A (zh) * | 2018-03-30 | 2018-07-24 | 中铁第四勘察设计院集团有限公司 | 无承台的一柱一桩结构及其施工方法 |
CN208430637U (zh) * | 2018-05-30 | 2019-01-25 | 中国十九冶集团有限公司 | 用于两段竖直钢管柱连接定位的装置 |
CN109339251A (zh) * | 2018-11-21 | 2019-02-15 | 福建工程学院 | 一种组合柱的转换节点结构及其施工方法 |
CN210049492U (zh) * | 2019-04-30 | 2020-02-11 | 广东铝遊家科技有限公司 | 多层模块化房屋支撑柱连接结构 |
-
2019
- 2019-04-30 CN CN201910331049.8A patent/CN110005135B/zh active Active
Patent Citations (25)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5195293A (en) * | 1990-03-15 | 1993-03-23 | Digirolamo Edward R | Structural system for supporting a building utilizing light weight steel framing for walls and hollow core concrete slabs for floors and method of making same |
JPH09203117A (ja) * | 1996-01-30 | 1997-08-05 | Maeda Corp | 遠心成型コンクリート充填鋼管柱の接合方法 |
CN2630360Y (zh) * | 2003-08-08 | 2004-08-04 | 北京城建二建设工程有限公司 | 钢柱对接临时柱箍 |
JP2005200994A (ja) * | 2004-01-19 | 2005-07-28 | Artes Corp | 閉鎖断面部材の接合構造 |
CN1896383A (zh) * | 2005-07-14 | 2007-01-17 | 胡柏英 | 一种预钻孔嵌岩钢管混凝土组合桩及其施工方法 |
JP2008025125A (ja) * | 2006-07-18 | 2008-02-07 | Okumura Corp | 柱ユニットおよび柱ユニットを用いた建物の施工方法 |
US20100071305A1 (en) * | 2006-08-30 | 2010-03-25 | Collins William M | Stackable column assemblies and methods of construction |
KR20110066350A (ko) * | 2009-12-11 | 2011-06-17 | 심종석 | 행거형 거푸집을 이용한 콘크리트 부분충전장치 및 이를 이용한 부분 충전방식의 각형강관 기둥과 보의 접합장치와 그 시공방법 |
CN101906893A (zh) * | 2010-07-21 | 2010-12-08 | 彭成中 | 建筑物隔震方法与续接装置 |
CN102493554A (zh) * | 2011-12-13 | 2012-06-13 | 北京城建中南土木工程集团有限公司 | 钢格构柱对接安装装置及施工方法 |
KR20140059332A (ko) * | 2012-11-07 | 2014-05-16 | 재단법인 포항산업과학연구원 | 철근 콘크리트 복합기둥, 철근연결장치 및 철근 콘크리트 복합기둥 시공방법 |
CN203334547U (zh) * | 2013-05-29 | 2013-12-11 | 中建钢构江苏有限公司 | 钢管混凝土柱现场对接结构 |
CN103866761A (zh) * | 2014-03-21 | 2014-06-18 | 李全民 | 端板重复利用预制混凝土桩的机械连接桩头及其制造方法 |
CN105735466A (zh) * | 2016-03-30 | 2016-07-06 | 上海建工二建集团有限公司 | 预制墙柱一段式钢筋连接结构及方法 |
CN205975959U (zh) * | 2016-07-27 | 2017-02-22 | 浙江越宫钢结构有限公司 | 一种采用双板连接的超高层建筑的柱形连接节点 |
CN106592755A (zh) * | 2017-01-17 | 2017-04-26 | 北京工业大学 | 一种模块化多高层整体装配式钢结构房屋结构体系 |
CN107542085A (zh) * | 2017-09-12 | 2018-01-05 | 南京友西科技股份有限公司 | 一种混凝土管桩接头的加固方法 |
CN207538204U (zh) * | 2017-09-27 | 2018-06-26 | 杭萧钢构(广东)有限公司 | 一种可插入式箱型钢柱对接节点 |
CN108301561A (zh) * | 2018-01-02 | 2018-07-20 | 重庆大学 | 一种装配式钢管混凝土柱身的连接结构 |
CN107989187A (zh) * | 2018-01-05 | 2018-05-04 | 上海欧本钢结构有限公司 | 一种预制钢筋混凝土柱机械连接节点及其施工方法 |
CN108301563A (zh) * | 2018-03-22 | 2018-07-20 | 中建二局第三建筑工程有限公司 | 一种地下室劲性柱结构及其施工方法 |
CN108316290A (zh) * | 2018-03-30 | 2018-07-24 | 中铁第四勘察设计院集团有限公司 | 无承台的一柱一桩结构及其施工方法 |
CN208430637U (zh) * | 2018-05-30 | 2019-01-25 | 中国十九冶集团有限公司 | 用于两段竖直钢管柱连接定位的装置 |
CN109339251A (zh) * | 2018-11-21 | 2019-02-15 | 福建工程学院 | 一种组合柱的转换节点结构及其施工方法 |
CN210049492U (zh) * | 2019-04-30 | 2020-02-11 | 广东铝遊家科技有限公司 | 多层模块化房屋支撑柱连接结构 |
Non-Patent Citations (2)
Title |
---|
唐阁威;黎汉杰;武锐;唐际宇;覃日飞;: "南宁华润中心东写字楼项目混凝土梁钢筋与钢柱连接技术", no. 18, pages 182 - 185 * |
杨昭宇;陈联盟;: "钢-混凝土组合结构在多层住宅结构中的应用研究", 中国水运(学术版), no. 07, pages 93 - 95 * |
Also Published As
Publication number | Publication date |
---|---|
CN110005135B (zh) | 2023-06-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103104092B (zh) | 一种梁板支撑组合结构 | |
CN207228316U (zh) | 一种采用型钢混凝土柱和钢梁组合的预制装配式框架 | |
CN107938835A (zh) | 一种采用型钢混凝土柱和钢梁组合的预制装配式框架 | |
CN106522374A (zh) | 用于连接模块化钢框架的连接装置及其连接方法 | |
CN206144032U (zh) | 一种装配式钢管混凝土柱与柱的拼接结构 | |
CN206289743U (zh) | 用于连接模块化钢框架的连接装置 | |
CN109736440B (zh) | 一种大跨度钢结构错层合拢安装方法 | |
CN103526859B (zh) | 型钢柱、钢梁和屈曲约束支撑组合抗震体系施工方法 | |
CN110005135A (zh) | 多层模块化房屋支撑柱连接结构及连接方法 | |
CN210049492U (zh) | 多层模块化房屋支撑柱连接结构 | |
CN210684994U (zh) | 装配式模块化建筑结构节点的连接角件 | |
CN206128303U (zh) | 一种模块化组合结构建筑体系 | |
CN105401960A (zh) | 一种用于铁路隧道仰拱施工的模架及其施工方法 | |
CN210558761U (zh) | 一种加装电梯井道的对接节点 | |
CN104947804B (zh) | 一种钢托架及利用其构建梁柱节点结构的施工方法 | |
CN218757940U (zh) | 一种多层模块式建筑节点连接组件 | |
CN205024833U (zh) | 一种钢骨混凝土组合预制构件 | |
CN207228475U (zh) | 一种应用于装配式框架的预制型钢混凝土柱单元 | |
CN206737115U (zh) | 一种钢管混凝土柱与钢梁连接节点 | |
CN214885930U (zh) | 一种模块化与整体式相结合的海上升压站 | |
CN213926774U (zh) | 预制外包钢混凝土柱与混凝土梁节点 | |
CN212715019U (zh) | 预制拼装式车站站台 | |
CN212000638U (zh) | 高架盖梁型钢支撑结构 | |
CN107989230A (zh) | 一种l型装配式芯柱钢板剪力墙及其装配施工方法 | |
CN108118804A (zh) | 一种z型装配式芯柱钢板剪力墙及其装配施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |