CN109914664A - A kind of box floor of modularization and installation method - Google Patents

A kind of box floor of modularization and installation method Download PDF

Info

Publication number
CN109914664A
CN109914664A CN201910340827.XA CN201910340827A CN109914664A CN 109914664 A CN109914664 A CN 109914664A CN 201910340827 A CN201910340827 A CN 201910340827A CN 109914664 A CN109914664 A CN 109914664A
Authority
CN
China
Prior art keywords
fixed frame
box floor
floor
box
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910340827.XA
Other languages
Chinese (zh)
Inventor
荣碧新
王小平
池明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Galaxy Steel Structure Engineering Co Ltd
Original Assignee
Hunan Galaxy Steel Structure Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Galaxy Steel Structure Engineering Co Ltd filed Critical Hunan Galaxy Steel Structure Engineering Co Ltd
Priority to CN201910340827.XA priority Critical patent/CN109914664A/en
Publication of CN109914664A publication Critical patent/CN109914664A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a kind of box floors of modularization, it is fixedly connected at the top of the bottom of the fixed frame and bottom plate, bearing block is fixedly connected at the top of the bottom plate, and the side and top of bearing block are fixedly connected with the inner wall of fixed frame, the quantity of the bearing block is eight, and the surrounding at the top of bottom plate is uniformly distributed, the surface of the fixed frame surrounding offers pipeline hole, the surface of the fixed frame surrounding and be located at pipeline hole two sides offer bolt hole, the present invention relates to floor laying technology fields.The box floor of the modularization and installation method, floor is subjected to modularized design, it can be carried out good fixation between each floor, floor has good bearing capacity, light-weight, a large amount of material can be saved, quickly and easily pipeline can be laid with when being installed pre-buried, using dry operation, quickly floor can be installed, working efficiency is greatly enhanced, the labor intensity of staff is reduced.

Description

A kind of box floor of modularization and installation method
Technical field
The present invention relates to floor laying technology field, the box floor of specially a kind of modularization and installation method.
Background technique
Floor refers generally to a kind of precast concrete of precasting yard processing.Supporting part in floor layer, it is by room Room vertical direction is divided into several layers, and the vertical loads such as people and furniture and floor self weight are transmitted to base by wall, beam or column Plinth.It is several that wood floor, brick arch floor, reinforced concrete floor and floor of steel liner plate load-bearing etc. can be divided by the material used in it Form.
Existing floor production, is usually used wet work, various raw material is transported to scene applying man-hour requirement, Operation process is complicated, and if desired pre-buried to route progress, operating process is increasingly complex, and construction personnel's labor intensity is very Greatly, and the time is expended, so that construction speed is slow, while Expenses Cost is larger.
Summary of the invention
(1) the technical issues of solving
In view of the deficiencies of the prior art, the present invention provides a kind of box floor of modularization and installation method, floor system is solved Make step complexity, expends a large amount of manpowers and construction cost, ineffective problem.
(2) technical solution
In order to achieve the above object, the present invention is achieved by the following technical programs: a kind of box floor of modularization, including bottom plate And fixed frame, it is fixedly connected at the top of the bottom of the fixed frame and bottom plate, is fixedly connected with bearing block at the top of the bottom plate, And the side and top of bearing block are fixedly connected with the inner wall of fixed frame.
Preferably, the quantity of the bearing block is eight, and the surrounding at the top of bottom plate is uniformly distributed.
Preferably, the surface of the fixed frame surrounding offers pipeline hole, the surface of the fixed frame surrounding and is located at The two sides of pipeline hole offer bolt hole.
Preferably, the surface of the fixed frame surrounding offers recirculation hole.
Preferably, the bottom plate, fixed frame and bearing block are light-high-strength alloy material, the bottom plate and fixed frame Length be 300mm.
The invention also discloses a kind of installation methods of the box floor of modularization, specifically includes the following steps:
S1, assembly: the flooring that operator can treat operation measures, to be carried out according to measurement result to box floor Assembly can grow up box floor assembly so that single box floor is assembled into the biggish box floor of muti-piece area 600mm, 900mm, 1200mm, 1500mm or 1800mm etc., when carrying out assembled, operator can will be on two box floors Bolt hole alignment, so that two box floors be fixed by bolt;
S2, lifting: after the box floor assembly in S1, operator can be hung the assembled successfully box floor of muti-piece On flooring, after flooring to be laid is laid with completely;
S3, box floor are fixed: after the box floor rigging out in S2, operator can pass through bolt and box floor On the mutual cooperation of bolt hole the box floor of muti-piece is fixed;
S4, pipe installation: after all fixing to the box floor in S3, operator can be made needs by pipeline hole Pipe inserting is inside fixed frame, to carry out pre-buried laying to pipeline;
S5, filling: in S4 pipeline hole be laid with it is pre-buried after, operator can in fixed frame fill concrete or its He makes the top surface of packing material be slightly above fixed frame surface 2-3cm, in packing material in order to rear by engineering packing material Phase is laid with ceramic tile or other decoration panels;
S6, panel be laid with: in S5 material filling after, operator personnel can packing material surface be laid with ceramic tile or Other decoration panels, make panel holding horizontal in lay panel, can be used after 48h is stood after panel is laid with.
(3) beneficial effect
The present invention provides a kind of box floor of modularization and installation methods.Have compared with prior art it is following the utility model has the advantages that
(1), the box floor of the modularization and installation method, by being fixedly connected at the top of the bottom of fixed frame and bottom plate, bottom plate Top be fixedly connected with bearing block, and the side of bearing block and top are fixedly connected with the inner wall of fixed frame, fixed frame The surface of surrounding offers pipeline hole, the surface of the fixed frame surrounding and two sides for being located at pipeline hole offer bolt hole, bottom Plate, fixed frame and bearing block are light-high-strength alloy material, and the length of bottom plate and fixed frame is 300mm, by floor into Row module design can be carried out good fixation between each floor, and floor has good bearing capacity, light-weight, can save a large amount of Material, quickly and easily pipeline can be laid with when being installed pre-buried.
(2), the box floor of the modularization and installation method, pass through S1, assembly: operator can treat the flooring of operation It measures, so that assembly is carried out to box floor according to measurement result, so that single box floor is assembled into muti-piece area Biggish box floor, S2, lifting: to the box floor in S1 it is assembled after, operator can will be assembled successfully more The box floor of block is lifted on flooring, and S3, box floor are fixed, S4, pipe installation, S5, filling, and S6, panel are laid with, using dry Method operation can quickly install floor, greatly enhance working efficiency, and the labour for reducing staff is strong Degree.
Detailed description of the invention
Fig. 1 is schematic structural view of the invention;
Fig. 2 is the schematic diagram of fixed frame of the present invention and floor structure;
Fig. 3 is the schematic diagram of fixed frame of the present invention and load-bearing block structure;
Fig. 4 is comparative experimental data statistical form figure of the present invention.
In figure, 1- bottom plate, 2- fixed frame, 3- bearing block, 4- pipeline hole, 5- bolt hole, 6- recirculation hole.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Fig. 1-4 is please referred to, the embodiment of the present invention provides a kind of technical solution: a kind of box floor of modularization, including bottom plate 1 It is fixedly connected with the bottom of fixed frame 2, fixed frame 2 with the top of bottom plate 1, is to be bolted between fixed frame 2 and bottom plate 1 Connection, the top of bottom plate 1 is fixedly connected with bearing block 3, and the side of bearing block 3 and top are solid with the inner wall of fixed frame 2 Fixed connection
In the present invention, the quantity of bearing block 3 is eight, and the surrounding at 1 top of bottom plate is uniformly distributed
In the present invention, the surface of 2 surrounding of fixed frame offers pipeline hole 4, the surface of 2 surrounding of fixed frame and is located at pipeline hole 4 Two sides offer bolt hole 5.
In the present invention, the surface of 2 surrounding of fixed frame offers recirculation hole 6, after having poured packing material, packing material It can be circulated between each box floor by recirculation hole 6, so that packing material is uniformly divided between each box floor Cloth.
In the present invention, bottom plate 1, fixed frame 2 and bearing block 3 are light-high-strength alloy material, bottom plate 1 and fixed frame 2 Length be 300mm.
The invention also discloses a kind of installation methods of the box floor of modularization, specifically includes the following steps:
S1, assembly: the flooring that operator can treat operation measures, to be carried out according to measurement result to box floor Assembly can grow up box floor assembly so that single box floor is assembled into the biggish box floor of muti-piece area 600mm, 900mm, 1200mm, 1500mm or 1800mm etc., when carrying out assembled, operator can will be on two box floors Bolt hole 5 be aligned, so that two box floors be fixed by bolt;
S2, lifting: after the box floor assembly in S1, operator can be hung the assembled successfully box floor of muti-piece On flooring, after flooring to be laid is laid with completely;
S3, box floor are fixed: after the box floor rigging out in S2, operator can pass through bolt and box floor On the mutual cooperation of bolt hole 5 the box floor of muti-piece is fixed;
S4, pipe installation: after all fixing to the box floor in S3, operator can will be needed by pipeline hole 4 The pipe inserting used is inside fixed frame 2, to carry out pre-buried laying to pipeline;
S5, filling: in S4 pipeline hole be laid with it is pre-buried after, operator can in fixed frame 2 fill concrete or Other Engineering packing material makes the top surface of packing material be slightly above 2 surface 2-3cm of fixed frame in packing material, in order to Later period is laid with ceramic tile or other decoration panels;
S6, panel be laid with: in S5 material filling after, operator personnel can packing material surface be laid with ceramic tile or Other decoration panels, make panel holding horizontal in lay panel, can be used after 48h is stood after panel is laid with.
Comparative test
Two pieces of 40 squares of floorings to be onstructed are chosen, embodiment form of construction work is respectively adopted and common form of construction work is constructed, it is real It applies a form of construction work and expends the time 8 hours, 6000 yuan of Expenses Cost, construction is qualified through quality testing after completing, common construction party Formula expends the time 25 hours, and 8000 yuan of Expenses Cost, construction is qualified through quality testing after completing.
In conclusion being substantially better than common form of construction work using embodiment form of construction work.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (6)

1. a kind of box floor of modularization, including bottom plate (1) and fixed frame (2), the bottom and bottom plate (1) of the fixed frame (2) Top be fixedly connected, it is characterised in that: be fixedly connected with bearing block (3) at the top of the bottom plate (1), and bearing block (3) Side and top be fixedly connected with the inner wall of fixed frame (2).
2. the box floor of a kind of modularization according to claim 1, it is characterised in that: the quantity of the bearing block (3) is Eight, and the surrounding at the top of bottom plate (1) is uniformly distributed.
3. the box floor of a kind of modularization according to claim 1, it is characterised in that: the table of fixed frame (2) surrounding Face offers pipeline hole (4), the surface of fixed frame (2) surrounding and be located at pipeline hole (4) two sides offer bolt Hole (5).
4. the box floor of a kind of modularization according to claim 1, it is characterised in that: the table of fixed frame (2) surrounding Face offers recirculation hole (6).
5. the box floor of a kind of modularization according to claim 1, it is characterised in that: the bottom plate (1), fixed frame (2) It is light-high-strength alloy material with bearing block (3), the length of the bottom plate (1) and fixed frame (2) is 300mm.
6. a kind of box floor of modularization described in -5 any one according to claim 1, it is characterised in that: its installation method tool Body the following steps are included:
S1, assembly: the flooring that operator can treat operation measures, to be carried out according to measurement result to box floor Assembly can grow up box floor assembly so that single box floor is assembled into the biggish box floor of muti-piece area 600mm, 900mm, 1200mm, 1500mm or 1800mm etc., when carrying out assembled, operator can will be on two box floors Bolt hole (5) alignment, so that two box floors be fixed by bolt;
S2, lifting: after the box floor assembly in S1, operator can be hung the assembled successfully box floor of muti-piece On flooring, after flooring to be laid is laid with completely;
S3, box floor are fixed: after the box floor rigging out in S2, operator can pass through bolt and box floor On the mutual cooperation of bolt hole (5) the box floor of muti-piece is fixed;
S4, pipe installation: to the box floor in S3 it is all fixed after, operator can need to by pipeline hole (4) Pipe inserting to be used is internal in fixed frame (2), to carry out pre-buried laying to pipeline;
S5, filling: in S4 pipeline hole be laid with it is pre-buried after, operator can be in fixed frame (2) interior fill concrete Or Other Engineering packing material makes the top surface of packing material be slightly above fixed frame (2) surface 2-3cm in packing material, with Ceramic tile or other decoration panels are laid with convenient for the later period;
S6, panel be laid with: in S5 material filling after, operator personnel can packing material surface be laid with ceramic tile or Other decoration panels, make panel holding horizontal in lay panel, can be used after 48h is stood after panel is laid with.
CN201910340827.XA 2019-04-25 2019-04-25 A kind of box floor of modularization and installation method Pending CN109914664A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910340827.XA CN109914664A (en) 2019-04-25 2019-04-25 A kind of box floor of modularization and installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910340827.XA CN109914664A (en) 2019-04-25 2019-04-25 A kind of box floor of modularization and installation method

Publications (1)

Publication Number Publication Date
CN109914664A true CN109914664A (en) 2019-06-21

Family

ID=66978646

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910340827.XA Pending CN109914664A (en) 2019-04-25 2019-04-25 A kind of box floor of modularization and installation method

Country Status (1)

Country Link
CN (1) CN109914664A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112012383A (en) * 2020-09-15 2020-12-01 青岛理工大学 Preparation method and application of load-bearing and heat-insulation integrated high-strength foam concrete rib-free prefabricated roof panel

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112012383A (en) * 2020-09-15 2020-12-01 青岛理工大学 Preparation method and application of load-bearing and heat-insulation integrated high-strength foam concrete rib-free prefabricated roof panel

Similar Documents

Publication Publication Date Title
CN103821276B (en) A kind of assembled, modular architectural system
WO2016062224A1 (en) Integrated column-equipped heat insulation wallboard, manufacturing and building processes and corollary equipment thereof
CN107090974B (en) Roof quick-release supporting system and construction method thereof
CN202810173U (en) Mounting and construction platform for steel lining bracket and circular crane track girder of nuclear power plant
CN104074305B (en) A kind of self-heat conserving decoration integrated Multi-function light concrete composite plates and curtain wall
CN213329955U (en) Flower basket diagonal rod type overhanging scaffold
CN103352537B (en) Overall load bearing heat preserving wallboard and production construction process thereof
CN105587097A (en) Ground aerial structure capable of being leveled
CN106193402B (en) Girder truss integrated form flooring module and its installation method
CN203403674U (en) Instrumental adjustable stair steel formwork
CN111809951A (en) Prefabricated assembled water pool and assembling method
CN109914664A (en) A kind of box floor of modularization and installation method
CN110578338A (en) System capable of moving aluminum alloy template integrally and operation method
CN112482779B (en) Integral hoisting construction method for cornice bucket arch of antique building
CN206554500U (en) Steel structure concrete, which is poured, uses adjustable transverse support bar
CN109267578B (en) Inclined plane plain concrete structure and construction method thereof
CN208803681U (en) Piping shaft and building structure
CN111576878A (en) Construction process for quick-release system of aluminum alloy template
CN217711934U (en) Air supply seat mounting structure
CN207504539U (en) A kind of cable trough with cable protection external member
CN108385895A (en) A kind of fast-assembling walling system
CN114673191A (en) Attached steel structure construction elevator foundation capable of rotating in week and using method thereof
CN208844782U (en) A kind of fast-assembling walling system and hangar system
CN210067172U (en) Modular box type floor slab
CN208220163U (en) Crosshead is used in the maintenance of slope roof type exterior walls of buildings

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination