CN208844782U - A kind of fast-assembling walling system and hangar system - Google Patents

A kind of fast-assembling walling system and hangar system Download PDF

Info

Publication number
CN208844782U
CN208844782U CN201820712795.2U CN201820712795U CN208844782U CN 208844782 U CN208844782 U CN 208844782U CN 201820712795 U CN201820712795 U CN 201820712795U CN 208844782 U CN208844782 U CN 208844782U
Authority
CN
China
Prior art keywords
board
base
connecting plate
pendant
mounting groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820712795.2U
Other languages
Chinese (zh)
Inventor
巴凌真
黎伟
张天宇
孔杰威
邱俊明
胡坚彬
蔡磊
余克鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
South China University of Technology SCUT
Original Assignee
South China University of Technology SCUT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by South China University of Technology SCUT filed Critical South China University of Technology SCUT
Priority to CN201820712795.2U priority Critical patent/CN208844782U/en
Application granted granted Critical
Publication of CN208844782U publication Critical patent/CN208844782U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model discloses a kind of fast-assembling walling systems, including shell system and wallboard, it further include hangar system, the shell system and wallboard are fastened and connected by hangar system, the hangar system includes the first pendant and the second pendant, first pendant is installed on shell system, and second pendant is installed on wallboard.Wallboard in the utility model can carry out quick lap joint installation and removal by hangar system, hardly generate pollution and building waste in the process;Shell system, wallboard and hangar system can carry out pre-production in factory, it can be achieved that medelling production, advantageously reduces production cost and economize on resources;Site operation link is reduced, and wallboard mounts and dismounts that process is extremely convenient, and construction period shortens, to economizing on resources and environment pollution control significant effect.A kind of hangar system is also disclosed, the shell system and wallboard for the fast-assembling walling system that is fastened and connected.Belong to construction wall field.

Description

A kind of fast-assembling walling system and hangar system
Technical field
The utility model relates to construction wall fields, and in particular to a kind of fast-assembling walling system and hangar system.
Background technique
Separate conventionally employed building block in domestic construction object as dividing, building-brick type partition wall is at high cost from great, produces and applies Work process generation dust is more, and environmental pollution is heavier.So light partition wall applies more and more, light partition wall in construction at present Has many advantages, such as light weight compared with building-brick type partition wall, convenient, function admirable of constructing.But light partition wall is during installation Wet construction is still used, working procedure is more complicated, and dust, noise and building waste that construction site generates etc. is to ring around Border causes more pollution.
Utility model content
In order to solve the problems existing in the prior art, the utility model provides a kind of fast-assembling walling system, and dry type is used to apply Work, almost pollution-free and without building waste, the degree of modularity is high, and in-site installation is convenient.
The utility model another object is that: provide a kind of hangar system, the bone for the fast-assembling walling system that is fastened and connected Frame system and wallboard.
The technical scheme that the utility model is provided is as follows:
A kind of fast-assembling walling system, including shell system and wallboard, further include hangar system, the shell system and wallboard It is fastened and connected by hangar system, the hangar system includes the first pendant and the second pendant, and first pendant is installed in bone In frame system, second pendant is installed on wallboard, and the first pendant includes upwards and the first mounting groove for being gradually increased second Pendant includes the second mounting groove downwards and being gradually increased.
Further, first pendant includes first base, the first connecting plate and the first anti-off board, the first base For the bar of linear, first connecting plate is perpendicularly fixed in first base, and first anti-off board passes through the first connecting plate It is connect with first base, first anti-off board is set in the middle part of the first connecting plate, the first base, the first connecting plate and the Opening upwards are formed between one anti-off board and the first mounting groove being gradually increased that is open;Second pendant include second base, Second connecting plate and the second anti-off board, second connecting plate are perpendicularly fixed in second base, and the two of second connecting plate End is separately connected second base and the second anti-off board, is formed and is opened between the second base, the second connecting plate and the second anti-off board Mouthful upwards and the second mounting groove for being gradually increased of opening;The minimum widith of first mounting groove is greater than the wall of the second anti-off board Thickness, the minimum widith of second mounting groove are greater than the wall thickness of the first anti-off board, and second pendant is inserted by the second anti-off board Enter the first mounting groove, the first pendant is also inserted into the second mounting groove simultaneously by the first anti-off board and forms wall hangar system.
Further, after first pendant and the connection of the second pendant form wall hangar system, the first connecting plate end It is connected in second base or the second connecting plate end is connected in first base or the first connecting plate end and Two connecting plate ends are connected in second base and first base simultaneously.
Further, first anti-off board is equipped with engagement or snap-in structure, institute towards the end face inside the first mounting groove It states the second anti-off board and is equipped with engagement or snap-in structure towards the end face inside the second mounting groove.
Further, the angle that the first base and the first anti-off board extended line are formed is slightly larger than second base and second The angle that anti-off board extended line is formed.
Further, settable the first connecting plate of two row or multi-row and the first anti-off board in the first base form two A or multiple first mounting grooves;Settable the second connecting plate of two row or multi-row and the second anti-off board in the second base are formed Two or more second mounting grooves, interval and two or more second mounting grooves between described two or multiple first mounting grooves Between interval match.
Further, the shell system includes horizontal keel and vertical keel, the horizontal keel include upper keel and Lower keel, the upper keel and lower keel are connected by vertical keel, and the vertical keel are equal between upper keel and lower keel Even arrangement.
Further, the horizontal keel and vertical keel are set as C-type steel, and the horizontal keel and vertical keel open up in advance There is conduit through bore.
Further, sound insulation or thermal insulation material are equipped between the vertical keel.
Further, groove is equipped between two blocks of wallboards at the connection gap of side, is equipped with connector in the groove, The groove and connector edge are that tooth type structures, the groove and connector size and tooth type structures match.
A kind of hangar system manufactured according to the utility model fast-assembling walling system, the hangar system include the first extension Part and the second pendant, the first pendant include the first mounting groove upwards and being gradually increased, and the second pendant includes increasing downwards and gradually The second big mounting groove, first pendant include first base, the first connecting plate and the first anti-off board, and the first base is The bar of linear, first connecting plate are perpendicularly fixed in first base, first anti-off board by the first connecting plate with First base connection, first anti-off board are set in the middle part of the first connecting plate, the first base, the first connecting plate and first Opening upwards are formed between anti-off board and the first mounting groove being gradually increased that is open;Second pendant includes second base, Two connecting plates and the second anti-off board, second connecting plate are perpendicularly fixed in second base, the both ends of second connecting plate It is separately connected second base and the second anti-off board, forms opening between the second base, the second connecting plate and the second anti-off board The second mounting groove that upward and opening is gradually increased;The minimum widith of first mounting groove is greater than the wall thickness of the second anti-off board, The minimum widith of second mounting groove is greater than the wall thickness of the first anti-off board, and second pendant passes through the second anti-off board insertion the One mounting groove, the first pendant are also inserted into the second mounting groove simultaneously by the first anti-off board and form wall hangar system.
Further, after first pendant and the connection of the second pendant form wall hangar system, the first connecting plate end It is connected in second base or the second connecting plate end is connected in first base or the first connecting plate end and Two connecting plate ends are connected in second base and first base simultaneously, inside the first mounting groove of the first anti-off board direction End face is equipped with engagement or snap-in structure, and second anti-off board is equipped with engagement or engaging knot towards the end face inside the second mounting groove Structure.The first base is greater than second base with the angle that the first anti-off board extended line is formed and is formed with the second anti-off board extended line Angle.
Compared with prior art, the utility model has the beneficial effects that:
The fast-assembling walling system of the utility model includes shell system and wallboard, and shell system and wallboard pass through hangar system It is connected, when construction, wallboard can carry out quick lap joint installation and removal by hangar system, hardly generate in the process Pollution and building waste;Shell system, wallboard and hangar system can carry out pre-production, it can be achieved that mode metaplasia in factory It produces, advantageously reduce production cost and economizes on resources;Site operation link is reduced, and wallboard installation and removal process is extremely convenient, Construction period shortens, to economizing on resources and environment pollution control significant effect.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model embodiment;
Fig. 2 is the structural schematic diagram in the utility model embodiment hangar system section;
Fig. 3 is the utility model embodiment connector scheme of installation.
Fig. 4 is the utility model embodiment connector schematic diagram.
Description of symbols:
1, horizontal keel;2, vertical keel;3, the first pendant;31, first base;32, the first connecting plate;33, first is anti- De- plate;4, the second pendant;41, second base;42, the second connecting plate;43, the second anti-off board;5, hangar system;6, connector; 7, wallboard.
Specific embodiment
In order to be best understood from the utility model, the utility model is made below in conjunction with the drawings and specific embodiments further detailed It describes in detail bright.
As shown in Figure 1, the system includes shell system and wallboard 7, the skeleton for fast-assembling walling system in the present embodiment System is connected with wallboard 7 by hangar system 5.As shown in Fig. 2, the hangar system 5 includes the first pendant 3 and the second pendant 4, the first pendant 3 and the second pendant 4 are aluminium alloy extruded molding.First pendant 3 includes first base 31, the first connecting plate 32 and first anti-off board 33, the first base 31 and the first anti-off board 33 pass through the first connecting plate 32 and connect, first base 31 For the bar of linear, the first connecting plate 32 is perpendicularly fixed in first base 31, and the first anti-off board 33 passes through the first connecting plate 32 It is connect with first base 31, the first anti-off board 33 is set to 32 middle part of the first connecting plate, first base 31,32 and of the first connecting plate Opening upwards are formed between first anti-off board 33 and the first mounting groove being gradually increased that is open, the minimum widith of the first mounting groove are big In the wall thickness of the second anti-off board 43.The first peace is formed between the first base 31, the first connecting plate 32 and the first anti-off board 33 Tankage;Second pendant 4 includes second base 41, the second connecting plate 42 and the second anti-off board 43,41 He of second base Second anti-off board 43 is connected by the second connecting plate 42, and the second connecting plate 42 is perpendicularly fixed in second base 41, the second connection The both ends of plate 42 are separately connected second base 41 and the second anti-off board 43, second base 41, the second connecting plate 42 and the second anticreep The second mounting groove that Open Side Down and that opening is gradually increased is formed between plate 43, the minimum widith of the second mounting groove is greater than first The wall thickness of anti-off board 33.The angle that the first base 31 and 33 extended line of the first anti-off board are formed is greater than second base 41 and the The angle that two anti-off boards, 43 extended line is formed.First anti-off board 33 towards the end face inside the first mounting groove be equipped with engagement or Snap-in structure, second anti-off board 43 also are provided with engagement or snap-in structure towards the end face inside the second mounting groove.In this reality It applies in example, as shown in Fig. 2, being provided with two in above-mentioned first base 31 ranked first connecting plate 32 and the first anti-off board 33, forms Two the first mounting grooves, two are correspondingly provided in above-mentioned second base 41 ranked second connecting plate 42 and the second anti-off board 43, shape Interval at two the second mounting grooves, and between two the first mounting grooves is identical as the interval between two the second mounting grooves. One or more first mounting grooves can be only set, and the quantity of the second mounting groove and interval are identical as the first mounting groove.As shown in Figure 2 Wall hangar system 5 is formed for the first pendant 3 and the connection of the second pendant 4, wherein the second pendant 4 is inserted by the second anti-off board 43 Entering the first mounting groove, the first pendant 3 is also inserted into the second mounting groove simultaneously by the first anti-off board 33, meanwhile, the first pendant 3 The end of first connecting plate 32 is connected in the second base 41 of the second pendant 4.
First pendant fills 3 and is located on shell system, and the second pendant 4 is installed on wallboard 7.The shell system includes Horizontal keel 1 and vertical keel 2, horizontal keel 1 and vertical keel 2 are set as C-type steel, and C-type steel is thin-walled steel plate cold roll forming.Institute Stating horizontal keel 1 includes upper keel and lower keel, and upper keel and lower keel are by the connection of vertical keel 2, and vertical keel 2 are in pliosaur It is evenly arranged between bone and lower keel.The horizontal keel 1 and vertical keel 2 also offer conduit through bore, the vertical dragon in advance Sound insulation or thermal insulation material can be equipped between bone 2.Metope is generally spliced by muti-piece wallboard, in order to improve the flatness of metope, As shown in figure 3, groove can be equipped at side splicing gap between every two blocks of wallboards 7, it is equipped with connector 6 in groove, such as Fig. 4 institute Show, groove and 6 edge of connector are that tooth type structures, the groove and 6 size of connector and tooth type structures match.
The fast-assembling walling system working principle of the utility model are as follows:
When construction, in the position for needing to be spaced wall, subscript eminence and subscript eminence install respectively fixed upper keel and Lower keel installs fixed vertical keel 2 between upper keel and lower keel in vertical direction, can be by the interval for being not more than 60cm Vertical keel 2 are uniformly installed, to complete the steel structure framework system of an entirety.According to the specification and size of wallboard 7, according to Certain vertical spacing, can be by the spacing for being not more than 60cm, from subscript eminence to subscript eminence, successively in shell system installation the First base 31 is fitted in vertical 2 surface of keel by one pendant 3, is consolidated first base 31 with vertical keel 2 by tapping screw Dingan County's dress, 3 hold mode of the first pendant when installation.The second pendant 4 can be mounted on 7 back side of wallboard in advance in factory, originated Position and spacing are consistent with the first pendant 3 in the position of shell system and spacing.When installation, 7 back side of wallboard second is prevented De- 43 the first anti-off board of end alignment of plate, 33 end, and slightly lift and inject the second anti-off board 43 in first mounting groove, due to The angle of first base 31 and the first anti-off board 33 be greater than second base 41 and the second anti-off board 43 angle, wallboard 7 oneself Under the ramp effect of weight and the first anti-off board 33, wallboard 7 with shell system direction towards moving vertically downward, in the first anti-off board 33 and 43 contact surface tooth type structures of the second anti-off board interlocking under so that the tightening of the second pendant 4 and the first pendant 3 is bonded, On the top to second base 41 of final first connecting plate, 32 end, to wallboard 7 move horizontally and limitation fixed function is played in rotation. Then it repeats the above process, completes the installation of remaining wall.Above-mentioned upper keel, lower keel, vertical keel 2, wallboard 7, first are hung The size of part 3 and the second pendant 4 can all be opened in advance in factory's pre-production, upper keel, lower keel and vertical keel 2 in factory Good conduit through bore, the second pendant 4 can be pre-installed on wallboard 7 in factory, and when site operation need to only build steel structure framework system System, and the first pendant 3 is installed in steel structure framework system, then hanging up wallboard 7 can be completed the installation of wall.
The embodiments of the present invention and embodiment are not limited to the above, according to the above content of the utility model, Using the ordinary technical knowledge and customary means of this field, under the premise of not departing from the utility model above-mentioned basic fundamental thought, The utility model can also make the modification, replacement or change of other diversified forms, all fall within the utility model rights protection model Within enclosing.

Claims (10)

1. a kind of fast-assembling walling system, including shell system and wallboard (7), it is characterised in that: further include hangar system (5), institute It states shell system and wallboard (7) to be fastened and connected by hangar system (5), the hangar system (5) includes the first pendant (3) and the Two pendants (4), first pendant (3) are installed on shell system, and second pendant (4) is installed on wallboard (7), and first Pendant (3) includes the first mounting groove upwards and being gradually increased, and the second pendant (4) includes the second installation downwards and being gradually increased Slot.
2. a kind of fast-assembling walling system according to claim 1, it is characterised in that: first pendant (3) includes first Pedestal (31), the first connecting plate (32) and the first anti-off board (33), the first base (31) be linear bar, described first Connecting plate (32) is perpendicularly fixed on first base (31), and first anti-off board (33) passes through the first connecting plate (32) and first Pedestal (31) connection, first anti-off board (33) are set in the middle part of the first connecting plate (32), the first base (31), first Opening upwards are formed between connecting plate (32) and the first anti-off board (33) and the first mounting groove being gradually increased that is open;Described second Pendant (4) includes second base (41), the second connecting plate (42) and the second anti-off board (43), and second connecting plate (42) is vertical It is fixed on second base (41), the both ends of second connecting plate (42) are separately connected second base (41) and the second anti-off board (43), between the second base (41), the second connecting plate (42) and the second anti-off board (43) formed opening upwards and opening by Cumulative the second big mounting groove;The minimum widith of first mounting groove be greater than the second anti-off board (43) wall thickness, described second The minimum widith of mounting groove is greater than the wall thickness of the first anti-off board (33), and second pendant (4) is inserted by the second anti-off board (43) Enter the first mounting groove, the first pendant (3) is also inserted into composition wall hanging in the second mounting groove by the first anti-off board (33) simultaneously System (5).
3. a kind of fast-assembling walling system according to claim 2, it is characterised in that: first pendant (3) and second is hung After part (4) connection composition wall hangar system (5), the first connecting plate (32) end is connected on second base (41), Huo Zhe Two connecting plates (42) end is connected on first base (31) or the first connecting plate (32) end and the second connecting plate (42) End is connected to simultaneously in second base (41) and first base (31).
4. a kind of fast-assembling walling system according to claim 2, it is characterised in that: first anti-off board (33) is towards the End face inside one mounting groove is equipped with engagement or snap-in structure, the end inside the second mounting groove of the second anti-off board (43) direction Face is equipped with engagement or snap-in structure.
5. a kind of fast-assembling walling system according to claim 2, it is characterised in that: the first base (31) is anti-with first The angle that the angle that de- plate (33) extended line is formed is greater than second base (41) and the second anti-off board (43) extended line is formed.
6. a kind of fast-assembling walling system according to claim 2, it is characterised in that: settable on the first base (31) The first connecting plate of two row or multi-row (32) and the first anti-off board (33) form two or more first mounting grooves;Second bottom Settable the second connecting plate of two row or multi-row (42) and the second anti-off board (43) on seat (41) form two or more second installations Slot, the interval between interval and two or more second mounting grooves between described two or multiple first mounting grooves match.
7. a kind of fast-assembling walling system according to claim 1, it is characterised in that: the shell system includes horizontal keel (1) and vertical keel (2), the horizontal keel (1) include upper keel and lower keel, and the upper keel and lower keel pass through vertical Keel (2) connection, the vertical keel (2) are evenly arranged between upper keel and lower keel, the horizontal keel (1) and vertically Keel (2) are set as C-type steel, and the horizontal keel (1) and vertical keel (2) offer conduit through bore in advance.
8. a kind of fast-assembling walling system according to claim 1, it is characterised in that: side between two blocks of wallboards (7) It is equipped with groove at connection gap, is equipped with connector (6) in the groove, the groove and connector (6) edge are tooth type structures, The groove and connector (6) size and tooth type structures match.
9. it is a kind of according to claim 1 in fast-assembling walling system and the hangar system (5) that manufactures, it is characterised in that: it is described to hang Extension system (5) includes the first pendant (3) and the second pendant (4), and the first pendant (3) includes the first installation upwards and being gradually increased Slot, the second pendant (4) include downwards and the second mounting groove for being gradually increased, first pendant (3) include first base (31), First connecting plate (32) and the first anti-off board (33), the first base (31) are the bar of linear, first connecting plate (32) it is perpendicularly fixed on first base (31), first anti-off board (33) passes through the first connecting plate (32) and first base (31) it connects, first anti-off board (33) is set in the middle part of the first connecting plate (32), the first base (31), the first connection Opening upwards are formed between plate (32) and the first anti-off board (33) and the first mounting groove being gradually increased that is open;Second pendant It (4) include second base (41), the second connecting plate (42) and the second anti-off board (43), second connecting plate (42) is vertically fixed In on second base (41), the both ends of second connecting plate (42) are separately connected second base (41) and the second anti-off board (43), between the second base (41), the second connecting plate (42) and the second anti-off board (43) formed opening upwards and opening by Cumulative the second big mounting groove;The minimum widith of first mounting groove be greater than the second anti-off board (43) wall thickness, described second The minimum widith of mounting groove is greater than the wall thickness of the first anti-off board (33), and second pendant (4) is inserted by the second anti-off board (43) Enter the first mounting groove, the first pendant (3) is also inserted into composition wall hanging in the second mounting groove by the first anti-off board (33) simultaneously System (5).
10. a kind of hangar system (5) according to claim 9, it is characterised in that: first pendant (3) and second is hung After part (4) connection composition wall hangar system (5), the first connecting plate (32) end is connected on second base (41), Huo Zhe Two connecting plates (42) end is connected on first base (31) or the first connecting plate (32) end and the second connecting plate (42) End is connected to simultaneously in second base (41) and first base (31), in the first mounting groove of the first anti-off board (33) direction The end face in portion is equipped with engagement or snap-in structure, and second anti-off board (43) is equipped with engagement towards the end face inside the second mounting groove Or snap-in structure, the angle that the first base (31) and the first anti-off board (33) extended line are formed be greater than second base (41) with The angle that second anti-off board (43) extended line is formed.
CN201820712795.2U 2018-05-14 2018-05-14 A kind of fast-assembling walling system and hangar system Expired - Fee Related CN208844782U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820712795.2U CN208844782U (en) 2018-05-14 2018-05-14 A kind of fast-assembling walling system and hangar system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820712795.2U CN208844782U (en) 2018-05-14 2018-05-14 A kind of fast-assembling walling system and hangar system

Publications (1)

Publication Number Publication Date
CN208844782U true CN208844782U (en) 2019-05-10

Family

ID=66350316

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820712795.2U Expired - Fee Related CN208844782U (en) 2018-05-14 2018-05-14 A kind of fast-assembling walling system and hangar system

Country Status (1)

Country Link
CN (1) CN208844782U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108385895A (en) * 2018-05-14 2018-08-10 华南理工大学 A kind of fast-assembling walling system
CN112554388A (en) * 2020-12-29 2021-03-26 浙江亚厦装饰股份有限公司 Buckle formula partition wall structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108385895A (en) * 2018-05-14 2018-08-10 华南理工大学 A kind of fast-assembling walling system
CN112554388A (en) * 2020-12-29 2021-03-26 浙江亚厦装饰股份有限公司 Buckle formula partition wall structure

Similar Documents

Publication Publication Date Title
CN102493622B (en) Wallboard installing component
CN206737222U (en) Cell cube section curtain wall installing device
CN102979312B (en) Indoor aluminum honeycomb board suspended ceiling reverse installation technology
CN208844782U (en) A kind of fast-assembling walling system and hangar system
CN107700711A (en) A kind of Multifunctional splicing partition wall body and its construction method
CN107060166A (en) A kind of circular arc rhombus stone curtain wall
CN108385895A (en) A kind of fast-assembling walling system
CN112064856A (en) Suspended ceiling pre-hanging piece and floor structure of building with same
CN208072731U (en) A kind of building curtain wall
CN202017287U (en) Connection structure capable of realizing optional quick-assembly and quick-disassembly of glass decorating plates of interior walls
CN206158021U (en) Metal roofing element modelled after an antique
CN208473060U (en) A kind of metal curtain wall
CN202834646U (en) Aluminum alloy hanging hook
CN204899108U (en) Node structure is hung futilely to marble
CN201649373U (en) Hanging structure of inter-storey unit type curtain wall board
CN203569833U (en) Novel dry hanging system for building outer decoration and insulation integrated boards
CN204983341U (en) Wall crown face curved surface hanger plate mounting structure
CN211313051U (en) Herringbone suspended ceiling framework erected by water pipes and electric wires
CN205077805U (en) Dry pendant mounting structure of wall
CN207827663U (en) A kind of single-row staircase decorative board mounting structure and staircase
CN204947971U (en) modular photovoltaic bracket
CN206607792U (en) A kind of bright frame plate fastening frame
CN205917951U (en) Light trough furred ceiling falls a grade device
CN109914664A (en) A kind of box floor of modularization and installation method
CN111075091A (en) Mounting structure of prefabricated grade furred ceiling light groove of falling of assembled

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190510