A kind of fast-assembling walling system and hangar system Download PDFInfo
- Publication number
- CN208844782U CN208844782U CN201820712795.2U CN201820712795U CN208844782U CN 208844782 U CN208844782 U CN 208844782U CN 201820712795 U CN201820712795 U CN 201820712795U CN 208844782 U CN208844782 U CN 208844782U
- Authority
- CN
- China
- Prior art keywords
- board
- base
- connecting plate
- pendant
- mounting groove
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009434 installation Methods 0.000 claims abstract description 14
- 229910000831 Steel Inorganic materials 0.000 claims description 8
- 239000010959 steel Substances 0.000 claims description 8
- 239000000203 mixture Substances 0.000 claims 4
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims 3
- 230000001186 cumulative effect Effects 0.000 claims 2
- 238000010276 construction Methods 0.000 abstract description 10
- 238000000034 method Methods 0.000 abstract description 8
- 238000004519 manufacturing process Methods 0.000 abstract description 6
- 239000002699 waste material Substances 0.000 abstract description 4
- 230000000694 effects Effects 0.000 abstract description 3
- 238000005192 partition Methods 0.000 description 5
- 210000000988 bone and bone Anatomy 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 239000011469 building brick Substances 0.000 description 2
- 239000000428 dust Substances 0.000 description 2
- 238000009413 insulation Methods 0.000 description 2
- 239000012774 insulation material Substances 0.000 description 2
- 229910000838 Al alloy Inorganic materials 0.000 description 1
- 206010054949 Metaplasia Diseases 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000003912 environmental pollution Methods 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 230000015689 metaplastic ossification Effects 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 238000010079 rubber tapping Methods 0.000 description 1
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Abstract
The utility model discloses a kind of fast-assembling walling systems, including shell system and wallboard, it further include hangar system, the shell system and wallboard are fastened and connected by hangar system, the hangar system includes the first pendant and the second pendant, first pendant is installed on shell system, and second pendant is installed on wallboard.Wallboard in the utility model can carry out quick lap joint installation and removal by hangar system, hardly generate pollution and building waste in the process;Shell system, wallboard and hangar system can carry out pre-production in factory, it can be achieved that medelling production, advantageously reduces production cost and economize on resources;Site operation link is reduced, and wallboard mounts and dismounts that process is extremely convenient, and construction period shortens, to economizing on resources and environment pollution control significant effect.A kind of hangar system is also disclosed, the shell system and wallboard for the fast-assembling walling system that is fastened and connected.Belong to construction wall field.
Description
Technical field
The utility model relates to construction wall fields, and in particular to a kind of fast-assembling walling system and hangar system.
Background technique
Separate conventionally employed building block in domestic construction object as dividing, building-brick type partition wall is at high cost from great, produces and applies
Work process generation dust is more, and environmental pollution is heavier.So light partition wall applies more and more, light partition wall in construction at present
Has many advantages, such as light weight compared with building-brick type partition wall, convenient, function admirable of constructing.But light partition wall is during installation
Wet construction is still used, working procedure is more complicated, and dust, noise and building waste that construction site generates etc. is to ring around
Border causes more pollution.
Utility model content
In order to solve the problems existing in the prior art, the utility model provides a kind of fast-assembling walling system, and dry type is used to apply
Work, almost pollution-free and without building waste, the degree of modularity is high, and in-site installation is convenient.
The utility model another object is that: provide a kind of hangar system, the bone for the fast-assembling walling system that is fastened and connected
Frame system and wallboard.
The technical scheme that the utility model is provided is as follows:
A kind of fast-assembling walling system, including shell system and wallboard, further include hangar system, the shell system and wallboard
It is fastened and connected by hangar system, the hangar system includes the first pendant and the second pendant, and first pendant is installed in bone
In frame system, second pendant is installed on wallboard, and the first pendant includes upwards and the first mounting groove for being gradually increased second
Pendant includes the second mounting groove downwards and being gradually increased.
Further, first pendant includes first base, the first connecting plate and the first anti-off board, the first base
For the bar of linear, first connecting plate is perpendicularly fixed in first base, and first anti-off board passes through the first connecting plate
It is connect with first base, first anti-off board is set in the middle part of the first connecting plate, the first base, the first connecting plate and the
Opening upwards are formed between one anti-off board and the first mounting groove being gradually increased that is open;Second pendant include second base,
Second connecting plate and the second anti-off board, second connecting plate are perpendicularly fixed in second base, and the two of second connecting plate
End is separately connected second base and the second anti-off board, is formed and is opened between the second base, the second connecting plate and the second anti-off board
Mouthful upwards and the second mounting groove for being gradually increased of opening;The minimum widith of first mounting groove is greater than the wall of the second anti-off board
Thickness, the minimum widith of second mounting groove are greater than the wall thickness of the first anti-off board, and second pendant is inserted by the second anti-off board
Enter the first mounting groove, the first pendant is also inserted into the second mounting groove simultaneously by the first anti-off board and forms wall hangar system.
Further, after first pendant and the connection of the second pendant form wall hangar system, the first connecting plate end
It is connected in second base or the second connecting plate end is connected in first base or the first connecting plate end and
Two connecting plate ends are connected in second base and first base simultaneously.
Further, first anti-off board is equipped with engagement or snap-in structure, institute towards the end face inside the first mounting groove
It states the second anti-off board and is equipped with engagement or snap-in structure towards the end face inside the second mounting groove.
Further, the angle that the first base and the first anti-off board extended line are formed is slightly larger than second base and second
The angle that anti-off board extended line is formed.
Further, settable the first connecting plate of two row or multi-row and the first anti-off board in the first base form two
A or multiple first mounting grooves;Settable the second connecting plate of two row or multi-row and the second anti-off board in the second base are formed
Two or more second mounting grooves, interval and two or more second mounting grooves between described two or multiple first mounting grooves
Between interval match.
Further, the shell system includes horizontal keel and vertical keel, the horizontal keel include upper keel and
Lower keel, the upper keel and lower keel are connected by vertical keel, and the vertical keel are equal between upper keel and lower keel
Even arrangement.
Further, the horizontal keel and vertical keel are set as C-type steel, and the horizontal keel and vertical keel open up in advance
There is conduit through bore.
Further, sound insulation or thermal insulation material are equipped between the vertical keel.
Further, groove is equipped between two blocks of wallboards at the connection gap of side, is equipped with connector in the groove,
The groove and connector edge are that tooth type structures, the groove and connector size and tooth type structures match.
A kind of hangar system manufactured according to the utility model fast-assembling walling system, the hangar system include the first extension
Part and the second pendant, the first pendant include the first mounting groove upwards and being gradually increased, and the second pendant includes increasing downwards and gradually
The second big mounting groove, first pendant include first base, the first connecting plate and the first anti-off board, and the first base is
The bar of linear, first connecting plate are perpendicularly fixed in first base, first anti-off board by the first connecting plate with
First base connection, first anti-off board are set in the middle part of the first connecting plate, the first base, the first connecting plate and first
Opening upwards are formed between anti-off board and the first mounting groove being gradually increased that is open;Second pendant includes second base,
Two connecting plates and the second anti-off board, second connecting plate are perpendicularly fixed in second base, the both ends of second connecting plate
It is separately connected second base and the second anti-off board, forms opening between the second base, the second connecting plate and the second anti-off board
The second mounting groove that upward and opening is gradually increased;The minimum widith of first mounting groove is greater than the wall thickness of the second anti-off board,
The minimum widith of second mounting groove is greater than the wall thickness of the first anti-off board, and second pendant passes through the second anti-off board insertion the
One mounting groove, the first pendant are also inserted into the second mounting groove simultaneously by the first anti-off board and form wall hangar system.
Further, after first pendant and the connection of the second pendant form wall hangar system, the first connecting plate end
It is connected in second base or the second connecting plate end is connected in first base or the first connecting plate end and
Two connecting plate ends are connected in second base and first base simultaneously, inside the first mounting groove of the first anti-off board direction
End face is equipped with engagement or snap-in structure, and second anti-off board is equipped with engagement or engaging knot towards the end face inside the second mounting groove
Structure.The first base is greater than second base with the angle that the first anti-off board extended line is formed and is formed with the second anti-off board extended line
Angle.
Compared with prior art, the utility model has the beneficial effects that:
The fast-assembling walling system of the utility model includes shell system and wallboard, and shell system and wallboard pass through hangar system
It is connected, when construction, wallboard can carry out quick lap joint installation and removal by hangar system, hardly generate in the process
Pollution and building waste;Shell system, wallboard and hangar system can carry out pre-production, it can be achieved that mode metaplasia in factory
It produces, advantageously reduce production cost and economizes on resources;Site operation link is reduced, and wallboard installation and removal process is extremely convenient,
Construction period shortens, to economizing on resources and environment pollution control significant effect.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model embodiment;
Fig. 2 is the structural schematic diagram in the utility model embodiment hangar system section;
Fig. 3 is the utility model embodiment connector scheme of installation.
Fig. 4 is the utility model embodiment connector schematic diagram.
Description of symbols:
1, horizontal keel;2, vertical keel;3, the first pendant;31, first base;32, the first connecting plate;33, first is anti-
De- plate;4, the second pendant;41, second base;42, the second connecting plate;43, the second anti-off board;5, hangar system;6, connector;
7, wallboard.
Specific embodiment
In order to be best understood from the utility model, the utility model is made below in conjunction with the drawings and specific embodiments further detailed
It describes in detail bright.
As shown in Figure 1, the system includes shell system and wallboard 7, the skeleton for fast-assembling walling system in the present embodiment
System is connected with wallboard 7 by hangar system 5.As shown in Fig. 2, the hangar system 5 includes the first pendant 3 and the second pendant
4, the first pendant 3 and the second pendant 4 are aluminium alloy extruded molding.First pendant 3 includes first base 31, the first connecting plate
32 and first anti-off board 33, the first base 31 and the first anti-off board 33 pass through the first connecting plate 32 and connect, first base 31
For the bar of linear, the first connecting plate 32 is perpendicularly fixed in first base 31, and the first anti-off board 33 passes through the first connecting plate 32
It is connect with first base 31, the first anti-off board 33 is set to 32 middle part of the first connecting plate, first base 31,32 and of the first connecting plate
Opening upwards are formed between first anti-off board 33 and the first mounting groove being gradually increased that is open, the minimum widith of the first mounting groove are big
In the wall thickness of the second anti-off board 43.The first peace is formed between the first base 31, the first connecting plate 32 and the first anti-off board 33
Tankage;Second pendant 4 includes second base 41, the second connecting plate 42 and the second anti-off board 43,41 He of second base
Second anti-off board 43 is connected by the second connecting plate 42, and the second connecting plate 42 is perpendicularly fixed in second base 41, the second connection
The both ends of plate 42 are separately connected second base 41 and the second anti-off board 43, second base 41, the second connecting plate 42 and the second anticreep
The second mounting groove that Open Side Down and that opening is gradually increased is formed between plate 43, the minimum widith of the second mounting groove is greater than first
The wall thickness of anti-off board 33.The angle that the first base 31 and 33 extended line of the first anti-off board are formed is greater than second base 41 and the
The angle that two anti-off boards, 43 extended line is formed.First anti-off board 33 towards the end face inside the first mounting groove be equipped with engagement or
Snap-in structure, second anti-off board 43 also are provided with engagement or snap-in structure towards the end face inside the second mounting groove.In this reality
It applies in example, as shown in Fig. 2, being provided with two in above-mentioned first base 31 ranked first connecting plate 32 and the first anti-off board 33, forms
Two the first mounting grooves, two are correspondingly provided in above-mentioned second base 41 ranked second connecting plate 42 and the second anti-off board 43, shape
Interval at two the second mounting grooves, and between two the first mounting grooves is identical as the interval between two the second mounting grooves.
One or more first mounting grooves can be only set, and the quantity of the second mounting groove and interval are identical as the first mounting groove.As shown in Figure 2
Wall hangar system 5 is formed for the first pendant 3 and the connection of the second pendant 4, wherein the second pendant 4 is inserted by the second anti-off board 43
Entering the first mounting groove, the first pendant 3 is also inserted into the second mounting groove simultaneously by the first anti-off board 33, meanwhile, the first pendant 3
The end of first connecting plate 32 is connected in the second base 41 of the second pendant 4.
First pendant fills 3 and is located on shell system, and the second pendant 4 is installed on wallboard 7.The shell system includes
Horizontal keel 1 and vertical keel 2, horizontal keel 1 and vertical keel 2 are set as C-type steel, and C-type steel is thin-walled steel plate cold roll forming.Institute
Stating horizontal keel 1 includes upper keel and lower keel, and upper keel and lower keel are by the connection of vertical keel 2, and vertical keel 2 are in pliosaur
It is evenly arranged between bone and lower keel.The horizontal keel 1 and vertical keel 2 also offer conduit through bore, the vertical dragon in advance
Sound insulation or thermal insulation material can be equipped between bone 2.Metope is generally spliced by muti-piece wallboard, in order to improve the flatness of metope,
As shown in figure 3, groove can be equipped at side splicing gap between every two blocks of wallboards 7, it is equipped with connector 6 in groove, such as Fig. 4 institute
Show, groove and 6 edge of connector are that tooth type structures, the groove and 6 size of connector and tooth type structures match.
The fast-assembling walling system working principle of the utility model are as follows:
When construction, in the position for needing to be spaced wall, subscript eminence and subscript eminence install respectively fixed upper keel and
Lower keel installs fixed vertical keel 2 between upper keel and lower keel in vertical direction, can be by the interval for being not more than 60cm
Vertical keel 2 are uniformly installed, to complete the steel structure framework system of an entirety.According to the specification and size of wallboard 7, according to
Certain vertical spacing, can be by the spacing for being not more than 60cm, from subscript eminence to subscript eminence, successively in shell system installation the
First base 31 is fitted in vertical 2 surface of keel by one pendant 3, is consolidated first base 31 with vertical keel 2 by tapping screw
Dingan County's dress, 3 hold mode of the first pendant when installation.The second pendant 4 can be mounted on 7 back side of wallboard in advance in factory, originated
Position and spacing are consistent with the first pendant 3 in the position of shell system and spacing.When installation, 7 back side of wallboard second is prevented
De- 43 the first anti-off board of end alignment of plate, 33 end, and slightly lift and inject the second anti-off board 43 in first mounting groove, due to
The angle of first base 31 and the first anti-off board 33 be greater than second base 41 and the second anti-off board 43 angle, wallboard 7 oneself
Under the ramp effect of weight and the first anti-off board 33, wallboard 7 with shell system direction towards moving vertically downward, in the first anti-off board
33 and 43 contact surface tooth type structures of the second anti-off board interlocking under so that the tightening of the second pendant 4 and the first pendant 3 is bonded,
On the top to second base 41 of final first connecting plate, 32 end, to wallboard 7 move horizontally and limitation fixed function is played in rotation.
Then it repeats the above process, completes the installation of remaining wall.Above-mentioned upper keel, lower keel, vertical keel 2, wallboard 7, first are hung
The size of part 3 and the second pendant 4 can all be opened in advance in factory's pre-production, upper keel, lower keel and vertical keel 2 in factory
Good conduit through bore, the second pendant 4 can be pre-installed on wallboard 7 in factory, and when site operation need to only build steel structure framework system
System, and the first pendant 3 is installed in steel structure framework system, then hanging up wallboard 7 can be completed the installation of wall.
The embodiments of the present invention and embodiment are not limited to the above, according to the above content of the utility model,
Using the ordinary technical knowledge and customary means of this field, under the premise of not departing from the utility model above-mentioned basic fundamental thought,
The utility model can also make the modification, replacement or change of other diversified forms, all fall within the utility model rights protection model
Within enclosing.
Claims (10)
1. a kind of fast-assembling walling system, including shell system and wallboard (7), it is characterised in that: further include hangar system (5), institute
It states shell system and wallboard (7) to be fastened and connected by hangar system (5), the hangar system (5) includes the first pendant (3) and the
Two pendants (4), first pendant (3) are installed on shell system, and second pendant (4) is installed on wallboard (7), and first
Pendant (3) includes the first mounting groove upwards and being gradually increased, and the second pendant (4) includes the second installation downwards and being gradually increased
Slot.
2. a kind of fast-assembling walling system according to claim 1, it is characterised in that: first pendant (3) includes first
Pedestal (31), the first connecting plate (32) and the first anti-off board (33), the first base (31) be linear bar, described first
Connecting plate (32) is perpendicularly fixed on first base (31), and first anti-off board (33) passes through the first connecting plate (32) and first
Pedestal (31) connection, first anti-off board (33) are set in the middle part of the first connecting plate (32), the first base (31), first
Opening upwards are formed between connecting plate (32) and the first anti-off board (33) and the first mounting groove being gradually increased that is open;Described second
Pendant (4) includes second base (41), the second connecting plate (42) and the second anti-off board (43), and second connecting plate (42) is vertical
It is fixed on second base (41), the both ends of second connecting plate (42) are separately connected second base (41) and the second anti-off board
(43), between the second base (41), the second connecting plate (42) and the second anti-off board (43) formed opening upwards and opening by
Cumulative the second big mounting groove;The minimum widith of first mounting groove be greater than the second anti-off board (43) wall thickness, described second
The minimum widith of mounting groove is greater than the wall thickness of the first anti-off board (33), and second pendant (4) is inserted by the second anti-off board (43)
Enter the first mounting groove, the first pendant (3) is also inserted into composition wall hanging in the second mounting groove by the first anti-off board (33) simultaneously
System (5).
3. a kind of fast-assembling walling system according to claim 2, it is characterised in that: first pendant (3) and second is hung
After part (4) connection composition wall hangar system (5), the first connecting plate (32) end is connected on second base (41), Huo Zhe
Two connecting plates (42) end is connected on first base (31) or the first connecting plate (32) end and the second connecting plate (42)
End is connected to simultaneously in second base (41) and first base (31).
4. a kind of fast-assembling walling system according to claim 2, it is characterised in that: first anti-off board (33) is towards the
End face inside one mounting groove is equipped with engagement or snap-in structure, the end inside the second mounting groove of the second anti-off board (43) direction
Face is equipped with engagement or snap-in structure.
5. a kind of fast-assembling walling system according to claim 2, it is characterised in that: the first base (31) is anti-with first
The angle that the angle that de- plate (33) extended line is formed is greater than second base (41) and the second anti-off board (43) extended line is formed.
6. a kind of fast-assembling walling system according to claim 2, it is characterised in that: settable on the first base (31)
The first connecting plate of two row or multi-row (32) and the first anti-off board (33) form two or more first mounting grooves;Second bottom
Settable the second connecting plate of two row or multi-row (42) and the second anti-off board (43) on seat (41) form two or more second installations
Slot, the interval between interval and two or more second mounting grooves between described two or multiple first mounting grooves match.
7. a kind of fast-assembling walling system according to claim 1, it is characterised in that: the shell system includes horizontal keel
(1) and vertical keel (2), the horizontal keel (1) include upper keel and lower keel, and the upper keel and lower keel pass through vertical
Keel (2) connection, the vertical keel (2) are evenly arranged between upper keel and lower keel, the horizontal keel (1) and vertically
Keel (2) are set as C-type steel, and the horizontal keel (1) and vertical keel (2) offer conduit through bore in advance.
8. a kind of fast-assembling walling system according to claim 1, it is characterised in that: side between two blocks of wallboards (7)
It is equipped with groove at connection gap, is equipped with connector (6) in the groove, the groove and connector (6) edge are tooth type structures,
The groove and connector (6) size and tooth type structures match.
9. it is a kind of according to claim 1 in fast-assembling walling system and the hangar system (5) that manufactures, it is characterised in that: it is described to hang
Extension system (5) includes the first pendant (3) and the second pendant (4), and the first pendant (3) includes the first installation upwards and being gradually increased
Slot, the second pendant (4) include downwards and the second mounting groove for being gradually increased, first pendant (3) include first base (31),
First connecting plate (32) and the first anti-off board (33), the first base (31) are the bar of linear, first connecting plate
(32) it is perpendicularly fixed on first base (31), first anti-off board (33) passes through the first connecting plate (32) and first base
(31) it connects, first anti-off board (33) is set in the middle part of the first connecting plate (32), the first base (31), the first connection
Opening upwards are formed between plate (32) and the first anti-off board (33) and the first mounting groove being gradually increased that is open;Second pendant
It (4) include second base (41), the second connecting plate (42) and the second anti-off board (43), second connecting plate (42) is vertically fixed
In on second base (41), the both ends of second connecting plate (42) are separately connected second base (41) and the second anti-off board
(43), between the second base (41), the second connecting plate (42) and the second anti-off board (43) formed opening upwards and opening by
Cumulative the second big mounting groove;The minimum widith of first mounting groove be greater than the second anti-off board (43) wall thickness, described second
The minimum widith of mounting groove is greater than the wall thickness of the first anti-off board (33), and second pendant (4) is inserted by the second anti-off board (43)
Enter the first mounting groove, the first pendant (3) is also inserted into composition wall hanging in the second mounting groove by the first anti-off board (33) simultaneously
System (5).
10. a kind of hangar system (5) according to claim 9, it is characterised in that: first pendant (3) and second is hung
After part (4) connection composition wall hangar system (5), the first connecting plate (32) end is connected on second base (41), Huo Zhe
Two connecting plates (42) end is connected on first base (31) or the first connecting plate (32) end and the second connecting plate (42)
End is connected to simultaneously in second base (41) and first base (31), in the first mounting groove of the first anti-off board (33) direction
The end face in portion is equipped with engagement or snap-in structure, and second anti-off board (43) is equipped with engagement towards the end face inside the second mounting groove
Or snap-in structure, the angle that the first base (31) and the first anti-off board (33) extended line are formed be greater than second base (41) with
The angle that second anti-off board (43) extended line is formed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820712795.2U CN208844782U (en) | 2018-05-14 | 2018-05-14 | A kind of fast-assembling walling system and hangar system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820712795.2U CN208844782U (en) | 2018-05-14 | 2018-05-14 | A kind of fast-assembling walling system and hangar system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208844782U true CN208844782U (en) | 2019-05-10 |
Family
ID=66350316
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820712795.2U Expired - Fee Related CN208844782U (en) | 2018-05-14 | 2018-05-14 | A kind of fast-assembling walling system and hangar system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208844782U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108385895A (en) * | 2018-05-14 | 2018-08-10 | 华南理工大学 | A kind of fast-assembling walling system |
CN112554388A (en) * | 2020-12-29 | 2021-03-26 | 浙江亚厦装饰股份有限公司 | Buckle formula partition wall structure |
-
2018
- 2018-05-14 CN CN201820712795.2U patent/CN208844782U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108385895A (en) * | 2018-05-14 | 2018-08-10 | 华南理工大学 | A kind of fast-assembling walling system |
CN112554388A (en) * | 2020-12-29 | 2021-03-26 | 浙江亚厦装饰股份有限公司 | Buckle formula partition wall structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102493622B (en) | Wallboard installing component | |
CN206737222U (en) | Cell cube section curtain wall installing device | |
CN102979312B (en) | Indoor aluminum honeycomb board suspended ceiling reverse installation technology | |
CN208844782U (en) | A kind of fast-assembling walling system and hangar system | |
CN107700711A (en) | A kind of Multifunctional splicing partition wall body and its construction method | |
CN107060166A (en) | A kind of circular arc rhombus stone curtain wall | |
CN108385895A (en) | A kind of fast-assembling walling system | |
CN112064856A (en) | Suspended ceiling pre-hanging piece and floor structure of building with same | |
CN208072731U (en) | A kind of building curtain wall | |
CN202017287U (en) | Connection structure capable of realizing optional quick-assembly and quick-disassembly of glass decorating plates of interior walls | |
CN206158021U (en) | Metal roofing element modelled after an antique | |
CN208473060U (en) | A kind of metal curtain wall | |
CN202834646U (en) | Aluminum alloy hanging hook | |
CN204899108U (en) | Node structure is hung futilely to marble | |
CN201649373U (en) | Hanging structure of inter-storey unit type curtain wall board | |
CN203569833U (en) | Novel dry hanging system for building outer decoration and insulation integrated boards | |
CN204983341U (en) | Wall crown face curved surface hanger plate mounting structure | |
CN211313051U (en) | Herringbone suspended ceiling framework erected by water pipes and electric wires | |
CN205077805U (en) | Dry pendant mounting structure of wall | |
CN207827663U (en) | A kind of single-row staircase decorative board mounting structure and staircase | |
CN204947971U (en) | modular photovoltaic bracket | |
CN206607792U (en) | A kind of bright frame plate fastening frame | |
CN205917951U (en) | Light trough furred ceiling falls a grade device | |
CN109914664A (en) | A kind of box floor of modularization and installation method | |
CN111075091A (en) | Mounting structure of prefabricated grade furred ceiling light groove of falling of assembled |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190510 |