Prior art keywords
cylinder
gantry
planer
fixing assembling
oil cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910109402.8A
Other languages
Chinese (zh)
Inventor
李海文
许绍明
杨林鑫
刘青辉
魏允伯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHIJIAZHUANG AOCHUANG MINING EQUIPMENT CO LTD
Original Assignee
SHIJIAZHUANG AOCHUANG MINING EQUIPMENT CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHIJIAZHUANG AOCHUANG MINING EQUIPMENT CO LTD filed Critical SHIJIAZHUANG AOCHUANG MINING EQUIPMENT CO LTD
Priority to CN201910109402.8A priority Critical patent/CN109681225A/en
Publication of CN109681225A publication Critical patent/CN109681225A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/10Making by using boring or cutting machines
    • E21D9/1006Making by using boring or cutting machines with rotary cutting tools
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/003Machines for drilling anchor holes and setting anchor bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D23/00Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
    • E21D23/04Structural features of the supporting construction, e.g. linking members between adjacent frames or sets of props; Means for counteracting lateral sliding on inclined floor

Abstract

The invention discloses rock gangway planer-type heading and anchoring integrated machines, including development machine, cutting units that development machine front end is set, the traveling crawler belt that driving motor spindle is set, for providing the hydraulic power unit and gantry device of operation power, the gantry device includes that principal arms, two gantry upright posts, gantry beam and jumbolter are released in two gantry;Described gantry releases principal arm and is correspondingly arranged at development machine two sides, and front end is fixedly connected with vertical gantry upright post, and the upper end fixing assembling of two gantry upright posts has gantry beam, is respectively and fixedly provided with jumbolter in the front and rear sides of gantry beam;The top fixing assembling of two gantry upright posts has gib.For machine of the present invention compared with the technique of the artificial Anchor Care of existing rock gangway, the application of rock gangway heading and anchoring integrated machine realizes safety in production;It improves work efficiency, reduces the number of workers of work surface.

Description

Rock gangway planer-type heading and anchoring integrated machine
Technical field
The present invention relates to all-in-one machine technical field, specific field is rock gangway planer-type heading and anchoring integrated machine.
Background technique
In present coal mine headwork, in order to realize safely, the target that proposes effect, subtract people, demand to heading and anchoring integrated machine It is higher and higher, but existing heading and anchoring integrated machine is all applied in coal road, and coal road is mostly rectangular shaped roadways, and rock gangway is mostly Arched tunnel still can be applicable in rock gangway without suitable heading and anchoring integrated machine, make rock gangway also realize safely, the target that proposes effect, subtract people.
Currently, operation often uses development machine to tunnel in rock gangway, then anchor brill is carried out with hand-held anchor drilling machine by worker And supporting.Operation has following significant drawback in this way: 1. occupation area of equipment is big, and walking is extremely inconvenient in rock gangway;2. a variety of Equipment uses different power sources, further increases occupied area;3. since pick three work of Anchor Care operate separately, so as to cause Operating clearance can bring certain collapsing risk;4. what is needed is artificial more, it usually needs 10 ~ 12 talents can complete above-mentioned behaviour Make.
Summary of the invention
It is mentioned above in the background art to solve the purpose of the present invention is to provide rock gangway planer-type heading and anchoring integrated machine Problem.
To achieve the above object, the invention provides the following technical scheme:
A kind of rock gangway planer-type heading and anchoring integrated machine, including development machine, cutting units that development machine front end is arranged in, setting tunneling The traveling crawler belt of motor spindle, for providing the hydraulic power unit and gantry device of operation power, the gantry device includes two dragons Door releases principal arm, two gantry upright posts, gantry beam and jumbolter;It releases principal arm and is correspondingly arranged at development machine two in described gantry Side, front end are fixedly connected with vertical gantry upright post, and the upper end fixing assembling of two gantry upright posts has gantry beam, The front and rear sides of gantry beam are respectively and fixedly provided with jumbolter;The top fixing assembling of two gantry upright posts has gib.
A further improvement of the present invention is that: it includes the outer cylinder being successively set with, middle cylinder, inner cylinder that principal arm is released at described gantry, (bottom is fixed on development machine, inner cylinder front end and gantry upright post fixing assembling, the front end of middle cylinder and ejection cylinder for the outer cylinder Piston rod is fixedly connected, and ejection cylinder is connected with hydraulic power unit.
A further improvement of the present invention is that: the front end two sides of the middle cylinder are correspondingly arranged two the first fixed pulleys, tail End two sides are correspondingly arranged two the second fixed pulleys;One end of first wirerope is fixed on the front end of outer cylinder, the other end around first The middle part of inner cylinder is fixed on after fixed pulley, one end of the second wirerope is fixed on the tail portion of inner cylinder, the other end and slides calmly around second It is fixed on the middle part of outer cylinder after wheel, realizes the slide fit connection of outer cylinder, middle cylinder, inner cylinder.
A further improvement of the present invention is that: being additionally provided between inner cylinder and middle cylinder prevents the opposite limit slipped of the two Block.
A further improvement of the present invention is that: the gantry upright post includes the column outer cylinder with inner cylinder fixing assembling, vertical The inner cavity side fixing assembling of column outer cylinder has a column oil cylinder, and the column oil cylinder is two-way cylinder, the piston rod of the upper end with it is upper Retracting cylinder fixing assembling, the piston rod of lower end and lower retracting cylinder fixing assembling;It is arranged in the inner cavity bottom right side of column outer cylinder The telescopic rod outer wall fixing assembling of beam lifting oil cylinder, beam lifting oil cylinder has beam lifting cylinder.
A further improvement of the present invention is that: the top of the upper retracting cylinder connects gib, and gib is arch Telescopic extension arm is arranged in bracket, both ends.
A further improvement of the present invention is that: it is articulated connection between the upper retracting cylinder and gib.
A further improvement of the present invention is that: the gantry beam includes horizontal frame body, and frame body both ends are separately fixed at On the opposite face of two beam lifting cylinders;One end fixing assembling of frame body has translation oil cylinder, and the piston rod front end of translation oil cylinder is solid Surely sliding block is assembled, sliding block is under the driving of translation oil cylinder along frame body horizontal displacement.
A further improvement of the present invention is that: the equal fixing assembling in the left and right ends of the sliding block has rotating device, and anchor pole bores Machine is fixed on the spinning device, and jumbolter drills out direction to be directed toward circumferencial direction.
A further improvement of the present invention is that: the jumbolter includes pedestal, balladeur train, balladeur train oil cylinder, power head, power Hair oil cylinder, clamper, drilling rod;The pedestal includes bottom plate, and two parallel slideways are fixedly installed on bottom plate along its length, Across balladeur train is set above two slideways, the balladeur train oil cylinder of drive carriage sliding is additionally provided on bottom plate;The top of the balladeur train is fixed Power head is installed, the through-hole that accommodating drilling rod passes through is opened up inside power head, the through-hole direction is consistent with the length direction of balladeur train; Chuck for clamping and unclamping drilling rod is installed inside through-hole;The power of driving power head sliding is additionally provided on balladeur train Hair oil cylinder;The front end of the balladeur train is fixedly installed with clamper, and the drilling passed through for drilling rod is opened up in clamper, is set in drilling It is equipped with the slips that can clamp and unclamp drilling rod;The drilling of the clamper and the through-hole of power head are to be coaxially set, and drilling rod is same When pass through clamper and power head and realize and fix.
Compared with prior art, the beneficial effects of the present invention are:
The present invention provides a kind of rock gangway planer-type heading and anchoring integrated machine, gantry device is increased on the basis of development machine to realize Anchor Care;By gantry release the cooperation of principal arm and gantry upright post, gantry upright post and gantry beam, gantry beam and jumbolter come Anchoring work after realizing driving is realized the protection of rock gangway roof by the support of gantry upright post and gib, is anchoring Work provides trouble free service space.The present invention will dig Anchor Care three work and orderly implement, and supporting immediately after driving is anchored again Operation, safety greatly improve;Three steps orderly carry out, and are worked using double anchor hole drilling machine, and driving speed obtains significant It improves.Machine of the present invention designs reasonable, compact layout, greatly reduces occupation area of equipment, while digging Anchor Care three work It is all made of the same power source, it is very convenient;Operation number is few, can reduce the number of workers of half work surface.Present device energy A variety of tunnel environment are enough adapted to, protection also can be supported effectively for rugged rock gangway.
Detailed description of the invention
Fig. 1 is overall structure diagram of the invention;
Fig. 2 is the overlooking structure diagram of Fig. 1;
Fig. 3 is the left view structural representation of Fig. 1;
Fig. 4 is the right side structural representation of Fig. 1;
Fig. 5 is the structural schematic diagram that principal arm is released at gantry;
Fig. 6 is the overlooking structure diagram of Fig. 5;
Fig. 7 is the enlarged diagram of part A in Fig. 6;
Fig. 8 is the enlarged diagram of part B in Fig. 6;
Fig. 9 is the structural schematic diagram of gantry upright post;
Figure 10 is the enlarged diagram of C portion in Fig. 9;
Figure 11 is the enlarged diagram of the part D in Fig. 9;
Figure 12 is the overlooking structure diagram of Fig. 9;
Figure 13 is the structural schematic diagram of gantry beam;
Figure 14 is the overlooking structure diagram of Figure 13;
Figure 15 is the overall structure diagram of jumbolter;
Figure 16 is that Figure 15 unloads the overlooking structure diagram after drilling rod;
Figure 17 is the overlooking structure diagram of Figure 16;
Figure 18 is the structural schematic diagram of jumbolter pedestal.
In figure: releasing principal arm, 2- gantry upright post, 3- gantry beam, 4- jumbolter, 5- gib, 6- liquid in the gantry 1- Retracting cylinder, the upper retracting cylinder of 9-, 10- column oil cylinder, 11- beam lifting cylinder, 12- beam lifting under press pump station, 7- column outer cylinder, 8- Oil cylinder, 13- outer cylinder, cylinder, 15- inner cylinder, 16- ejection cylinder, the first wirerope of 171-, the second wirerope of 172-, 18- connect in 14- Connect frame, the first fixed pulley of 191-, the second fixed pulley of 192-, 20- frame body, 21- translation oil cylinder, 22- sliding block, 23- rotating device, 24- development machine, 25- cutting units, 26- traveling crawler belt, 27- pedestal, 271- bottom plate, 272- rotating part, 273- rotation mounting hole, 28- balladeur train, 29- balladeur train oil cylinder, 30- power head, 31- power head oil cylinder, 32- clamper, 33- drilling rod, 34- baffle, 35- are hit Plate, 36- sliding rail.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Fig. 1-14 is please referred to, the present invention provides technical solution:
A kind of rock gangway planer-type heading and anchoring integrated machine, including development machine 24 are equipped with cutting for driving in 24 front end of development machine Portion 25 is cut, 24 two sides of the bottom of development machine are correspondingly arranged traveling crawler belt 26.There are two being correspondingly arranged in the two sides of 24 fuselage of development machine Gantry pushing arm 1, each 1 front end of gantry pushing arm are fixedly connected with a gantry upright post 2, and the middle part of two gantry upright posts 2 passes through dragon Door crossbeam 3 realizes connection, and the top of two gantry upright posts 2 is connected with the gib 5 of arch;The front and back of the gantry beam 3 A jumbolter 4 is assembled respectively in two sides.It is additionally provided in the development machine 24 for providing the hydraulic power unit 6 of motion-promotion force.
The gantry of left and right two releases principal arm 1 and is connected respectively with development machine or so track frame, can be by gantry device by digging The front that cutting units is pushed forward above into machine revolving platform carries out drilling operation.Two jumbolters 4 are connected with gantry beam 3, Gantry beam 3 can be moved up and down along gantry upright post 2, to adapt to the tunnel of different height and realize the purpose withdrawn at gantry;Two Platform jumbolter 4 can be moved left and right along gantry beam 3, and 270 ° can be rotated centered on its centre of gyration, to realize in arch The purpose of bolthole is beaten in tunnel;Gib 5 is connected with left and right gantry upright post 2, can rise under the promotion of gantry upright post 2 At the top of to tunnel, the working space of a safety is provided for Anchor Care operation;Hydraulic power unit 6 is fixed on machine body of boring machine, for pick Anchor Care system provides power support.
Specifically, it includes the outer cylinder 13, middle cylinder 14, the inner cylinder 15 that are successively set with that principal arm 1 is released at gantry, 15 front end of inner cylinder with 2 fixing assembling of gantry upright post;The front end two sides of the middle cylinder 14 are correspondingly arranged two the first fixed pulleys 191, tail end two sides pair Two the second fixed pulleys 192 should be set;One end of first wirerope 171 is fixed on the front end of outer cylinder 13, the other end around first Be fixed on the middle part of inner cylinder 15 after fixed pulley 191, one end of the second wirerope 172 be fixed on the tail portion of inner cylinder 15, the other end around It is fixed on the middle part of outer cylinder 13 after crossing the second fixed pulley 192, to realize the slide fit connection of outer cylinder 13, middle cylinder 14, inner cylinder 15.Institute It states outer cylinder 13 to be fixed on the connection frame 18 of its bottom, connection frame 18 is mutually solid by the left and right track frame of bolt and development machine It is fixed;The front end of middle cylinder 14 is fixedly connected with the piston rod 16 of ejection cylinder, and ejection cylinder is connected with hydraulic power unit 6;Inner cylinder 15 Front end and 2 fixing assembling of gantry upright post.Being additionally provided between inner cylinder 13 and middle cylinder 14 prevents the opposite limit slipped of the two Block, the limited block are fixed on inner tank theca.
It is that cylinder 14 stretches out in the promotion of piston rod 16 of ejection cylinder first when the stretching of principal arm 1 is released at gantry, two groups of movable pulleys It drives inner cylinder to release with the speed of twice of oil cylinder by two groups of wirerope respectively, gantry is quickly pushed to cutterhead to reach The purpose of front.After gantry is pushed to operating position, gantry upright post 2 is started to work.
Specifically, gantry upright post 2 includes column outer cylinder 7, column outer cylinder 7 and 13 fixing assembling of inner cylinder.In column outer cylinder 7 Inner cavity on the left of fixing assembling have a column oil cylinder 10, the column oil cylinder 10 is two-way cylinder, the piston rod of the upper end with above stretch 9 fixing assembling of contracting cylinder, the piston rod of lower end and lower 8 fixing assembling of retracting cylinder.The interim branch of top connection of the upper retracting cylinder 9 Shield 5 is between the two articulated connection, it can be achieved that the rotation of certain angle is adjusted, preferably to adapt to the shape at the top of rock gangway.Institute Stating gib 5 is arch support, and telescopic extension arm is arranged in both ends, and the width after extension arm stretches out is greater than driving machine width Degree, can the rock gangway to different in width realizes effectively support.
Outside the inner cavity bottom right side setting beam lifting oil cylinder 12 of column outer cylinder 7, the telescopic rod of beam lifting oil cylinder 12 Wall fixing assembling has beam lifting cylinder 11;Gantry beam 3 is fixedly connected between two beam lifting cylinders 11.
When gantry upright post 2 is started to work, the piston rod at 2 central post oil cylinder of gantry upright post, 10 both ends stretches out, while driving Retracting cylinder 9 and lower 8 rise and fall of retracting cylinder, upper retracting cylinder 9 drive gib 5 to withstand at the top of tunnel, and lower retracting cylinder 8 drives bottom Foot is stood on the ground of tunnel, achievees the purpose that roof supporting and ground, and gib 5 becomes safety work space below;Support After the completion of work, lifting cylinder 12 drives gantry beam 3 to move up and down, and the centre of gyration of jumbolter 4 is made to reach spring line Highly.
Practical under gravity, column oil cylinder 10 often first drives lower retracting cylinder 8 to stretch out at work, reaches Upper retracting cylinder 9 is driven to stretch out behind ground;After upper retracting cylinder 9 reaches top plate, column oil cylinder 10 continues to pressurize, and realizes top plate and ground The two-way of face steps up.Two column oil cylinders 10 are connect with hydraulic power unit 6, and oil circuit pressure is identical, lower retracting cylinder 8 and upper retracting cylinder 9 stretching stroke is consistent, and stability of strutting system is high.
Specifically, gantry beam 3 includes horizontal frame body 20,20 both ends of frame body are bolted on two cross respectively On 11 opposite face of beam lifting tube.One end fixing assembling of frame body 20 has translation oil cylinder 21, and the piston rod front end of translation oil cylinder 21 is solid Surely assemble sliding block 22, sliding block 22 and the sliding of frame body 20 are clamped, the driving sliding block 22 of translation oil cylinder 21 can be horizontal along frame body 20 Displacement.The equal fixing assembling in the left and right ends of sliding block 22 has rotating device 23, and jumbolter 4 is fixed on rotating device 23;Pass through The drilling rod of the adjustable jumbolter 4 of rotating device 23 drills out direction.
After the position of gantry beam 3 determines, translation oil cylinder 21 pushes sliding block 22 in 20 internal slide of frame body, bores anchor pole The transverse width center of the centre of gyration (i.e. the rotation center of rotating device 23) the alignment rock gangway of machine 4;As center, pass through rotation Rotary device 23 drives jumbolter 4 to carry out 270 ° of rotations, and the position for finding bolthole at any angle carries out circumferential drilling.Due to There are two jumbolters 4 for setting in product of the present invention, it is possible to while two rows of punchings, and two jumbolters 4 are independent control System, punching stroke can be inconsistent, is easy to use.
The jumbolter 4, as shown in Figure 15 ~ Figure 18, including pedestal 27, balladeur train 28, balladeur train oil cylinder 29, power head 30, Power head oil cylinder 31, clamper 32, drilling rod 33.The pedestal 27 includes bottom plate 271 and the vertically disposed rotating part of bottom plate 271 272;As shown in figure 15, bottom plate 271 is horizontally disposed, and the rotating part 272 of right end is vertically arranged;Rotating part 272 be used for The rotating device 23 of heading and anchoring integrated machine connects, to realize that anchor bores rotating in a circumferential direction for direction.The rotating part 272 is offered and is revolved The rotation mounting hole 273 that rotary device 23 is connected, the through-hole of even cloth setting installation bolt around rotation mounting hole 273.
Two parallel slideways are fixedly installed on the bottom plate 271 along its length, across setting balladeur train above two slideways 28, balladeur train 28 is slidably matched with slideway;It is provided with friction plate between 271 surface of lower end surface and bottom plate of balladeur train 28, to guarantee Balladeur train slides at the uniform velocity stable.The locating part for preventing balladeur train from slipping is provided in the front end of slideway.It is additionally provided on bottom plate 271 The balladeur train oil cylinder 29 that drive carriage 28 is slided, the power output end of the balladeur train oil cylinder 29 is fixed on the front end of balladeur train 28, another End is fixed on bottom plate 271 by several screws, realizes balladeur train 28 bottom of at by flexible can drive of 29 piston rod of balladeur train oil cylinder It is moved on plate 271.
Power head 30 is fixedly mounted in the top of the balladeur train 28, opened up inside power head 30 accommodating drilling rod 33 pass through it is logical Hole, the through-hole direction are consistent with the length direction of balladeur train 28;Chuck for holding drill pipe 33 is installed inside through-hole.? Power head oil cylinder 31 is additionally provided on balladeur train 28;The power output end of the power head oil cylinder 31 is fixed on power head 30, separately Balladeur train 28 is fixed on by screw in one end, and power head oil cylinder 31 can drive power head to be slided on balladeur train 28.
Specifically, being provided with the gasket of increasing friction force between the power head 30 and balladeur train 28.
Specifically, sliding rail 36 is arranged on the upper surface of the balladeur train 28, the setting of 30 bottom of power head matches with sliding rail 36 The sliding slot of conjunction passes through the cooperation of sliding rail 36 and sliding slot, it is ensured that the glide direction of power head 30 avoids the hair when anchor is bored and vibrated Raw offset.
The front end of the balladeur train 28 is also fixedly installed with clamper 32, and the brill passed through for drilling rod 33 is opened up in clamper 32 Hole;The through-hole of the drilling of the clamper 32 and power head 30 is to be coaxially set, and drilling rod 33 is also cross clamper 32 and moves Power head 30 is realized and is fixed.The slips that can clamp and unclamp drilling rod 33 is provided in the clamper 32.The card of the power head 30 The slips of disk and clamper 32 is the driving of respective independent control, and the individually operated of either component may be implemented.
Specifically, baffle 34 is fixedly installed in the front end of the balladeur train 28, baffle 34 is vertical with bottom plate 271, clamper 32 It is fixedly mounted on the top of baffle 34.Be additionally provided with crash panel 35 in the front end of baffle 34, the crash panel 35 be it is horizontally disposed, For clamping tunnel side wall, the stability of drilling rod 33 when anchor bores is improved.A row, which is additionally provided with, at the shock end of crash panel 35 hits point, Its clamping brace effect with tunnel side wall can be improved, prevent from vibrating lower loosen.
The course of work of the invention are as follows:
After heading and anchoring integrated machine driving, gantry is adjusted first and releases principal arm work, cylinder, first are slided calmly in ejection cylinder promotion Wheel, the second fixed pulley drive inner cylinder to release with the speed of twice of oil cylinder by wirerope simultaneously, are pushed to gantry to reach Before cutting units.After gantry is pushed to operating position, gantry upright post is started to work, and the piston rod at column oil cylinder both ends is stretched Out, while upper retracting cylinder and lower retracting cylinder being driven to stretch out, upper retracting cylinder drives gib to withstand at the top of tunnel, lower retracting cylinder band Dynamic footing is stood on the ground of tunnel, achievees the purpose that stable roof supporting and ground, and the extension arm of gib stretches out, below As safety work space.After the completion of supporting work, beam lifting oil cylinder drives gantry beam to move up and down, and makes jumbolter The centre of gyration reaches the height of spring line;After the position of gantry beam determines, translation oil cylinder pushes sliding block to slide along frame body, makes The transverse width center of the centre of gyration alignment rock gangway of jumbolter;As center, jumbolter 4 is driven by rotating device 270 ° of rotations are carried out, the position for finding bolthole at any angle carries out circumferential drilling.
After the completion of punching, Anchor Agent is filled into hole.Then jumbolter is rotated to horizontal position, translation oil cylinder is received It returns, jumbolter is made to be no more than complete machine width in width direction;Beam lifting oil cylinder drives gantry beam to rise to maximum position; Column oil cylinder is withdrawn, and withdraws gib and footing;Ejection cylinder is withdrawn, and band driven portal is recovered on development machine revolving platform Side.Heading and anchoring integrated machine continues headwork.
The drill-through journey of anchor of the invention are as follows:
When boring work starts, balladeur train stretches out and withstands wall, and the chuck in power head is opened, and the slips in clamper is beaten It opens, drilling rod is passed through from power head center;When the drill bit on drilling rod passes through clamper and chuck when close to wall, in power head Clamping drilling rod, clamper unclamp drilling rod, and the chuck in power head starts high speed rotation, and power head oil cylinder drives power head to promote, Start boring work;
After power head oil cylinder shifts range onto, the chuck in power head stops rotating, slips in clamper clamp drilling rod, Chuck in power head unclamps, and power head return back to the rearmost end of balladeur train, the card in power head under the drive of power head oil cylinder Disk clamping drilling rod, clamper unclamp drilling rod, and the chuck in power head starts high speed rotation, drive of the power head in power head oil cylinder Under promote again, start to drill, until drilling depth is met the requirements;Then the chuck in power head stops rotating, and power head exists The other end of balladeur train, the chuck release of clamp holder clamping drilling rod, power head are returned under the drive of power head oil cylinder, power head exists Balladeur train front end is advanced under the drive of power head oil cylinder, power head clamping drilling rod, clamper unclamp drilling rod, and power head is in power The tail portion for falling back on balladeur train under the drive of hair oil cylinder again, is iteratively repeated the above movement, until drilling rod exits bolthole completely.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (10)

1. a kind of rock gangway planer-type heading and anchoring integrated machine, it is characterised in that: including development machine (24), be arranged before development machine (24) The cutting units (25) at end is arranged in the traveling crawler belt (26) of development machine (24) bottom, for providing the hydraulic power unit of operation power (6) and gantry device, the gantry device include that principal arm (1), two gantry upright posts (2), gantry beam (3) are released in two gantry With jumbolter (4);It releases principal arm (1) and is correspondingly arranged at development machine (24) two sides, front end and vertical gantry in described gantry Column (2) is fixedly connected, and the upper end fixing assembling of two gantry upright posts (2) has gantry beam (3), in gantry beam (3) Front and rear sides be respectively and fixedly provided with jumbolter (4);The top fixing assembling of two gantry upright posts (2) has gib (5).
2. rock gangway planer-type heading and anchoring integrated machine according to claim 1, it is characterised in that: release principal arm in described gantry It (1) include the outer cylinder (13), middle cylinder (14), inner cylinder (15) being successively set with, (13 bottoms are fixed on development machine (24) to the outer cylinder On, inner cylinder (15) front end and gantry upright post (2) fixing assembling, the front end of middle cylinder (14) and the piston rod of ejection cylinder (16) are fixed Connection, ejection cylinder (16) are connected with hydraulic power unit (6).
3. rock gangway planer-type heading and anchoring integrated machine according to claim 2, it is characterised in that: the front end of the middle cylinder (14) Two sides are correspondingly arranged two the first fixed pulleys (191), and tail end two sides are correspondingly arranged two the second fixed pulleys (192);First steel One end of cord (171) is fixed on the front end of outer cylinder (13), the other end is fixed on inner cylinder (15) after bypassing the first fixed pulley (191) Middle part, one end of the second wirerope (172) is fixed on the tail portion of inner cylinder (15), the other end around after the second fixed pulley (192) It is fixed on the middle part of outer cylinder (13), realizes the slide fit connection of outer cylinder (13), middle cylinder (14), inner cylinder (15).
4. rock gangway planer-type heading and anchoring integrated machine according to claim 3, it is characterised in that: in inner cylinder (13) and middle cylinder (14) being additionally provided between prevents the opposite limited block slipped of the two.
5. rock gangway planer-type heading and anchoring integrated machine according to claim 1, it is characterised in that: gantry upright post (2) packet Include with the column outer cylinder (7) of inner cylinder (13) fixing assembling, have column oil cylinder in the inner cavity side fixing assembling of column outer cylinder (7) (10), the column oil cylinder (10) is two-way cylinder, the piston rod of the upper end and upper retracting cylinder (9) fixing assembling, lower end Piston rod and lower retracting cylinder (8) fixing assembling;In the inner cavity bottom right side of column outer cylinder (7), beam lifting oil cylinder (12) are set, The telescopic rod outer wall fixing assembling of beam lifting oil cylinder (12) has beam lifting cylinder (11).
6. rock gangway planer-type heading and anchoring integrated machine according to claim 5, it is characterised in that: the upper retracting cylinder (9) Top connects gib (5), and gib (5) is arch support, and telescopic extension arm is arranged in both ends.
7. rock gangway planer-type heading and anchoring integrated machine according to claim 6, it is characterised in that: the upper retracting cylinder (9) with It is articulated connection between gib (5).
8. rock gangway planer-type heading and anchoring integrated machine according to claim 1, it is characterised in that: gantry beam (3) packet It includes horizontal frame body (20), frame body (20) both ends are separately fixed on the opposite face of two beam lifting cylinders (11);Frame body (20) One end fixing assembling have translation oil cylinder (21), the piston rod front end fixing assembling sliding block (22) of translation oil cylinder (21), sliding block (2) 2 under the driving of translation oil cylinder (21) along frame body (20) horizontal displacement.
9. rock gangway planer-type heading and anchoring integrated machine according to claim 8, it is characterised in that: the left and right of the sliding block (22) The equal fixing assembling in both ends has rotating device (23), and jumbolter (4) is fixed on rotating device (23), the brill of jumbolter (4) Direction is to be directed toward circumferencial direction out.
10. rock gangway planer-type heading and anchoring integrated machine according to claim 9, it is characterised in that: jumbolter (4) packet Include pedestal (27), balladeur train (28), balladeur train oil cylinder (29), power head (30), power head oil cylinder (31), clamper (32), drilling rod (33);The pedestal (27) includes bottom plate (271), and two parallel slideways are fixedly installed on bottom plate (271) along its length, Across setting balladeur train (28) above two slideways, the balladeur train oil cylinder (29) of drive carriage (28) sliding is additionally provided on bottom plate (271);Institute Power head (30) are fixedly mounted in the top for stating balladeur train (28), and the through-hole that accommodating drilling rod (33) passes through is opened up inside power head (30), The through-hole direction is consistent with the length direction of balladeur train (28);It is equipped with inside through-hole for clamping and unclamping drilling rod (33) Chuck;The power head oil cylinder (31) of driving power head (30) sliding is additionally provided on balladeur train (28);Before the balladeur train (28) End is fixedly installed with clamper (32), is opened up the drilling passed through for drilling rod (33) in clamper (32), is provided with energy in drilling Clamp and unclamp the slips of drilling rod (33);The through-hole of the drilling of the clamper (32) and power head (30) is to be coaxially set.
CN201910109402.8A 2019-02-10 2019-02-10 Rock gangway planer-type heading and anchoring integrated machine Pending CN109681225A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910109402.8A CN109681225A (en) 2019-02-10 2019-02-10 Rock gangway planer-type heading and anchoring integrated machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910109402.8A CN109681225A (en) 2019-02-10 2019-02-10 Rock gangway planer-type heading and anchoring integrated machine

Publications (1)

Publication Number Publication Date
CN109681225A true CN109681225A (en) 2019-04-26

Family

ID=66194340

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910109402.8A Pending CN109681225A (en) 2019-02-10 2019-02-10 Rock gangway planer-type heading and anchoring integrated machine

Country Status (1)

Country Link
CN (1) CN109681225A (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009155776A1 (en) * 2008-06-25 2009-12-30 Yan Zhendong A dilling, loading, transporting and anchoring integration machine for laneway in coal mine
CN201443396U (en) * 2009-08-07 2010-04-28 三一重型装备有限公司 Excavating, anchoring and supporting all-in-one machine
CN102364053A (en) * 2011-11-07 2012-02-29 石家庄中煤装备制造股份有限公司 Heading-anchoring machine
CN104564050A (en) * 2015-01-19 2015-04-29 郑东风 Process method and equipment for heading and anchoring parallel operation construction
CN104736769A (en) * 2012-10-26 2015-06-24 日立建机株式会社 Multi-stage telescopic arm device and deep-digging excavator comprising multi-stage telescopic arm device
CN105370295A (en) * 2015-12-03 2016-03-02 山西天巨重工机械有限公司 Cantilever type impact heading machine
CN106194201A (en) * 2016-09-21 2016-12-07 田胜利 Heading and anchoring integrated machine
CN208106466U (en) * 2018-04-05 2018-11-16 欧玉金 Pick shield windlass
CN108868810A (en) * 2018-08-16 2018-11-23 日照市上普重型装备股份有限公司 Cantilevered digging and anchoring integrated machine
CN208416529U (en) * 2018-05-09 2019-01-22 上海创力集团股份有限公司 Anchor Care device for development machine
CN209604008U (en) * 2019-02-10 2019-11-08 石家庄奥创矿用设备有限公司 Rock gangway planer-type heading and anchoring integrated machine

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009155776A1 (en) * 2008-06-25 2009-12-30 Yan Zhendong A dilling, loading, transporting and anchoring integration machine for laneway in coal mine
CN201443396U (en) * 2009-08-07 2010-04-28 三一重型装备有限公司 Excavating, anchoring and supporting all-in-one machine
CN102364053A (en) * 2011-11-07 2012-02-29 石家庄中煤装备制造股份有限公司 Heading-anchoring machine
CN104736769A (en) * 2012-10-26 2015-06-24 日立建机株式会社 Multi-stage telescopic arm device and deep-digging excavator comprising multi-stage telescopic arm device
CN104564050A (en) * 2015-01-19 2015-04-29 郑东风 Process method and equipment for heading and anchoring parallel operation construction
CN105370295A (en) * 2015-12-03 2016-03-02 山西天巨重工机械有限公司 Cantilever type impact heading machine
CN106194201A (en) * 2016-09-21 2016-12-07 田胜利 Heading and anchoring integrated machine
CN208106466U (en) * 2018-04-05 2018-11-16 欧玉金 Pick shield windlass
CN208416529U (en) * 2018-05-09 2019-01-22 上海创力集团股份有限公司 Anchor Care device for development machine
CN108868810A (en) * 2018-08-16 2018-11-23 日照市上普重型装备股份有限公司 Cantilevered digging and anchoring integrated machine
CN209604008U (en) * 2019-02-10 2019-11-08 石家庄奥创矿用设备有限公司 Rock gangway planer-type heading and anchoring integrated machine

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
应自新: "采煤机械液压传动", 30 June 1982, 煤炭工业出版社, pages: 76 - 77 *
廖原时: "金刚石串珠锯在饰面石材生产中的应用技术", 31 January 2009, 冶金工业出版社, pages: 439 - 441 *

Similar Documents

Publication Publication Date Title
CN100559013C (en) Tunneling, anchoring and drilling composite machine
CN101832102B (en) Movable two-platform partitioned four-arm hanging wall anchor rod and anchor cable construction drill carriage
CN100516465C (en) Integrated tunnelling and anchoring machine
US5340199A (en) Method and machine for excavating drifts, tunnels, stopes, caverns or the like
CN107355230B (en) Gantry drilling and tunneling trolley
CN101230781B (en) Tunneling and bolting integrative machine
CN109736798A (en) Dig six arm anchor driving machines of anchoring integral
CN109693222B (en) Self-propelled tunnel lining dismantling equipment and use method
CN101832103B (en) Movable two-arm hanging wall anchor rod and anchor cable construction drill carriage
CN101070758A (en) Digging-drilling integrated digging-drilling machine
CN110259395A (en) A kind of turnover type drilling platform manipulator
CN102278110A (en) Movable two-arm of lifting platform hanging wall anchor rod and anchor cable construction drill carriage
CN208416529U (en) Anchor Care device for development machine
CN209817930U (en) Rail-walking type foldable tunnel pipe erecting machine for coal mine
CN106194022A (en) A kind of Portable drilling device for fully-mechanized mining working passing fault and using method
US4371211A (en) Tunnel boring machine and method of operating same
CN209604008U (en) Rock gangway planer-type heading and anchoring integrated machine
CN109372428A (en) A kind of Pneumatic drilling machine of multifunctional foldable
CN109798136A (en) Tunnel support vehicle
CN2900788Y (en) Tunnelling and drilling integrated tunnelling machine
CN109681225A (en) Rock gangway planer-type heading and anchoring integrated machine
CN117432430A (en) Method and equipment for tunneling drilled hard rock tunnel
CN101845952B (en) Movable three-arm top-assisting anchor rod and anchor cable construction drill carriage
CN201635656U (en) Side-propping anchor rod-anchor cable construction drill carriage with three movable arms
CN111456728A (en) Support system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination