CN109653469A - The levelling floor construction method of anti-hollowing essence - Google Patents

The levelling floor construction method of anti-hollowing essence Download PDF

Info

Publication number
CN109653469A
CN109653469A CN201910097294.7A CN201910097294A CN109653469A CN 109653469 A CN109653469 A CN 109653469A CN 201910097294 A CN201910097294 A CN 201910097294A CN 109653469 A CN109653469 A CN 109653469A
Authority
CN
China
Prior art keywords
absolute altitude
altitude control
control piece
floor
horizontal absolute
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910097294.7A
Other languages
Chinese (zh)
Inventor
肖汝朋
何龙
黄香琼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Love Fullan Construction Co Ltd
Original Assignee
Guangdong Love Fullan Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Love Fullan Construction Co Ltd filed Critical Guangdong Love Fullan Construction Co Ltd
Priority to CN201910097294.7A priority Critical patent/CN109653469A/en
Publication of CN109653469A publication Critical patent/CN109653469A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/02Flooring or floor layers composed of a number of similar elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/02Flooring or floor layers composed of a number of similar elements
    • E04F15/0215Flooring or floor layers composed of a number of similar elements specially adapted for being adhesively fixed to an underlayer; Fastening means therefor; Fixing by means of plastics materials hardening after application

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Floor Finish (AREA)

Abstract

The present invention relates to technical field of building construction, aiming at the problem that hollowing is easy to appear after ground tile paving, provide a kind of levelling floor construction method of anti-hollowing essence, comprising the following steps: S1, base cleaning;It is S2, thick levelling;S3, floor leveling;S4, it is laid with cement sand bed;S5, floor tile pretreatment;S6, ground tile paving.Height by controlling concrete layer is not less than 4cm, is conducive to the uniformity for improving concrete layer, so that concrete is not easy crack phenomenon occur during conserving molding, advantageously reduces after floor is laid with and is easy to appear hollowing.

Description

The levelling floor construction method of anti-hollowing essence
Technical field
The present invention relates to technical field of building construction, more specifically, it relates to a kind of levelling floor construction of anti-hollowing essence Method.
Background technique
The superficial layer on floor, i.e. house earth surface or flooring, is made by timber or other materials.
Existing floor construction is usually first in base's laying dry cement mortar and levelling, then in dry cement bonded sand Floor tile is adhered to be made by adhesive on slurry.But it is larger due to usually containing sand, stone isodensity in dry cement mortar Gather materials, since sand, stone are easy that stirring is uneven in stirring so that be placed in the strength of cement mortar of top section compared with It is weak.When dry cement mortar is during drying and moulding, and surface dehydration is too fast, be easy to cause in capillary generate compared with Big negative pressure and dry cement mortar volume is sharply shunk, thus be easy so that being placed in the strong of the concrete of top section Degree is difficult to resist the contraction of itself, so that dry cement mortar is easy to produce cracking, and then floor is easy to cause hollowing occur The phenomenon that, therefore, still there is improved space.
Summary of the invention
In view of the deficiencies of the prior art, the present invention intends to provide a kind of anti-hollowing essence levelling floor construction side Method has the advantages that reducing floor hollowing occurs.
To achieve the above object, the present invention provides the following technical scheme that
A kind of levelling floor construction method of anti-hollowing essence, comprising the following steps:
S1, base cleaning;
It is S2, thick levelling: pea gravel concreten bed course to be laid in base, the height of the pea gravel concreten bed course is not less than, and leads to Cross the thick leveling concrete bed course of surveying setting-out;
S3, floor leveling: by making several consistent horizontal absolute altitude control pieces of shape size, the horizontal absolute altitude control piece is extremely Few there are two planar horizontals to be arranged, and determines the position of horizontal absolute altitude control piece by measurement, then by horizontal absolute altitude control piece its In a horizontal plane be bonded with the upper surface of pea gravel concreten layer, use the fixed horizontal absolute altitude control of polymer cement mortar Part, and the upper surface of the horizontal absolute altitude control piece is controlled in same level height;
S4, it is laid with cement sand bed: being laid with cement sand bed on pea gravel concreten layer, led at once by aluminium side in horizontal absolute altitude Control piece upper surface rolling, so that the upper surface of cement sand bed is flushed with the upper surface of horizontal absolute altitude control piece;
S5, floor tile pretreatment: it in one layer of back rubberised layer of floor tile backside coating and dries in the shade;
S6, ground tile paving: adhesive is coated on the back rubberised layer of floor tile and floor tile is adhered on cement sand bed, through conserving Form floor.
By adopting the above technical scheme, 4cm is not less than by control concrete layer, so that the height of concrete layer subtracts significantly It is small, though so that sand, stone in pea gravel concreten are settled down to bottom, it is also not far at the top of pea gravel concreten layer, thus favorably In the uniformity for improving pea gravel concreten layer, so that concrete is not easy crack phenomenon occur during conserving molding, into And advantageously reduce the case where being easy to appear hollowing phenomenon after floor is laid with;By first using the levelling horizontal absolute altitude control of infrared essence The upper surface of part re-lays cement sand bed, so that cement mortar so that the upper surface of several horizontal absolute altitude control pieces flushes Layer is flushed with the upper surface of horizontal absolute altitude control piece, is conducive to the levelling precision for improving cement sand bed, so that cement sand bed Levelling error range controls within 4mm, consequently facilitating the laying of floor tile so that floor tile when being laid with without again levelling, Be conducive to improve construction efficiency, meanwhile, so that being not easy between floor tile and cement sand bed there are gap, so that floor is not It is easy to appear hollowing phenomenon;In addition, horizontal absolute altitude control piece can also play a supportive role to floor tile, so that the intensity of cement sand bed Enhancing, so that cement sand bed is not easily susceptible to cracking, so that floor is not easy the phenomenon that hollowing occur;By elder generation on ground One layer of back gluing of brick backside coating, then floor tile is adhered on cement sand bed with clay, be conducive to back gluing and be completely covered ground The back side of brick, so that be not easy that there are gaps between the floor tile back side and back gluing, meanwhile, back gluing and adhesive have good Compatibility, so that be not easy after ground tile paving is on cement sand bed, between floor tile and cement sand bed there are gap, into And floor is made to be not easy hollowing phenomenon occur.
The present invention is further arranged to: the horizontal absolute altitude control piece is equipped with through-hole, and the through-hole runs through horizontal absolute altitude Two horizontally disposed planes of control piece, in the step S3, behind the position for determining horizontal absolute altitude control piece, and by infrared After line measuring instrument absolute altitude, polymer cement mortar, and the horizontal mark of adjustment before polymer cement mortar initial set are poured into through-hole The height of high control piece makes the level height of the upper surface of horizontal absolute altitude control piece reach the absolute altitude of the infrared measurement machine;
By adopting the above technical scheme, after by the position of the horizontal absolute altitude control piece of determination, into through-hole, joints cement is with will be horizontal Absolute altitude control piece is pre-fixed on concrete layer, convenient for the fixation of horizontal absolute altitude control piece, so that horizontal absolute altitude control piece is consolidated Fixed operation is not necessarily to while carrying out manual fixation, is conducive to improve working efficiency;Meanwhile so that horizontal absolute altitude control piece is not easy to send out The upward displacement of unboiled water square, the precision of the position for the absolute altitude control piece that is conducive to improve the standard, to be conducive to improve floor tile Mat formation the accuracy of position.
The present invention is further arranged to: the polymer water silt particle in the step S3, in horizontal absolute altitude control piece through-hole After starching drying and moulding, polymer cement mortar is smeared close to the periphery of pea gravel concreten layer one end in horizontal absolute altitude control piece, is made Horizontal absolute altitude control piece is obtained to be fixed on pea gravel concreten layer.
By adopting the above technical scheme, by the through-hole of horizontal absolute altitude control piece joints cement to pre-fix after, then Horizontal absolute altitude control piece smears cement close to the periphery of concrete layer one end with fixation, is conducive to enhancing horizontal absolute altitude control piece position The stability set, so that horizontal absolute altitude control piece is less likely to occur to be displaced after being fixed, to be conducive to absolute altitude control of improving the standard The position precision of product, so that the position of mating formation of floor tile is more accurate.
The present invention is further arranged to: in the step S4, the upper surface of cement sand bed and horizontal absolute altitude control piece Upper surface flushes.
By adopting the above technical scheme, it is not less than 2cm by controlling the height of cement sand bed, is conducive to reinforced cement mortar The intensity of layer, so that cement sand bed is not easily susceptible to cracking when being pressurized, so that being not easy between floor tile and cement sand bed There are gaps, so that floor is not easy hollowing phenomenon occur.
The present invention is further arranged to: in the step S5, floor tile includes natural stone floor tile, artificial stone floor tile and ceramic tile, Before natural stone floor tile coats back gluing, six face protective treatments first are carried out to natural stone floor tile.
By adopting the above technical scheme, since natural stone floor tile is as made of the direct sanding and polishing of natural stone, without other Processing is conducive to improve natural stone floor tile by first carrying out six face protective treatments to natural stone floor tile before gluing is carried on the back in coating Waterproof performance and alkali prevention performance, to be conducive to extend the service life of natural stone floor tile.
The present invention is further arranged to: in the step S6, after maintenance, the gap between adjacent floor tile is using U.S. seam Treasured sealing.
By adopting the above technical scheme, the precious gap sealed between adjacent floor tile is stitched by using beauty, is conducive to improve floor Impervious waterproof performance so that water is not easy to infiltrate into cement sand bed and concrete layer, to be conducive to extend cement The service life of screed and concrete layer, so that cement sand bed and concrete layer are not easily susceptible to cracking, so that ground Brick is not easy hollowing phenomenon occur;Meanwhile so that the gap between adjacent floor tile is not easy to shelter evil people and countenance evil practices, so that being adjacent to Gap between brick is not allowed to be also easy to produce mould, and the cleaning for being also convenient for floor is swept;In addition, also helping the beautiful effect on enhancing floor Fruit, so that the class on floor improves, to be conducive to improve the economic value on floor.
The present invention is further arranged to: in the step S6, floor tile reserves expansion joint in process of deployment, adjacent described to stretch Spacing between contracting seam is 4-5 meters.
By adopting the above technical scheme, by reserving expansion joint during ground tile paving, be conducive to carry out building element Protection so that building element because climate temperature changes expand with heat and contract with cold the case where when, building element is not allowed to be also easy to produce Crack, to be conducive to extend the service life of building element.
The present invention is further arranged to: in the step S6, described adhesive uses soft flexible organic clay.
By adopting the above technical scheme, by using soft flexible organic clay as adhesive, so that adhesive has There is certain elasticity, be conducive to the toughness for enhancing adhesive, so that adhesive floor tile is not easily susceptible to cracking when being pressurized;Together When, also help enhancing floor tramples comfort level.
In conclusion the invention has the following advantages:
1. the height by control concrete layer is to be conducive to the uniformity for improving pea gravel concreten layer not less than 4cm, so that mixed Solidifying soil is not easy crack phenomenon occur during conserving molding, advantageously reduces after floor is laid with and is easy to appear hollowing;
2. being poured by the upper surface of the first infrared levelling horizontal absolute altitude control piece of essence, then by the through-hole toward horizontal absolute altitude control piece Polymer cement mortar layer can adjust the height of horizontal absolute altitude control piece, poly- before polymer cement mortar layer not initial set After closing the drying of object cement mortar, the height of the upper surface of horizontal absolute altitude control piece is flushed, is conducive to improve cement sand bed Levelling precision, so that the levelling error range of cement sand bed controls within 4mm, so that between floor tile and cement sand bed not It is easy there are gap, so that floor tile is not easy hollowing occur;
3. horizontal absolute altitude control piece plays a supportive role to floor tile, so that cement sand bed is not easily susceptible to cracking, so that floor is not It is easy to appear hollowing;
4. by the way that first floor tile is adhered on cement sand bed in one layer of back gluing of floor tile backside coating, then with clay, so that ground It is not easy that there are gaps between the brick back side and back gluing, meanwhile, so that be not easy between floor tile and cement sand bed there are gap, So that floor is not easy hollowing occur.
Specific embodiment
With reference to embodiments, invention is further described in detail.
A kind of levelling floor construction method of anti-hollowing essence, comprising the following steps:
S1, base cleaning, specific as follows:
With scour without sediment motion base, surface dust, dust in base are removed, then base is cleaned up, by the dirt removal in base Completely, it dries, and by the soil compaction of base.
It is S2, thick levelling, specific as follows:
The dimensional parameters of base are measured according to architectural drawing, and are done in base according to architectural drawing, by level corresponding Graticule and production ash cake absolute altitude.
Pea gravel concreten is poured in base to form pea gravel concreten bed course, control pea gravel concreten bed course pours height Degree is 5cm, and passes through the elevation line marked slightly levelling pea gravel concreten bed course, so that the upper surface water of pea gravel concreten bed course It is flat.
S3, ground essence are levelling, specific as follows:
It pours to form the consistent horizontal absolute altitude control piece of several shape sizes, in the present embodiment, horizontal absolute altitude control using cement Product is cylindrical, and the center of horizontal absolute altitude control piece, which is run through, has through-hole so that the section of horizontal absolute altitude control piece is in circle It is cyclic annular.The outer diameter of horizontal absolute altitude control piece is 20cm, and the internal diameter of horizontal absolute altitude control piece is 5cm, the height of horizontal absolute altitude control piece Degree is 2cm.
After pea gravel concreten bed course, which conserves, to be formed, horizontal absolute altitude control piece is determined according to architectural drawing and by measurement Position, and the fixation position of horizontal absolute altitude control piece is marked, it is corresponding solid that horizontal absolute altitude control piece is then placed in its Positioning is set, so that the annulus bottom surface of horizontal absolute altitude control piece is bonded with the upper surface of concrete cushion.Adjacent level absolute altitude control At a distance of 1.5m between product.
Polymer water slurry liquid then is poured into the through-hole of horizontal absolute altitude control piece, so that horizontal absolute altitude control piece is pre- solid Due on concrete layer.
Then by the upper surface of the levelling horizontal absolute altitude control piece of infrared ray essence, the wherein height of the infrared measurement machine absolute altitude Height than horizontal absolute altitude control piece is higher by 2mm, makes the upper surface of horizontal absolute altitude control piece by lifting horizontal absolute altitude control piece Height reach the height of infrared ray absolute altitude.When raising horizontal absolute altitude control piece, it is located at not pre-hardening in horizontal absolute altitude control piece Polymer cement mortar flowed to out of through-hole between horizontal absolute altitude control piece lower surface and pea gravel concreten layer upper surface between Gap.
After the polymer water slurry liquid in the through-hole of horizontal absolute altitude control piece is dry, in horizontal absolute altitude control piece close to mixed The outer circumferential walls of solidifying soil layer one end smear polymer water slurry liquid again, so that horizontal absolute altitude control piece is fixed on pea gravel concreten layer On.
S4, it is laid with cement sand bed, specific as follows:
After the polymer cement mortar for fixing of horizontal absolute altitude control piece outer circumferential walls is dry, filled on concrete cushion Cement mortar is filled the water, and is conserved to form cement sand bed.It is logical by aluminium side between every two adjacent horizontal absolute altitude control piece The upper surface of cement sand bed is flushed with the upper surface of horizontal absolute altitude control piece.
S5, floor tile pretreatment, specific as follows:
Floor tile includes natural stone floor tile, artificial stone floor tile and ceramic tile.First uniformly it is coated in six outer surfaces of natural stone floor tile Machine silicon waterproof coating, when coating organosilicon waterproof coating, respectively in the horizontal and vertical each painting of the front and back of natural stone floor tile It covers primary.After the completion of organic silicon water-proofing coating is coated and is conserved, then respectively to natural stone floor tile, artificial stone floor tile or ceramic tile The back side uniformly coats back gluing, and stands 10h-12h, to form back rubberised layer, while to carry on the back rubberised layer far from the floor tile back side Plane it is parallel with tile surface.
S6, ground tile paving, specific as follows:
Organic clay is uniformly coated on the back rubberised layer at the floor tile back side, then floor tile is adhered to cement mortar by organic clay On layer, so that floor tile is fixed on cement sand bed.
During being laid with floor tile, expansion joint is reserved, is spaced 4.5m between adjacent expansion seam.
After the completion of floor tile is pasted, 14h is conserved, then be coated in the gap of adjacent floor tile using U.S. seam treasured, so that phase Gap sealing before adjacent floor tile, to form floor.
The embodiment of present embodiment is presently preferred embodiments of the present invention, not limits protection of the invention according to this Range, therefore: the equivalence changes that all structures under this invention, shape, principle are done, should all be covered by protection scope of the present invention it It is interior.

Claims (8)

1. a kind of levelling floor construction method of anti-hollowing essence, it is characterized in that: the following steps are included:
S1, base cleaning;
It is S2, thick levelling: pea gravel concreten bed course is laid in base, the height of the pea gravel concreten bed course is not less than 4cm, and Pass through the thick leveling concrete bed course of surveying setting-out;
S3, floor leveling: by making several consistent horizontal absolute altitude control pieces of shape size, the horizontal absolute altitude control piece is extremely Few there are two planar horizontals to be arranged, and determines the position of horizontal absolute altitude control piece by measurement, then by horizontal absolute altitude control piece its In a horizontal plane be bonded with the upper surface of pea gravel concreten layer, use the fixed horizontal absolute altitude control of polymer cement mortar Part, and the upper surface of the horizontal absolute altitude control piece is controlled in same level height;
S4, it is laid with cement sand bed: being laid with cement sand bed on pea gravel concreten layer, led at once by aluminium side in horizontal absolute altitude Control piece upper surface rolling, so that the upper surface of cement sand bed is flushed with the upper surface of horizontal absolute altitude control piece;
S5, floor tile pretreatment: it in one layer of back rubberised layer of floor tile backside coating and dries in the shade;
S6, ground tile paving: adhesive is coated on the back rubberised layer of floor tile and floor tile is adhered on cement sand bed, through conserving Form floor.
2. the levelling floor construction method of anti-hollowing essence according to claim 1, it is characterized in that: the horizontal absolute altitude control piece It is equipped with through-hole, the through-hole runs through two horizontally disposed planes of horizontal absolute altitude control piece, in the step S3, determines water Behind the position of flat absolute altitude control piece, and by after the infrared measurement machine absolute altitude, pouring polymer cement mortar into through-hole, and The height of the horizontal absolute altitude control piece of adjustment before polymer cement mortar initial set, keeps the level of the upper surface of horizontal absolute altitude control piece high Degree reaches the absolute altitude of the infrared measurement machine.
3. the levelling floor construction method of anti-hollowing essence according to claim 2, it is characterized in that: working as water in the step S3 After polymer cement mortar drying and moulding in flat absolute altitude control piece through-hole, in horizontal absolute altitude control piece close to pea gravel concreten layer Polymer cement mortar is smeared in the periphery of one end, so that horizontal absolute altitude control piece is fixed on pea gravel concreten layer.
4. the levelling floor construction method of anti-hollowing essence according to claim 1 to 3, it is characterized in that: the step S4 In, the upper surface of cement sand bed is flushed with the upper surface of horizontal absolute altitude control piece.
5. the levelling floor construction method of anti-hollowing essence according to claim 1 to 3, it is characterized in that: the step S5 In, floor tile includes natural stone floor tile, artificial stone floor tile and ceramic tile, before natural stone floor tile coats back gluing, to natural stone first Brick carries out six face protective treatments.
6. the levelling floor construction method of anti-hollowing essence according to claim 1 to 3, it is characterized in that: the step S6 In, after maintenance, the gap between adjacent floor tile is using the precious sealing of U.S. seam.
7. the levelling floor construction method of anti-hollowing essence according to claim 1 to 3, it is characterized in that: the step S6 In, it is the expansion joint 8mm-10mm that floor tile reserves width in process of deployment, and the spacing between the adjacent expansion joint is 4-5 meters.
8. the levelling floor construction method of anti-hollowing essence according to claim 1 to 3, it is characterized in that: the step S6 In, described adhesive uses soft flexible organic clay.
CN201910097294.7A 2019-01-31 2019-01-31 The levelling floor construction method of anti-hollowing essence Pending CN109653469A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910097294.7A CN109653469A (en) 2019-01-31 2019-01-31 The levelling floor construction method of anti-hollowing essence

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910097294.7A CN109653469A (en) 2019-01-31 2019-01-31 The levelling floor construction method of anti-hollowing essence

Publications (1)

Publication Number Publication Date
CN109653469A true CN109653469A (en) 2019-04-19

Family

ID=66121917

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910097294.7A Pending CN109653469A (en) 2019-01-31 2019-01-31 The levelling floor construction method of anti-hollowing essence

Country Status (1)

Country Link
CN (1) CN109653469A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111472524A (en) * 2020-04-15 2020-07-31 广州市第二装修有限公司 Anti-hollowing floor construction method capable of achieving precise leveling
CN112064955A (en) * 2020-08-31 2020-12-11 中铁十二局集团建筑安装工程有限公司 Paving construction method applied to floor tiles
CN114790808A (en) * 2022-04-28 2022-07-26 上海金茂建筑装饰有限公司 Hollowing-proof paving method for floor tiles

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030115829A1 (en) * 2001-12-26 2003-06-26 Southern Rick K. Methods for attaching solid hardwood floor planks to concrete floor surfaces
CN201502164U (en) * 2009-03-30 2010-06-09 方豫 Tool for paving floor tile
CN102140836A (en) * 2010-01-29 2011-08-03 华煜建设集团有限公司 Construction method of large-size floor tile
CN102828600A (en) * 2012-09-07 2012-12-19 华鼎建筑装饰工程有限公司 Method for laying floor artificial stones
CN104047410B (en) * 2014-06-11 2016-08-24 江南园林有限公司 Stone material paving construction method
CN106013703A (en) * 2016-07-01 2016-10-12 江苏兆佳建材科技有限公司 Quick paving structure of ground tile
CN206616752U (en) * 2017-03-27 2017-11-07 南通大学 The prefabricated superimposed sheet surface structure of assembled architecture
CN108797943A (en) * 2018-05-30 2018-11-13 湖州汇德集团有限公司 A kind of laying process of solid wooden floor board

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030115829A1 (en) * 2001-12-26 2003-06-26 Southern Rick K. Methods for attaching solid hardwood floor planks to concrete floor surfaces
CN201502164U (en) * 2009-03-30 2010-06-09 方豫 Tool for paving floor tile
CN102140836A (en) * 2010-01-29 2011-08-03 华煜建设集团有限公司 Construction method of large-size floor tile
CN102828600A (en) * 2012-09-07 2012-12-19 华鼎建筑装饰工程有限公司 Method for laying floor artificial stones
CN104047410B (en) * 2014-06-11 2016-08-24 江南园林有限公司 Stone material paving construction method
CN106013703A (en) * 2016-07-01 2016-10-12 江苏兆佳建材科技有限公司 Quick paving structure of ground tile
CN206616752U (en) * 2017-03-27 2017-11-07 南通大学 The prefabricated superimposed sheet surface structure of assembled architecture
CN108797943A (en) * 2018-05-30 2018-11-13 湖州汇德集团有限公司 A kind of laying process of solid wooden floor board

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111472524A (en) * 2020-04-15 2020-07-31 广州市第二装修有限公司 Anti-hollowing floor construction method capable of achieving precise leveling
CN112064955A (en) * 2020-08-31 2020-12-11 中铁十二局集团建筑安装工程有限公司 Paving construction method applied to floor tiles
CN114790808A (en) * 2022-04-28 2022-07-26 上海金茂建筑装饰有限公司 Hollowing-proof paving method for floor tiles

Similar Documents

Publication Publication Date Title
CN109653469A (en) The levelling floor construction method of anti-hollowing essence
US7493732B2 (en) Litho-mosaic
CN104032930A (en) Press molded concrete ground construction method
CN106381980B (en) A kind of ground tile paving technique
CN202990369U (en) Water stop device with bathroom threshold stones
CN102400525A (en) Thin-layer plastering method for autoclaved aerated concrete block wall bodies
CN108625252A (en) Urban road laying construction method
CN204492022U (en) The waterproof construction of parapet high-low bay deformation joint
CN111042479B (en) Construction method for laying building ground decoration floor tiles
CN104831926B (en) A kind of tenon joint type bulk surface layer flooring method for paving
CN111734085A (en) Floating integral terrace and construction method thereof
CN105625140A (en) Construction method for air-permeable and water-drainage self-grained composite plastic track
CN107724642A (en) The construction method of color wearing proof terrace
CN110005170A (en) A kind of light emitting-type cement base grinding stone terrace system and its construction technology
CN103572786A (en) Pile head joint waterproof processing device and construction method thereof
KR200385757Y1 (en) A new epoxy resin pavement system and porous solid tile using basaltic screenings
CN214169786U (en) Terrazzo floor used in shopping center
CN105155387A (en) Garden road structure
CN205063211U (en) Dry tiling structure of ceramic tiles
CN114876155A (en) Construction process for polishing ground by using non-ignition fine stone concrete
CN212836509U (en) Floating integral terrace
CN107327117A (en) The preparation method on flat-die color concrete ground
CN113235863A (en) Epoxy terrace construction method for preventing cracking and settlement
CN113431211A (en) Waterproof construction base layer structure and construction process thereof
CN208518097U (en) Shower cabinet waterproof construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190419