CN109588220A - A kind of high precipitous rock slope ecological restoring method - Google Patents

A kind of high precipitous rock slope ecological restoring method Download PDF

Info

Publication number
CN109588220A
CN109588220A CN201910066462.6A CN201910066462A CN109588220A CN 109588220 A CN109588220 A CN 109588220A CN 201910066462 A CN201910066462 A CN 201910066462A CN 109588220 A CN109588220 A CN 109588220A
Authority
CN
China
Prior art keywords
slope
restoring method
soil
hypothallus
ecological restoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910066462.6A
Other languages
Chinese (zh)
Inventor
李伟
高飞
刘立勋
王酉宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Earth Environment Technology Co Ltd
Original Assignee
Dalian Earth Environment Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Earth Environment Technology Co Ltd filed Critical Dalian Earth Environment Technology Co Ltd
Priority to CN201910066462.6A priority Critical patent/CN109588220A/en
Publication of CN109588220A publication Critical patent/CN109588220A/en
Pending legal-status Critical Current

Links

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G22/00Cultivation of specific crops or plants not otherwise provided for
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01BSOIL WORKING IN AGRICULTURE OR FORESTRY; PARTS, DETAILS, OR ACCESSORIES OF AGRICULTURAL MACHINES OR IMPLEMENTS, IN GENERAL
    • A01B79/00Methods for working soil
    • A01B79/02Methods for working soil combined with other agricultural processing, e.g. fertilising, planting
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G17/00Cultivation of hops, vines, fruit trees, or like trees
    • A01G17/005Cultivation methods
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines

Abstract

The present invention provides a kind of high precipitous rock slope ecological restoring methods, comprising the following steps: (1) slope surface is cleared up;(2) gutter is set;(3) slope surface drills, and is driven into holdfast;(4) laying high-strength geotechnical grid;(5) binder course is sprayed;(6) hypothallus is sprayed;(7) injection plantation layer;(8) non-woven fabrics is covered.It is preferable that the present invention plants sufficient layer nutrient, water conservation and slow release effect, guarantee plant initial stage and late growth, root system of plant can penetrate plantation layer and enter hypothallus, hypothallus can continue to provide nutrient, later period root system of plant penetrates plantation layer and enters binder course, it can make to plant layer, hypothallus, binder course and slope of rock mass firm connection, and soil still can provide nutrient for plant growth in binder course, ensure plant just, intermediary and later stages well-grown, the firm connection for guaranteeing every aspect and slope of rock mass simultaneously avoids sliding and rain drop erosion is lost.

Description

A kind of high precipitous rock slope ecological restoring method
Technical field
The present invention relates to side slope recovery technique field, specifically a kind of high precipitous rock slope ecological restoring method.
Background technique
Soil and moisture are one of necessary conditions of plant growth.For slope of rock mass, hardness is big, soil is few even Nothing, plant establishment, development are extremely difficult.Because the rock side slope after excavating is mostly relatively steep, the planting matrix backfilled in slope surface is past Toward being difficult to fix, even if adhering to for the moment, it can be also lost because of rainfall, flowing water and strong wind etc., make planting matrix together with growth Plant slides together, avalanche therefore, rock slope greening need to have two primary conditions: first is that must have plant that can rely in slope surface With the planting matrix of continued propagation, second is that planting matrix can be permanently affixed on scar.
The traditional greening method of slope of rock mass is to transplant climber, top of the slope cultivation Hanging Plants in slope foot or dig on scar The realizations greenings such as planting groove or fish-scale pit plant climb, Hanging Plants and flowering shrub.These methods are simple and easy, but speed of application Slowly, maintenance is difficult, and survival rate is low, it is important that scar reach be completely covered generally require to grow very much when ask.In recent years popular Plant concrete spray seeding technique it is insufficient to often result in plant later period nutrition supply since stromal thickness of sowing grass seeds by duster is small.In addition, There is geotechnical grid technology, but matrix bottom is unstable in conjunction with slope of rock mass, rainy season will cause soil matrix loss.
Summary of the invention
Invention is designed to provide a kind of high precipitous rock slope ecological restoring method, to solve to deposit in above-mentioned background technique The problem of.
The technical scheme of the present invention is realized as follows:
A kind of high precipitous rock slope ecological restoring method, comprising the following steps:
(1) weeds, fallen leaves deadwood, the surface dust float stone etc. on slope surface are removed;
(2) in side slope surrounding, side slope, longitudinally gutter is arranged in every 15 ~ 20m;
(3) it drills in slope surface, hole depth 40cm ~ 50cm is driven into holdfast;
(4) laying high-strength geotechnical grid is secured using iron wire and holdfast binding in holdfast contact position;
(5) by rubble powder, cement, flyash, soil, water according to each material mass percentage: rubble powder 30% ~ 40%, cement 5% ~ 10%, flyash 10% ~ 15%, soil 30% ~ 35%, water 10% ~ 15% are uniformly mixed, and are sprayed in slope surface, are obtained binder course;
(6) by soil, sludge, cow dung, binder according to each material mass percentage: soil 30% ~ 35%, sludge 50% ~ 57%, ox Excrement 10% ~ 14%, binder 1% ~ 3% are uniformly mixed, and are sprayed on binder course, are obtained hypothallus;
(7) by haydite, soil, biogas residue, cement, stalk fibre, biological carbon, binder according to each material mass percentage: haydite 5% ~ 10%, soil 40% ~ 45%, biogas residue 30% ~ 35%, cement 3% ~ 5%, stalk fibre 3% ~ 6%, biological carbon 4% ~ 7%, binder 2% ~ 5% are mixed Close uniformly, vegetable seeds is then added, stirs evenly, injection on hypothallus, obtain plantation layer;
(8) non-woven fabrics, regular sprinkling maintenance are covered on plantation layer.
Preferably, step (3) holdfast use Φ 20mm reinforcing bar, length 50cm ~ 65cm, holdfast spacing 1.5m × 1.5m, holdfast tilt upwards, with 95~100 ° of slope surface angle.
Preferably, the high-strength geotechnological lattice height of the step (4) is 10 ~ 15cm.
Preferably, step (5) joint thickness is 1cm ~ 2cm.
Preferably, the step (6), step (7) binder are starch grafted polyacrylamide copolymer.
Preferably, step (6) hypothallus is with a thickness of 7cm ~ 10cm.
Preferably, step (7) the haydite diameter is 1 ~ 3cm.
Preferably, step (7) the biogas residue moisture content 60% ~ 70%.
Preferably, step (7) stalk fibre is rice-straw fibre, and length is 5 ~ 10mm.
Preferably, step (7) the plantation layer is with a thickness of 2cm ~ 3cm.
The invention has the benefit that
The present invention increases spray binder course in the junction of hypothallus and slope of rock mass, and hypothallus can be made closer in conjunction with slope surface, It prevents hypothallus from sliding, and can avoid rain penetration and hypothallus is caused to be lost, in addition hypothallus of the present invention, plantation layer largely consume Sludge solid waste, reduces environmental pollution, and resource utilization is high.
Present invention plantation layer nutrient is sufficient, be retained and slow release effect is preferable, guarantees plant initial stage and late growth, plant roots System can penetrate plantation layer and enter hypothallus, and hypothallus can continue to provide nutrient, and later period root system of plant penetrates plantation layer and enters combination Layer can make to plant layer, hypothallus, binder course and slope of rock mass firm connection, and soil can still mention in binder course for plant growth For nutrient, it is ensured that plant just, intermediary and later stages well-grown, while guaranteeing the firm connection of every aspect and slope of rock mass, avoid sliding It falls and is lost with rain drop erosion.
Specific embodiment
Technical solution of the present invention is clearly and completely described below in conjunction with embodiment, it is clear that implement describedly Example is only a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, this field is common Technical staff's every other embodiment obtained without making creative work belongs to the model that the present invention protects It encloses.
Embodiment 1
A kind of high precipitous rock slope ecological restoring method, comprising the following steps:
(1) weeds, fallen leaves deadwood, the surface dust float stone etc. on slope surface are removed;
(2) in side slope surrounding, side slope, longitudinally gutter is arranged in every 15m;
(3) it drills in slope surface, hole depth 40cm is driven into holdfast, length 50cm;
(4) laying high-strength geotechnical grid is highly 10cm, secured using iron wire and holdfast binding in holdfast contact position;
(5) by rubble powder, cement, flyash, soil, water according to each material mass percentage: rubble powder 30%, cement 10%, powder Coal ash 12%, soil 35%, water 13% are uniformly mixed, and are sprayed in slope surface, binder course are obtained, with a thickness of 1cm;
(6) by soil, sludge, cow dung, binder according to each material mass percentage: soil 30%, cow dung 10%, glues sludge 57% It ties agent 3% to be uniformly mixed, sprays on binder course, hypothallus is obtained, with a thickness of 7cm;
(7) by haydite, soil, biogas residue, cement, stalk fibre, biological carbon, binder according to each material mass percentage: haydite 5%, Soil 45%, biogas residue 35%, cement 3%, stalk fibre 6%, biological carbon 4%, binder 2% are uniformly mixed, biogas residue moisture content 60%, so After vegetable seeds is added, stir evenly, injection on hypothallus, obtain plantation layer, with a thickness of 2cm;
(8) non-woven fabrics, regular sprinkling maintenance are covered on plantation layer.
Embodiment 2
A kind of high precipitous rock slope ecological restoring method, comprising the following steps:
(1) weeds, fallen leaves deadwood, the surface dust float stone etc. on slope surface are removed;
(2) in side slope surrounding, side slope, longitudinally gutter is arranged in every 18m;
(3) it drills in slope surface, hole depth 45cm is driven into holdfast, length 57cm;
(4) laying high-strength geotechnical grid is highly 12cm, secured using iron wire and holdfast binding in holdfast contact position;
(5) by rubble powder, cement, flyash, soil, water according to each material mass percentage: rubble powder 35%, cement 8%, fine coal Ash 15%, soil 32%, water 10% are uniformly mixed, and are sprayed in slope surface, binder course are obtained, with a thickness of 1.5cm;
(6) by soil, sludge, cow dung, binder according to each material mass percentage: soil 32%, cow dung 12%, glues sludge 54% It ties agent 2% to be uniformly mixed, sprays on binder course, hypothallus is obtained, with a thickness of 8cm;
(7) by haydite, soil, biogas residue, cement, stalk fibre, biological carbon, binder according to each material mass percentage: haydite 8%, Soil 42%, biogas residue 32%, cement 4%, stalk fibre 5%, biological carbon 5%, binder 4% are uniformly mixed, biogas residue moisture content 65%, so After vegetable seeds is added, stir evenly, injection on hypothallus, obtain plantation layer, with a thickness of 2.5cm;
(8) non-woven fabrics, regular sprinkling maintenance are covered on plantation layer.
Embodiment 3
A kind of high precipitous rock slope ecological restoring method, comprising the following steps:
(1) weeds, fallen leaves deadwood, the surface dust float stone etc. on slope surface are removed;
(2) in side slope surrounding, side slope, longitudinally gutter is arranged in every 20m;
(3) it drills in slope surface, hole depth 50cm is driven into holdfast, length 65cm;
(4) laying high-strength geotechnical grid is highly 15cm, secured using iron wire and holdfast binding in holdfast contact position;
(5) by rubble powder, cement, flyash, soil, water according to each material mass percentage: rubble powder 40%, cement 5%, fine coal Ash 10%, soil 30%, water 15% are uniformly mixed, and are sprayed in slope surface, binder course are obtained, with a thickness of 2cm;
(6) by soil, sludge, cow dung, binder according to each material mass percentage: soil 35%, cow dung 14%, glues sludge 50% It ties agent 1% to be uniformly mixed, sprays on binder course, hypothallus is obtained, with a thickness of 10cm;
(7) haydite, soil, biogas residue, cement, stalk fibre, biological carbon, binder are shone into each material mass percentage: haydite 10%, soil 40%, biogas residue 30%, cement 5%, stalk fibre 3%, biological carbon 7%, binder 5% are uniformly mixed, biogas residue moisture content 70%, vegetable seeds is then added, stirs evenly, injection is on hypothallus, obtaining plantation layer, with a thickness of 3cm;
(8) non-woven fabrics, regular sprinkling maintenance are covered on plantation layer.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Within mind and principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (10)

1. a kind of high precipitous rock slope ecological restoring method, comprising the following steps:
(1) weeds, fallen leaves deadwood, the surface dust float stone etc. on slope surface are removed;
(2) in side slope surrounding, side slope, longitudinally gutter is arranged in every 15 ~ 20m;
(3) it drills in slope surface, hole depth 40cm ~ 50cm is driven into holdfast;
(4) laying high-strength geotechnical grid is secured using iron wire and holdfast binding in holdfast contact position;
(5) by rubble powder, cement, flyash, soil, water according to each material mass percentage: rubble powder 30% ~ 40%, cement 5% ~ 10%, flyash 10% ~ 15%, soil 30% ~ 35%, water 10% ~ 15% are uniformly mixed, and are sprayed in slope surface, are obtained binder course;
(6) by soil, sludge, cow dung, binder according to each material mass percentage: soil 30% ~ 35%, sludge 50% ~ 57%, ox Excrement 10% ~ 14%, binder 1% ~ 3% are uniformly mixed, and are sprayed on binder course, are obtained hypothallus;
(7) by haydite, soil, biogas residue, cement, stalk fibre, biological carbon, binder according to each material mass percentage: haydite 5% ~ 10%, soil 40% ~ 45%, biogas residue 30% ~ 35%, cement 3% ~ 5%, stalk fibre 3% ~ 6%, biological carbon 4% ~ 7%, binder 2% ~ 5% are mixed Close uniformly, vegetable seeds is then added, stirs evenly, injection on hypothallus, obtain plantation layer;
(8) non-woven fabrics, regular sprinkling maintenance are covered on plantation layer.
2. a kind of high precipitous rock slope ecological restoring method according to claim 1, which is characterized in that the step (3) Holdfast uses Φ 20mm reinforcing bar, and length 50cm ~ 65cm, holdfast spacing 1.5m × 1.5m, holdfast tilts upwards, with slope surface angle 95 ~100 °.
3. a kind of high precipitous rock slope ecological restoring method according to claim 1, which is characterized in that the step (4) High-strength geotechnique's lattice height is 10 ~ 15cm.
4. a kind of high precipitous rock slope ecological restoring method according to claim 1, which is characterized in that the step (5) Joint thickness is 1cm ~ 2cm.
5. a kind of high precipitous rock slope ecological restoring method according to claim 1, which is characterized in that the step (6), Step (7) binder is starch grafted polyacrylamide copolymer.
6. a kind of high precipitous rock slope ecological restoring method according to claim 1, which is characterized in that the step (6) Hypothallus is with a thickness of 7cm ~ 10cm.
7. a kind of high precipitous rock slope ecological restoring method according to claim 1, which is characterized in that the step (7) Haydite diameter is 1 ~ 3cm.
8. a kind of high precipitous rock slope ecological restoring method according to claim 1, which is characterized in that the step (7) Biogas residue moisture content 60% ~ 70%.
9. a kind of high precipitous rock slope ecological restoring method according to claim 1, which is characterized in that the step (7) Stalk fibre is rice-straw fibre, and length is 5 ~ 10mm.
10. a kind of high precipitous rock slope ecological restoring method according to claim 1, which is characterized in that the step (7) Layer is planted with a thickness of 2cm ~ 3cm.
CN201910066462.6A 2019-01-24 2019-01-24 A kind of high precipitous rock slope ecological restoring method Pending CN109588220A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910066462.6A CN109588220A (en) 2019-01-24 2019-01-24 A kind of high precipitous rock slope ecological restoring method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910066462.6A CN109588220A (en) 2019-01-24 2019-01-24 A kind of high precipitous rock slope ecological restoring method

Publications (1)

Publication Number Publication Date
CN109588220A true CN109588220A (en) 2019-04-09

Family

ID=65965347

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910066462.6A Pending CN109588220A (en) 2019-01-24 2019-01-24 A kind of high precipitous rock slope ecological restoring method

Country Status (1)

Country Link
CN (1) CN109588220A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110122270A (en) * 2019-06-18 2019-08-16 大连地拓环境科技有限公司 A kind of northern area high gradient slope is sowed grass seeds by duster matrix and its application method
CN110122269A (en) * 2019-06-18 2019-08-16 大连地拓环境科技有限公司 A kind of high gradient slope is sowed grass seeds by duster with granule agent and its application method
CN110226431A (en) * 2019-07-15 2019-09-13 大连地拓环境科技有限公司 A kind of planting technique structure and its construction method for high precipitous rock slope
CN111748350A (en) * 2020-06-28 2020-10-09 北京中嘉晟景科技有限公司 Rock slope ecological restoration engineering soil replacement water evaporation inhibiting material and application thereof
CN112482402A (en) * 2020-11-05 2021-03-12 河南省恒丰集成技术有限责任公司 Construction method for greening ecological soil slope protection

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101748719A (en) * 2009-12-23 2010-06-23 南京大学 Method of vegetation restoration and reconstruction of bare rock slope in East China
CN101974911A (en) * 2010-09-17 2011-02-16 北京矿冶研究总院 Ecological restoration method for side slope of acid waste rock yard
CN108035363A (en) * 2017-12-27 2018-05-15 北京东方园林环境股份有限公司 A kind of side slope ecological renovation method of breakage mountain body
CN108797612A (en) * 2018-06-19 2018-11-13 江苏东珠景观股份有限公司 A kind of high stability side slope vertical planting ecological restoring method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101748719A (en) * 2009-12-23 2010-06-23 南京大学 Method of vegetation restoration and reconstruction of bare rock slope in East China
CN101974911A (en) * 2010-09-17 2011-02-16 北京矿冶研究总院 Ecological restoration method for side slope of acid waste rock yard
CN108035363A (en) * 2017-12-27 2018-05-15 北京东方园林环境股份有限公司 A kind of side slope ecological renovation method of breakage mountain body
CN108797612A (en) * 2018-06-19 2018-11-13 江苏东珠景观股份有限公司 A kind of high stability side slope vertical planting ecological restoring method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王耀健等: "基于喷混植生的高陡岩质边坡生态修复新思路——以梧桐山道立交边坡为例", 《中国水土保持》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110122270A (en) * 2019-06-18 2019-08-16 大连地拓环境科技有限公司 A kind of northern area high gradient slope is sowed grass seeds by duster matrix and its application method
CN110122269A (en) * 2019-06-18 2019-08-16 大连地拓环境科技有限公司 A kind of high gradient slope is sowed grass seeds by duster with granule agent and its application method
CN110122270B (en) * 2019-06-18 2021-06-15 大连地拓环境科技有限公司 Spray seeding matrix for high and steep slope in northern area and application method thereof
CN110122269B (en) * 2019-06-18 2021-08-24 大连地拓环境科技有限公司 Aggregate for spray seeding on high and steep slope and application method thereof
CN110226431A (en) * 2019-07-15 2019-09-13 大连地拓环境科技有限公司 A kind of planting technique structure and its construction method for high precipitous rock slope
CN111748350A (en) * 2020-06-28 2020-10-09 北京中嘉晟景科技有限公司 Rock slope ecological restoration engineering soil replacement water evaporation inhibiting material and application thereof
CN112482402A (en) * 2020-11-05 2021-03-12 河南省恒丰集成技术有限责任公司 Construction method for greening ecological soil slope protection

Similar Documents

Publication Publication Date Title
CN109588220A (en) A kind of high precipitous rock slope ecological restoring method
CN105815066B (en) Water-saving and fast-growing method for preserving soil moisture in plant planting
CN104255280B (en) A kind of high precipitous rock slope vegetation implantation methods
CN107382608A (en) A kind of vegetation is multiple green to sow grass seeds by duster auxiliary material, sow grass seeds by duster material and the multiple green construction method of vegetation without native composite fibre
CN101103696B (en) Technology for recovering vegetation on slope of rock and application thereof
CN102498875A (en) Method for constructing shrub and grass plant communities on rocky slope and application thereof
CN102839679B (en) Method for protecting vegetation of concrete slope
CN103250536A (en) Method for spraying to green side slope of hard rock with joints being not developed
CN103556642B (en) High rock slope green covered plant underground habitat reconstruction method
CN108547307A (en) Protecting slope ecology method based on artificial loam
CN108093729A (en) Side-slope greening and protection method
CN103416278A (en) Method for culturing vegetation in Karst landform region
CN110089353A (en) A kind of hard side slope greening restoration method
CN208266847U (en) Quickly repair structure in Gullied suitable for Canal in Loess Area
CN105178340A (en) Anti-scouring structure used for ecological regreening of rock slope and concrete material used for anti-scouring structure
CN103708776A (en) Ecological recovery method with combination application of planting ecological concrete and high-molecular aggregates
CN108702890A (en) One kind being suitable for Stands in Arsenic Sandstone Area slope surface process for comprehensively treating
CN107047189A (en) A kind of cuttage and seedling culture method of tea tree
CN102812837B (en) Irrigation-free sandbreak forest planting technique
CN102379201A (en) Method of quick restoration of vegetation in reservoir hydro-fluctuation belt
CN106576474A (en) Efficient ecological restoration method for slope in South China
CN109169014A (en) A kind of the Northeast's magnesite mining junkyard temporarily plants raw restorative procedure
CN109328805A (en) A kind of Rocky Desertification Region ecological treatment of slope method
CN111802183A (en) Ecological slope protection and vertical greening process
CN104770270B (en) Shrub planting and establishing method and its seedling protecting cover in a kind of side slope protection

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190409

RJ01 Rejection of invention patent application after publication