CN109583772A - Method for managing and monitoring, device, system and the readable storage medium storing program for executing of construction site - Google Patents

Method for managing and monitoring, device, system and the readable storage medium storing program for executing of construction site Download PDF

Info

Publication number
CN109583772A
CN109583772A CN201811474597.8A CN201811474597A CN109583772A CN 109583772 A CN109583772 A CN 109583772A CN 201811474597 A CN201811474597 A CN 201811474597A CN 109583772 A CN109583772 A CN 109583772A
Authority
CN
China
Prior art keywords
monitored
construction site
area
monitoring
managing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811474597.8A
Other languages
Chinese (zh)
Inventor
苟金鹏
张贵文
何兵
娄天
靳义图
张博涵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201811474597.8A priority Critical patent/CN109583772A/en
Publication of CN109583772A publication Critical patent/CN109583772A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Alarm Systems (AREA)

Abstract

The invention discloses a kind of method for managing and monitoring of construction site, device, system and computer readable storage mediums, including carry out region division to construction site according to BIM model and construction speed simulation, and determine area to be monitored;Area to be monitored in construction site is monitored, the monitoring information of area to be monitored is obtained;Monitoring information is sent to monitor terminal equipment to show, so that supervisor determines danger zone according to monitoring information, and corresponding operating personnel is notified to take corresponding emergency measure.It is simulated in the application according to the BIM model and construction speed of construction site and region division is carried out to construction site, determine each area to be monitored, and each area to be monitored is monitored, then each monitoring information that monitoring obtains is sent in monitor terminal equipment and is shown, so that supervisor can have found in time danger zone and coverage according to monitoring information, and corresponding operating personnel is notified to take corresponding stringent effort.

Description

Method for managing and monitoring, device, system and the readable storage medium storing program for executing of construction site
Technical field
The present embodiments relate to construction engineering technical fields, more particularly to a kind of monitoring management side of construction site Method, device, system and computer readable storage medium.
Background technique
With the development of science and technology, modern architecture engineering gradually embodies that the higher, boundary of works area of building is wide, construction work The features such as sequence is complicated, and BIM technology is also more and more extensive in the application of building field.Currently, to construction site, main structure It is that BIM technology carries out one important application when safety analysis on construction ground that BIM model three-dimensional, which carries out safety analysis,.
In the prior art, pass through BIM technology in terms of safety is told somebody what one's real intentions are and visualize the side such as identification of dangerous source, virtual emergency drilling Danger source and emergency drilling are showed operating personnel by formula, to be carried out in work progress after generation accident on construction ground, are made Industry personnel can take corresponding emergency measure according to the mode of rehearsal.But due to operating personnel's body in the construction process Psychological tired out and field condition is complicated and changeable, so on-site personnel is difficult to find in time dangerous and takes effective emergency Measure.
In consideration of it, how to provide method for managing and monitoring, the device, system of a kind of construction site for solving above-mentioned technical problem And computer readable storage medium becomes those skilled in the art's problem to be solved.
Summary of the invention
The purpose of the embodiment of the present invention is that providing a kind of method for managing and monitoring of construction site, device, system and computer Readable storage medium storing program for executing is conducive to staff in use and finds danger zone and coverage in time, and notifies corresponding Operating personnel take corresponding stringent effort.
In order to solve the above technical problems, the embodiment of the invention provides a kind of method for managing and monitoring of construction site, comprising:
Region division is carried out to construction site according to BIM model and construction speed simulation, and determines each area to be monitored Domain;
Each area to be monitored in the construction site is monitored, is obtained and each area to be monitored Corresponding monitoring information;
Each monitoring information is sent to monitor terminal equipment to show, so that supervisor is according to the monitoring Information determines danger zone, and corresponding operating personnel is notified to take corresponding emergency measure.
Optionally, further includes:
Corresponding area to be monitored is judged with the presence or absence of abnormal conditions, if so, determining different according to the monitoring information Normal position, and control suggestion device and issue prompt information to the operating personnel of the area to be monitored.
Optionally, further includes:
Emergency plan is generated according to the BIM model, the monitoring information and the abnormal position, and notifies to be located at described The operating personnel in region to be monitored.
Optionally, the area to be monitored includes high-risk operations region and half-light subject job region.
Optionally, the process that each area to be monitored in the construction site is monitored are as follows:
Each area to be monitored in the construction site is monitored using thermal imaging system.
Optionally, the mistake that each area to be monitored in the construction site is monitored using thermal imaging system Journey are as follows:
Just supervise in the area to be monitored of operation to current in the construction site using moveable thermal imaging system Control.
Optionally, further includes:
The corresponding position in each area to be monitored is marked in the BIM model.
The embodiment of the present invention provides a kind of monitoring management apparatus of construction site accordingly, comprising:
Division module for carrying out region division to construction site according to BIM model and construction speed simulation, and is determined Each area to be monitored;
Monitoring module, for being monitored to each area to be monitored in the construction site, obtain with each The corresponding monitoring information in the area to be monitored;
Sending module is shown for each monitoring information to be sent to terminal device.
The embodiment of the invention also provides a kind of monitoring management systems of construction site, comprising:
Memory, for storing computer program;
Processor realizes the method for managing and monitoring of construction site as described above when for executing the computer program The step of.
The embodiment of the invention also provides a kind of computer readable storage medium, deposited on the computer readable storage medium Computer program is contained, the computer program realizes the monitoring management of construction site as described above when being executed by processor The step of method.
The embodiment of the invention provides a kind of method for managing and monitoring of construction site, device, system and computer-readable deposit Storage media, comprising: region division is carried out to construction site according to BIM model and construction speed simulation, and determines area to be monitored Domain;Area to be monitored in construction site is monitored, the monitoring information of area to be monitored is obtained;Monitoring information is sent to Monitor terminal equipment is shown, so that supervisor determines danger zone according to monitoring information, and notifies corresponding operation Personnel take corresponding emergency measure.
Region stroke is carried out to construction site as it can be seen that simulating in the application according to the BIM model and construction speed of construction site Point, it further determines that out each area to be monitored, and be monitored to each area to be monitored, then obtains monitoring each Monitoring information is sent in monitor terminal equipment and is shown, so that supervisor can send out in time according to the monitoring information of display Existing danger zone and coverage, and corresponding operating personnel is notified to take corresponding stringent effort.
Detailed description of the invention
It to describe the technical solutions in the embodiments of the present invention more clearly, below will be to institute in the prior art and embodiment Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the invention Example, for those of ordinary skill in the art, without creative efforts, can also obtain according to these attached drawings Obtain other attached drawings.
Fig. 1 is a kind of flow diagram of the method for managing and monitoring of construction site provided in an embodiment of the present invention;
Fig. 2 is a kind of structural schematic diagram of the monitoring management apparatus of construction site provided in an embodiment of the present invention.
Specific embodiment
The embodiment of the invention provides a kind of method for managing and monitoring of construction site, device, system and computer-readable deposit Storage media is conducive to staff in use and finds danger zone and coverage in time, and notifies corresponding operation Personnel take corresponding stringent effort.
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is A part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art Every other embodiment obtained without making creative work, shall fall within the protection scope of the present invention.
Fig. 1 is please referred to, Fig. 1 is a kind of process signal of method for managing and monitoring of construction site provided in an embodiment of the present invention Figure.This method, comprising:
S110: region division is carried out to construction site according to BIM model and construction speed simulation, and is determined each wait supervise Control region;
It should be noted that BIM model can restore construction site, theme three-dimensional 1:1, and according to pre-establishing Good construction speed, which is simulated, is divided into multiple regions for construction site, and each area to be monitored is determined from multiple regions Domain.Can specifically prevent fires to the corresponding construction site of each stage in construction speed (danger source) subregion and facade subregion, To realize the region division to construction site, determine and each area to be tested in the construction site in each stage, sheet It is illustrated by taking the region to be monitored of one of them construction stage corresponding construction site as an example in application.Wherein, area to be detected Domain may include high-risk operations region and half-light subject job region, can specifically be determined according to the actual situation.
S120: being monitored each area to be monitored in construction site, and it is right respectively with each area to be monitored to obtain The monitoring information answered;
Specifically, being monitored, obtaining to each area to be monitored after determining each area to be monitored of construction site Take the monitoring information of each area to be monitored, specifically can each prefixed time interval obtain the monitoring letter an of area to be monitored Breath.
S130: being sent to monitor terminal equipment for each monitoring information and show, so that supervisor is according to monitoring letter Breath determines danger zone, and corresponding operating personnel is notified to take corresponding emergency measure.
Each monitoring information is sent to monitor terminal equipment to show, it specifically can be by using the side of wireless transmission Monitoring information is sent in monitor terminal equipment by formula, and supervisor can be according to each monitoring shown in monitor terminal equipment Information is determined with the presence or absence of abnormal conditions in corresponding area to be monitored, so that supervisor can pass through each monitoring information Abnormal conditions present in discovery area to be monitored in time, so that the operating personnel in the area to be monitored be notified to adopt in time in time Corresponding emergency measure is taken, safety is further increased.Furthermore it is also possible to each monitoring information be saved, to supervise Personnel periodically analyze construction site existing stealthy danger source in the construction process according to corresponding monitoring information, secondary to exclude The transmission of accident further ensures that the personal safety of operating personnel.
Further, this method further includes:
Corresponding area to be monitored is judged with the presence or absence of abnormal conditions, if so, determining exception bits according to monitoring information It sets, and controls suggestion device and issue prompt information to the operating personnel of area to be monitored.
It should be noted that in order to further enable the operating personnel in region to be monitored note abnormalities in time feelings Condition, can also be determined according to monitoring information in the application corresponding area to be monitored with the presence or absence of abnormal conditions, it is abnormal when existing Abnormal position can be determined when situation, and notice is located at the operating personnel in the area to be monitored in time, so as to operating personnel Corresponding emergency measure can be taken in time.Wherein, which can be alarm prompt, such as whistle etc., can also be Voice prompting, such as voice broadcast abnormal position can also include corresponding Exception Type in the prompt information, so as to corresponding Operating personnel can quickly determine emergency measure according to Exception Type and abnormal position.
Further, this method further include:
Emergency plan is generated according to BIM model, monitoring information and abnormal position, and notifies the operation for being located at region to be monitored Personnel.
It should also be noted that, operating personnel, cannot after obtaining the notice of abnormal position and Exception Type in order to prevent It is enough to determine that emergency measure, the application generate emergency plan according to BIM model, monitoring information and abnormal position in time, The emergency plan can be notified into corresponding operating personnel in the form of voice broadcast, so that operating personnel can be according to the emergency Scheme takes corresponding emergency measure in time, to further increase working security.
For example, believing previously according to BIM model foundation default emergency plan corresponding with default abnormal conditions when by monitoring After breath determines abnormal position, what can be pre-established from BIM model according to the abnormal position and monitoring information is each default Default emergency plan accordingly is matched in emergency plan, is notified as current emergency plan to corresponding operation people Member.
Further, the process being monitored in above-mentioned S120 to each area to be monitored in construction site, specifically may be used With are as follows:
Each area to be monitored in construction site is monitored using thermal imaging system.
Specifically, utilizing infrared ray since thermal imaging system is to be monitored based on thermal imaging to the environment in visual field Image-forming principle can not be influenced by changeable object, material, the machine etc. in construction site, to improve monitoring quality.In addition, thermal imagery Instrument has the functions such as temperature feedback and prediction concurrently, can monitor the use fire behavior condition in region to be monitored, and under subdued light conditions Effectively construction worker and environment can be monitored.
Further, the process each area to be monitored in construction site being monitored using thermal imaging system are as follows:
Using moveable thermal imaging system to being currently just monitored in the area to be monitored of operation in construction site.
It should be noted that due to each region to be monitored in construction site be not carry out operation simultaneously, so It can be only to being currently just monitored in the area to be tested of operation, and moveable thermal imaging system is utilized, it will moveable heat As instrument is moved to currently just in the region to be monitored of operation, to be monitored to it, to save monitoring cost.In addition, can Mobile thermal imaging system is easy to use, more liquid, can satisfy the monitoring requirements in regional scope to be monitored.
Further, this method further includes:
The corresponding position in each area to be monitored is marked in BIM model.
It should also be noted that, can also be marked respectively in corresponding BIM model after marking off each area to be monitored Position corresponding with each area to be monitored out, so that staff can quickly determine accordingly from BIM model wait supervise Region is surveyed, and when abnormal conditions occurs in some region to be monitored, also helps staff and is quickly positioned from BIM model Abnormal position out.
Region stroke is carried out to construction site as it can be seen that simulating in the application according to the BIM model and construction speed of construction site Point, it further determines that out each area to be monitored, and be monitored to each area to be monitored, then obtains monitoring each Monitoring information is sent to terminal device and is shown, so that staff can have found in time danger according to the monitoring information of display Region and coverage, and corresponding operating personnel is notified to take corresponding stringent effort.
On the basis of the above embodiments, the embodiment of the present invention provides a kind of monitoring management dress of construction site accordingly It sets, specifically referring to figure 2..The device includes:
Division module 21 for carrying out region division to construction site according to BIM model and construction speed simulation, and determines Each area to be monitored out;
Monitoring module 22, for being monitored to each area to be monitored in construction site, obtain with it is each to be monitored The corresponding monitoring information in region;
Sending module 23 is shown for each monitoring information to be sent to monitor terminal equipment, so as to supervisor Danger zone is determined according to monitoring information, and corresponding operating personnel is notified to take corresponding emergency measure.
Optionally, the device further include:
Judgment module, for judging that corresponding area to be monitored whether there is abnormal conditions according to monitoring information, if so, Determine abnormal position, and trigger control module;
Control module issues prompt information to the operating personnel of construction site for controlling suggestion device.
Optionally, the device further include:
Generation module, for generating emergency plan according to BIM model, monitoring information and abnormal position, and notify to be located to Monitor the operating personnel in region.
Optionally, area to be monitored includes high-risk operations region and half-light subject job region.
Optionally, monitoring module includes thermal imaging system.
Wherein, specifically can using moveable thermal imaging system in construction site it is current just the area to be monitored of operation into Row is monitored.
Optionally, the device further include:
Mark module, for the corresponding position in each area to be monitored to be marked in BIM model.
It should be noted that the monitoring management apparatus of the construction site provided in the embodiment of the present invention has and above-mentioned implementation The identical beneficial effect of method for managing and monitoring provided in example, and to construction site involved in this present embodiment The specific introduction of method for managing and monitoring please refers to above-described embodiment, and details are not described herein by the application.
On the basis of the above embodiments, the embodiment of the invention also provides a kind of monitoring management system of construction site, The system includes:
Memory, for storing computer program;
Processor, when for executing computer program the step of the realization such as method for managing and monitoring of above-mentioned construction site.
For example, processor in the present embodiment for realizing according to BIM model and construction speed simulation to construction site into Row region division, and determine area to be monitored;Area to be monitored in construction site is monitored, area to be monitored is obtained Monitoring information;Monitoring information is sent to terminal device to show.
On the basis of the above embodiments, the embodiment of the invention also provides a kind of computer readable storage mediums, calculate It is stored with computer program on machine readable storage medium storing program for executing, such as above-mentioned construction site is realized when computer program is executed by processor Method for managing and monitoring the step of.
The computer readable storage medium may include: USB flash disk, mobile hard disk, read-only memory (Read-Only Memory, ROM), random access memory (Random Access Memory, RAM), magnetic or disk etc. is various to deposit Store up the medium of program code.
Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are with other The difference of embodiment, the same or similar parts in each embodiment may refer to each other.For device disclosed in embodiment For, since it is corresponded to the methods disclosed in the examples, so being described relatively simple, related place is said referring to method part It is bright.
It should also be noted that, in the present specification, such as the terms "include", "comprise" or its any other variant meaning Covering non-exclusive inclusion, so that the process, method, article or equipment for including a series of elements not only includes that A little elements, but also including other elements that are not explicitly listed, or further include for this process, method, article or The intrinsic element of equipment.In the absence of more restrictions, the element limited by sentence "including a ...", is not arranged Except there is also other identical elements in the process, method, article or apparatus that includes the element.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest scope of cause.

Claims (10)

1. a kind of method for managing and monitoring of construction site characterized by comprising
Region division is carried out to construction site according to BIM model and construction speed simulation, and determines each area to be monitored;
Each area to be monitored in the construction site is monitored, obtains distinguishing with each area to be monitored Corresponding monitoring information;
Each monitoring information is sent to monitor terminal equipment to show, so that supervisor is according to the monitoring information It determines danger zone, and corresponding operating personnel is notified to take corresponding emergency measure.
2. the method for managing and monitoring of construction site according to claim 1, which is characterized in that further include:
Corresponding area to be monitored is judged with the presence or absence of abnormal conditions, if so, determining exception bits according to the monitoring information It sets, and controls suggestion device and issue prompt information to the operating personnel of the area to be monitored.
3. the method for managing and monitoring of construction site according to claim 2, which is characterized in that further include:
Emergency plan is generated according to the BIM model, the monitoring information and the abnormal position, and notifies to be located at described wait supervise Survey the operating personnel in region.
4. the method for managing and monitoring of construction site according to claim 1, which is characterized in that the area to be monitored includes High-risk operations region and half-light subject job region.
5. the method for managing and monitoring of construction site according to claim 4, which is characterized in that described to the construction site In the process that is monitored of each area to be monitored are as follows:
Each area to be monitored in the construction site is monitored using thermal imaging system.
6. the method for managing and monitoring of construction site according to claim 5, which is characterized in that described to use thermal imaging system to institute State the process that each area to be monitored in construction site is monitored are as follows:
Using moveable thermal imaging system to being currently just monitored in the area to be monitored of operation in the construction site.
7. the method for managing and monitoring of construction site described in -6 any one according to claim 1, which is characterized in that further include:
The corresponding position in each area to be monitored is marked in the BIM model.
8. a kind of monitoring management apparatus of construction site characterized by comprising
Division module for carrying out region division to construction site according to BIM model and construction speed simulation, and is determined each Area to be monitored;
Monitoring module obtains and each described for being monitored to each area to be monitored in the construction site The corresponding monitoring information in area to be monitored;
Sending module is shown for each monitoring information to be sent to terminal device.
9. a kind of monitoring management system of construction site characterized by comprising
Memory, for storing computer program;
Processor realizes construction site as claimed in any one of claims 1 to 7 when for executing the computer program The step of method for managing and monitoring.
10. a kind of computer readable storage medium, which is characterized in that be stored with computer on the computer readable storage medium Program, the computer program realize the prison of construction site as claimed in any one of claims 1 to 7 when being executed by processor The step of controlling management method.
CN201811474597.8A 2018-12-04 2018-12-04 Method for managing and monitoring, device, system and the readable storage medium storing program for executing of construction site Pending CN109583772A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811474597.8A CN109583772A (en) 2018-12-04 2018-12-04 Method for managing and monitoring, device, system and the readable storage medium storing program for executing of construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811474597.8A CN109583772A (en) 2018-12-04 2018-12-04 Method for managing and monitoring, device, system and the readable storage medium storing program for executing of construction site

Publications (1)

Publication Number Publication Date
CN109583772A true CN109583772A (en) 2019-04-05

Family

ID=65927307

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811474597.8A Pending CN109583772A (en) 2018-12-04 2018-12-04 Method for managing and monitoring, device, system and the readable storage medium storing program for executing of construction site

Country Status (1)

Country Link
CN (1) CN109583772A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110813977A (en) * 2019-09-25 2020-02-21 浙江天之元物流科技有限公司 On-site recycling and retreatment process for bottom materials
CN110991282A (en) * 2019-11-21 2020-04-10 深圳市赛为智能股份有限公司 Construction safety management method and device based on unmanned aerial vehicle and computer equipment
CN112182710A (en) * 2020-09-28 2021-01-05 杭州品茗安控信息技术股份有限公司 Construction road arrangement method, device and equipment and readable storage medium
CN112907211A (en) * 2021-03-02 2021-06-04 惠州城际工程咨询有限公司 BIM-based project progress supervision method, device, equipment and storage medium
CN114037029A (en) * 2021-10-19 2022-02-11 中铁桥研科技有限公司 Bolt screwing monitoring method and system based on BIM
CN116433036A (en) * 2023-06-14 2023-07-14 北京万赋互联网科技集团有限公司 Cloud-based labor supervision system and supervision method thereof
WO2024066058A1 (en) * 2022-09-27 2024-04-04 深圳先进技术研究院 Safety supervision resource scheduling method based on 4d building model and multi-objective optimization

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105631154A (en) * 2016-01-11 2016-06-01 中铁隧道集团有限公司 Method for viewing tunnel monitoring and measurement data on BIM (Building Information Modeling) construction management platform
CN106296473A (en) * 2015-05-28 2017-01-04 上海宝冶集团有限公司 A kind of construction project progress real-time control method based on BIM technology
CN106934980A (en) * 2017-05-10 2017-07-07 南京三宝弘正视觉科技有限公司 Method for safety monitoring and alarm method
CN107220798A (en) * 2017-04-24 2017-09-29 郑州铁路职业技术学院 A kind of construction monitoring and managing method based on BIM
CN107993389A (en) * 2017-11-29 2018-05-04 湖南大学 A kind of construction site safe early warning method and system based on BIM models
CN108732979A (en) * 2018-05-15 2018-11-02 浙江大学 A kind of construction safety managing and control system based on BIM technology

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106296473A (en) * 2015-05-28 2017-01-04 上海宝冶集团有限公司 A kind of construction project progress real-time control method based on BIM technology
CN105631154A (en) * 2016-01-11 2016-06-01 中铁隧道集团有限公司 Method for viewing tunnel monitoring and measurement data on BIM (Building Information Modeling) construction management platform
CN107220798A (en) * 2017-04-24 2017-09-29 郑州铁路职业技术学院 A kind of construction monitoring and managing method based on BIM
CN106934980A (en) * 2017-05-10 2017-07-07 南京三宝弘正视觉科技有限公司 Method for safety monitoring and alarm method
CN107993389A (en) * 2017-11-29 2018-05-04 湖南大学 A kind of construction site safe early warning method and system based on BIM models
CN108732979A (en) * 2018-05-15 2018-11-02 浙江大学 A kind of construction safety managing and control system based on BIM technology

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110813977A (en) * 2019-09-25 2020-02-21 浙江天之元物流科技有限公司 On-site recycling and retreatment process for bottom materials
CN110991282A (en) * 2019-11-21 2020-04-10 深圳市赛为智能股份有限公司 Construction safety management method and device based on unmanned aerial vehicle and computer equipment
CN112182710A (en) * 2020-09-28 2021-01-05 杭州品茗安控信息技术股份有限公司 Construction road arrangement method, device and equipment and readable storage medium
CN112907211A (en) * 2021-03-02 2021-06-04 惠州城际工程咨询有限公司 BIM-based project progress supervision method, device, equipment and storage medium
CN112907211B (en) * 2021-03-02 2024-06-04 惠州城际工程咨询有限公司 BIM-based engineering progress supervision method, device, equipment and storage medium
CN114037029A (en) * 2021-10-19 2022-02-11 中铁桥研科技有限公司 Bolt screwing monitoring method and system based on BIM
WO2024066058A1 (en) * 2022-09-27 2024-04-04 深圳先进技术研究院 Safety supervision resource scheduling method based on 4d building model and multi-objective optimization
CN116433036A (en) * 2023-06-14 2023-07-14 北京万赋互联网科技集团有限公司 Cloud-based labor supervision system and supervision method thereof
CN116433036B (en) * 2023-06-14 2023-10-20 北京万赋互联网科技集团有限公司 Cloud-based labor supervision system and supervision method thereof

Similar Documents

Publication Publication Date Title
CN109583772A (en) Method for managing and monitoring, device, system and the readable storage medium storing program for executing of construction site
CN107879260B (en) Tower crane collision avoidance system and security system based on BIM
US11881094B2 (en) Infrastructure construction digital integrated twin (ICDIT)
CN110390789A (en) Forest fire protection data analysis system based on big data
CN102737466B (en) Method and system for estimating position and intensity of ignition source of fire
CN108553783A (en) A kind of method and system of fire-fighting control
CN103617699A (en) Intelligent safety monitor system of electric power working site
CN106548676A (en) A kind of Campus Fire rehearsal simulated scenario system based on VR technologies
KR102584863B1 (en) Firefighting facility management and inspection apparatus based on augmented reality and building property information
EP2589030A1 (en) Control module for a route guidance system
CN107451709A (en) The system and method that the dynamic risk level indicator of ATM websites or other remote monitoring websites is shown on map
CN108111342B (en) Visualization-based threat alarm display method
JP7376162B2 (en) Artificial intelligence-linked intelligent disaster safety management method and system for implementing such method
CN111611439A (en) Fire safety monitoring method and device, computer equipment and storage medium
CN109816912A (en) Fire evacuation method, apparatus and readable storage medium storing program for executing
CN105194829A (en) Box door opening detection system, method thereof, and control apparatus
CN205810045U (en) A kind of wireless fire disaster detection and fire protection warning fire extinguishing system
KR20210074541A (en) Error detection and visualization method using Automotive Intelligence Knowledge-Base based on Digital Twin
CN109461290A (en) A kind of monitoring management system and equipment of civil construction
CN109110646A (en) Implementation method, system and the storage medium of a kind of pair of safety of tower crane inspection management
JP6609625B2 (en) Situation judgment system, decision support system, and situation judgment method
CN110366111A (en) Fire extinguisher orientation management system
CN111144776A (en) Construction safety supervisory systems based on BIM model
CN109257576A (en) Transmission line of electricity external force damage prevention monitoring system and method based on artificial intelligence technology
CN108388873A (en) A kind of supervisory systems of machine vision, method and client computer, storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190405