CN111144776A - Construction safety supervisory systems based on BIM model - Google Patents

Construction safety supervisory systems based on BIM model Download PDF

Info

Publication number
CN111144776A
CN111144776A CN201911396691.0A CN201911396691A CN111144776A CN 111144776 A CN111144776 A CN 111144776A CN 201911396691 A CN201911396691 A CN 201911396691A CN 111144776 A CN111144776 A CN 111144776A
Authority
CN
China
Prior art keywords
module
communication module
construction
safety
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911396691.0A
Other languages
Chinese (zh)
Inventor
谭敏谊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Tuweihui Information Technology Co ltd
Original Assignee
Guangzhou Tuweihui Information Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Tuweihui Information Technology Co ltd filed Critical Guangzhou Tuweihui Information Technology Co ltd
Priority to CN201911396691.0A priority Critical patent/CN111144776A/en
Publication of CN111144776A publication Critical patent/CN111144776A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01SRADIO DIRECTION-FINDING; RADIO NAVIGATION; DETERMINING DISTANCE OR VELOCITY BY USE OF RADIO WAVES; LOCATING OR PRESENCE-DETECTING BY USE OF THE REFLECTION OR RERADIATION OF RADIO WAVES; ANALOGOUS ARRANGEMENTS USING OTHER WAVES
    • G01S5/00Position-fixing by co-ordinating two or more direction or position line determinations; Position-fixing by co-ordinating two or more distance determinations
    • G01S5/02Position-fixing by co-ordinating two or more direction or position line determinations; Position-fixing by co-ordinating two or more distance determinations using radio waves
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/048Monitoring; Safety
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/12Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N7/00Television systems
    • H04N7/14Systems for two-way working

Abstract

The invention provides a construction safety supervision system based on a BIM model, which relates to the field of construction safety, and comprises a management platform and safety terminal equipment, wherein the management platform supervises a plurality of construction site constructors through the safety terminal equipment, and is characterized by comprising: the device comprises a storage module, a monitoring module, a positioning module and a first communication module; the secure terminal device includes: the device comprises a second communication module, a processing module and an identity module. Confirm whether the constructor is on time at the building site and easily supervise constructor to constructor's supervision through safety terminal equipment, solved and to have carried out the problem of supervision to constructor effectively. Compared with the prior art, the construction safety supervision system has more effective supervision and can more effectively position constructors.

Description

Construction safety supervisory systems based on BIM model
Technical Field
The invention relates to the field of construction safety, in particular to a construction safety supervision system based on a BIM (building information modeling) model.
Background
Under the development of science and technology in the modern building construction industry, many steps are free from the traditional construction method. In the aspect of construction supervision, along with diversification of monitoring modes, the prior art provides many different types of solutions for supervision problems of constructors. Because the traditional supervision mode needs a large amount of manpower and material resources, the supervision through equipment is the most important supervision mode for modern construction. However, there are many problems with supervision through the device, such as: the supervision range is not in place, the supervision effectiveness can not be guaranteed, the supervision function is limited, and the like.
In order to solve the above problems, the reference CN106385563B proposes a real-time monitoring system for a construction site, in which a monitoring device disposed on the site is connected to a management platform and interacts with a safety helmet to monitor constructors and construction tasks, and this solution solves some problems of construction monitoring to some extent, but still has the problems of easy drilling during monitoring, poor monitoring effect, and the like. Therefore, the prior art still has no good solution to the problem of how to effectively and safely supervise the constructors through the management platform.
Disclosure of Invention
The present invention is directed to solving the above-described deficiencies of the prior art to a certain extent.
The embodiment of the invention provides a construction safety supervision system based on a BIM (building information modeling) model, which aims to solve the technical problem that constructors cannot be effectively and safely supervised through a management platform.
According to an aspect of an embodiment of the present invention, a construction safety supervision system based on a BIM model is provided, the construction safety supervision system includes a management platform and safety terminal devices, the management platform supervises a plurality of construction site constructors through the safety terminal devices, and is characterized in that the management platform includes:
a positioning module for periodically generating a positioning request;
the first communication module is used for sending a positioning request to the second communication module;
the secure terminal device includes:
the second communication module is used for receiving the positioning request sent by the first communication module;
the identity module is used for confirming the identity information of the constructor corresponding to the safety terminal equipment under the condition that the second communication module receives the positioning request;
the processing module is used for generating use information according to the confirmation result of the identity module;
the second communication module is also used for sending the use information to the first communication module;
the positioning module is also used for confirming the identity of a constructor corresponding to the safety terminal equipment and the specific position of the constructor according to the use information received by the first communication module;
the management platform further comprises:
the storage module is used for storing or updating a three-dimensional model of a construction area, and storing or updating the identity information of the constructors corresponding to each safety terminal device and the instant and historical positions of the constructors corresponding to the safety terminal devices according to the specific positions of the constructors corresponding to the safety terminal devices calculated by the positioning module;
the monitoring module is used for judging whether the constructors are in the normal construction area or not according to the three-dimensional model of the construction area stored in the storage module, the constructors corresponding to each safety terminal device and the instant and historical positions of the constructors;
the using information comprises a position signal for confirming the position of the safety terminal equipment and constructor identity information; the safety terminal device is carried by constructors.
The biggest problem of modern supervision is how to determine the position of a supervised object in a supervision area, but if the supervision is performed only by video or infrared, a monitoring range has many dead angles, so that a management platform is difficult to accurately monitor the real-time position of a monitoring person, and if the management platform uses GPS positioning, the cost is too high, and the positioned position is only limited to a two-dimensional plane map, which is not in accordance with the construction supervision requirement. The safety supervision system directly carries out communication positioning on the safety terminal equipment through the passing module of the management platform, the positioning is more accurate and the cost is low, the three-dimensional coordinate positioning of the supervision object relative to the construction area can be completed based on the positioning information and the modeling of the construction area based on the BIM model, the supervision effectiveness is improved, meanwhile, the safety of constructors is better guaranteed based on the supervision mode with improved effectiveness, and further, the technical problem that the constructors cannot be effectively and safely supervised through the management platform is solved.
Preferably, the secure terminal device further includes:
the environment module is used for detecting the environment information around the safety terminal equipment;
the use information sent by the processing module also comprises physical sign information of constructors corresponding to the safety terminal equipment and environmental information around the safety terminal equipment;
the management platform further comprises:
the early warning module is used for judging whether constructors corresponding to the safety terminal equipment are in a safe state according to the use information received by the first communication module;
and the evaluation module is used for judging whether large-scale accidents occur according to the judgment result of the early warning module on whether the constructors corresponding to all the safety terminal devices are in the safety state and whether the second communication module can normally send the use information.
The management platform analyzes the physical signs of the constructors and the real-time data of the construction area at the same time, judges the safety condition of the constructors, and can find the danger possibly faced by the constructors more timely compared with the traditional supervision technology.
Preferably, the management platform further comprises:
the task module is used for confirming the construction tasks and marking the construction task distribution of the construction area;
the storage module is also used for storing or confirming the construction task completion history of constructors and updating the construction task distribution information of the construction area according to the construction task distribution information of the construction area confirmed by the task module;
the task module is also used for judging the type of work which is good for the constructors according to the construction task completion history of the constructors and distributing the construction tasks to the constructors;
the supervision module is further used for determining whether the constructors are in the working state and the time when the constructors are in the working state according to the three-dimensional model of the construction area stored in the storage module, the constructors corresponding to each safety terminal device and the construction tasks judged and distributed by the instantaneous and historical positions of the constructors.
The method and the system have the advantages that task process tracking and task allocation are carried out by combining the three-dimensional model of the building area in the storage module and information of constructors, the construction states of the constructors are effectively supervised based on the task process tracking and the task allocation, and supervision efficiency of a management platform is improved.
Preferably, the first communication module comprises at least three fixed signal points at different positions;
the positioning module is also used for establishing a three-dimensional coordinate system based on a three-dimensional model of a construction area and confirming the three-dimensional coordinates of the fixed signal points on the three-dimensional coordinate system;
the positioning module is further used for calculating the distance between the safety terminal equipment and each fixed signal point according to the position signals sent by the second communication module and received by all the fixed signal points of the first communication module, and calculating the three-dimensional coordinates of the safety terminal equipment relative to the three-dimensional model of the construction area according to the distance between the safety terminal equipment and each fixed signal point.
The signal points with fixed positions are arranged near the construction area to position the constructors, so that the management platform can position the constructors more accurately, interference factors of the position signals are less, the requirement on signal transmission of the position signals is lower, and the requirement of the safety supervision system on communication equipment is further reduced.
Preferably, the positioning module is further configured to form a relocation request in a case that the positioning module cannot position the location of the secure terminal device according to the location signal received by the location point;
the construction safety supervision system further comprises:
the bridging signal point is used for sending a positioning request to the second communication module according to the received relocation request sent by the fixed signal point and receiving a position signal fed back by the second communication module;
the bridging signal point is also used for forming relative information according to the received position signal and sending the relative information to the fixed signal point;
the positioning module is further used for calculating the position of the bridging signal point according to the relative information sent by the bridging signal point received by the fixed signal point, and then calculating the three-dimensional coordinate of the safety terminal device relative to the three-dimensional model of the construction area according to the relative information and the position of the bridging signal point;
the relative information comprises the position signal sent by the second communication module and the position information of the bridging signal point, which are received by the bridging signal point.
The safety supervision system refers to the multi-hop network and mainly aims to amplify a position signal of a signal source by using an intermediate node and avoid or divide interference factors of the position signal in the transmission process. The multi-hop cooperation can enable the management platform to effectively position and supervise constructors under the condition of complex conditions or terrains.
Preferably, the monitoring module is further configured to send a video request to the second communication module;
the secure terminal device further includes:
the video call module is used for carrying out voice and video communication with the management platform through the first communication module under the condition that the second communication module receives the call request sent by the first communication module;
the storage module is also used for storing the real-time video received by the first communication module.
By means of the video call module, the management platform or the management personnel can observe the field condition or communicate with the field construction personnel, and the management platform and the field construction personnel can effectively communicate while the management platform and the field construction personnel are effectively supervised.
Preferably, the safety terminal device is a safety helmet.
The safety helmet is an article which must be carried by a constructor, and if the safety terminal equipment is the safety helmet, the constructor does not need to carry an additional instrument, so that the safety terminal equipment can realize the set function of the safety supervision system while the work of the constructor is not influenced.
Preferably, the construction safety supervision system further comprises an environment monitoring device;
the environment monitoring apparatus includes:
the acquisition module is used for acquiring building information of buildings in a construction area;
the third communication module is used for sending the building information to the first communication module and receiving an alarm instruction fed back by the first communication module;
the alarm module is used for sending an alarm signal to the second communication module according to the alarm instruction received by the third communication module;
the building information comprises the earthquake resistance strength of the building in the construction area, concrete stress data, wall density, vibration information borne by the building and wind power information borne by the outer wall surface.
Because the construction accident in the building is mostly originated from the building itself, set up the environmental monitoring equipment and can supervise the risk that the building inside and outside faces in order to guarantee that management platform when supervising constructor, set up alarm module simultaneously and be used for the early warning in advance to constructor for the security of management platform's supervision is higher.
Preferably, the management platform further comprises:
the evaluation module is also used for evaluating the use information of the building in the construction area according to the building information received by the first communication module;
the first communication module is also used for sending the use information to the third communication module;
wherein the usage information includes a lifetime and a risk of use of a building within the construction area.
The management platform can evaluate the risk and the age limit of the building in the construction area through the use information, and managers can determine whether the construction reaches the standard according to a risk evaluation result.
Preferably, the storage module is further configured to update the three-dimensional model of the construction area stored in the storage module according to the building earthquake resistance, the concrete stress data, and the wall density of the construction area in the usage information received by the first communication module.
The usage information may also be used to update the BIM information base so that the information of the three-dimensional model of the construction area is more comprehensive.
Compared with the prior art, the technical scheme of the invention has the advantages that:
1. the constructor positioning is more accurate than that of the prior art, and the construction supervision standard can be higher based on the technology;
2. various supervision modes are set, and the communication information between managers and field construction personnel is richer;
3. the safety of field construction personnel is guaranteed by adding a module for risk assessment and real-time danger alarm of a safety terminal equipment wearer;
4. the method has the advantages that the field constructor positioning with higher precision is carried out in a field signal point bridging mode, and a foundation for creating more advanced schemes is provided for supervision;
5. the advantages of the BIM model are combined, the three-dimensional information of the building is combined and applied to construction supervision, and the supervision effect is more excellent.
Drawings
FIG. 1 is an architecture diagram of a BIM-model-based construction safety supervision system according to the present invention;
FIG. 2 is a relationship diagram of a construction safety supervision system based on a BIM model according to the present invention;
FIG. 3 is a block flow diagram of a construction safety supervision system based on a BIM model according to the present invention.
Detailed Description
The drawings are only for purposes of illustration and are not to be construed as limiting the invention.
The technical solution of the present invention is further described below with reference to the accompanying drawings and examples.
Example 1
As shown in fig. 1, fig. 2 and fig. 3, according to an aspect of the embodiment of the present invention, there is provided a construction safety supervision system based on a BIM model, the construction safety supervision system including a management platform 110 and safety terminal devices 120, the management platform 110 supervises a plurality of worksite constructors through the safety terminal devices 120, and the management platform 110 includes:
a positioning module 111 for periodically generating a positioning request;
a first communication module 112, configured to send a positioning request to a second communication module 122;
the secure terminal device 120 includes:
a second communication module 122, configured to receive the positioning request sent by the first communication module 112;
the identity module 123 is configured to confirm identity information of a constructor corresponding to the security terminal device 120 when the second communication module 122 receives the positioning request;
a processing module 121, configured to generate usage information according to the confirmation result of the identity module 123;
the second communication module 122 is further configured to send the usage information to the first communication module 112;
the positioning module 111 is further configured to confirm the identity of the constructor corresponding to the security terminal 120 and the specific location of the constructor according to the usage information received by the first communication module 112;
the management platform 110 further comprises:
the storage module 113 is configured to store or update a three-dimensional model of a construction area, store or update identity information of a constructor corresponding to each safety terminal device 120 and an instant and historical position of the constructor corresponding to the safety terminal device 120 according to the specific position of the constructor corresponding to the safety terminal device 120 calculated by the positioning module 111;
the monitoring module 114 is configured to determine whether the constructor is in the normal construction area according to the three-dimensional model of the construction area stored in the storage module 113, the constructor corresponding to each safety terminal device 120, and the real-time and historical positions of the constructor;
wherein the use information includes a position signal for confirming the position of the safety terminal device 120 and constructor identity information; the safety terminal 120 is carried around by the construction personnel.
The biggest problem of modern supervision is how to determine the position of a supervised object in a supervision area, but if the supervision is performed only by video or infrared, the monitoring range has many dead angles, so that the management platform 110 is difficult to accurately monitor the real-time position of the monitoring personnel, and if the GPS positioning is used, the cost is too high, and the positioned position is only limited to a two-dimensional plane map, which is not in accordance with the construction supervision requirement. The safety supervision system directly carries out communication positioning on the safety terminal equipment 120 through the passing module of the management platform 110, positioning is more accurate and low in cost, three-dimensional coordinate positioning of the supervision object relative to the construction area can be completed based on the positioning information and the BIM model-based modeling of the construction area, supervision effectiveness is improved, meanwhile, safety of constructors is better guaranteed based on a supervision mode with improved effectiveness, and further, the technical problem that the constructors cannot be effectively and safely supervised through the management platform 110 is solved.
In a specific implementation process, the secure terminal device 120 further includes:
an environment module for detecting environmental information around the secure terminal device 120;
the use information sent by the processing module 121 further includes sign information of a constructor corresponding to the safety terminal device 120 and environmental information around the safety terminal device 120;
the management platform 110 further comprises:
the early warning module is used for judging whether constructors corresponding to the safety terminal equipment 120 are in a safe state according to the use information received by the first communication module 112;
and the evaluation module is configured to judge whether a large-scale accident occurs according to a judgment result of the early warning module on whether the constructors corresponding to all the safety terminal devices 120 are in a safe state and whether the second communication module 122 can normally send the use information.
The management platform 110 analyzes the physical signs of the constructors and the real-time data of the construction area at the same time, judges the safety condition of the constructors, and can find the danger possibly faced by the constructors more timely compared with the traditional supervision technology.
Specifically, the management platform 110 further includes:
the task module is used for confirming the construction tasks and marking the construction task distribution of the construction area;
the storage module 113 is further configured to store or confirm a construction task completion history of a constructor and update construction task distribution information of a construction area according to the construction task distribution information of the construction area confirmed by the task module;
the task module is also used for judging the type of work which is good for the constructors according to the construction task completion history of the constructors and distributing the construction tasks to the constructors;
the supervision module is further configured to determine whether the constructor is in the working state and the time when the constructor is in the working state according to the three-dimensional model of the construction area stored in the storage module 113, the constructor corresponding to each safety terminal device 120, and the construction task determined and allocated by the instantaneous and historical positions of the constructor.
By combining the three-dimensional model of the building area in the storage module 113 and the information of the constructors, task process tracking and task allocation are performed, and the construction state of the constructors is effectively supervised based on the task process tracking and the task allocation, so that the supervision efficiency of the management platform 110 is improved.
Specifically, the first communication module 112 includes at least three fixed signal points at different positions;
the positioning module 111 is further configured to establish a three-dimensional coordinate system based on a three-dimensional model of a construction area and confirm three-dimensional coordinates of the fixed signal point on the three-dimensional coordinate system;
the positioning module 111 is further configured to calculate a distance from the security terminal 120 to each fixed signal point according to the position signals sent by the second communication module 122 and received by all the fixed signal points of the first communication module 112, and calculate a three-dimensional coordinate of the security terminal 120 relative to the three-dimensional model of the construction area according to the distance from the security terminal 120 to each fixed signal point.
The signal points with fixed positions are arranged near the construction area to position the constructors, so that the management platform 110 can position the constructors more accurately, interference factors of the position signals are less, the requirement on signal transmission of the position signals is lower, and the requirement of the safety supervision system on communication equipment is further reduced.
Specifically, the positioning module 111 is further configured to form a relocation request in a case that the positioning module 111 cannot position the location of the secure terminal device 120 according to the location signal received by the location point;
the construction safety supervision system further comprises:
the bridging signal point is configured to send a positioning request to the second communication module 122 according to the received relocation request sent by the fixed signal point, and receive a position signal fed back by the second communication module 122;
the bridging signal point is also used for forming relative information according to the received position signal and sending the relative information to the fixed signal point;
the positioning module 111 is further configured to calculate a position of the bridging signal point according to the relative information sent by the bridging signal point received by the fixed signal point, and then calculate a three-dimensional coordinate of the security terminal device 120 relative to the three-dimensional model of the construction area according to the relative information and the position of the bridging signal point;
the relative information includes the position signal sent by the second communication module 122 and the position information of the bridge signal point received by the bridge signal point.
The safety supervision system refers to the multi-hop network and mainly aims to amplify a position signal of a signal source by using an intermediate node and avoid or divide interference factors of the position signal in the transmission process. The multi-hop collaboration may allow the management platform 110 to effectively position and supervise the constructors under conditions of complex conditions or terrain.
Specifically, the monitoring module 114 is further configured to send a video request to the second communication module 122;
the secure terminal device 120 further includes:
a video call module, configured to perform voice and video communication with the management platform 110 through the first communication module 112 when the second communication module 122 receives a call request sent by the first communication module 112;
the storage module 113 is further configured to store the real-time video received by the first communication module 112.
By means of the video call module, the management platform 110 or the manager can observe the field condition or communicate with the field constructor, and the management platform 110 and the constructor can effectively communicate while effectively supervising.
Specifically, the safety terminal device 120 is a safety helmet.
The safety helmet is an article that the constructor must carry, and if the safety terminal device 120 is the safety helmet, the constructor does not need to carry additional instruments, so that the safety terminal device 120 can realize the set function of the safety supervision system while not affecting the work of the constructor.
Specifically, the construction safety supervision system further comprises an environment monitoring device;
the environment monitoring apparatus includes:
the acquisition module is used for acquiring building information of buildings in a construction area;
the third communication module is used for sending the building information to the first communication module 112 and receiving an alarm instruction fed back by the first communication module 112;
the alarm module is used for sending an alarm signal to the second communication module 122 according to the alarm instruction received by the third communication module;
the building information comprises the earthquake resistance strength of the building in the construction area, concrete stress data, wall density, vibration information borne by the building and wind power information borne by the outer wall surface.
Because the construction accident in the building mostly comes from the building itself, set up the environmental monitoring equipment in order to guarantee that management platform 110 can supervise the risk that the building inside and outside faces when supervising constructor, set up alarm module simultaneously and be used for the early warning to constructor in advance for the security of management platform 110's supervision is higher.
Specifically, the management platform 110 further includes:
the evaluation module is further configured to evaluate the use information of the building in the construction area according to the building information received by the first communication module 112;
the first communication module 112 is further configured to send the usage information to a third communication module;
wherein the usage information includes a lifetime and a risk of use of a building within the construction area.
The management platform 110 can perform risk and age assessment on the buildings in the construction area by using the information, and managers can determine whether the construction reaches the standard according to a risk assessment result.
Specifically, the storage module 113 is further configured to update the three-dimensional model of the construction area stored by the storage module 113 according to the building earthquake resistant strength, the concrete stress data, and the wall density of the construction area in the usage information received by the first communication module 112.
The usage information may also be used to update the BIM information base so that the information of the three-dimensional model of the construction area is more comprehensive.
Example 2
As shown in fig. 1, 2 and 3, before the construction starts, a manager enters a BIM information base corresponding to a construction area through the management platform 110 to form a three-dimensional model of the construction area and stores the three-dimensional model in the storage module 113; the manager sets a task of the construction area through a task module of the management platform 110 and allocates the task to the constructor corresponding to the security terminal device 120.
In construction, the management platform 110 forms a communication connection relationship with the second communication modules 122 of all the supervised security terminal devices 120 through the first communication module 112; the management platform 110 locates the specific position of the safety terminal device 120 through the locating module 111, and determines the specific position of the constructor in the construction area through the safety terminal device 120; the management platform 110 supervises, through the monitoring module 114, whether the constructor is in the construction area, the time when the constructor is in the construction area, and whether the physical sign of the constructor is normal through the processing module 121; the management platform 110 periodically updates the task data through the task module and simultaneously updates the construction area model stored in the storage module 113; the manager performs voice communication with the constructor corresponding to the safety terminal device 120 through the management platform 110 or performs on-site video supervision of the construction area.

Claims (10)

1. The utility model provides a construction safety supervisory systems based on BIM model, construction safety supervisory systems includes management platform and safety terminal equipment, management platform supervises a plurality of building site constructors through a plurality of safety terminal equipment, its characterized in that, management platform includes:
a positioning module for periodically generating a positioning request;
the first communication module is used for sending a positioning request to the second communication module;
the secure terminal device includes:
the second communication module is used for receiving the positioning request sent by the first communication module;
the identity module is used for confirming the identity information of the constructor corresponding to the safety terminal equipment under the condition that the second communication module receives the positioning request;
the processing module is used for generating use information according to the confirmation result of the identity module;
the second communication module is also used for sending the use information to the first communication module;
the positioning module is also used for confirming the identity of a constructor corresponding to the safety terminal equipment and the specific position of the constructor according to the use information received by the first communication module;
the management platform further comprises:
the storage module is used for storing or updating a three-dimensional model of a construction area, and storing or updating the identity information of the constructors corresponding to each safety terminal device and the instant and historical positions of the constructors corresponding to the safety terminal devices according to the specific positions of the constructors corresponding to the safety terminal devices calculated by the positioning module;
the monitoring module is used for judging whether the constructors are in the normal construction area or not according to the three-dimensional model of the construction area stored in the storage module, the constructors corresponding to each safety terminal device and the instant and historical positions of the constructors;
the using information comprises a position signal for confirming the position of the safety terminal equipment and constructor identity information; the safety terminal device is carried by constructors.
2. The BIM model-based construction safety supervision system according to claim 1, wherein the safety terminal device further comprises:
the environment module is used for detecting the environment information around the safety terminal equipment;
the use information sent by the processing module also comprises physical sign information of constructors corresponding to the safety terminal equipment and environmental information around the safety terminal equipment;
the management platform further comprises:
the early warning module is used for judging whether constructors corresponding to the safety terminal equipment are in a safe state according to the use information received by the first communication module;
and the evaluation module is used for judging whether large-scale accidents occur according to the judgment result of the early warning module on whether the constructors corresponding to all the safety terminal devices are in the safety state and whether the second communication module can normally send the use information.
3. The BIM model-based construction safety supervision system according to claim 1, wherein the management platform further comprises:
the task module is used for confirming the construction tasks and marking the construction task distribution of the construction area;
the storage module is also used for storing or confirming the construction task completion history of constructors and updating the construction task distribution information of the construction area according to the construction task distribution information of the construction area confirmed by the task module;
the task module is also used for judging the type of work which is good for the constructors according to the construction task completion history of the constructors and distributing the construction tasks to the constructors;
the supervision module is further used for determining whether the constructors are in the working state and the time when the constructors are in the working state according to the three-dimensional model of the construction area stored in the storage module, the constructors corresponding to each safety terminal device and the construction tasks judged and distributed by the instantaneous and historical positions of the constructors.
4. The BIM model-based construction safety supervision system according to claim 1, wherein the first communication module comprises at least three fixed signal points at different positions;
the positioning module is also used for establishing a three-dimensional coordinate system based on a three-dimensional model of a construction area and confirming the three-dimensional coordinates of the fixed signal points on the three-dimensional coordinate system;
the positioning module is further used for calculating the distance between the safety terminal equipment and each fixed signal point according to the position signals sent by the second communication module and received by all the fixed signal points of the first communication module, and calculating the three-dimensional coordinates of the safety terminal equipment relative to the three-dimensional model of the construction area according to the distance between the safety terminal equipment and each fixed signal point.
5. The BIM-model-based construction safety supervision system according to claim 4, wherein the positioning module is further configured to form a relocation request in case that the positioning module cannot position the location of the safety terminal device according to the location signal received by the positioning point;
the construction safety supervision system further comprises:
the bridging signal point is used for sending a positioning request to the second communication module according to the received relocation request sent by the fixed signal point and receiving a position signal fed back by the second communication module;
the bridging signal point is also used for forming relative information according to the received position signal and sending the relative information to the fixed signal point;
the positioning module is further used for calculating the position of the bridging signal point according to the relative information sent by the bridging signal point received by the fixed signal point, and then calculating the three-dimensional coordinate of the safety terminal device relative to the three-dimensional model of the construction area according to the relative information and the position of the bridging signal point;
the relative information comprises the position signal sent by the second communication module and the position information of the bridging signal point, which are received by the bridging signal point.
6. The BIM-model-based construction safety supervision system according to claim 1, wherein the monitoring module is further configured to send a video request to the second communication module;
the secure terminal device further includes:
the video call module is used for carrying out voice and video communication with the management platform through the first communication module under the condition that the second communication module receives the call request sent by the first communication module;
the storage module is also used for storing the real-time video received by the first communication module.
7. The BIM model-based construction safety supervision system according to claim 1, wherein the safety terminal device is a safety helmet.
8. The BIM model-based construction safety supervision system according to claim 1, further comprising environmental monitoring equipment;
the environment monitoring apparatus includes:
the acquisition module is used for acquiring building information of buildings in a construction area;
the third communication module is used for sending the building information to the first communication module and receiving an alarm instruction fed back by the first communication module;
the alarm module is used for sending an alarm signal to the second communication module according to the alarm instruction received by the third communication module;
the building information comprises the earthquake resistance strength of the building in the construction area, concrete stress data, wall density, vibration information borne by the building and wind power information borne by the outer wall surface.
9. The BIM model-based construction safety supervision system according to claim 8, wherein the management platform further comprises:
the evaluation module is also used for evaluating the use information of the building in the construction area according to the building information received by the first communication module;
the first communication module is also used for sending the use information to the third communication module;
wherein the usage information includes a lifetime and a risk of use of a building within the construction area.
10. The BIM-model-based construction safety supervision system according to claim 8, wherein the storage module is further configured to update the three-dimensional model of the construction area stored in the storage module according to the earthquake resistance, the concrete stress data and the wall density of the building of the construction area in the usage information received by the first communication module.
CN201911396691.0A 2019-12-30 2019-12-30 Construction safety supervisory systems based on BIM model Pending CN111144776A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911396691.0A CN111144776A (en) 2019-12-30 2019-12-30 Construction safety supervisory systems based on BIM model

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911396691.0A CN111144776A (en) 2019-12-30 2019-12-30 Construction safety supervisory systems based on BIM model

Publications (1)

Publication Number Publication Date
CN111144776A true CN111144776A (en) 2020-05-12

Family

ID=70521874

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911396691.0A Pending CN111144776A (en) 2019-12-30 2019-12-30 Construction safety supervisory systems based on BIM model

Country Status (1)

Country Link
CN (1) CN111144776A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112116228A (en) * 2020-09-08 2020-12-22 杭州数筑云科技有限公司 Engineering project dynamic safety supervision system based on BIM
CN113296427A (en) * 2021-05-24 2021-08-24 湖南长顺项目管理有限公司 Building site safety monitoring system based on thing networking
CN113360977A (en) * 2021-06-02 2021-09-07 年畅(武汉)软件科技有限公司 Visual video talkback command management system for high-rise building engineering project construction site

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107682807A (en) * 2017-08-30 2018-02-09 深圳市易联智道科技有限公司 Construction site workmen's BIM model real-time location methods
CN107927979A (en) * 2017-11-29 2018-04-20 湖南大学 A kind of safety cap based on BIM model safety early warning systems
CN108732979A (en) * 2018-05-15 2018-11-02 浙江大学 A kind of construction safety managing and control system based on BIM technology
CN109239697A (en) * 2018-10-31 2019-01-18 广西路桥工程集团有限公司 One kind being based on three-dimensional visualization employee real-time positioning system and method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107682807A (en) * 2017-08-30 2018-02-09 深圳市易联智道科技有限公司 Construction site workmen's BIM model real-time location methods
CN107927979A (en) * 2017-11-29 2018-04-20 湖南大学 A kind of safety cap based on BIM model safety early warning systems
CN108732979A (en) * 2018-05-15 2018-11-02 浙江大学 A kind of construction safety managing and control system based on BIM technology
CN109239697A (en) * 2018-10-31 2019-01-18 广西路桥工程集团有限公司 One kind being based on three-dimensional visualization employee real-time positioning system and method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112116228A (en) * 2020-09-08 2020-12-22 杭州数筑云科技有限公司 Engineering project dynamic safety supervision system based on BIM
CN113296427A (en) * 2021-05-24 2021-08-24 湖南长顺项目管理有限公司 Building site safety monitoring system based on thing networking
CN113360977A (en) * 2021-06-02 2021-09-07 年畅(武汉)软件科技有限公司 Visual video talkback command management system for high-rise building engineering project construction site
CN113360977B (en) * 2021-06-02 2022-05-13 蓝城伟业控股有限公司 Visual video talkback command management system for high-rise building engineering project construction site

Similar Documents

Publication Publication Date Title
Jiang et al. Cyber physical system for safety management in smart construction site
CN111144776A (en) Construction safety supervisory systems based on BIM model
CN206042382U (en) Tunnel constructor management system
CN205445677U (en) Tunnel safety precaution and automatic control system of measurationing
CN105976563B (en) A kind of fire-fighting and rescue system
CN109993431B (en) Operator position information supervision method and system
CN204069358U (en) Constructing tunnel personnel positioning management system
CN106679625A (en) High-precision deformation monitoring method of wide-area electric iron tower based on Beidou system
CN108090610A (en) Orbit construction system based on BIM technology
CN108506043A (en) A kind of downhole intelligent InterWorking Equipment monitoring system and its personnel positioning method based on NB-IOT honeycomb technology of Internet of things
CN101860786A (en) Method and system for managing domain-based mobile node
CN109239697A (en) One kind being based on three-dimensional visualization employee real-time positioning system and method
CN207301751U (en) The engineering machinery vehicle operation monitoring system of power grid wisdom building site control platform
CN112950152A (en) Personnel on-duty positioning management system and method
CN108647452A (en) Super High work progress monitoring method based on BIM technology and system
CN102074097A (en) Radioactive source supervision system and method
KR101890283B1 (en) Indoor and Outdoor Positioning Apparatus and Positioning System Including The Same
CN110471028B (en) Personnel positioning method, device and system for construction site
CN115494802A (en) Flow operation multi-level safety digital intelligent monitoring system
CN201364485Y (en) Bridge monitoring system based on C/S mode
CN112116228A (en) Engineering project dynamic safety supervision system based on BIM
CN113204041A (en) Electronic job ticket management and control system and method based on location service
CN105954714A (en) Tunnel personnel positioning system and method
RU123187U1 (en) SYSTEM OF AUTOMATED FUNCTIONAL-TECHNICAL MANAGEMENT IN REAL TIME BY THE INFRASTRUCTURE OF ENGINEERING SAFETY OF UNDERLOADING CONSTRUCTIONS OF UNIQUE RESIDENTIAL AND PUBLIC BUILDINGS
CN110597115A (en) Cable head real-time monitoring device and data processing communication method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20200512