CN107927979A - A kind of safety cap based on BIM model safety early warning systems - Google Patents
A kind of safety cap based on BIM model safety early warning systems Download PDFInfo
- Publication number
- CN107927979A CN107927979A CN201711225250.5A CN201711225250A CN107927979A CN 107927979 A CN107927979 A CN 107927979A CN 201711225250 A CN201711225250 A CN 201711225250A CN 107927979 A CN107927979 A CN 107927979A
- Authority
- CN
- China
- Prior art keywords
- safety
- safety cap
- matter sources
- early warning
- dangerous
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- A—HUMAN NECESSITIES
- A42—HEADWEAR
- A42B—HATS; HEAD COVERINGS
- A42B3/00—Helmets; Helmet covers ; Other protective head coverings
- A42B3/04—Parts, details or accessories of helmets
- A42B3/0406—Accessories for helmets
- A42B3/0433—Detecting, signalling or lighting devices
- A42B3/046—Means for detecting hazards or accidents
Abstract
The present invention discloses a kind of safety cap based on BIM model safety early warning systems, comprises the following steps:Install feature sensor (2) in safety cap additional, specify dangerous source region to send corresponding dangerous source signal immediately to construction personnel once construction personnel reaches;Reload temperature sensor (3) in safety cap, to monitor construction site temperature conditions;Install timer in safety cap additional, the working time of construction personnel in monitor hazardous source region;Quick Response Code (5) mark is carried out to each safety cap, determines the identity information of site operation personnel;It is the visual safety cap (1) of its outfit for security official, ensures that it can record video information;Safety cap of the invention based on BIM model safety early warning systems, pass through BIM threedimensional models, and safety pre-warning system ensure that effective renewal of dangerous matter sources at the first time, and it is applied to safety cap, while sending early warning, high degree reduces casualties caused by the dangerous matter sources of construction site.
Description
Technical field
The present invention relates to construction safety early warning field, more particularly to it is a kind of based on BIM model safety early warning systems
Safety cap
Background technology
At the construction field (site), safety cap is the important tool for ensureing site operation personnel safety.In the prior art, it is most
Safety cap can only accomplish resistance to additional impact force, and can not accomplish to carry out effective early warning to dangerous matter sources.Passed although wearing
System safety cap can greatly reduce the injury that impact force is brought, but construction site dangerous matter sources are numerous, and many dangerous matter sources are brought
Injury be not that safety cap can be offset, can effectively be given warning in advance to dangerous matter sources and be just particularly important.Therefore, will pacify
Full early warning system acts on the life security that safety cap will greatly ensure construction personnel.
Meanwhile personal article of the safety cap as each construction personnel scene, safety pre-warning system is mutually tied with safety cap
Close, also high degree ensure that safety pre-warning system can be smoothly communicated to site operation personnel at, farthest guarantee
The validity of early warning system.
The content of the invention
In view of this, the present invention is directed to propose a kind of safety cap based on BIM model safety early warning systems, to ensure safety
Early warning system can upgrade in time, and the safety of the construction personnel into dangerous source region can be protected.
To solve the above problems, the present invention uses following technical scheme:A kind of peace based on BIM model safety early warning systems
Full cap, comprises the following steps:
Step 1:Using BIM model safety early warning systems, i.e.,:Establish BIM threedimensional models;
Step 2:Dangerous matter sources feature locations are established into coordinate points and import threedimensional model;There is provided according to site safety person
Danger sources information changes, and updates characteristic coordinates point;
Step 3:Judge whether it enters danger zone according to the feature sensor safety cap of construction personnel;Safety cap meeting
Dangerous matter sources prompting is carried out to the construction personnel for entering dangerous source region;Synchronous signal and picture passback monitoring center and scene are dangerous
Source control security official, monitoring center personnel carry out real-time oversight to entering dangerous source region worker;
Step 4:Live dangerous matter sources control security official can also supervise the construction personnel near dangerous matter sources at the same time, at the same time
Picture passback monitoring center ensures that it carries out safe construction.
Preferably, in step 2, feature sensor (2) is installed in safety cap additional, once construction personnel, which reaches, specifies dangerous matter sources
Region sends corresponding dangerous source signal to construction personnel immediately, and returns monitoring center and live dangerous matter sources control peace at the same time
Crew;It is internal to contain storage standby system (8) at the same time, ensure the backup of data;
It is furthermore preferred that in step 3, relevant hazards are controlled, reload temperature sensor (3) in safety cap, at some
Under the ambient conditions (such as weld construction environment) of non-normal temperature, once scene temperature goes beyond the limit, monitoring center will and
When prompting site operation personnel exit scene;
It is furthermore preferred that in step 3, Quick Response Code (5) mark is carried out to each safety cap, ensures to determine at the first time existing
The identity information of field construction personnel, to determine if effectively be managed at dangerous matter sources, and to it;
Timer is installed in safety cap feature sensor (2) additional, for haveing no alternative but applying in dangerous matter sources working region for a long time
Worker person, once its operating time exceedes certain limit, it will and remind it to be in dangerous matter sources in time, when ensureing that it will not be because of work
Grow and produce careless and inadvertent;
It is its outfit monitoring image system (1) more preferably, for security official and construction personnel, guarantee can be by live feelings
The information state that condition passes through video feed to backstage, the preferably live dangerous matter sources of renewal;
It is highly preferred that the elements of a fix point of safety cap output is smaller than 1 meter with the characteristic coordinates point in BIM threedimensional models
It can be considered same coordinate points, farthest to ensure the safety of site operation personnel;
A kind of safety cap based on BIM model safety early warning systems, including cap hoop in external shell of safety helmet, cap, its feature exist
In:Monitor image system (1), feature sensor (2), temperature sensor (3), personal information Quick Response Code (5), charging hole (4),
Built-in power (6), warning device (7), storage standby system (8);Wherein feature sensor, temperature sensor, built-in power,
Warning device and storage standby system are all installed on the cushion cap between the interior hoop and shell at the top of safety cap, ensure that wearing
It is comfortable;The cabling of sensor-based system, stocking system and charging system is connected to survey in external shell of safety helmet and completed, and is close to inner casing
Ensure to wear unaffected.
Compared with prior art, the present invention has following benefit:
1. safety cap of the present invention except that can accomplish the resistance to additional impact force, can also be accomplished to carry out dangerous matter sources effective
Early warning.Although the injury that impact force is brought, wound caused by many dangerous matter sources can be greatly reduced by wearing conventional security cap
Evil is not that safety cap can be offset, and can effectively be given warning in advance to dangerous matter sources and is just particularly important.Will peace in the present invention
Full early warning system acts on the life security that safety cap will greatly ensure construction personnel.
2. there are the safety cap data to upload backup functionality, more comprehensively and quick for engineering safety control, ensure
For all security situations of construction site all in control range, security information can also be accurate to individual by relevant Quick Response Code,
Ensure construction site safety from point to surface.
Brief description of the drawings
In the following drawings, 1 be monitoring image system, 2 be characterized sensor, 3 be temperature sensor, 5 be personal information two
Dimension code, 4 be charging hole, 6 be built-in power, 7 be warning device, 8 be store standby system.
Fig. 1 is a kind of safety cap entirety sectional view based on BIM model safety early warning systems.
Embodiment
Attached drawing in implementing with reference to the present invention, the technical solution in implementing to the present invention are described further.Below
Embodiment will be helpful to those skilled in the art and further understand the present invention, but the invention is not limited in any way.
As shown in Figure 1, a kind of occupation mode of the safety cap based on BIM model safety early warning systems, comprises the following steps:
Step 1:Using BIM model safety early warning systems, i.e.,:Establish BIM threedimensional models;
Step 2:Dangerous matter sources feature locations are established into coordinate points and import threedimensional model;There is provided according to site safety person
Danger sources information changes, and updates characteristic coordinates point;
Step 3:Judge whether it enters danger zone according to the feature sensor safety cap of construction personnel;Safety cap meeting
Dangerous matter sources prompting is carried out to the construction personnel for entering dangerous source region by warning device built in safety cap;Synchronous signal and picture
Monitoring center and live dangerous matter sources control security official are returned, monitoring center personnel are supervised in real time to entering dangerous source region worker
Superintend and direct;
Step 4:Live dangerous matter sources control security official also can at the same time supervise and notify the constructor near dangerous matter sources
Member, while picture passback monitoring center ensures that it carries out safe construction.
When occurring that high-temperature condition such as weather temperature is too high or fire occurs under normal construction environment, according to safety cap
The data of temperature sensor and monitoring image system carry out associated working and judge that linkage warning device carries out safety alarm;
The safety cap, carries out each safety cap two-dimentional code labeling, and safety cap is closed with Field Force to correspond
System, ensures to determine the identity information of site operation personnel at the first time, come determine if should be and right at dangerous matter sources
It is effectively managed;
Timer is installed in the safety cap feature sensor additional, for haveing no alternative but applying in dangerous matter sources working region for a long time
Worker person, once its operating time exceedes certain limit, it will and remind it to be in dangerous matter sources in time, when ensureing that it will not be because of work
Grow and produce careless and inadvertent;
The safety cap feature sensor, elements of a fix point and the characteristic coordinates in BIM threedimensional models of safety cap output
Point is smaller than 1 meter and can be considered same coordinate points, farthest to ensure the safety of site operation personnel;
The safety cap includes storage standby system, and the data at scene are stored to ensure under event of data loss
Retain backup.
Claims (8)
1. a kind of safety cap based on BIM model safety early warning systems, includes the following steps:
Step 1:Using BIM model safety early warning systems, i.e.,:Establish BIM threedimensional models;
Step 2:Dangerous matter sources feature locations are established into coordinate points and import threedimensional model;The danger provided according to site safety person
Source information changes, and updates characteristic coordinates point;
Step 3:Judge whether it enters danger zone according to the sensor safe cap of construction personnel;Safety cap can endanger to entering
The construction personnel of dangerous source region carries out dangerous matter sources prompting;Synchronous signal is pacified with picture passback monitoring center and live dangerous matter sources control
Crew, monitoring center personnel carry out real-time oversight to entering dangerous source region worker;
Step 4:Live dangerous matter sources control security official can also supervise the construction personnel near dangerous matter sources, while picture at the same time
Passback monitoring center ensures that it carries out safe construction.
2. installing feature sensor (2) in safety cap additional, dangerous source region is specified to send immediately accordingly once construction personnel reaches
Dangerous source signal returns monitoring center and live dangerous matter sources control security official at the same time to construction personnel;Installed additional in safety cap
Temperature sensor (3), judges construction environment situation according to the picture of passback, once scene temperature goes beyond the limit, monitoring center will
Prompting site operation personnel it can exit scene in time;Quick Response Code (5) mark is carried out to each safety cap, is ensured true at the first time
The identity information of site operation personnel is determined, to determine if effectively be managed at dangerous matter sources, and to it;Peace
Timer is installed additional in full cap, for not being able to for a long time in the construction personnel of dangerous matter sources working region, once its operating time surpasses
Cross certain limit, it will remind it to exit construction area in time, ensure that it will not produce negligence because of operating time;It is more excellent
Selection of land, is its outfit monitoring image system (1) for security official and construction personnel, guarantee can be anti-by video by field condition
Backstage is fed to, preferably the information state of the live dangerous matter sources of renewal;It is highly preferred that the elements of a fix point and BIM of safety cap output
Characteristic coordinates point in threedimensional model is smaller than 1 meter and can be considered same coordinate points, farthest ensures site operation people
The safety of member.
3. the safety cap according to claim 2 based on BIM model safety early warning systems, including in external shell of safety helmet, cap
Cap hoop, it is characterised in that:Monitor image system (1), feature sensor (2), temperature sensor (3), personal information Quick Response Code
(5), charging hole (4), built-in power (6), warning device (7), storage standby system (8).
4. the safety cap according to claim 2 based on BIM model safety early warning systems, it is characterised in that:In safety cap
Interior installation feature sensor (2), ensures that specific danger sources information is delivered at site operation personnel at the first time.
5. the safety cap according to claim 2 based on BIM model safety early warning systems, it is characterised in that:In safety cap
Interior reload temperature sensor (3), once construction site temperature (such as non-solder region hot environment) under abnormal condition is super
Cross predetermined limits, it will remind construction personnel to exit scene in time.
6. the safety cap according to claim 2 based on BIM model safety early warning systems, it is characterised in that:In safety cap
Interior installation timer, once time-out will be reminded by monitoring center personnel, when ensureing that construction personnel will not be because of work at dangerous matter sources
Between it is long and produce careless mood.
7. the safety cap according to claim 2 based on BIM model safety early warning systems, it is characterised in that:To each it pacify
Full cap sets Quick Response Code (5) mark, ensures to determine the information for entering dangerous source region construction personnel at the first time, and judge that it is
It is no should be at dangerous matter sources.
8. the safety cap according to claim 2 based on BIM model safety early warning systems, it is characterised in that:For security official
With construction personnel be equipped with monitoring image system (1) can by construction site dangerous matter sources situation of change more intuitively return system,
Ensure effective renewal of dangerous matter sources.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711225250.5A CN107927979A (en) | 2017-11-29 | 2017-11-29 | A kind of safety cap based on BIM model safety early warning systems |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711225250.5A CN107927979A (en) | 2017-11-29 | 2017-11-29 | A kind of safety cap based on BIM model safety early warning systems |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107927979A true CN107927979A (en) | 2018-04-20 |
Family
ID=61946697
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711225250.5A Pending CN107927979A (en) | 2017-11-29 | 2017-11-29 | A kind of safety cap based on BIM model safety early warning systems |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107927979A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108732979A (en) * | 2018-05-15 | 2018-11-02 | 浙江大学 | A kind of construction safety managing and control system based on BIM technology |
CN111144776A (en) * | 2019-12-30 | 2020-05-12 | 广州途威慧信息科技有限公司 | Construction safety supervisory systems based on BIM model |
CN111493441A (en) * | 2020-04-20 | 2020-08-07 | 贰佰号科技(北京)有限公司 | Safety monitoring system based on intelligent safety helmet |
CN111523432A (en) * | 2020-04-16 | 2020-08-11 | 重庆大学 | Intelligent construction site safety helmet detection system and method thereof |
CN112561387A (en) * | 2020-12-24 | 2021-03-26 | 中交第四航务工程局有限公司 | Work efficiency analysis method and system based on visualization and personnel management |
CN114155679A (en) * | 2021-07-07 | 2022-03-08 | 中船第九设计研究院工程有限公司 | Safety management system in building construction |
CN117315883A (en) * | 2023-12-01 | 2023-12-29 | 广州南华工程管理有限公司 | Construction safety early warning method, system, server and storage medium |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105639816A (en) * | 2016-03-21 | 2016-06-08 | 中国十七冶集团有限公司 | Safety helmet with attendance check and positioning functions |
CN106383463A (en) * | 2016-09-06 | 2017-02-08 | 华中科技大学 | Construction environmental monitoring system and method based on safety helmet |
CN206150555U (en) * | 2016-10-28 | 2017-05-10 | 武汉八维时空信息技术股份有限公司 | Safety helmet based on BIM theory |
CN106647585A (en) * | 2017-01-20 | 2017-05-10 | 深圳广田集团股份有限公司 | Monitoring method and system based on BIM (building information module) three-dimensional model and intelligent safety helmet |
-
2017
- 2017-11-29 CN CN201711225250.5A patent/CN107927979A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105639816A (en) * | 2016-03-21 | 2016-06-08 | 中国十七冶集团有限公司 | Safety helmet with attendance check and positioning functions |
CN106383463A (en) * | 2016-09-06 | 2017-02-08 | 华中科技大学 | Construction environmental monitoring system and method based on safety helmet |
CN206150555U (en) * | 2016-10-28 | 2017-05-10 | 武汉八维时空信息技术股份有限公司 | Safety helmet based on BIM theory |
CN106647585A (en) * | 2017-01-20 | 2017-05-10 | 深圳广田集团股份有限公司 | Monitoring method and system based on BIM (building information module) three-dimensional model and intelligent safety helmet |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108732979A (en) * | 2018-05-15 | 2018-11-02 | 浙江大学 | A kind of construction safety managing and control system based on BIM technology |
CN111144776A (en) * | 2019-12-30 | 2020-05-12 | 广州途威慧信息科技有限公司 | Construction safety supervisory systems based on BIM model |
CN111523432A (en) * | 2020-04-16 | 2020-08-11 | 重庆大学 | Intelligent construction site safety helmet detection system and method thereof |
CN111523432B (en) * | 2020-04-16 | 2021-07-09 | 重庆大学 | Intelligent construction site safety helmet detection system and method thereof |
CN111493441A (en) * | 2020-04-20 | 2020-08-07 | 贰佰号科技(北京)有限公司 | Safety monitoring system based on intelligent safety helmet |
CN112561387A (en) * | 2020-12-24 | 2021-03-26 | 中交第四航务工程局有限公司 | Work efficiency analysis method and system based on visualization and personnel management |
CN114155679A (en) * | 2021-07-07 | 2022-03-08 | 中船第九设计研究院工程有限公司 | Safety management system in building construction |
CN117315883A (en) * | 2023-12-01 | 2023-12-29 | 广州南华工程管理有限公司 | Construction safety early warning method, system, server and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107927979A (en) | A kind of safety cap based on BIM model safety early warning systems | |
US20210248505A1 (en) | Personal protective equipment system having analytics engine with integrated monitoring, alerting, and predictive safety event avoidance | |
CN109310893B (en) | Indicating hazardous exposure in an air-fed respirator system | |
US20160035246A1 (en) | Facility operations management using augmented reality | |
CN109310894B (en) | Pixel optical sensing of visible light transmissive objects with reflective materials for personal protective equipment | |
KR101339928B1 (en) | Integrated wireless ship management system based on local information of worker | |
US20180055134A1 (en) | Multifunctional and Intelligent Industrial Helment | |
CN106383463A (en) | Construction environmental monitoring system and method based on safety helmet | |
CN109196563A (en) | Predicted temperature rise event | |
CN110443976A (en) | Safety prompt function method, apparatus and storage medium based on safety cap | |
US20140203938A1 (en) | System and method for burn prevention | |
Dong et al. | Automated PPE misuse identification and assessment for safety performance enhancement | |
CN205230246U (en) | Fire alarm system that can early warning conflagration | |
US20190054328A1 (en) | Smart fall arrest system | |
KR20100050002A (en) | Fireman helmet and method for controlling there of | |
CN111611439A (en) | Fire safety monitoring method and device, computer equipment and storage medium | |
CN107898041A (en) | A kind of safety cap based on BIM wears management system | |
GB2571118A (en) | Eye wear-attachable safety communication apparatus, safety insurance method and a system | |
Colombo et al. | Deep vision shield: Assessing the use of hmd and wearable sensors in a smart safety device | |
Krithika et al. | Safety scheme for mining industry using zigbee module | |
CN202866897U (en) | Monitoring and controlling system of mine | |
Borkar et al. | IoT based smart helmet for underground mines | |
CN113243606A (en) | Protective safety helmet with remote communication function and safety management method | |
CN112656081A (en) | Indoor positioning system based on vector position and attitude measurement technology | |
CN110984955A (en) | Remote monitoring system for drilling machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180420 |