CN107220798A - A kind of construction monitoring and managing method based on BIM - Google Patents
A kind of construction monitoring and managing method based on BIM Download PDFInfo
- Publication number
- CN107220798A CN107220798A CN201710271394.8A CN201710271394A CN107220798A CN 107220798 A CN107220798 A CN 107220798A CN 201710271394 A CN201710271394 A CN 201710271394A CN 107220798 A CN107220798 A CN 107220798A
- Authority
- CN
- China
- Prior art keywords
- monitored area
- simulant building
- error
- bim
- parameter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Abstract
The invention discloses a kind of construction monitoring and managing method based on BIM, it is related to technical field of information management.This method includes:BIM is set up in construction supervisory systems according to architecture information, and construction simulation is carried out based on BIM;Simulant building monitored area predetermined symbol and simulant building monitored area amplification sample coordinate diagram are set in simulant building monitored area;The actual parameter of the actual building monitored area of collection, amplifies the contrast of sample coordinate diagram with simulant building monitored area under the coordinate system of simulant building monitored area amplification sample coordinate diagram by actual parameter enlarged drawing and shows;Such as comparing result is not in error range, and the actual parameter to the monitored area not in error range and the analog parameter not in error range carry out error analysis;Adjusted and constructed according to error result.This method carries out construction supervision on BIM by the comparison diagram of amplification and accurate error analysis result, supervises intuitive and convenient, accurate reliable;And monitored area can be arbitrarily set, and supervision effect is good.
Description
Technical field
The present invention relates to technical field of information management, a kind of construction monitoring and managing method based on BIM is more particularly related to.
Background technology
, it is necessary to gather various architecture informations in real time (for example in building construction process:The sunshine of building, external maintenance knot
Heat transfer conditions of structure etc.), engineers and technicians make correct understanding and efficiently reply according to various architecture informations, are design team
And each side's construction bodies including building unit of operation provide the basis cooperated, to improve production efficiency, section
About cost, shorten the duration.
In existing construction monitoring and managing method, engineers and technicians are according to the architecture information collected, with construction
What experience was judged, this artificial judgment result often deposits larger deviation, and the counter-measure finally made is also tended to
It is not optimal.
In summary, there is supervision deviation greatly, influence asking for counter-measure in construction monitoring and managing method of the prior art
Topic.
The content of the invention
The embodiment of the present invention provides a kind of construction monitoring and managing method based on BIM, to solve to exist in the prior art
Supervise deviation big, the problem of influenceing counter-measure.
The embodiment of the present invention provides a kind of construction monitoring and managing method based on BIM, including:
BIM is set up in construction supervisory systems according to architecture information, and construction simulation is carried out based on BIM;Wherein, build
Building construction supervision system includes architecture information database;
Simulant building monitored area predetermined symbol and the amplification of simulant building monitored area are set in simulant building monitored area
Sample coordinate diagram;
By simulant building monitored area predetermined symbol, simulant building monitored area analog parameter, and simulant building monitoring
Region predetermined symbol is stored to architecture information database with simulant building monitored area analog parameter corresponding relation;Wherein, simulate
Proportionally relation pair should for the size of building monitored area analog parameter and simulant building monitored area amplification sample coordinate diagram;
The actual parameter of the actual building monitored area of collection, by simulant building monitored area predetermined symbol by actual parameter
Coordinate is carried out with simulant building monitored area analog parameter to associate;According to simulant building monitored area analog parameter and simulant building
The proportionate relationship of the size of monitored area amplification sample coordinate diagram, sample is amplified by actual parameter enlarged drawing in simulant building monitored area
Shown under the coordinate system of coordinate diagram with the amplification sample coordinate diagram contrast of simulant building monitored area;
Such as comparing result is in error range, then actual parameter enlarged drawing amplifies sample coordinate diagram with simulant building monitored area
Same color is shown, continues to construct;
Such as comparing result is not in error range, then actual parameter enlarged drawing amplifies sample coordinate with simulant building monitored area
Figure shows different colours, and obtains the monitored area not in error range;To the reality of the monitored area not in error range
Border parameter and the analog parameter progress error analysis not in error range, and error result is included in actual parameter enlarged drawing
Amplify the correspondence position of sample coordinate diagram with simulant building monitored area;Adjusted and constructed according to error result.
It is preferred that be also stored with the architecture information database engineering name, person in charge of the technology aspect, unit in charge of construction and engineering
Overview.
It is preferred that the size of the simulant building monitored area amplification sample coordinate diagram is simulant building monitored area mould
Intend parameter 3~10 times.
It is preferred that the actual parameter of the monitored area to not in error range and the simulation not in error range
Parameter carry out error analysis be by backward error analysis method to the actual parameter of the monitored area not in error range and not
Analog parameter in error range carries out error analysis.
It is preferred that the error result is grade of errors or error value.
There is provided a kind of construction monitoring and managing method based on BIM in the embodiment of the present invention, compared with prior art, it has
Beneficial effect is:The present invention can embody high efficiency of the BIM in architecture information management, and production is improved in building construction process
Efficiency, cost-effective and shortening duration aspect play a significant role, i.e., pass through the comparison diagram and accurate error of amplification on BIM
Analysis result carries out construction supervision, supervises intuitive and convenient, accurate reliable;And monitored area can be arbitrarily set, supervised
Effect is good.
Brief description of the drawings
Fig. 1 is a kind of construction monitoring and managing method flow chart based on BIM provided in an embodiment of the present invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on
Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made
Embodiment, belongs to the scope of protection of the invention.
Fig. 1 is a kind of construction monitoring and managing method flow chart based on BIM provided in an embodiment of the present invention.As shown in figure 1,
This method includes:
Step S101, sets up BIM, and carry out construction mould based on BIM according to architecture information in construction supervisory systems
Intend;Wherein, construction supervisory systems includes architecture information database.
It should be noted that be also stored with architecture information database engineering name, person in charge of the technology aspect, unit in charge of construction and work
Journey overview.
Step S102, simulant building monitored area predetermined symbol and simulant building monitoring are set in simulant building monitored area
Amplify sample coordinate diagram in region.
It should be noted that fast searching monitored area is easy in the setting of predetermined symbol;And monitoring can be arbitrarily set
Region, supervision effect is good.
Step S103, by simulant building monitored area predetermined symbol, simulant building monitored area analog parameter, and simulation
Building monitored area predetermined symbol is stored to architecture information database with simulant building monitored area analog parameter corresponding relation;Its
In, the size of sample coordinate diagram proportionally relation pair is amplified in simulant building monitored area analog parameter and simulant building monitored area
Should.
It is preferred that the size of simulant building monitored area amplification sample coordinate diagram is simulant building monitored area analog parameter
3~10 times.
Step S104, the actual parameter of the actual building monitored area of collection, passes through simulant building monitored area predetermined symbol
Actual parameter and simulant building monitored area analog parameter are carried out into coordinate to associate;According to simulant building monitored area analog parameter
Amplify the proportionate relationship of the size of sample coordinate diagram with simulant building monitored area, actual parameter enlarged drawing is monitored in simulant building
Shown under the coordinate system of region amplification sample coordinate diagram with the amplification sample coordinate diagram contrast of simulant building monitored area.
Step S105, such as comparing result are in error range, then actual parameter enlarged drawing is put with simulant building monitored area
Full-page proof coordinate diagram shows same color, continues to construct.
Step S106, such as comparing result be not in error range, then actual parameter enlarged drawing and simulant building monitored area
Amplify sample coordinate diagram and show different colours, and obtain the monitored area not in error range;To the prison not in error range
Survey the actual parameter in region and the analog parameter not in error range carries out error analysis, and error result is included in reality
Parameter enlarged drawing amplifies the correspondence position of sample coordinate diagram with simulant building monitored area;Adjusted and constructed according to error result.
It is preferred that the actual parameter to the monitored area not in error range and the analog parameter not in error range
It is to the actual parameter of the monitored area not in error range and not by mistake by backward error analysis method to carry out error analysis
Analog parameter in poor scope carries out error analysis.
It is preferred that error result is grade of errors or error value, according to error result, system provides related measure automatically
Scheme is for reference.
It should be noted that when inputting the essential information of engineering to system, can be to needing the engineering installation password of encryption;
Simulant building can also be printed.
It should be noted that the present invention can embody high efficiency of the BIM in architecture information management, in construction
Production efficiency is improved in journey, is played a significant role in terms of the cost-effective and shortening duration, i.e., passes through the comparison diagram of amplification on BIM
Construction supervision is carried out with accurate error analysis result, intuitive and convenient is supervised, it is accurate reliable.
Disclosed above is only several specific embodiments of the present invention, and those skilled in the art can be to present invention progress
It is various to change with modification without departing from the spirit and scope of the present invention, if these modifications and variations of the present invention belong to the present invention
Within the scope of claim and its equivalent technologies, then the present invention is also intended to comprising including these changes and modification.
Claims (5)
1. a kind of construction monitoring and managing method based on BIM, it is characterised in that including:
BIM is set up in construction supervisory systems according to architecture information, and construction simulation is carried out based on BIM;Wherein, building is applied
Work supervisory systems includes architecture information database;
Simulant building monitored area predetermined symbol and simulant building monitored area amplification sample is set to sit in simulant building monitored area
Mark on a map;
By simulant building monitored area predetermined symbol, simulant building monitored area analog parameter, and simulant building monitored area
Predetermined symbol is stored to architecture information database with simulant building monitored area analog parameter corresponding relation;Wherein, simulant building
Proportionally relation pair should for the size of monitored area analog parameter and simulant building monitored area amplification sample coordinate diagram;
The actual parameter of the actual building monitored area of collection, by simulant building monitored area predetermined symbol by actual parameter and mould
Proposed monitored area analog parameter of building carries out coordinate association;Monitored according to simulant building monitored area analog parameter and simulant building
The proportionate relationship of the size of region amplification sample coordinate diagram, sample coordinate is amplified by actual parameter enlarged drawing in simulant building monitored area
Shown under the coordinate system of figure with the amplification sample coordinate diagram contrast of simulant building monitored area;
Such as comparing result is in error range, then actual parameter enlarged drawing is shown with simulant building monitored area amplification sample coordinate diagram
Same color, continues to construct;
Such as comparing result is not in error range, then actual parameter enlarged drawing shows with simulant building monitored area amplification sample coordinate diagram
Show different colours, and obtain the monitored area not in error range;To the actual ginseng of the monitored area not in error range
Number and the analog parameter progress error analysis not in error range, and error result is included in actual parameter enlarged drawing and mould
It is proposed to build the correspondence position that sample coordinate diagram is amplified in monitored area;Adjusted and constructed according to error result.
2. the construction monitoring and managing method as claimed in claim 1 based on BIM, it is characterised in that the architecture information data
Also be stored with engineering name, person in charge of the technology aspect, unit in charge of construction and project profile in storehouse.
3. the construction monitoring and managing method as claimed in claim 1 based on BIM, it is characterised in that the simulant building monitoring
The size of region amplification sample coordinate diagram is 3~10 times of simulant building monitored area analog parameter.
4. the construction monitoring and managing method as claimed in claim 1 based on BIM, it is characterised in that described to not in error model
It is by Backward error that the actual parameter of monitored area in enclosing and the analog parameter not in error range, which carry out error analysis,
Analog parameter of the analytic approach to the actual parameter of the monitored area not in error range and not in error range carries out error
Analysis.
5. the construction monitoring and managing method as claimed in claim 1 based on BIM, it is characterised in that the error result is mistake
Poor grade or error value.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710271394.8A CN107220798A (en) | 2017-04-24 | 2017-04-24 | A kind of construction monitoring and managing method based on BIM |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710271394.8A CN107220798A (en) | 2017-04-24 | 2017-04-24 | A kind of construction monitoring and managing method based on BIM |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107220798A true CN107220798A (en) | 2017-09-29 |
Family
ID=59945323
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710271394.8A Pending CN107220798A (en) | 2017-04-24 | 2017-04-24 | A kind of construction monitoring and managing method based on BIM |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107220798A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109461098A (en) * | 2019-01-16 | 2019-03-12 | 浙江至诚建设有限公司 | A kind of building construction unified integration monitoring and managing method based on BIM |
CN109583772A (en) * | 2018-12-04 | 2019-04-05 | 上海宝冶集团有限公司 | Method for managing and monitoring, device, system and the readable storage medium storing program for executing of construction site |
WO2020056671A1 (en) * | 2018-09-20 | 2020-03-26 | 中建科技有限公司深圳分公司 | Data growth method and device for fabricated building construction platform |
CN112364427A (en) * | 2020-11-23 | 2021-02-12 | 浙江宝龙建设有限公司 | Building construction supervision method based on BIM |
CN113592231A (en) * | 2021-06-29 | 2021-11-02 | 四川省交通建设集团股份有限公司 | Engineering quality control method based on BIM technology |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101630335A (en) * | 2008-07-18 | 2010-01-20 | 纬衡浩建科技(深圳)有限公司 | Method for comparing similarity and difference between drawings |
US20140164072A1 (en) * | 2012-12-06 | 2014-06-12 | Solibri, Inc. | System and Method for Quantified Quality Analysis and Benchmarking for Building Information Modeling |
CN104236522A (en) * | 2014-09-01 | 2014-12-24 | 中国十七冶集团有限公司 | Three-dimensional visualization measuring system |
CN105631154A (en) * | 2016-01-11 | 2016-06-01 | 中铁隧道集团有限公司 | Method for viewing tunnel monitoring and measurement data on BIM (Building Information Modeling) construction management platform |
CN106354950A (en) * | 2016-08-31 | 2017-01-25 | 华中科技大学 | Steel structure pre-splicing method and system |
CN106408172A (en) * | 2016-08-31 | 2017-02-15 | 广东达安项目管理股份有限公司 | Project management system |
-
2017
- 2017-04-24 CN CN201710271394.8A patent/CN107220798A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101630335A (en) * | 2008-07-18 | 2010-01-20 | 纬衡浩建科技(深圳)有限公司 | Method for comparing similarity and difference between drawings |
US20140164072A1 (en) * | 2012-12-06 | 2014-06-12 | Solibri, Inc. | System and Method for Quantified Quality Analysis and Benchmarking for Building Information Modeling |
CN104236522A (en) * | 2014-09-01 | 2014-12-24 | 中国十七冶集团有限公司 | Three-dimensional visualization measuring system |
CN105631154A (en) * | 2016-01-11 | 2016-06-01 | 中铁隧道集团有限公司 | Method for viewing tunnel monitoring and measurement data on BIM (Building Information Modeling) construction management platform |
CN106354950A (en) * | 2016-08-31 | 2017-01-25 | 华中科技大学 | Steel structure pre-splicing method and system |
CN106408172A (en) * | 2016-08-31 | 2017-02-15 | 广东达安项目管理股份有限公司 | Project management system |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2020056671A1 (en) * | 2018-09-20 | 2020-03-26 | 中建科技有限公司深圳分公司 | Data growth method and device for fabricated building construction platform |
CN109583772A (en) * | 2018-12-04 | 2019-04-05 | 上海宝冶集团有限公司 | Method for managing and monitoring, device, system and the readable storage medium storing program for executing of construction site |
CN109461098A (en) * | 2019-01-16 | 2019-03-12 | 浙江至诚建设有限公司 | A kind of building construction unified integration monitoring and managing method based on BIM |
CN112364427A (en) * | 2020-11-23 | 2021-02-12 | 浙江宝龙建设有限公司 | Building construction supervision method based on BIM |
CN113592231A (en) * | 2021-06-29 | 2021-11-02 | 四川省交通建设集团股份有限公司 | Engineering quality control method based on BIM technology |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107220798A (en) | A kind of construction monitoring and managing method based on BIM | |
CN109447480A (en) | A kind of road and bridge engineering equipment safety monitoring system and method based on BIM+GIS modeling | |
CN109784746A (en) | Urban-rural water supply network waterpower simulation of water quality platform | |
CN102708518B (en) | Transmission and transformation project environment sensitive area comprehensive management system based on geographic information technology | |
CN107818430A (en) | A kind of building engineering construction progress msg management method and system based on BIM | |
CN104536436B (en) | A kind of Auto-Test System of industrial processes control logic and method | |
CN111241660B (en) | Civil engineering experiment detection system and method based on cloud computing technology | |
CN114092025B (en) | Temporary land use full life cycle monitoring method | |
CN104252519A (en) | Increment updating method of topographic database | |
CN108169586A (en) | One kind is used for avionics system integration test method | |
CN113177774A (en) | Building construction supervision method based on BIM | |
CN105894706B (en) | A kind of forest fire prediction technique and its system | |
CN106710651A (en) | Method and system for demonstrating nuclear accident status change in nuclear power plant | |
CN106383956B (en) | The converting system and method for thermal power plant civil engineering model data | |
CN112507416A (en) | BIM-based highway construction real-time supervision system and working method thereof | |
CN106295144A (en) | A kind of medical data acquisition method of quality control | |
CN103279555B (en) | PI point automatic maintenance methods and device based on operation system | |
CN104332992A (en) | Power distribution network looped network diagram safety verification method | |
CN102087728A (en) | Technology for expressing assessment result of disaster risk by using function curve grade map | |
CN107944767A (en) | Selecting address on building method and its system based on BIM and electronic map | |
CN103049583B (en) | The conversion method of earth monitor data and translation interface | |
CN105046586A (en) | Measuring point geographic information management system | |
CN102182938A (en) | Method for generating real-time dynamic water supply network pressure distribution pattern | |
CN117474214B (en) | Carbon neutralization process analysis management system based on data monitoring | |
CN116299165B (en) | Bluetooth beacon personnel positioning correction method and system based on positioning card path model |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170929 |
|
RJ01 | Rejection of invention patent application after publication |