CN109530577A - 一种剪力墙钢筋绑扎用拉筋的弯钩成型装置 - Google Patents
一种剪力墙钢筋绑扎用拉筋的弯钩成型装置 Download PDFInfo
- Publication number
- CN109530577A CN109530577A CN201811497145.1A CN201811497145A CN109530577A CN 109530577 A CN109530577 A CN 109530577A CN 201811497145 A CN201811497145 A CN 201811497145A CN 109530577 A CN109530577 A CN 109530577A
- Authority
- CN
- China
- Prior art keywords
- block
- lacing wire
- force
- holding force
- molding machine
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910001294 Reinforcing steel Inorganic materials 0.000 title claims abstract description 15
- 238000000465 moulding Methods 0.000 title claims abstract description 14
- 238000005452 bending Methods 0.000 claims description 13
- 239000000203 mixture Substances 0.000 claims 1
- 230000002787 reinforcement Effects 0.000 abstract description 14
- 238000010276 construction Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 210000003205 muscle Anatomy 0.000 description 2
- 239000000725 suspension Substances 0.000 description 2
- 238000000034 method Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21F—WORKING OR PROCESSING OF METAL WIRE
- B21F1/00—Bending wire other than coiling; Straightening wire
- B21F1/004—Bending wire other than coiling; Straightening wire by means of press-type tooling
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Reinforcement Elements For Buildings (AREA)
Abstract
本发明公开了一种剪力墙钢筋绑扎用拉筋的弯钩成型装置,包括有铰接的持力块与施力块组成;持力块的顶端设置有铰接座,持力块的中部开设有槽口水平向前的拉筋定位卡槽,持力块上开设有槽口向上的条形槽,条形槽的水平轴线与拉筋定位卡槽的水平轴线形成45度的夹角;施力块包括有挤压块和连接于挤压块上的施力把手,挤压块的端部设置有与铰接座连接的铰接板,挤压块的下端面上设置有向下延伸的凸块,凸块朝向持力块的侧面为朝向持力块的斜面,凸块的斜面与水平面的角度为45度。本发明设置有持力块与施力块,持力块上的拉筋定位卡槽和条形槽分别用于定位拉筋和下排主筋,使得拉筋的弯钩可准确固定于双向主筋节点上。
Description
技术领域
本发明涉及剪力墙钢筋绑扎领域,具体是一种剪力墙钢筋绑扎用拉筋的弯钩成型装置。
背景技术
建筑结构施工过程中,包括剪力墙及结构板均需设置拉筋,拉筋的悬挂应使得拉筋与结构上下排主筋之间连接紧密,而一般拉筋设计均需在两侧设置内折135度弯钩,弯钩长度为10倍拉筋直径,由此便造成拉筋开口间距离小于结构上下排主筋距离,拉筋无法正常悬挂的施工问题。
发明内容
本发明要解决的技术问题是提供一种剪力墙钢筋绑扎用拉筋的弯钩成型装置,对正常悬挂后的拉筋进行二次加工,使拉筋与上下排主筋连接紧密的同时能够满足两侧弯钩向内弯折135度的设计要求。
本发明的技术方案为:
一种剪力墙钢筋绑扎用拉筋的弯钩成型装置,包括有铰接的持力块与施力块组成;所述的持力块包括有一体塑型的上台阶块和下台阶块,所述的上台阶块的顶端设置有铰接座,所述的持力块的中部开设有槽口水平向前的拉筋定位卡槽,且拉筋定位卡槽贯通持力块的顶端和底端,所述的下台阶块上开设有槽口向上的条形槽,条形槽的两端分别贯通持力块的前端面和侧面,所述的条形槽的水平轴线与拉筋定位卡槽的水平轴线形成45度的夹角;所述的施力块包括有挤压块和施力把手,所述的挤压块的端部设置有与铰接座连接的铰接板,所述的挤压块位于水平状态时,施力把手固定连接于挤压块的上端面上,所述的挤压块的下端面上设置有向下延伸的凸块,所述的凸块位于持力块的斜上方,且凸块朝向持力块的侧面为朝向下台阶块的斜面,所述的凸块的斜面与水平面的角度为45度。
所述的上台阶块的侧壁上固定连接有水平定位杆。
所述的水平定位杆包括有相互连接的水平部分和弯折部分,水平部分和弯折部分的角度为150度,所述的弯折部分的外端与上台阶块的侧壁固定连接。
所述的施力块的施力把手为施力管,施工管的底端与挤压块固定连接。
所述的凸块的底端固定连接有两个向下延伸的卡板,所述的两个卡板之间形成拉筋定位卡槽。
所述的凸块和两个卡板为一体塑型结构。
所述的铰接座为耳板座结构,所述的铰接板为耳板结构,所述的铰接板伸入到铰接座内通过铰接螺栓连接。
本发明的优点:
本发明设置有持力块与施力块,持力块上的拉筋定位卡槽用于定位竖直设置的拉筋,持力块上的条形槽用于定位下排主筋,使得拉筋的弯钩可准确固定于双向主筋节点上;本发明的施力块上设置的凸块用于对拉筋进行施力挤压其进行弯折形成弯钩结构,凸块的斜面设置为45度斜面,保证拉筋实现135度的大角度精准弯折;本发明设置有水平定位杆,施工时用脚踩住,保证弯钩成型装置使用时的稳定性;本发明凸块的底端设置有两个卡板,两个卡板之间形成拉筋定位卡槽,便于凸块挤压时对拉筋进行定位,避免其脱离弯折轨迹。
附图说明
图1是本发明的结构示意图;
图2是图1中持力块的俯视图;
图3是图1中施力块的侧视图;
图4是本发明进行拉筋弯折前对拉筋和主筋进行定位的结构示意图。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
见图1-图3,一种剪力墙钢筋绑扎用拉筋的弯钩成型装置,包括有铰接的持力块1与施力块组成;持力块包括有一体塑型的上台阶块11和下台阶块12,上台阶块11的侧壁固定连接有水平定位杆13,上台阶块11的顶端设置有耳板座14,持力块的中部开设有槽口水平向前的拉筋定位卡槽15,且拉筋定位卡槽15贯通持力块1的顶端和底端,下台阶块12上开设有槽口向上的条形槽16,条形槽16的两端分别贯通持力块1的前端面和侧面,条形槽16的水平轴线与拉筋定位卡槽15的水平轴线形成45度的夹角;施力块包括有挤压块21和施力管22,挤压块21的端部设置有与耳板座14通过铰接螺栓连接的耳板23,挤压块21位于水平状态时,施力管22的底端固定连接于挤压块21上,挤压块21的下端面上设置有向下延伸的凸块24,凸块24位于持力块1的斜上方,且凸块24朝向持力块1的侧面为朝向下台阶块12的斜面,凸块24的斜面与水平面的角度为45度,凸块24的底端固定连接有两个向下延伸的卡板25,凸块24和两个卡板25为一体塑型结构,两个卡板25之间形成拉筋定位卡槽。
其中,水平定位杆13包括有相互连接的水平部分和弯折部分,水平部分和弯折部分的角度为150度,弯折部分的外端与上台阶块11的侧壁固定连接。
见图4,拉筋弯折前,本发明的施力块远离持力块1,首先将拉筋3竖直卡置于拉筋定位卡槽15内,然后将下排主筋4水平放置于条形槽16内,上排主筋5放置于下排主筋4上且与下排主筋4为交叉结构;弯折时,脚踩水平定位杆13对持力块1进行定位,手持施力管22带动挤压块21朝向持力块1转动,直至凸块24将拉筋3弯折135度,拉筋的弯钩固定于下排主筋4和上排主筋5的交叉节点处。
尽管已经示出和描述了本发明的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由所附权利要求及其等同物限定。
Claims (7)
1.一种剪力墙钢筋绑扎用拉筋的弯钩成型装置,其特征在于:包括有铰接的持力块与施力块组成;所述的持力块包括有一体塑型的上台阶块和下台阶块,所述的上台阶块的顶端设置有铰接座,所述的持力块的中部开设有槽口水平向前的拉筋定位卡槽,且拉筋定位卡槽贯通持力块的顶端和底端,所述的下台阶块上开设有槽口向上的条形槽,条形槽的两端分别贯通持力块的前端面和侧面,所述的条形槽的水平轴线与拉筋定位卡槽的水平轴线形成45度的夹角;所述的施力块包括有挤压块和施力把手,所述的挤压块的端部设置有与铰接座连接的铰接板,所述的挤压块位于水平状态时,施力把手固定连接于挤压块的上端面上,所述的挤压块的下端面上设置有向下延伸的凸块,所述的凸块位于持力块的斜上方,且凸块朝向持力块的侧面为朝向下台阶块的斜面,所述的凸块的斜面与水平面的角度为45度。
2.根据权利要求1所述的一种剪力墙钢筋绑扎用拉筋的弯钩成型装置,其特征在于:所述的上台阶块的侧壁上固定连接有水平定位杆。
3.根据权利要求2所述的一种剪力墙钢筋绑扎用拉筋的弯钩成型装置,其特征在于:所述的水平定位杆包括有相互连接的水平部分和弯折部分,水平部分和弯折部分的角度为150度,所述的弯折部分的外端与上台阶块的侧壁固定连接。
4.根据权利要求1所述的一种剪力墙钢筋绑扎用拉筋的弯钩成型装置,其特征在于:所述的施力块的施力把手为施力管,施工管的底端与挤压块固定连接。
5.根据权利要求1所述的一种剪力墙钢筋绑扎用拉筋的弯钩成型装置,其特征在于:所述的凸块的底端固定连接有两个向下延伸的卡板,所述的两个卡板之间形成拉筋定位卡槽。
6.根据权利要求5所述的一种剪力墙钢筋绑扎用拉筋的弯钩成型装置,其特征在于:所述的凸块和两个卡板为一体塑型结构。
7.根据权利要求1所述的一种剪力墙钢筋绑扎用拉筋的弯钩成型装置,其特征在于:所述的铰接座为耳板座结构,所述的铰接板为耳板结构,所述的铰接板伸入到铰接座内通过铰接螺栓连接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811497145.1A CN109530577B (zh) | 2018-12-07 | 2018-12-07 | 一种剪力墙钢筋绑扎用拉筋的弯钩成型装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811497145.1A CN109530577B (zh) | 2018-12-07 | 2018-12-07 | 一种剪力墙钢筋绑扎用拉筋的弯钩成型装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109530577A true CN109530577A (zh) | 2019-03-29 |
CN109530577B CN109530577B (zh) | 2024-01-26 |
Family
ID=65854004
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811497145.1A Active CN109530577B (zh) | 2018-12-07 | 2018-12-07 | 一种剪力墙钢筋绑扎用拉筋的弯钩成型装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109530577B (zh) |
Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0726014U (ja) * | 1993-10-21 | 1995-05-16 | 大成建設株式会社 | 鉄筋の端部折曲加工装置 |
JPH09206865A (ja) * | 1996-02-01 | 1997-08-12 | Kyowa Kenki Kogyo Kk | 鉄筋の曲げ加工装置 |
JPH11309514A (ja) * | 1998-04-22 | 1999-11-09 | Matsumoto Kogyo Kk | 鉄筋折り曲げ装置 |
JPH11319955A (ja) * | 1998-05-15 | 1999-11-24 | Matsumoto Kogyo Kk | 鉄筋折り曲げ装置 |
JP2004190368A (ja) * | 2002-12-12 | 2004-07-08 | Hidenori Mizushima | 差し筋の接続方法及び接続器具 |
US20040216415A1 (en) * | 2003-02-04 | 2004-11-04 | Pfeiffer Henry E. | Welded wire reinforcement for modular concrete forms |
CN103272963A (zh) * | 2013-05-27 | 2013-09-04 | 青岛兴河建材有限公司 | 一种预制桩钢筋笼桩尖弯折设备 |
CN203448581U (zh) * | 2013-08-29 | 2014-02-26 | 中交第四公路工程局有限公司 | 钢筋角度弯折设备 |
CN205147172U (zh) * | 2015-12-07 | 2016-04-13 | 中民筑友有限公司 | 一种钢筋折弯装置 |
CN205253971U (zh) * | 2015-11-18 | 2016-05-25 | 中国三冶集团有限公司 | 一种箍筋弯钩校正工具 |
KR101696854B1 (ko) * | 2016-01-01 | 2017-02-01 | (주)나우기술 | 프리캐스트 콘크리트 e블럭 옹벽의 다양한 조립 시공방법 |
CN207013640U (zh) * | 2017-07-05 | 2018-02-16 | 上海宝冶集团有限公司 | 用于现场灌注桩钢筋笼纵向主筋的弯曲工具 |
CN107838322A (zh) * | 2017-12-12 | 2018-03-27 | 河南省第二建设集团有限公司 | 一种钢筋快速加工弯钩装置 |
CN108465749A (zh) * | 2018-04-23 | 2018-08-31 | 佛山市集知汇科技有限公司 | 一种箍筋的弯折方法 |
CN209379817U (zh) * | 2018-12-07 | 2019-09-13 | 中铁四局集团第四工程有限公司 | 一种剪力墙钢筋绑扎用拉筋的弯钩成型装置 |
-
2018
- 2018-12-07 CN CN201811497145.1A patent/CN109530577B/zh active Active
Patent Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0726014U (ja) * | 1993-10-21 | 1995-05-16 | 大成建設株式会社 | 鉄筋の端部折曲加工装置 |
JPH09206865A (ja) * | 1996-02-01 | 1997-08-12 | Kyowa Kenki Kogyo Kk | 鉄筋の曲げ加工装置 |
JPH11309514A (ja) * | 1998-04-22 | 1999-11-09 | Matsumoto Kogyo Kk | 鉄筋折り曲げ装置 |
JPH11319955A (ja) * | 1998-05-15 | 1999-11-24 | Matsumoto Kogyo Kk | 鉄筋折り曲げ装置 |
JP2004190368A (ja) * | 2002-12-12 | 2004-07-08 | Hidenori Mizushima | 差し筋の接続方法及び接続器具 |
US20040216415A1 (en) * | 2003-02-04 | 2004-11-04 | Pfeiffer Henry E. | Welded wire reinforcement for modular concrete forms |
CN103272963A (zh) * | 2013-05-27 | 2013-09-04 | 青岛兴河建材有限公司 | 一种预制桩钢筋笼桩尖弯折设备 |
CN203448581U (zh) * | 2013-08-29 | 2014-02-26 | 中交第四公路工程局有限公司 | 钢筋角度弯折设备 |
CN205253971U (zh) * | 2015-11-18 | 2016-05-25 | 中国三冶集团有限公司 | 一种箍筋弯钩校正工具 |
CN205147172U (zh) * | 2015-12-07 | 2016-04-13 | 中民筑友有限公司 | 一种钢筋折弯装置 |
KR101696854B1 (ko) * | 2016-01-01 | 2017-02-01 | (주)나우기술 | 프리캐스트 콘크리트 e블럭 옹벽의 다양한 조립 시공방법 |
CN207013640U (zh) * | 2017-07-05 | 2018-02-16 | 上海宝冶集团有限公司 | 用于现场灌注桩钢筋笼纵向主筋的弯曲工具 |
CN107838322A (zh) * | 2017-12-12 | 2018-03-27 | 河南省第二建设集团有限公司 | 一种钢筋快速加工弯钩装置 |
CN108465749A (zh) * | 2018-04-23 | 2018-08-31 | 佛山市集知汇科技有限公司 | 一种箍筋的弯折方法 |
CN209379817U (zh) * | 2018-12-07 | 2019-09-13 | 中铁四局集团第四工程有限公司 | 一种剪力墙钢筋绑扎用拉筋的弯钩成型装置 |
Also Published As
Publication number | Publication date |
---|---|
CN109530577B (zh) | 2024-01-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209384444U (zh) | 一种装配式剪力墙竖向连接结构 | |
CN209379817U (zh) | 一种剪力墙钢筋绑扎用拉筋的弯钩成型装置 | |
CN109530577A (zh) | 一种剪力墙钢筋绑扎用拉筋的弯钩成型装置 | |
CN110670807A (zh) | 混凝土垫块、专用模具及其制作方法 | |
CN209509482U (zh) | 一种防止变形的室内墙体浇筑模板 | |
CN208379874U (zh) | 一种混凝土叠合板 | |
CN205502574U (zh) | 一种快捷式吊模模具 | |
CN209538529U (zh) | 一种侧向钢筋支架 | |
CN205557839U (zh) | 一种砌体填充墙与主体框架的柔性连接装置 | |
CN208235724U (zh) | 一种土建施工用混凝土预埋件 | |
CN212802452U (zh) | 一种利用多窗口连锁的悬挑支架 | |
CN207110299U (zh) | 一种装饰面反打连接件 | |
CN209163066U (zh) | 一种装配式结构预制墙体坐浆的施工工具 | |
CN104405126B (zh) | 塑料建筑模板的阴角模板 | |
CN209568573U (zh) | 一种剪力墙体的新型加固结构 | |
CN208219873U (zh) | 现浇混凝土楼层顶板后浇带及施工缝侧模定型装置 | |
CN208472986U (zh) | 一种集成型钢拼装建筑施工结构 | |
CN104264979B (zh) | 正挑梁结构塑料建筑模板 | |
CN207525778U (zh) | 预制夹心墙与预制夹心墙的中间连接节点结构 | |
CN207079790U (zh) | 钢板桁架式承重板 | |
CN202124934U (zh) | 钢筋混凝土梁与剪力墙的连接装置 | |
CN206220263U (zh) | 预埋件 | |
CN217711720U (zh) | 一种房建工程框架柱模板加固密封装置 | |
CN205857158U (zh) | 一种预应力混凝土槽型板桩 | |
CN216075937U (zh) | 一种建筑钢筋的连接件 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: Wangjiang Road in Baohe District of Hefei city of Anhui Province, No. 96 230023 Applicant after: CHINA TIESIJU CIVIL ENGINEERING GROUP Co.,Ltd. Applicant after: THE FOURTH ENGINEERING CO., LTD. OF CTCE Group Address before: Hefei City, Anhui Province Zhang Sag Road 230041 No. 106 Applicant before: THE FOURTH ENGINEERING CO., LTD. OF CTCE Group Applicant before: CHINA TIESIJU CIVIL ENGINEERING GROUP Co.,Ltd. |
|
CB02 | Change of applicant information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |