CN109506536A - A kind of method of the quick-fried heap width of optimal control surface mine bench blasting - Google Patents

A kind of method of the quick-fried heap width of optimal control surface mine bench blasting Download PDF

Info

Publication number
CN109506536A
CN109506536A CN201811444458.0A CN201811444458A CN109506536A CN 109506536 A CN109506536 A CN 109506536A CN 201811444458 A CN201811444458 A CN 201811444458A CN 109506536 A CN109506536 A CN 109506536A
Authority
CN
China
Prior art keywords
quick
fried heap
blasting
width
quarrel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811444458.0A
Other languages
Chinese (zh)
Other versions
CN109506536B (en
Inventor
刘为洲
仪海豹
杨海涛
张西良
辛国帅
汪禹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ma'an Mountain Mine Research Institute Blasting Engineering Co Ltd
Huawei National Engineering Research Center of High Efficient Cyclic and Utilization of Metallic Mineral Resources Co Ltd
Sinosteel Maanshan General Institute of Mining Research Co Ltd
Original Assignee
Ma'an Mountain Mine Research Institute Blasting Engineering Co Ltd
Huawei National Engineering Research Center of High Efficient Cyclic and Utilization of Metallic Mineral Resources Co Ltd
Sinosteel Maanshan General Institute of Mining Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ma'an Mountain Mine Research Institute Blasting Engineering Co Ltd, Huawei National Engineering Research Center of High Efficient Cyclic and Utilization of Metallic Mineral Resources Co Ltd, Sinosteel Maanshan General Institute of Mining Research Co Ltd filed Critical Ma'an Mountain Mine Research Institute Blasting Engineering Co Ltd
Priority to CN201811444458.0A priority Critical patent/CN109506536B/en
Publication of CN109506536A publication Critical patent/CN109506536A/en
Application granted granted Critical
Publication of CN109506536B publication Critical patent/CN109506536B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D3/00Particular applications of blasting techniques
    • F42D3/04Particular applications of blasting techniques for rock blasting

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a kind of methods of the quick-fried heap width of optimal control surface mine bench blasting to return quick-fried heap width L when obtaining single row of holes explosion using regression analysis0With clear quarrel variable and stay the regression equation of quarrel variable respectively: when being cut clearly: L0=A1+B1·(h1/ W), wherein A1And B1To return numerical value;When staying quarrel: L0=A2+B2·[h1/ (W+S)], wherein A2And B2To return numerical value.It by a large amount of field test data combination blasthole array pitch parameters, predicts quick-fried heap width and carries out field demonstration, and then instruct blasting parameters optimization according to field condition.The method of the present invention can instruct blasting parameters optimization, preferably control quick-fried heap width, reduce quick-fried heap extension and lower throwing amount, improve shovel dress efficiency;While guaranteeing that Highwall mining is safe, slope of stope angle is improved, reduces rock overburden amount, reduces mine blasting cost of winning.The present invention has similar abrupt slope exploitation surface mine promotes reference function well.

Description

A kind of method of the quick-fried heap width of optimal control surface mine bench blasting
Technical field
The invention belongs to air bench blasting technical field more particularly to a kind of optimal control surface mine bench blasting are quick-fried The method of heap width.
Background technique
Opencast technical process is general are as follows: perforation, explosion, shovel dress, transport and row's rock, each process link are mutually held in the mouth It connects, influence each other, mutually restrict, constitute the opencast most basic production cycle.Explosion is opencast one important Whole ore-rock is crushed by bursting work, is loosened, forms the big gun heap of certain shapes by process, pretends industry for subsequent adopt Operating condition is provided.Blasting work quality, the quality of demolition effect, which directly affect, subsequent adopt the production efficiency for pretending industry and adopts Fill operating cost;Wherein quick-fried heap width is an important control content, is become apparent especially for the mine of abrupt slope exploitation, Slope angle can be preferably improved, rock overburden amount is reduced, removing cost is reduced, creates significant economic benefit.
" analyses of opencut electric shovel dress efficiency affecting factors " basis that the 5th phase of " chemical mine technology " nineteen ninety-five delivers The correlation analysis of efficiency power shovel and quick-fried heap width measured data, obtains relation curve between the two, the results showed that power shovel effect Rate increases with quick-fried heap width and is improved, but when quick-fried heap width is more than certain value, efficiency power shovel declines instead, this is because quick-fried heap Width is excessive, and quick-fried heap laxity is not to influence the principal element of efficiency power shovel, and excessively thin quick-fried heap drops efficiency power shovel obviously It is low." prediction technique of the quick-fried heap width of step demolition of strip mines " Wen Zhongti that the 2nd phase of " western mineral exploration engineering " nineteen ninety-five delivers Out according to the maximum initial velocity of Rock Displacement Movement and maximum casting distance, the quick-fried heap forward setting distance of production resettlement is predicted.
Therefore, it optimal control and predicts the quick-fried heap width of surface mine bench blasting, shovels dress efficiency for improving, reduces and remove Amount improves slope of stope angle, is of great significance.
Summary of the invention
The purpose of the present invention is be exactly to solve quick-fried heap length prediction difficulty and nothing in existing surface mine bench blasting Method accomplishes the technical problem with shovel dress coordination optimization, and provides a kind of side of quick-fried heap width of optimal control surface mine bench blasting Method shovels dress efficiency to improve, avoids ore-rock from reversely transporting, increase slope of stope angle, reduces rock and removes cost, while improving and adopting Field step production safety.
Experimental study shows that the principal element for influencing quick-fried heap width L has: the powder charge section in front-seat blasthole on production step Height h1, the width W of toe burden, quick-fried heap stay quarrel thickness S, multiple-row blasting section blocking quality (including blocking section height h2 And compactness) and charge constitution, rock mass characteristic, explosive property, firing order.In lithology, explosive property, charge constitution etc. In the case where certain, to quick-fried heap width L when determining single row of holes explosion0Two key variables that value plays a major role: h1/W、h1/(W + S), wherein h1/ W is clear quarrel variable, h1/ (W+S) is to stay quarrel variable.
Above-mentioned purpose to realize the present invention, a kind of side of the quick-fried heap width of optimal control surface mine bench blasting of the present invention Method is realized by following steps:
1) according to the blasting parameter of design: aperture, pitch-row, hole depth, charge constitution, on surface mine production step Arrange front-seat blasthole, front-seat the number of the boring hole is controlled according to field condition in 3~5 ranges;Front-seat blasthole and bench slope bottom Width be toe burden width W;When staying quarrel, the quick-fried heap width in scope of freedom direction is to stay quarrel thickness S in front of production step;
2) according to the explosive payload of design, explosive is packed into blast hole projectile filling section, the height of blast hole projectile filling section in front-seat blasthole Degree is h1;It is blocked in multiple-row blasting section, the height h of strict control multiple-row blasting section2And the compactness of blocking;Then connect Blasting circuit is connect, is detonated after errorless on inspection;
3) the quick-fried heap width after explosion, using rangefinder, steel tape or other dimensional measuring instruments, after measuring explosion;
4) according to above-mentioned steps, for different lithology, quarrel two schemes are cut and are stayed clearly, carry out 15~35 live explosion examinations It tests, improves the reliability of experimental data;
In the step, the quick-fried heap width L measured using 22~30 field tests0Data carry out regression analysis and are preferred.It is secondary Number is very few, has an impact to accuracy, reliability;Number is excessive, and the field test time is long, at high cost.
5) the quick-fried heap width data by step 3), 4) measured, using regression analysis, when recurrence obtains single row of holes explosion Quick-fried heap width L0Respectively with clear quarrel variable h1/ W and stay quarrel variable h1The regression equation of/(W+S):
When clear quarrel: L0=A1+B1·(h1/ W), wherein A1And B1To return numerical value;
When staying quarrel: L0=A2+B2·[h1/ (W+S)], wherein A2And B2To return numerical value;
L0Quick-fried heap width when single shot hole blasting, the unit of each parameter is rice in formula;
6) width of quick-fried heap (5) is determined according to each blasting hole number of rows N and blasthole array pitch b using multiple rows of shot hole blasting again Spend LiCalculation formula:
When clear quarrel: Li=A1+B1·(h1/W)+(N-1)×b;
When staying quarrel: Li=A2+B2·[h1/(W+S)]+(N-1)×b;
In formula: LiQuick-fried heap width when multiple rows of shot hole blasting, N- blasthole number of rows, the unit of other each parameters are rice;
7) the live explosion bulge test for carrying out different blasthole number of rows N, measures actual quick-fried heap width L, with formula calculated result It compares, verifies the accuracy of calculation formula;
8) calculation formula according to the quick-fried heap width L of the quick-fried heap obtained, changes further according to field condition, predicts other steps The quick-fried heap width of explosion instructs the adjustment of blasting parameter, direction of detonating, guarantees shotfiring safety, avoid being flushed to following platform under quick-fried heap Rank improves shovel dress efficiency.
Test result shows that the present invention carries out regression analysis by a large amount of live Burst Test Data, and through testing Card has very high reliability and confidence level.
A kind of method of the quick-fried heap width of optimal control surface mine bench blasting of the present invention after the above technical solution is adopted, takes What is obtained has the beneficial effect that
(1) blasting parameters optimization can be instructed, quick-fried heap width is preferably controlled, quick-fried heap extension and lower throwing amount is reduced, improves Shovel dress efficiency
(2) while guaranteeing that Highwall mining is safe, slope of stope angle is improved, reduces rock overburden amount, reduces mine blasting Cost of winning.
Detailed description of the invention
Fig. 1 is a kind of bench blasting planar cloth of the method for the quick-fried heap width of optimal control surface mine bench blasting of the present invention Set schematic diagram;
Fig. 2 is a kind of bench blasting section of the method for the quick-fried heap width of optimal control surface mine bench blasting of the present invention Arrangement schematic diagram;
The quick-fried heap width L of single row of holes explosion when Fig. 3 is clear quarrel0With h1The relational graph of/W;
Fig. 4 is the quick-fried heap width L of single row of holes explosion when staying quarrel0With h1The relational graph of/(W+S).
Appended drawing reference are as follows: 1- produces step;2- blasthole;3- blast hole projectile filling section, height h1;4- multiple-row blasting section, height h2; The quick-fried heap of 5-, width L;6- bench slope.
Specific embodiment
To better describe the present invention, with reference to the accompanying drawings and examples to a kind of optimal control surface mine platform of the present invention The method of the quick-fried heap width of rank explosion is described in further detail.
A kind of bench blasting of the method for the quick-fried heap width of optimal control surface mine bench blasting of the present invention as shown in Figure 1 Plan view simultaneously combines Fig. 2 to find out, a kind of method of the quick-fried heap width of optimal control surface mine bench blasting of the present invention, It is realized by following technique, step:
1) according to the blasting parameter of design: aperture, pitch-row, hole depth, charge constitution produce step 1 in surface mine The front-seat blasthole 2 of upper arrangement, front-seat 2 quantity of blasthole are controlled according to field condition in 3~5 ranges;Front-seat blasthole 2 and bench slope The width of 7 bottoms is toe burden width W;When staying quarrel, the quick-fried heap width in production 1 front scope of freedom direction of step is to stay quarrel Thickness S;
2) according to the explosive payload of design, explosive is packed into blast hole projectile filling section 3 in front-seat blasthole 2, blast hole projectile filling section 3 Height is h1;It is blocked in multiple-row blasting section 4, the height h of strict control multiple-row blasting section 42And the compactness of blocking;So After connect blasting circuit, detonate after errorless on inspection;
3) the quick-fried heap width after explosion, using rangefinder, steel tape or other dimensional measuring instruments, after measuring explosion;
4) according to above-mentioned steps, for different lithology, quarrel two schemes are cut and are stayed clearly, carry out 15~35 live explosion examinations It tests, improves the reliability of experimental data;It is preferred in the step 2) using 22~30 field tests.
5) the quick-fried heap width data by step 3), 4) measured, using regression analysis, when recurrence obtains single row of holes explosion Quick-fried heap width L0Respectively with clear quarrel variable h1/ W and stay quarrel variable h1The regression equation of/(W+S):
When clear quarrel: L0=A1+B1·(h1/ W), wherein A1And B1To return numerical value;
When staying quarrel: L0=A2+B2·[h1/ (W+S)], wherein A2And B2To return numerical value;
L0Quick-fried heap width when single shot hole blasting, the unit of each parameter is rice in formula;
6) width of quick-fried heap 5 is determined according to each blasting hole number of rows N and blasthole array pitch b using multiple rows of shot hole blasting again LiCalculation formula:
When clear quarrel: Li=A1+B1·(h1/W)+(N-1)×b;
When staying quarrel: Li=A2+B2·[h1/(W+S)]+(N-1)×b;
In formula: LiQuick-fried heap width when multiple rows of shot hole blasting, N- blasthole number of rows, the unit of other each parameters are rice;
7) the live explosion bulge test for carrying out different blasthole number of rows N, measures actual quick-fried heap width L, with formula calculated result It compares, verifies the accuracy of calculation formula;
8) calculation formula according to the quick-fried heap width L of the quick-fried heap 5 obtained, changes further according to field condition, predicts other The quick-fried heap width of rank explosion instructs the adjustment of blasting parameter, direction of detonating, guarantees shotfiring safety, avoid being flushed under quick-fried heap following Step improves shovel dress efficiency.
Here quick-fried heap width L both includes L0, also include Li
Case study on implementation: certain produces 5000000 tons of large-scale outdoors iron ore, blasthole diameter 250mm, using powdery emulsifying explosive per year; Pitch-row 6.5m~7m when normal blasting, array pitch b=5.6m~6m;Buffer blasting pitch-row 6m~6.5m, array pitch b=5.2m~ 5.6m;Width W=8m~8.5m of toe burden, ultra-deep 2m.Ignition plan uses oblique initiation, and the blasthole of every separate explosion is arranged The number row of N=2~4.
1) when clear quarrel, h1The Ratio control of/W, by a large amount of field tests, has obtained single row of holes explosion 0.45~0.71 When quick-fried heap width L0With h1The relation equation of/W, L0=-5.2268+39.199 (h1/ W), when clear quarrel as shown in Figure 3, is single The quick-fried heap width L of Hole placing blast0With h1The relational graph of/W.
When more Hole placing blasts, quick-fried heap width Li=-5.2268+39.199 (h1/W)+(N-1)×5.8。
Through multiple on-site verification, quick-fried 95% or more the heap width calculation formula accuracy rate, amplitude of variation deviation+50cm with It is interior.
2) when staying quarrel, h1The Ratio control of/W, by a large amount of field tests, it is quick-fried to have obtained single blasthole 0.45~0.77 Quick-fried heap width L when broken0With h1The relation equation of/(W+S), L0=-14.469+41.958 [h/ (W+S)], as shown in Figure 4 The quick-fried heap width L of single row of holes explosion when staying quarrel0With h1The relational graph of/(W+S).
When more Hole placing blasts, quick-fried heap width Li=-14.469+41.958 [h1/(W+S)]+(N-1)×5.5
Through multiple on-site verification, quick-fried 96% or more the heap width calculation formula accuracy rate, amplitude of variation deviation+45cm with It is interior.
By controlling the quick-fried heap width of bench blasting, berm width is controlled within 8m, and slope of stope angle improves 4.3 °, in fact Show steep wall mining, it is annual to reduce 2,300,000 tons of rock amount of removing or more, achieve significant economic benefit.

Claims (2)

1. a kind of method of the quick-fried heap width of optimal control surface mine bench blasting, it is characterised in that realized by following steps:
1) according to the blasting parameter of design: aperture, pitch-row, hole depth, charge constitution, in surface mine production step (1) Arrange front-seat blasthole (2), blasthole (2) quantity is controlled according to field condition in 3~5 ranges;Front-seat blasthole (2) and bench slope (7) width of bottom is toe burden width W;When staying quarrel, the quick-fried heap width in scope of freedom direction is in front of production step (1) Stay quarrel thickness S;
2) according to the explosive payload of design, explosive is packed into blast hole projectile filling section (3), blast hole projectile filling section (3) in front-seat blasthole (2) Height be h1;It is blocked in multiple-row blasting section (4), the height h of strict control multiple-row blasting section (4)2And blocking is closely knit Degree;Then blasting circuit is connected, is detonated after errorless on inspection;
3) the quick-fried heap width after explosion, using rangefinder, steel tape or other dimensional measuring instruments, after measuring explosion;
4) according to above-mentioned steps, for different lithology, quarrel two schemes are cut and are stayed clearly, carry out 15~35 live explosion bulge tests, Improve the reliability of experimental data;
5) the quick-fried heap width data by step 3), 4) measured is returned quick-fried when obtaining single row of holes explosion using regression analysis Heap width L0Respectively with clear quarrel variable h1/ W and stay quarrel variable h1The regression equation of/(W+S):
When clear quarrel: L0=A1+B1·(h1/ W), wherein A1And B1To return numerical value;
When staying quarrel: L0=A2+B2·[h1/ (W+S)], wherein A2And B2To return numerical value;
L0Quick-fried heap width when single shot hole blasting, the unit of each parameter is rice in formula;
6) the width L of quick-fried heap (5) is determined according to each blasting hole number of rows N and blasthole array pitch b using multiple rows of shot hole blasting againi Calculation formula:
When clear quarrel: Li=A1+B1·(h1/W)+(N-1)×b;
When staying quarrel: Li=A2+B2·[h1/(W+S)]+(N-1)×b;
In formula: LiQuick-fried heap width when multiple rows of shot hole blasting, N- blasthole number of rows, the unit of other each parameters are rice;
7) the live explosion bulge test for carrying out different blasthole number of rows N, measures actual quick-fried heap width L, carries out with formula calculated result Comparison, verifies the accuracy of calculation formula;
8) calculation formula according to the quick-fried heap width L of the quick-fried heap (5) obtained, changes further according to field condition, predicts other steps The quick-fried heap width of explosion instructs the adjustment of blasting parameter, direction of detonating, guarantees shotfiring safety, avoid being flushed to following platform under quick-fried heap Rank improves shovel dress efficiency.
2. the method for the quick-fried heap width of optimal control surface mine bench blasting as described in claim 1, it is characterised in that: in step In rapid single blasthole scene explosion bulge test 2), the quick-fried heap width L that is measured using 22~30 field tests0Data are returned Analysis.
CN201811444458.0A 2018-11-29 2018-11-29 Method for optimally controlling bench blasting width of surface mine Active CN109506536B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811444458.0A CN109506536B (en) 2018-11-29 2018-11-29 Method for optimally controlling bench blasting width of surface mine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811444458.0A CN109506536B (en) 2018-11-29 2018-11-29 Method for optimally controlling bench blasting width of surface mine

Publications (2)

Publication Number Publication Date
CN109506536A true CN109506536A (en) 2019-03-22
CN109506536B CN109506536B (en) 2020-10-09

Family

ID=65751319

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811444458.0A Active CN109506536B (en) 2018-11-29 2018-11-29 Method for optimally controlling bench blasting width of surface mine

Country Status (1)

Country Link
CN (1) CN109506536B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110806155A (en) * 2019-10-18 2020-02-18 甘肃酒钢集团宏兴钢铁股份有限公司 Method for optimizing explosive distribution
CN110823028A (en) * 2019-11-21 2020-02-21 张�杰 Method for optimally controlling bench blasting width of surface mine
CN111426246A (en) * 2020-03-30 2020-07-17 南阳市神威爆破工程有限公司 Ore slope blasting optimization method
CN114741906A (en) * 2022-06-15 2022-07-12 矿冶科技集团有限公司 Method for calculating annular blast hole blasting parameters
CN115479512A (en) * 2022-09-20 2022-12-16 中煤科工集团沈阳研究院有限公司 Intelligent drilling and blasting pile block rate optimization method for strip mine

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5194689A (en) * 1991-11-25 1993-03-16 Atlantic Richfield Company Earth excavation using blast casting and excavating apparatus
CN102927866A (en) * 2012-11-16 2013-02-13 鞍钢集团矿业公司 Open-bench blasting method capable of controlling forward stroke of blasting muck pile
CN102937397A (en) * 2012-11-27 2013-02-20 武汉大学 Step blasting dynamic design method based on close-range photogrammetry technology
CN104835074A (en) * 2015-02-11 2015-08-12 中南大学 Ore blending method of strip mine production
CN106525610A (en) * 2016-08-25 2017-03-22 中国黄金集团内蒙古矿业有限公司 Implementation method for distribution rule of blast muckpiles in surface mine
CN108073774A (en) * 2017-12-29 2018-05-25 辽宁科技大学 A kind of reliable method for verifying quick-fried heap LUMPINESS DISTRIBUTION

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5194689A (en) * 1991-11-25 1993-03-16 Atlantic Richfield Company Earth excavation using blast casting and excavating apparatus
CN102927866A (en) * 2012-11-16 2013-02-13 鞍钢集团矿业公司 Open-bench blasting method capable of controlling forward stroke of blasting muck pile
CN102937397A (en) * 2012-11-27 2013-02-20 武汉大学 Step blasting dynamic design method based on close-range photogrammetry technology
CN104835074A (en) * 2015-02-11 2015-08-12 中南大学 Ore blending method of strip mine production
CN106525610A (en) * 2016-08-25 2017-03-22 中国黄金集团内蒙古矿业有限公司 Implementation method for distribution rule of blast muckpiles in surface mine
CN108073774A (en) * 2017-12-29 2018-05-25 辽宁科技大学 A kind of reliable method for verifying quick-fried heap LUMPINESS DISTRIBUTION

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110806155A (en) * 2019-10-18 2020-02-18 甘肃酒钢集团宏兴钢铁股份有限公司 Method for optimizing explosive distribution
CN110823028A (en) * 2019-11-21 2020-02-21 张�杰 Method for optimally controlling bench blasting width of surface mine
CN110823028B (en) * 2019-11-21 2022-03-25 张�杰 Method for optimally controlling bench blasting width of surface mine
CN111426246A (en) * 2020-03-30 2020-07-17 南阳市神威爆破工程有限公司 Ore slope blasting optimization method
CN114741906A (en) * 2022-06-15 2022-07-12 矿冶科技集团有限公司 Method for calculating annular blast hole blasting parameters
CN115479512A (en) * 2022-09-20 2022-12-16 中煤科工集团沈阳研究院有限公司 Intelligent drilling and blasting pile block rate optimization method for strip mine
CN115479512B (en) * 2022-09-20 2023-08-22 中煤科工集团沈阳研究院有限公司 Intelligent drilling and blasting pile large block rate optimization method for strip mine

Also Published As

Publication number Publication date
CN109506536B (en) 2020-10-09

Similar Documents

Publication Publication Date Title
CN109506536A (en) A kind of method of the quick-fried heap width of optimal control surface mine bench blasting
CN110067557B (en) Pressure relief method for fully mechanized caving mining bottom coal of steeply inclined coal seam
CN102927866B (en) Open-bench blasting method capable of controlling forward stroke of blasting muck pile
CN107003104B (en) Delaying blasting method and explosion and delay tool between most short column inner hole
CN102607353B (en) A kind of perron Delay between holes controlled blasting method
CN101762218A (en) Hole-by-hole blasting method
Hagan, TO*, Milev, AM*, Spottiswoode, SM*, Hildyard, MW*, Grodner, M.*, Rorke, AJ**, Finnie, GJ***, Reddy, N.*, Haile, AT*, Le Bron, KB*, & Grave Simulated rockburst experiment-an overview
CN109163630A (en) A kind of loading method of Caving Method with Large Space mining deep hole water pressure blasting explosion
CN110132080A (en) A kind of open-pit high bench In-hole short delay blasting method
CN210268381U (en) Blasting structure of soft and hard superposed rock mass for bedding development of opencast coal mine
CN107524444B (en) A kind of control blasting method for improving resuing stoping and falling mine efficiency
CN104296609A (en) Different-hardness-degree rock stratum blasting control method used in deep-hole bench blasting
CN110879028A (en) Surface mine blasting technical method for preventing frozen layer from being massive
CN110044223A (en) A kind of monitoring device and monitoring method of outdoor radioactivity mine blasting displacement
CN211318054U (en) Experimental system for researching action mechanism of explosive stress wave of surrounding rock
CN110553559B (en) Method for controlling explosive property by utilizing liquid carbon dioxide phase change
CN109506537A (en) The determination method of the quick-fried heap width of surface mine bench blasting
CN109188507B (en) Based on CO2Mine earthquake advanced detection method of cannon
Battison et al. Reducing crest loss at Barrick Cowal gold mine
Esen et al. Muck pile shaping for draglines and dozers at surface coalmines
Landman How electronics can release the imagination
Roy et al. Influence of initiation mode of explosives in opencast blasting on ground vibration
Sastry et al. Application of high-speed videography in assessing the performance of blasts
Ylitalo Effect of detonator position on fragmentation at Kevitsa open pit mine
Kabetenov et al. Rational parameters of blasting, considering action time of explosion-generated pulse

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 243000 Xitang Road, Ma'anshan Economic Development Zone, Anhui, No. 666

Applicant after: MAANSHAN Mine Research Institute Co.,Ltd.

Applicant after: MAANSHAN INSTITUTE OF MINING RESEARCH BLASTING ENGINEERING Co.,Ltd.

Applicant after: HUAWEI METAL MINERAL RESOURCE EFFICIENT RECYCLING UTILIZATION NATIONAL ENGINEERING RESEARCH CENTER Co.,Ltd.

Address before: 243000 Xitang Road, Ma'anshan Economic Development Zone, Anhui, No. 666

Applicant before: SINOSTEEL MAANSHAN INSTITUTE OF MINING RESEARCH Co.,Ltd.

Applicant before: MAANSHAN INSTITUTE OF MINING RESEARCH BLASTING ENGINEERING Co.,Ltd.

Applicant before: HUAWEI METAL MINERAL RESOURCE EFFICIENT RECYCLING UTILIZATION NATIONAL ENGINEERING RESEARCH CENTER Co.,Ltd.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant