CN109506537A - The determination method of the quick-fried heap width of surface mine bench blasting - Google Patents

The determination method of the quick-fried heap width of surface mine bench blasting Download PDF

Info

Publication number
CN109506537A
CN109506537A CN201811444523.XA CN201811444523A CN109506537A CN 109506537 A CN109506537 A CN 109506537A CN 201811444523 A CN201811444523 A CN 201811444523A CN 109506537 A CN109506537 A CN 109506537A
Authority
CN
China
Prior art keywords
quick
fried heap
width
blasting
quarrel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811444523.XA
Other languages
Chinese (zh)
Other versions
CN109506537B (en
Inventor
张西良
刘为洲
仪海豹
汪禹
潘祖瑛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ma'an Mountain Mine Research Institute Blasting Engineering Co Ltd
Huawei National Engineering Research Center of High Efficient Cyclic and Utilization of Metallic Mineral Resources Co Ltd
Sinosteel Maanshan General Institute of Mining Research Co Ltd
Original Assignee
Ma'an Mountain Mine Research Institute Blasting Engineering Co Ltd
Huawei National Engineering Research Center of High Efficient Cyclic and Utilization of Metallic Mineral Resources Co Ltd
Sinosteel Maanshan General Institute of Mining Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ma'an Mountain Mine Research Institute Blasting Engineering Co Ltd, Huawei National Engineering Research Center of High Efficient Cyclic and Utilization of Metallic Mineral Resources Co Ltd, Sinosteel Maanshan General Institute of Mining Research Co Ltd filed Critical Ma'an Mountain Mine Research Institute Blasting Engineering Co Ltd
Priority to CN201811444523.XA priority Critical patent/CN109506537B/en
Publication of CN109506537A publication Critical patent/CN109506537A/en
Application granted granted Critical
Publication of CN109506537B publication Critical patent/CN109506537B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D3/00Particular applications of blasting techniques
    • F42D3/04Particular applications of blasting techniques for rock blasting

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

The invention discloses a kind of determination methods of the quick-fried heap width of surface mine bench blasting, determine the principal element for influencing the quick-fried heap width L of quick-fried heap (5), it may be assumed that the height h of powder charge section (3)1, the width W of toe burden, quick-fried heap (5) the height h for staying quarrel thickness S, multiple-row blasting section (4)2And compactness.Control two key variables: clear quarrel variable h1/ W and stay quarrel variable h1/ (W+S), it returns to obtain calculation formula by a large amount of field test datas, in conjunction with blasthole array pitch parameter, predicts quick-fried heap width and carry out field demonstration, and then blasting parameters optimization is instructed according to field condition, it avoids reversely transporting, shovel dress efficiency is improved, under the premise of guaranteeing side slope safety, reduce overburden amount, slope of stope angle is improved, blasting excavation cost is reduced, has to similar abrupt slope exploitation surface mine and promotes reference function well.The method of the present invention can be in the non-quick-fried middle extensive use of coal solid surface mine bench blasting such as black, coloured, gold, building materials.

Description

The determination method of the quick-fried heap width of surface mine bench blasting
Technical field
The invention belongs to air bench blasting technical field more particularly to a kind of quick-fried heap width of surface mine steep wall mining Determination method, can be in the non-quick-fried middle extensive use of coal solid surface mine bench blasting such as black, coloured, gold, building materials.
Background technique
Opencast technical process is general are as follows: perforation, explosion, shovel dress, transport and row's rock, each process link are mutually held in the mouth It connects, influence each other, mutually restrict, constitute the opencast most basic production cycle.Explosion is opencast one important Whole ore-rock is crushed by bursting work, is loosened, forms the big gun heap of certain shapes by process, pretends industry for subsequent adopt Operating condition is provided.Blasting work quality, the quality of demolition effect, which directly affect, subsequent adopt the production efficiency for pretending industry and adopts Fill operating cost;Wherein quick-fried heap width is an important control content, is become apparent especially for the mine of abrupt slope exploitation, Slope angle can be preferably improved, rock overburden amount is reduced, removing cost is reduced, creates significant economic benefit.
Surface mine mainly has railway and the big means of transportation of automobile two.For the former, quick-fried heap width is excessive, is easy to draw Detonation heap buried weight rail accident greatly increases track shifting and sets and cleaning workload;For the latter, if the depth of abrupt slope exploitation Recessed opencut, step platform narrower width, quick-fried heap width is excessive, and the ore-rock under explosion is easily flushed on following step, lower throwing Amount is more, reduces shovel dress efficiency, increases reversed freight volume, while threatening the safety of following step.
It is displaced throwing principle according to sillar, quick-fried heap width is bigger, and cleaning workload is just big, and shovel dress efficiency is lower.Usually For, shovel dress efficiency is improved with the increase of quick-fried heap width, but when quick-fried heap width is more than a certain range, under shovel fills efficiency instead Drop.This is because quick-fried heap width is bigger, three angular amount proportions in quick-fried heap are bigger, increase shovel and install standby movement time Number increases the receipts quarrel time, reduces the effective time of shovel dress, reduces shovel dress bucket fill degree, to reduce shovel dress effect Rate.Therefore, while meeting blasting crush rate, it is necessary to control reasonable quick-fried heap width.
Currently, the common quick-fried heap parametric technique of regulation and control has: retaining gear dike in the preshoot portion of quick-fried heap;Upper separate explosion Talus as barricade carry out tight-face blasting;Change drilling and blasting parameter, pack distribution and shot elevation, short-delay time interval and side Formula, the pack order of connection and blasting method.The opencut narrow to workbench, first two method require have certain explosion mine Rock amount deposit and its bank up place." the opencut difference based on SIMIO that " coal engineering " the 2nd phase of volume 48 in 2016 delivers It proposes to establish model using SIMIO software in a digging bandwidth simulative optimization research " text, be predicted by the method for numerical simulation The width of dass." the prediction side of the quick-fried heap width of step demolition of strip mines that the 2nd phase of " western mineral exploration engineering " nineteen ninety-five delivers It is proposed to be predicted according to the maximum initial velocity of Rock Displacement Movement and maximum casting distance in a method " text the quick-fried heap preshoot of production resettlement away from From.
However, having quick-fried heap width control method does not propose effective quick-fried heap length prediction formula, there is certain answer Use limitation.For this purpose, passing through calculation formula the invention proposes a kind of determination method of the quick-fried heap width of surface mine bench blasting It predicts quick-fried heap width, and then instructs blasting parameters optimization according to field condition, improve shovel dress efficiency, reduce overburden amount, raising is adopted Field slope angle.
Summary of the invention
The purpose of the present invention is be exactly the skill in order to solve quick-fried heap length prediction difficulty in existing surface mine bench blasting Art problem, and a kind of determination method of quick-fried heap width of surface mine bench blasting is provided.This method is pre- by providing quick-fried heap width Formula is surveyed, not only quick-fried heap width can be predicted according to live blasting parameter, optimizing and revising for blasting parameter can also be instructed, effectively Quick-fried heap width is controlled, dress efficiency is shoveled to improve, avoids ore-rock from reversely transporting, increase slope of stope angle, reduce rock and remove cost, Stope step production safety is improved simultaneously.
Above-mentioned purpose to realize the present invention, the determination method of the quick-fried heap width of surface mine bench blasting of the present invention, passes through Following steps are realized:
1) determine that the principal element for influencing the width L of quick-fried heap has first: the powder charge section in front-seat blasthole on production step Height h1, the width W of toe burden, quick-fried heap stay quarrel thickness S, multiple-row blasting section blocking quality (including blocking section height h2 And compactness) and charge constitution, rock mass characteristic, explosive property, firing order.In lithology, explosive property, charge constitution etc. In the case where certain, to quick-fried heap width L when determining single row of holes explosion0Two key variables that value plays a major role: h1/W、h1/(W + S), wherein h1/ W is clear quarrel variable, h1/ (W+S) is to stay quarrel variable.
2) single shot hole blasting is first carried out, respectively for being cut and staying quarrel two schemes clearly, using 10~35 field tests The quick-fried heap width L measured0Data carry out regression analysis, obtain L respectively0With h1/ W and h1The relation equation of/(W+S):
When clear quarrel: L0=A1+B1·(h1/ W), wherein A1And B1To return numerical value;
When staying quarrel: L0=A2+B2·[h1/ (W+S)], wherein A2And B2To return numerical value;
L0Quick-fried heap width when single shot hole blasting, the unit of each parameter is rice in formula;
In the step, the quick-fried heap width L measured using 20~25 field tests0Data carry out regression analysis and are preferred.It is secondary Number is very few, has an impact to accuracy, reliability;Number is excessive, and the field test time is long, at high cost.
3) width of quick-fried heap (5) is determined according to each blasting hole number of rows N and blasthole array pitch b using multiple rows of shot hole blasting again Spend LiCalculation formula:
When clear quarrel: Li=A1+B1·(h1/W)+(N-1)×b;
When staying quarrel: Li=A2+B2·[h1/(W+S)]+(N-1)×b;
In formula: LiQuick-fried heap width when multiple rows of shot hole blasting, N- blasthole number of rows, the unit of other each parameters are rice.
In the step, according to detonation scale domination the number of the boring hole, blasthole number of rows N general control is in 2~4 rows.
4) calculation formula according to the quick-fried heap width L of the quick-fried heap obtained, changes further according to field condition, predicts other steps The quick-fried heap width of explosion instructs the adjustment of blasting parameter, direction of detonating, guarantees shotfiring safety, avoid being flushed to following platform under quick-fried heap Rank improves shovel dress efficiency.
Test result shows that the present invention carries out regression analysis by a large amount of live Burst Test Data, and through testing Card has very high reliability and confidence level.
The determination method of the quick-fried heap width of surface mine bench blasting of the present invention after the above technical solution is adopted, acquirement it is beneficial Effect are as follows:
(1) blasting parameters optimization can be instructed, quick-fried heap width is preferably controlled, quick-fried heap extension and lower throwing amount is reduced, improves Shovel dress efficiency
(2) while guaranteeing that Highwall mining is safe, slope of stope angle is improved, reduces rock overburden amount, reduces mine blasting Cost of winning.
Detailed description of the invention
Fig. 1 is the bench blasting horizontal layout signal of the determination method of the quick-fried heap width of surface mine bench blasting of the present invention Figure;
Fig. 2 is the bench blasting section arrangement signal of the determination method of the quick-fried heap width of surface mine bench blasting of the present invention Figure;
The quick-fried heap width L of single row of holes explosion when Fig. 3 is clear quarrel0With h1The relational graph of/W;
Fig. 4 is the quick-fried heap width L of single row of holes explosion when staying quarrel0With h1The relational graph of/(W+S).
Appended drawing reference are as follows: 1- produces step;2- blasthole;3- blast hole projectile filling section, height h1;4- multiple-row blasting section, height h2; The quick-fried heap of 5-, width L;6- bench slope.
Specific embodiment
It is wide to the quick-fried heap of surface mine bench blasting of the present invention with reference to the accompanying drawings and examples to better describe the present invention The determination method of degree is described in further detail.
The bench blasting horizontal layout of the determination method of the quick-fried heap width of surface mine bench blasting of the present invention as shown in Figure 1 Schematic diagram simultaneously finds out that the determination method of the quick-fried heap width of surface mine bench blasting of the present invention passes through following technique, step in conjunction with Fig. 2 It is rapid to realize:
1) according to the blasting parameters such as 2 aperture of the blasthole of design, pitch-row, hole depth, front-seat blasthole 2 and 7 bottom of bench slope The width in portion is toe burden W.Determine that the principal element for influencing the width L of quick-fried heap 5 has first: the front row on production step 1 The height h of powder charge section 3 in blasthole 21, the width W of toe burden, quick-fried heap 5 the height for staying quarrel thickness S, multiple-row blasting section 4 h2And compactness and charge constitution, rock mass characteristic, explosive property, firing order, to quick-fried heap width when determining single row of holes explosion L0Two key variables that value plays a major role: h1/W、h1/ (W+S), wherein h1/ W is clear quarrel variable, h1/ (W+S) is that quarrel is stayed to become Amount.
2) single shot hole blasting is first carried out, respectively for being cut and staying clearly quarrel two schemes, carries out repeatedly live explosion bulge test, Improve the reliability of experimental data.The quick-fried heap width L generally measured using 20~25 field tests0Data, which return, divides Analysis, obtains L respectively0With h1/ W and h1The relation equation of/(W+S):
When clear quarrel: L0=A1+B1·(h1/ W), wherein A1And B1To return numerical value;
When staying quarrel: L0=A2+B2·[h1/ (W+S)], wherein A2And B2To return numerical value;
L0Quick-fried heap width when single shot hole blasting, the unit of each parameter is rice in formula.
3) width of quick-fried heap (5) is determined according to each blasting hole number of rows N and blasthole array pitch b using multiple rows of shot hole blasting again Spend LiCalculation formula:
When clear quarrel: Li=A1+B1·(h1/W)+(N-1)×b;
When staying quarrel: Li=A2+B2·[h1/(W+S)]+(N-1)×b;
In formula: LiQuick-fried heap width when multiple rows of shot hole blasting, N- blasthole number of rows, the unit of other each parameters are rice;
In the step, according to detonation scale domination the number of the boring hole, blasthole number of rows N is controlled in 2~4 rows.
4) calculation formula according to the quick-fried heap width L of the quick-fried heap 5 obtained, changes further according to field condition, predicts other The quick-fried heap width of rank explosion instructs the adjustment of blasting parameter, direction of detonating, guarantees shotfiring safety, avoid being flushed under quick-fried heap following Step improves shovel dress efficiency.
Here quick-fried heap width L both includes L0, also include Li
Case study on implementation: certain produces 5000000 tons of large-scale outdoors iron ore, blasthole diameter 250mm, using powdery emulsifying explosive per year; Pitch-row 6.5m~7m when normal blasting, array pitch b=5.6m~6m;Buffer blasting pitch-row 6m~6.5m, array pitch b=5.2m~ 5.6m;Width W=8m~8.5m of toe burden, ultra-deep 2m.Ignition plan uses oblique initiation, and the blasthole of every separate explosion is arranged The number row of N=2~4.
1) when clear quarrel, h1The Ratio control of/W, by a large amount of field tests, has obtained single row of holes explosion 0.45~0.71 When quick-fried heap width L0With h1The relation equation of/W, L0=-5.2268+39.199 (h1/ W), when clear quarrel as shown in Figure 3, is single The quick-fried heap width L of Hole placing blast0With h1The relational graph of/W.
When more Hole placing blasts, quick-fried heap width Li=-5.2268+39.199 (h1/W)+(N-1)×5.8。
Through multiple on-site verification, quick-fried 95% or more the heap width calculation formula accuracy rate, amplitude of variation deviation+50cm with It is interior.
2) when staying quarrel, h1The Ratio control of/W, by a large amount of field tests, it is quick-fried to have obtained single blasthole 0.45~0.77 Quick-fried heap width L when broken0With h1The relation equation of/(W+S), L0=-14.469+41.958 [h/ (W+S)], as shown in Figure 4 The quick-fried heap width L of single row of holes explosion when staying quarrel0With h1The relational graph of/(W+S).
When more Hole placing blasts, quick-fried heap width Li=-14.469+41.958 [h1/(W+S)]+(N-1)×5.5
Through multiple on-site verification, quick-fried 96% or more the heap width calculation formula accuracy rate, amplitude of variation deviation+45cm with It is interior.
By controlling the quick-fried heap width of bench blasting, berm width is controlled within 8m, and slope of stope angle improves 4.3 °, in fact Show steep wall mining, it is annual to reduce 2,300,000 tons of rock amount of removing or more, achieve significant economic benefit.

Claims (3)

1. a kind of determination method of the quick-fried heap width of surface mine bench blasting, it is characterised in that realized by following steps:
1) determine that the principal element for influencing the quick-fried heap width L of quick-fried heap (5) has first: in the front-seat blasthole (2) in production step (1) Powder charge section (3) height h1, the width W of toe burden, quick-fried heap (5) the height h for staying quarrel thickness S, multiple-row blasting section (4)2 And compactness and charge constitution, rock mass characteristic, explosive property, firing order, to quick-fried heap width L when determining single row of holes explosion0 Two key variables that value plays a major role: h1/W、h1/ (W+S), wherein h1/ W is clear quarrel variable, h1/ (W+S) is that quarrel is stayed to become Amount;
2) single shot hole blasting is first carried out, respectively for being cut and staying quarrel two schemes clearly, is measured using 10~35 field tests Quick-fried heap width L0Data carry out regression analysis, obtain L respectively0With h1/ W and h1The relation equation of/(W+S):
When clear quarrel: L0=A1+B1·(h1/ W), wherein A1And B1To return numerical value;
When staying quarrel: L0=A2+B2·[h1/ (W+S)], wherein A2And B2To return numerical value;
L0Quick-fried heap width when single shot hole blasting, the unit of each parameter is rice in formula;
3) the width L of quick-fried heap (5) is determined according to each blasting hole number of rows N and blasthole array pitch b using multiple rows of shot hole blasting againi Calculation formula:
When clear quarrel: Li=A1+B1·(h1/W)+(N-1)×b;
When staying quarrel: Li=A2+B2·[h1/(W+S)]+(N-1)×b;
In formula: LiQuick-fried heap width when multiple rows of shot hole blasting, N- blasthole number of rows, the unit of other each parameters are rice;
4) calculation formula according to the quick-fried heap width L of the quick-fried heap (5) obtained, changes further according to field condition, predicts other steps The quick-fried heap width of explosion instructs the adjustment of blasting parameter, direction of detonating, guarantees shotfiring safety, avoid being flushed to following platform under quick-fried heap Rank improves shovel dress efficiency.
2. the determination method of the quick-fried heap width of surface mine bench blasting as described in claim 1, it is characterised in that: in step 2) The explosion bulge test of single blasthole scene in, the quick-fried heap width L that is measured using 20~25 field tests0Data, which return, divides Analysis.
3. the determination method of the quick-fried heap width of surface mine bench blasting as claimed in claim 1 or 2, it is characterised in that: in step As many as 3) in rapid artillery salvo hole field test, according to detonation scale domination the number of the boring hole, blasthole number of rows N is controlled in 2~4 rows.
CN201811444523.XA 2018-11-29 2018-11-29 Method for determining bench blasting pile width of surface mine Active CN109506537B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811444523.XA CN109506537B (en) 2018-11-29 2018-11-29 Method for determining bench blasting pile width of surface mine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811444523.XA CN109506537B (en) 2018-11-29 2018-11-29 Method for determining bench blasting pile width of surface mine

Publications (2)

Publication Number Publication Date
CN109506537A true CN109506537A (en) 2019-03-22
CN109506537B CN109506537B (en) 2020-10-09

Family

ID=65751318

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811444523.XA Active CN109506537B (en) 2018-11-29 2018-11-29 Method for determining bench blasting pile width of surface mine

Country Status (1)

Country Link
CN (1) CN109506537B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110823028A (en) * 2019-11-21 2020-02-21 张�杰 Method for optimally controlling bench blasting width of surface mine

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5194689A (en) * 1991-11-25 1993-03-16 Atlantic Richfield Company Earth excavation using blast casting and excavating apparatus
CN102927866A (en) * 2012-11-16 2013-02-13 鞍钢集团矿业公司 Open-bench blasting method capable of controlling forward stroke of blasting muck pile
CN102937397A (en) * 2012-11-27 2013-02-20 武汉大学 Step blasting dynamic design method based on close-range photogrammetry technology
CN104835074A (en) * 2015-02-11 2015-08-12 中南大学 Ore blending method of strip mine production
CN106525610A (en) * 2016-08-25 2017-03-22 中国黄金集团内蒙古矿业有限公司 Implementation method for distribution rule of blast muckpiles in surface mine
CN108073774A (en) * 2017-12-29 2018-05-25 辽宁科技大学 A kind of reliable method for verifying quick-fried heap LUMPINESS DISTRIBUTION

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5194689A (en) * 1991-11-25 1993-03-16 Atlantic Richfield Company Earth excavation using blast casting and excavating apparatus
CN102927866A (en) * 2012-11-16 2013-02-13 鞍钢集团矿业公司 Open-bench blasting method capable of controlling forward stroke of blasting muck pile
CN102937397A (en) * 2012-11-27 2013-02-20 武汉大学 Step blasting dynamic design method based on close-range photogrammetry technology
CN104835074A (en) * 2015-02-11 2015-08-12 中南大学 Ore blending method of strip mine production
CN106525610A (en) * 2016-08-25 2017-03-22 中国黄金集团内蒙古矿业有限公司 Implementation method for distribution rule of blast muckpiles in surface mine
CN108073774A (en) * 2017-12-29 2018-05-25 辽宁科技大学 A kind of reliable method for verifying quick-fried heap LUMPINESS DISTRIBUTION

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110823028A (en) * 2019-11-21 2020-02-21 张�杰 Method for optimally controlling bench blasting width of surface mine
CN110823028B (en) * 2019-11-21 2022-03-25 张�杰 Method for optimally controlling bench blasting width of surface mine

Also Published As

Publication number Publication date
CN109506537B (en) 2020-10-09

Similar Documents

Publication Publication Date Title
CN102269554B (en) Method for treating underground mine goaf by forming covering layer by chamber blasting technology
CN110067557B (en) Pressure relief method for fully mechanized caving mining bottom coal of steeply inclined coal seam
CN109506536A (en) A kind of method of the quick-fried heap width of optimal control surface mine bench blasting
CN102927866B (en) Open-bench blasting method capable of controlling forward stroke of blasting muck pile
CN110388209B (en) Deep hole mining method for steeply inclined double-layer ore body stage
CN101762218A (en) Hole-by-hole blasting method
CN102967191A (en) Blasting method for treatment of gob
CN104929641A (en) Treatment method applied to disaster of steeply dipping seam roof
CN104296609A (en) Different-hardness-degree rock stratum blasting control method used in deep-hole bench blasting
CN210268381U (en) Blasting structure of soft and hard superposed rock mass for bedding development of opencast coal mine
CN110879028A (en) Surface mine blasting technical method for preventing frozen layer from being massive
CN109506537A (en) The determination method of the quick-fried heap width of surface mine bench blasting
CN110553559B (en) Method for controlling explosive property by utilizing liquid carbon dioxide phase change
CN109798813A (en) A kind of lateral caving blasthole structure and lateral caving method
CN109594986A (en) A kind of foam type creates medium-length hole back production explosion collocation structure and its construction method
CN108592716A (en) A kind of method of underground stope fining blasting excavation
CN112378300B (en) Separation blasting method for mixed blasting area of ore and rock
CN108709467A (en) It is lower that the method that vertical long hole refines explosion is replaced to fan-shaped deep hole
CN112361910A (en) Mining method for accurate delay in-situ blasting and crushing of layered rock mass
Himanshu et al. Blasting Technology for Underground Hard Rock Mining
Esen et al. Muck pile shaping for draglines and dozers at surface coalmines
Sarathy Bench blasting: objectives and best practices--a recap.
Ding et al. Analysis of key technologies and development of integrated digital processing system for cast blasting design
Nguyen et al. Prediction of ground vibration due to blasting: case study in some quarries in Vietnam
CN109556470A (en) Coal mine thick and hard roof based on detonation wave collision Mohaupt effect is layered fracturing method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 243000 Xitang Road, Ma'anshan Economic Development Zone, Anhui, No. 666

Applicant after: MAANSHAN Mine Research Institute Co.,Ltd.

Applicant after: MAANSHAN INSTITUTE OF MINING RESEARCH BLASTING ENGINEERING Co.,Ltd.

Applicant after: HUAWEI METAL MINERAL RESOURCE EFFICIENT RECYCLING UTILIZATION NATIONAL ENGINEERING RESEARCH CENTER Co.,Ltd.

Address before: 243000 Xitang Road, Ma'anshan Economic Development Zone, Anhui, No. 666

Applicant before: SINOSTEEL MAANSHAN INSTITUTE OF MINING RESEARCH Co.,Ltd.

Applicant before: MAANSHAN INSTITUTE OF MINING RESEARCH BLASTING ENGINEERING Co.,Ltd.

Applicant before: HUAWEI METAL MINERAL RESOURCE EFFICIENT RECYCLING UTILIZATION NATIONAL ENGINEERING RESEARCH CENTER Co.,Ltd.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant