CN109594986A - A kind of foam type creates medium-length hole back production explosion collocation structure and its construction method - Google Patents
A kind of foam type creates medium-length hole back production explosion collocation structure and its construction method Download PDFInfo
- Publication number
- CN109594986A CN109594986A CN201811197390.0A CN201811197390A CN109594986A CN 109594986 A CN109594986 A CN 109594986A CN 201811197390 A CN201811197390 A CN 201811197390A CN 109594986 A CN109594986 A CN 109594986A
- Authority
- CN
- China
- Prior art keywords
- foams
- medium
- back production
- length hole
- ore body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000006260 foam Substances 0.000 title claims abstract description 64
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 33
- 238000004880 explosion Methods 0.000 title claims abstract description 27
- 238000010276 construction Methods 0.000 title claims abstract description 14
- 238000005553 drilling Methods 0.000 claims abstract description 21
- 238000007599 discharging Methods 0.000 claims abstract description 17
- 238000000034 method Methods 0.000 claims abstract description 14
- 239000002002 slurry Substances 0.000 claims abstract description 14
- 238000005422 blasting Methods 0.000 claims description 23
- 239000011435 rock Substances 0.000 claims description 7
- 230000007717 exclusion Effects 0.000 claims description 5
- 230000006378 damage Effects 0.000 claims description 4
- 231100000241 scar Toxicity 0.000 claims description 3
- 238000005520 cutting process Methods 0.000 abstract description 6
- 239000004576 sand Substances 0.000 abstract description 5
- 239000002360 explosive Substances 0.000 abstract description 3
- 238000005065 mining Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 230000000149 penetrating effect Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 229940079593 drug Drugs 0.000 description 1
- 239000003814 drug Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Layouts therefor
- E21C41/16—Methods of underground mining; Layouts therefor
- E21C41/22—Methods of underground mining; Layouts therefor for ores, e.g. mining placers
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
- E21F15/02—Supporting means, e.g. shuttering, for filling-up materials
- E21F15/04—Stowing mats; Goaf wire netting; Partition walls
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Remote Sensing (AREA)
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
Abstract
The present invention provides a kind of foam types to create medium-length hole back production explosion collocation structure and its construction method, including ore body and obturation, and the ore body is equipped with drilling drift and discharging tunnel;The drilling drift is located above ore body;The discharging tunnel is located at below ore body;Foams are equipped between the ore body and obturation.The present invention is directed to prevent filling slurry and the close knot of pre- stope using the foams of certain volume, there are a certain range of weak body spaces, when it is next be recycled back to and adopt explosion when space can be easily opened for explosion fall between mine is provided with empty profit, change the process for multiple cutting grooves that need to construct when big thick ore body medium-length hole back production built on the sand, save a large amount of explosives, it is at low cost, high-efficient, labor intensity is low, safety is good.
Description
Technical field
The invention belongs to underground mining mine technology fields, and in particular to a kind of foam type creation medium-length hole back production explosion benefit
Compensation structure and its construction method.
Background technique
It is not allow for biggish exposed area since ore-rock is relatively broken for the unsteady big thick ore body of underground mining, it is main
Mine is fallen using shallow bore hole, to control rock mass exposure range, guarantee Stope safty, but stoping cost is high, low efficiency, safety is poor
Etc..With the continuous development of mining technique, lot of domestic and international mine uses medium-length hole back production to improve production capacity at present,
Biggish goaf is left after medium-length hole back production ore removal to need to be handled in time, otherwise can large area collapse and cause not exploiting
Or Other Engineering accident, many mines carry out filling dead zone after back production a certain range, then carry out again deep in subsequent cycle
Hole back production, thus can be in each circulation construction cutting groove, and explosive loss is big, at high cost, long construction period, and cutting groove explosion
When generate biggish impact endurance test shock to closing on ore-rock, seriously affect STOPE STABILITY.
Summary of the invention
In order to solve the above technical problems, the present invention provides a kind of foam type create medium-length hole back production explosion collocation structure and
Its construction method.
The present invention is achieved by the following technical programs.
A kind of foam type creation medium-length hole back production compensating space in blasting structure, including ore body and obturation, the ore body are set
There are drilling drift and discharging tunnel;The drilling drift is located above ore body;The discharging tunnel is located at below ore body;The mine
Foams are equipped between body and obturation.
As further technological improvement, barricade is equipped between discharging tunnel and foams described above.
As further technological improvement, ore body described above is equipped with blasthole close to the position of foams.
As further technological improvement, above-described foam type creates applying for medium-length hole back production compensating space in blasting structure
Work method, steps are as follows:
Step 1, after the ore of upper circulation avalanche goes out sky by discharging tunnel, filling counterfort of constructing near open wiring mouth,
Prevent filling slurry from filling discharging tunnel;
Step 2 customizes foams according to compensation space needed for subsequent cycle explosion;
The foams of customization are sent into dead zone from drilling drift rope etc., and adjust foam body position by step 3, make it
It is in close contact as far as possible with ore body side;
Step 4 is filled, until obturation reaches drilling drift floor level;
Step 5 after body to be filled consolidates and reaches some strength, carries out long and medium hole drilling operation;
Step 6 carries out charge explosion after the completion of rock drilling operation, and foams, by comminuted destruction, collapse in blasting process
Its volume exclusion is realized explosion compensation by the ore fallen, completes back production circulation.
As further technological improvement, foams are placed adjacent to Ileal neobladder side in step 2 described above, as far as possible with rock
Face is closely sealed, prevents filling slurry from excessively penetrating into.
As further technological improvement, foams should have certain intensity in step 2 described above, need to be able to bear
Filling slurry bring side pressure.
As further technological improvement, foams are placed in range of the dead zone close to Ileal neobladder in step 3 described above
It is interior, to guarantee subsequent cycle compensating space in blasting.
As further technological improvement, using a circulation goaf on slush medium-length hole in step 4 described above.
The beneficial effects of the present invention are:
Foam type of the invention creates medium-length hole back production explosion collocation structure and its construction method, in big thick ore body built on the sand
After medium-length hole back production, in placing foam weakness body in subsequent cycle operation space of planes, to fill upper circulation dead zone
When, prevent obturation from enriching dead zone, there are a certain range of weak body spaces.Foams are in blasting process by comminuted broken
Bad, its volume exclusion is realized explosion compensation, completes stoping operation by the ore of avalanche.
The present invention is directed to prevent filling slurry and the close knot of pre- stope using the foams of certain volume, there are certain
The weak body space of range, when it is next be recycled back to and adopt explosion when space easily can be opened for explosion and fall mine being provided with empty profit
Between, the process for multiple cutting grooves that need to construct when big thick ore body medium-length hole back production built on the sand is changed, a large amount of explosives are saved,
It is at low cost, high-efficient, labor intensity is low, safety is good.
Detailed description of the invention
Fig. 1 is the structural schematic diagram that foam type creates medium-length hole back production compensating space in blasting.
Fig. 2 is foams destruction and broken ore schematic diagram after medium-length hole blasting.
In figure:
1- drilling drift, 2- ore body, 3- foams, 4- obturation, 5- barricade, 6- blasthole, 7- discharging tunnel.
Specific embodiment
Be described further below technical solution of the present invention, but claimed range be not limited to it is described.
A kind of foam type as described in Fig. 1-2 creates medium-length hole back production compensating space in blasting structure, including ore body 2 and filling
Body 4, the ore body 2 are equipped with drilling drift 1 and discharging tunnel 7;The drilling drift 1 is located at 2 top of ore body;The discharging tunnel
7 are located at 2 lower section of ore body;Foams 3 are equipped between the ore body 2 and obturation 4.
Barricade 5 is equipped between the discharging tunnel 7 and foams 3.
The ore body 2 is equipped with blasthole 6 close to the position of foams 3.
The foam type creates the construction method of medium-length hole back production compensating space in blasting structure, and steps are as follows:
Step 1, after the ore of upper circulation avalanche goes out sky by discharging tunnel 7, filling counterfort of constructing near open wiring mouth
5, prevent filling slurry from filling discharging tunnel 7;
Step 2 customizes foams 3 according to compensation space needed for subsequent cycle explosion;
The foams 3 of customization are sent into dead zone from rope of drilling drift 1 etc., and adjust 3 position of foams by step 3,
It is in close contact it with 2 side of ore body as far as possible;
Step 4 is filled, until obturation 4 reaches 1 floor level of drilling drift;
Step 5 after body 4 to be filled consolidates and reaches some strength, carries out long and medium hole drilling operation;
Step 6, carries out charge explosion after the completion of rock drilling operation, foams 3 in blasting process by comminuted destruction,
Its volume exclusion is realized explosion compensation by the ore of avalanche, completes back production circulation.
Foams 3 are placed adjacent to Ileal neobladder side in the step 2, closely sealed with scar as far as possible, prevent filling slurry excessive
It penetrates into.
Foams 3 should have certain intensity in the step 2, need to be able to bear filling slurry bring side pressure.
Foams 3 are placed in dead zone in the range of Ileal neobladder in the step 3, to guarantee that subsequent cycle explosion is mended
Repay space.
Using a circulation goaf on slush medium-length hole in the step 4.
The invention discloses a kind of methods that foam type creates medium-length hole back production compensating space in blasting.In thick big mine built on the sand
After 2 medium-length hole back production of body, in placing foam weakness body in subsequent cycle operation space of planes, to fill upper circulation sky
Qu Shi prevents obturation 4 from enriching dead zone, and there are a certain range of weak body spaces.Foams 3 are crushed in blasting process
Property destroy, its volume exclusion is realized explosion compensation by the ore of avalanche, completes stoping operation.
The method of the present invention mainly have the following three steps:
1. foams 3 are placed in dead zone guarantees subsequent cycle compensating space in blasting in Ileal neobladder a certain range;
2. a circulation goaf on slush medium-length hole;
3. after body 4 to be filled consolidates and reaches some strength, construction ranking hole carries out explosion, without cutting groove of constructing.
Technical requirements:
1. placing foams 3 appropriate according to the size of required compensating space in blasting;
2. foams 3 are placed adjacent to Ileal neobladder side, closely sealed with scar as far as possible, prevent filling slurry from excessively penetrating into.
3. foams 3 there should be certain intensity, it is able to bear filling slurry bring side pressure, in order to avoid be squeezed brokenly
It is bad.
The present invention is directed to prevent filling slurry and the close knot of pre- stope using the foams 3 of certain volume, there are one
The weak body space for determining range, when it is next be recycled back to and adopt explosion when space easily can be opened for explosion and fall mine being provided with empty profit
Between, the process for multiple cutting grooves that need to construct when 2 medium-length hole back production of big thick ore body built on the sand is changed, is saved a large amount of fried
Medicine, it is at low cost, high-efficient, labor intensity is low, safety is good.
Claims (8)
1. a kind of foam type creates medium-length hole back production compensating space in blasting structure, including ore body (2) and obturation (4), feature
Be: the ore body (2) is equipped with drilling drift (1) and discharging tunnel (7);The drilling drift (1) is located above ore body (2);
The discharging tunnel (7) is located at below ore body (2);Foams (3) are equipped between the ore body (2) and obturation (4).
2. foam type as described in claim 1 creates medium-length hole back production compensating space in blasting structure, it is characterised in that: it is described go out
Barricade (5) are equipped between mine tunnel (7) and foams (3).
3. foam type as described in claim 1 creates medium-length hole back production compensating space in blasting structure, it is characterised in that: the mine
Body (2) is equipped with blasthole (6) close to the position of foams (3).
4. a kind of foam type as claimed in any one of claims 1-3 creates applying for medium-length hole back production compensating space in blasting structure
Work method, which is characterized in that steps are as follows:
Step 1, after the ore of upper circulation avalanche goes out sky by discharging tunnel (7), filling counterfort of constructing near open wiring mouth
(5), prevent filling slurry from filling discharging tunnel (7);
Step 2 customizes foams (3) according to compensation space needed for subsequent cycle explosion;
The foams (3) of customization are sent into dead zone from drilling drift (1) rope etc., and adjust foams (3) position by step 3
It sets, is in close contact it with ore body (2) side as far as possible;
Step 4 is filled, until obturation (4) reach drilling drift (1) floor level;
Step 5 after body (4) to be filled consolidates and reaches some strength, carries out long and medium hole drilling operation;
Step 6 carries out charge explosion after the completion of rock drilling operation, and foams (3), by comminuted destruction, collapse in blasting process
Its volume exclusion is realized explosion compensation by the ore fallen, completes back production circulation.
5. foam type as claimed in claim 4 creates the construction method of medium-length hole back production compensating space in blasting structure, feature
Be: foams (3) are placed adjacent to Ileal neobladder side in the step 2, closely sealed with scar as far as possible, prevent filling slurry excessive
It penetrates into.
6. foam type as claimed in claim 4 creates the construction method of medium-length hole back production compensating space in blasting structure, feature
Be: foams (3) should have certain intensity in the step 2, need to be able to bear filling slurry bring side pressure.
7. foam type as claimed in claim 4 creates the construction method of medium-length hole back production compensating space in blasting structure, feature
It is: foams (3) is placed in dead zone in the range of Ileal neobladder in the step 3, guarantees that subsequent cycle explosion compensates
Space.
8. foam type as claimed in claim 4 creates the construction method of medium-length hole back production compensating space in blasting structure, feature
It is: using a circulation goaf on slush medium-length hole in the step 4.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811197390.0A CN109594986A (en) | 2018-10-15 | 2018-10-15 | A kind of foam type creates medium-length hole back production explosion collocation structure and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811197390.0A CN109594986A (en) | 2018-10-15 | 2018-10-15 | A kind of foam type creates medium-length hole back production explosion collocation structure and its construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109594986A true CN109594986A (en) | 2019-04-09 |
Family
ID=65957439
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811197390.0A Pending CN109594986A (en) | 2018-10-15 | 2018-10-15 | A kind of foam type creates medium-length hole back production explosion collocation structure and its construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109594986A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111622803A (en) * | 2020-07-29 | 2020-09-04 | 矿冶科技集团有限公司 | Mining method for broken ore body |
CN113605971A (en) * | 2021-09-18 | 2021-11-05 | 中南大学 | Filling structure for preventing filling body from being unstable and mining method applying filling structure |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204007361U (en) * | 2014-07-21 | 2014-12-10 | 马鞍山矿山研究院爆破工程有限责任公司 | A kind of mine blasting vibration damping retaining wall charge constitution |
CN104453904A (en) * | 2014-11-24 | 2015-03-25 | 西北矿冶研究院 | Sublevel filling mining method without drawing groove |
CN105626073A (en) * | 2016-01-28 | 2016-06-01 | 贵州开磷集团股份有限公司 | Mining method capable of preserving cutting groove based on filling mining method |
CN106522955A (en) * | 2016-12-05 | 2017-03-22 | 广西大学 | Studding recovery method for reconstructing covering layer through dead zone wastefill and top surrounding rock spallation collaboratively |
CN107178366A (en) * | 2017-07-28 | 2017-09-19 | 长沙矿山研究院有限责任公司 | A kind of stoping method of post ore body |
-
2018
- 2018-10-15 CN CN201811197390.0A patent/CN109594986A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204007361U (en) * | 2014-07-21 | 2014-12-10 | 马鞍山矿山研究院爆破工程有限责任公司 | A kind of mine blasting vibration damping retaining wall charge constitution |
CN104453904A (en) * | 2014-11-24 | 2015-03-25 | 西北矿冶研究院 | Sublevel filling mining method without drawing groove |
CN105626073A (en) * | 2016-01-28 | 2016-06-01 | 贵州开磷集团股份有限公司 | Mining method capable of preserving cutting groove based on filling mining method |
CN106522955A (en) * | 2016-12-05 | 2017-03-22 | 广西大学 | Studding recovery method for reconstructing covering layer through dead zone wastefill and top surrounding rock spallation collaboratively |
CN107178366A (en) * | 2017-07-28 | 2017-09-19 | 长沙矿山研究院有限责任公司 | A kind of stoping method of post ore body |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111622803A (en) * | 2020-07-29 | 2020-09-04 | 矿冶科技集团有限公司 | Mining method for broken ore body |
CN113605971A (en) * | 2021-09-18 | 2021-11-05 | 中南大学 | Filling structure for preventing filling body from being unstable and mining method applying filling structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107989614B (en) | The mining methods of the inclined thick ore body of disk rock crusher in a kind of back production | |
CN104453904B (en) | Sublevel filling mining method without drawing groove | |
CN104481539B (en) | From kerve tight-face blasting caved stopes | |
CN105041314A (en) | Method for united mining of deep subsequent stoping chamber and layered stoping jamb | |
CN109209472A (en) | The coal seam pressure relief anti-burst method that a kind of punching, explosion, water filling intercouple | |
CN110331978A (en) | A kind of environment reconstruction segmentation medium-length hole afterwards filling mining method | |
CN101285384B (en) | Large diameter, deep borehole and non undercutting mining method | |
CN109141149A (en) | A kind of tunnel excavation hydraulic pressure demolition construction method | |
AU2021101512A4 (en) | Panel area and panel area column collaborative mining method for an inclined thick and large ore body | |
US20230228193A1 (en) | Raise caving method for mining an ore from an ore body, and a mining infrastructure, monitoring system, machinery, control system and data medium therefor | |
CN109577979A (en) | To sublevel fill-mining method under a kind of high-ground stress large size ore body | |
CN107524444B (en) | A kind of control blasting method for improving resuing stoping and falling mine efficiency | |
CN109594986A (en) | A kind of foam type creates medium-length hole back production explosion collocation structure and its construction method | |
CN104389604A (en) | Method for forming covering layer by stope caving method | |
CN112081592B (en) | Safe stoping method for steeply-inclined crushed thin vein | |
CN110219650A (en) | A kind of environment remodeling stage deep hole afterwards filling mining method | |
CN105863727A (en) | Method for treating pillar goaf | |
CN111963175A (en) | Thick ore body mining method | |
CN106285677A (en) | Side back production subregion filling studding recovery method is expanded to route on Chao Qian | |
CN113047836B (en) | Goaf isolated ore pillar safe stoping method | |
CN107131805B (en) | Mining method for improving ore removal grade of underground caving stope | |
CN111594183A (en) | Coal seam deep hole blasting pressure relief method for improving blasting effect by using original pressure relief holes | |
CN107559009B (en) | Collapse the recovery method of area's high-grade ore body in a kind of deep | |
CN113187481A (en) | Filling mining method for overburden rock concentrated grouting caving stoping | |
CN112361910A (en) | Mining method for accurate delay in-situ blasting and crushing of layered rock mass |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190409 |
|