CN109594986A - A kind of foam type creates medium-length hole back production explosion collocation structure and its construction method - Google Patents

A kind of foam type creates medium-length hole back production explosion collocation structure and its construction method Download PDF

Info

Publication number
CN109594986A
CN109594986A CN201811197390.0A CN201811197390A CN109594986A CN 109594986 A CN109594986 A CN 109594986A CN 201811197390 A CN201811197390 A CN 201811197390A CN 109594986 A CN109594986 A CN 109594986A
Authority
CN
China
Prior art keywords
foams
medium
back production
length hole
ore body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811197390.0A
Other languages
Chinese (zh)
Inventor
郑禄璟
褚洪涛
孙文
吉斌
刘镐
吴岩佩
王能跃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUIZHOU JINFENG MINING Ltd
Original Assignee
GUIZHOU JINFENG MINING Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUIZHOU JINFENG MINING Ltd filed Critical GUIZHOU JINFENG MINING Ltd
Priority to CN201811197390.0A priority Critical patent/CN109594986A/en
Publication of CN109594986A publication Critical patent/CN109594986A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/22Methods of underground mining; Layouts therefor for ores, e.g. mining placers
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • E21F15/02Supporting means, e.g. shuttering, for filling-up materials
    • E21F15/04Stowing mats; Goaf wire netting; Partition walls

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Remote Sensing (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

The present invention provides a kind of foam types to create medium-length hole back production explosion collocation structure and its construction method, including ore body and obturation, and the ore body is equipped with drilling drift and discharging tunnel;The drilling drift is located above ore body;The discharging tunnel is located at below ore body;Foams are equipped between the ore body and obturation.The present invention is directed to prevent filling slurry and the close knot of pre- stope using the foams of certain volume, there are a certain range of weak body spaces, when it is next be recycled back to and adopt explosion when space can be easily opened for explosion fall between mine is provided with empty profit, change the process for multiple cutting grooves that need to construct when big thick ore body medium-length hole back production built on the sand, save a large amount of explosives, it is at low cost, high-efficient, labor intensity is low, safety is good.

Description

A kind of foam type creates medium-length hole back production explosion collocation structure and its construction method
Technical field
The invention belongs to underground mining mine technology fields, and in particular to a kind of foam type creation medium-length hole back production explosion benefit Compensation structure and its construction method.
Background technique
It is not allow for biggish exposed area since ore-rock is relatively broken for the unsteady big thick ore body of underground mining, it is main Mine is fallen using shallow bore hole, to control rock mass exposure range, guarantee Stope safty, but stoping cost is high, low efficiency, safety is poor Etc..With the continuous development of mining technique, lot of domestic and international mine uses medium-length hole back production to improve production capacity at present, Biggish goaf is left after medium-length hole back production ore removal to need to be handled in time, otherwise can large area collapse and cause not exploiting Or Other Engineering accident, many mines carry out filling dead zone after back production a certain range, then carry out again deep in subsequent cycle Hole back production, thus can be in each circulation construction cutting groove, and explosive loss is big, at high cost, long construction period, and cutting groove explosion When generate biggish impact endurance test shock to closing on ore-rock, seriously affect STOPE STABILITY.
Summary of the invention
In order to solve the above technical problems, the present invention provides a kind of foam type create medium-length hole back production explosion collocation structure and Its construction method.
The present invention is achieved by the following technical programs.
A kind of foam type creation medium-length hole back production compensating space in blasting structure, including ore body and obturation, the ore body are set There are drilling drift and discharging tunnel;The drilling drift is located above ore body;The discharging tunnel is located at below ore body;The mine Foams are equipped between body and obturation.
As further technological improvement, barricade is equipped between discharging tunnel and foams described above.
As further technological improvement, ore body described above is equipped with blasthole close to the position of foams.
As further technological improvement, above-described foam type creates applying for medium-length hole back production compensating space in blasting structure Work method, steps are as follows:
Step 1, after the ore of upper circulation avalanche goes out sky by discharging tunnel, filling counterfort of constructing near open wiring mouth, Prevent filling slurry from filling discharging tunnel;
Step 2 customizes foams according to compensation space needed for subsequent cycle explosion;
The foams of customization are sent into dead zone from drilling drift rope etc., and adjust foam body position by step 3, make it It is in close contact as far as possible with ore body side;
Step 4 is filled, until obturation reaches drilling drift floor level;
Step 5 after body to be filled consolidates and reaches some strength, carries out long and medium hole drilling operation;
Step 6 carries out charge explosion after the completion of rock drilling operation, and foams, by comminuted destruction, collapse in blasting process Its volume exclusion is realized explosion compensation by the ore fallen, completes back production circulation.
As further technological improvement, foams are placed adjacent to Ileal neobladder side in step 2 described above, as far as possible with rock Face is closely sealed, prevents filling slurry from excessively penetrating into.
As further technological improvement, foams should have certain intensity in step 2 described above, need to be able to bear Filling slurry bring side pressure.
As further technological improvement, foams are placed in range of the dead zone close to Ileal neobladder in step 3 described above It is interior, to guarantee subsequent cycle compensating space in blasting.
As further technological improvement, using a circulation goaf on slush medium-length hole in step 4 described above.
The beneficial effects of the present invention are:
Foam type of the invention creates medium-length hole back production explosion collocation structure and its construction method, in big thick ore body built on the sand After medium-length hole back production, in placing foam weakness body in subsequent cycle operation space of planes, to fill upper circulation dead zone When, prevent obturation from enriching dead zone, there are a certain range of weak body spaces.Foams are in blasting process by comminuted broken Bad, its volume exclusion is realized explosion compensation, completes stoping operation by the ore of avalanche.
The present invention is directed to prevent filling slurry and the close knot of pre- stope using the foams of certain volume, there are certain The weak body space of range, when it is next be recycled back to and adopt explosion when space easily can be opened for explosion and fall mine being provided with empty profit Between, the process for multiple cutting grooves that need to construct when big thick ore body medium-length hole back production built on the sand is changed, a large amount of explosives are saved, It is at low cost, high-efficient, labor intensity is low, safety is good.
Detailed description of the invention
Fig. 1 is the structural schematic diagram that foam type creates medium-length hole back production compensating space in blasting.
Fig. 2 is foams destruction and broken ore schematic diagram after medium-length hole blasting.
In figure:
1- drilling drift, 2- ore body, 3- foams, 4- obturation, 5- barricade, 6- blasthole, 7- discharging tunnel.
Specific embodiment
Be described further below technical solution of the present invention, but claimed range be not limited to it is described.
A kind of foam type as described in Fig. 1-2 creates medium-length hole back production compensating space in blasting structure, including ore body 2 and filling Body 4, the ore body 2 are equipped with drilling drift 1 and discharging tunnel 7;The drilling drift 1 is located at 2 top of ore body;The discharging tunnel 7 are located at 2 lower section of ore body;Foams 3 are equipped between the ore body 2 and obturation 4.
Barricade 5 is equipped between the discharging tunnel 7 and foams 3.
The ore body 2 is equipped with blasthole 6 close to the position of foams 3.
The foam type creates the construction method of medium-length hole back production compensating space in blasting structure, and steps are as follows:
Step 1, after the ore of upper circulation avalanche goes out sky by discharging tunnel 7, filling counterfort of constructing near open wiring mouth 5, prevent filling slurry from filling discharging tunnel 7;
Step 2 customizes foams 3 according to compensation space needed for subsequent cycle explosion;
The foams 3 of customization are sent into dead zone from rope of drilling drift 1 etc., and adjust 3 position of foams by step 3, It is in close contact it with 2 side of ore body as far as possible;
Step 4 is filled, until obturation 4 reaches 1 floor level of drilling drift;
Step 5 after body 4 to be filled consolidates and reaches some strength, carries out long and medium hole drilling operation;
Step 6, carries out charge explosion after the completion of rock drilling operation, foams 3 in blasting process by comminuted destruction, Its volume exclusion is realized explosion compensation by the ore of avalanche, completes back production circulation.
Foams 3 are placed adjacent to Ileal neobladder side in the step 2, closely sealed with scar as far as possible, prevent filling slurry excessive It penetrates into.
Foams 3 should have certain intensity in the step 2, need to be able to bear filling slurry bring side pressure.
Foams 3 are placed in dead zone in the range of Ileal neobladder in the step 3, to guarantee that subsequent cycle explosion is mended Repay space.
Using a circulation goaf on slush medium-length hole in the step 4.
The invention discloses a kind of methods that foam type creates medium-length hole back production compensating space in blasting.In thick big mine built on the sand After 2 medium-length hole back production of body, in placing foam weakness body in subsequent cycle operation space of planes, to fill upper circulation sky Qu Shi prevents obturation 4 from enriching dead zone, and there are a certain range of weak body spaces.Foams 3 are crushed in blasting process Property destroy, its volume exclusion is realized explosion compensation by the ore of avalanche, completes stoping operation.
The method of the present invention mainly have the following three steps:
1. foams 3 are placed in dead zone guarantees subsequent cycle compensating space in blasting in Ileal neobladder a certain range;
2. a circulation goaf on slush medium-length hole;
3. after body 4 to be filled consolidates and reaches some strength, construction ranking hole carries out explosion, without cutting groove of constructing.
Technical requirements:
1. placing foams 3 appropriate according to the size of required compensating space in blasting;
2. foams 3 are placed adjacent to Ileal neobladder side, closely sealed with scar as far as possible, prevent filling slurry from excessively penetrating into.
3. foams 3 there should be certain intensity, it is able to bear filling slurry bring side pressure, in order to avoid be squeezed brokenly It is bad.
The present invention is directed to prevent filling slurry and the close knot of pre- stope using the foams 3 of certain volume, there are one The weak body space for determining range, when it is next be recycled back to and adopt explosion when space easily can be opened for explosion and fall mine being provided with empty profit Between, the process for multiple cutting grooves that need to construct when 2 medium-length hole back production of big thick ore body built on the sand is changed, is saved a large amount of fried Medicine, it is at low cost, high-efficient, labor intensity is low, safety is good.

Claims (8)

1. a kind of foam type creates medium-length hole back production compensating space in blasting structure, including ore body (2) and obturation (4), feature Be: the ore body (2) is equipped with drilling drift (1) and discharging tunnel (7);The drilling drift (1) is located above ore body (2); The discharging tunnel (7) is located at below ore body (2);Foams (3) are equipped between the ore body (2) and obturation (4).
2. foam type as described in claim 1 creates medium-length hole back production compensating space in blasting structure, it is characterised in that: it is described go out Barricade (5) are equipped between mine tunnel (7) and foams (3).
3. foam type as described in claim 1 creates medium-length hole back production compensating space in blasting structure, it is characterised in that: the mine Body (2) is equipped with blasthole (6) close to the position of foams (3).
4. a kind of foam type as claimed in any one of claims 1-3 creates applying for medium-length hole back production compensating space in blasting structure Work method, which is characterized in that steps are as follows:
Step 1, after the ore of upper circulation avalanche goes out sky by discharging tunnel (7), filling counterfort of constructing near open wiring mouth (5), prevent filling slurry from filling discharging tunnel (7);
Step 2 customizes foams (3) according to compensation space needed for subsequent cycle explosion;
The foams (3) of customization are sent into dead zone from drilling drift (1) rope etc., and adjust foams (3) position by step 3 It sets, is in close contact it with ore body (2) side as far as possible;
Step 4 is filled, until obturation (4) reach drilling drift (1) floor level;
Step 5 after body (4) to be filled consolidates and reaches some strength, carries out long and medium hole drilling operation;
Step 6 carries out charge explosion after the completion of rock drilling operation, and foams (3), by comminuted destruction, collapse in blasting process Its volume exclusion is realized explosion compensation by the ore fallen, completes back production circulation.
5. foam type as claimed in claim 4 creates the construction method of medium-length hole back production compensating space in blasting structure, feature Be: foams (3) are placed adjacent to Ileal neobladder side in the step 2, closely sealed with scar as far as possible, prevent filling slurry excessive It penetrates into.
6. foam type as claimed in claim 4 creates the construction method of medium-length hole back production compensating space in blasting structure, feature Be: foams (3) should have certain intensity in the step 2, need to be able to bear filling slurry bring side pressure.
7. foam type as claimed in claim 4 creates the construction method of medium-length hole back production compensating space in blasting structure, feature It is: foams (3) is placed in dead zone in the range of Ileal neobladder in the step 3, guarantees that subsequent cycle explosion compensates Space.
8. foam type as claimed in claim 4 creates the construction method of medium-length hole back production compensating space in blasting structure, feature It is: using a circulation goaf on slush medium-length hole in the step 4.
CN201811197390.0A 2018-10-15 2018-10-15 A kind of foam type creates medium-length hole back production explosion collocation structure and its construction method Pending CN109594986A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811197390.0A CN109594986A (en) 2018-10-15 2018-10-15 A kind of foam type creates medium-length hole back production explosion collocation structure and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811197390.0A CN109594986A (en) 2018-10-15 2018-10-15 A kind of foam type creates medium-length hole back production explosion collocation structure and its construction method

Publications (1)

Publication Number Publication Date
CN109594986A true CN109594986A (en) 2019-04-09

Family

ID=65957439

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811197390.0A Pending CN109594986A (en) 2018-10-15 2018-10-15 A kind of foam type creates medium-length hole back production explosion collocation structure and its construction method

Country Status (1)

Country Link
CN (1) CN109594986A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111622803A (en) * 2020-07-29 2020-09-04 矿冶科技集团有限公司 Mining method for broken ore body
CN113605971A (en) * 2021-09-18 2021-11-05 中南大学 Filling structure for preventing filling body from being unstable and mining method applying filling structure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204007361U (en) * 2014-07-21 2014-12-10 马鞍山矿山研究院爆破工程有限责任公司 A kind of mine blasting vibration damping retaining wall charge constitution
CN104453904A (en) * 2014-11-24 2015-03-25 西北矿冶研究院 Sublevel filling mining method without drawing groove
CN105626073A (en) * 2016-01-28 2016-06-01 贵州开磷集团股份有限公司 Mining method capable of preserving cutting groove based on filling mining method
CN106522955A (en) * 2016-12-05 2017-03-22 广西大学 Studding recovery method for reconstructing covering layer through dead zone wastefill and top surrounding rock spallation collaboratively
CN107178366A (en) * 2017-07-28 2017-09-19 长沙矿山研究院有限责任公司 A kind of stoping method of post ore body

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204007361U (en) * 2014-07-21 2014-12-10 马鞍山矿山研究院爆破工程有限责任公司 A kind of mine blasting vibration damping retaining wall charge constitution
CN104453904A (en) * 2014-11-24 2015-03-25 西北矿冶研究院 Sublevel filling mining method without drawing groove
CN105626073A (en) * 2016-01-28 2016-06-01 贵州开磷集团股份有限公司 Mining method capable of preserving cutting groove based on filling mining method
CN106522955A (en) * 2016-12-05 2017-03-22 广西大学 Studding recovery method for reconstructing covering layer through dead zone wastefill and top surrounding rock spallation collaboratively
CN107178366A (en) * 2017-07-28 2017-09-19 长沙矿山研究院有限责任公司 A kind of stoping method of post ore body

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111622803A (en) * 2020-07-29 2020-09-04 矿冶科技集团有限公司 Mining method for broken ore body
CN113605971A (en) * 2021-09-18 2021-11-05 中南大学 Filling structure for preventing filling body from being unstable and mining method applying filling structure

Similar Documents

Publication Publication Date Title
CN107989614B (en) The mining methods of the inclined thick ore body of disk rock crusher in a kind of back production
CN104453904B (en) Sublevel filling mining method without drawing groove
CN104481539B (en) From kerve tight-face blasting caved stopes
CN105041314A (en) Method for united mining of deep subsequent stoping chamber and layered stoping jamb
CN109209472A (en) The coal seam pressure relief anti-burst method that a kind of punching, explosion, water filling intercouple
CN110331978A (en) A kind of environment reconstruction segmentation medium-length hole afterwards filling mining method
CN101285384B (en) Large diameter, deep borehole and non undercutting mining method
CN109141149A (en) A kind of tunnel excavation hydraulic pressure demolition construction method
AU2021101512A4 (en) Panel area and panel area column collaborative mining method for an inclined thick and large ore body
US20230228193A1 (en) Raise caving method for mining an ore from an ore body, and a mining infrastructure, monitoring system, machinery, control system and data medium therefor
CN109577979A (en) To sublevel fill-mining method under a kind of high-ground stress large size ore body
CN107524444B (en) A kind of control blasting method for improving resuing stoping and falling mine efficiency
CN109594986A (en) A kind of foam type creates medium-length hole back production explosion collocation structure and its construction method
CN104389604A (en) Method for forming covering layer by stope caving method
CN112081592B (en) Safe stoping method for steeply-inclined crushed thin vein
CN110219650A (en) A kind of environment remodeling stage deep hole afterwards filling mining method
CN105863727A (en) Method for treating pillar goaf
CN111963175A (en) Thick ore body mining method
CN106285677A (en) Side back production subregion filling studding recovery method is expanded to route on Chao Qian
CN113047836B (en) Goaf isolated ore pillar safe stoping method
CN107131805B (en) Mining method for improving ore removal grade of underground caving stope
CN111594183A (en) Coal seam deep hole blasting pressure relief method for improving blasting effect by using original pressure relief holes
CN107559009B (en) Collapse the recovery method of area's high-grade ore body in a kind of deep
CN113187481A (en) Filling mining method for overburden rock concentrated grouting caving stoping
CN112361910A (en) Mining method for accurate delay in-situ blasting and crushing of layered rock mass

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190409

RJ01 Rejection of invention patent application after publication