CN107524444B - A kind of control blasting method for improving resuing stoping and falling mine efficiency - Google Patents

A kind of control blasting method for improving resuing stoping and falling mine efficiency Download PDF

Info

Publication number
CN107524444B
CN107524444B CN201710856936.8A CN201710856936A CN107524444B CN 107524444 B CN107524444 B CN 107524444B CN 201710856936 A CN201710856936 A CN 201710856936A CN 107524444 B CN107524444 B CN 107524444B
Authority
CN
China
Prior art keywords
mine
blasthole
cliff
once
falling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710856936.8A
Other languages
Chinese (zh)
Other versions
CN107524444A (en
Inventor
唐学义
汪志国
严鹏
郭树林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changchun Gold Research Institute
Original Assignee
Changchun Gold Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changchun Gold Research Institute filed Critical Changchun Gold Research Institute
Priority to CN201710856936.8A priority Critical patent/CN107524444B/en
Publication of CN107524444A publication Critical patent/CN107524444A/en
Application granted granted Critical
Publication of CN107524444B publication Critical patent/CN107524444B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/22Methods of underground mining; Layouts therefor for ores, e.g. mining placers
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D3/00Particular applications of blasting techniques
    • F42D3/04Particular applications of blasting techniques for rock blasting

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Remote Sensing (AREA)
  • General Engineering & Computer Science (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

The invention discloses the control blasting method that a kind of raising resuing stoping falls mine efficiency, the methods are as follows: disk or lower wall country rock Drilling cliff blasthole on quasi- cliff once fall mine blasthole in mineral ore Drilling, implement once to fall mine shot hole blasting;Continue Drilling secondary falling mine blasthole in mineral ore, implements secondary falling mine shot hole blasting, concentrating mining;Implement cliff shot hole blasting, fills stope;So circulation is until entire block stoping finishes.Control blasting method of the present invention falls the Controlled blasting technique of cliff of mine by introducing in resuing stoping twice, considerably increases broken ore amount, hence it is evident that reduce barren rock mixed volume, improve resuing stoping falls mine efficiency.

Description

A kind of control blasting method for improving resuing stoping and falling mine efficiency
Technical field
The present invention relates to a kind of underground metal mines to control blasting method, more particularly, to a kind of mentioning suitable for narrow vein High resuing stoping falls the control blasting method of mine efficiency.
Background technique
In non-ferrous metal and gold mine field, belong to extra narrow vein there are many mineral deposit, this part mineral ore is due to due to width It spends small, to guarantee enough working spaces, back production is generally carried out using resuing stoping.
Existing scarps filling mining method (such as application No. is 201610067459.2, a kind of entitled narrow vein presplitting Scarps filling mining method) in, mineral ore (country rock) of first avalanche, then country rock (mineral ore) waste fill of avalanche produces ore body The space left, so circulation are until block stoping terminates.Although this method can be realized narrow vein ore-rock point and adopt, reduce thin The working of lodes rate of dilution, but since mineral ore is narrow, causes to fall mine amount few, and barren rock is easily mixed into ore, and production efficiency is low, Transport, promotion and beneficiation cost are increased simultaneously, the length of service of Tailings Dam is shortened, seriously restricts the development in mine, shadow Ring the economic benefit of enterprise.
Summary of the invention
For above-mentioned problems of the prior art, the present invention provides a kind of raising resuing stopings to fall mine efficiency Blasting method is controlled, with the avalanche amount of lifting ore, and barren rock mixed volume is considerably reduced, to improve resuing stoping Fall mine efficiency.Technical scheme is as follows:
A kind of control blasting method for improving resuing stoping and falling mine efficiency, the control blasting method are quick-fried to fall mine twice A broken and cliff explosion is a cycle period, and so circulation is until entire block stoping finishes.
The detailed process of the control blasting method are as follows: disk or lower wall country rock Drilling cliff blasthole on quasi- cliff, in mine Arteries and veins Drilling once falls mine blasthole, implements once to fall mine shot hole blasting;Continue Drilling secondary falling mine blasthole in mineral ore, implements secondary falling Mine shot hole blasting, concentrating mining;Implement cliff shot hole blasting, fills stope;So circulation is until entire block stoping finishes.
Further, before once falling mine explosion, the cliff blasthole whole Drilling of disk on quasi- cliff or lower wall country rock is finished; Mine blasthole and directly powder charge detonation are once fallen in mineral ore Drilling, is fallen on mine ore storage after divulging information, then once after once detonation Continue Drilling secondary falling mine blasthole, concentrating mining after explosion;Finally implement cliff shot hole blasting, avalanche country rock fills stope.
Further, it once falls mine blasthole and secondary falling mine blasthole total depth is equal to cliff blast hole depth, secondary falling mine big gun Hole depth is 1.1 to 1.2 times for once falling mine blast hole depth.
Further, mine blasthole spacing and common resuing stoping identical, the secondary falling mine big gun that falls mine blasthole spacing are once fallen Pitch of holes is 0.75 to 0.85 times for once falling mine blasthole spacing, and cliff blasthole spacing, which is less than or equal to, once falls mine blasthole spacing 2 times.
Further, once falling mine blast hole projectile filling coefficient and common resuing stoping, to fall mine blast hole projectile filling coefficient identical, and two The secondary mine blast hole projectile filling coefficient that falls is 1.1 to 1.2 times for once falling mine blast hole projectile filling coefficient, cliff blast hole projectile filling coefficient with once fall Mine blast hole projectile filling coefficient is identical.
Compared with prior art, the beneficial effects of the present invention are:
Control blasting method of the present invention falls the control of cliff of mine by introducing in resuing stoping twice Blasting technique considerably increases broken ore amount, hence it is evident that reduces barren rock mixed volume, improve resuing stoping falls mine effect Rate.
Detailed description of the invention
Fig. 1 is that of the present invention introduce in resuing stoping falls the Controlled blasting technique of cliff of mine twice and fall mine and show Effect is intended to.
When Fig. 2 is that resuing stoping once falls mine, the arrangement schematic diagram of blasthole and cliff blasthole.
When Fig. 3 is resuing stoping secondary falling mine, the arrangement schematic diagram of blasthole.
Fig. 4 is I-I cross-sectional view in Fig. 2;
Fig. 5 is II-II cross-sectional view in Fig. 3.
In figure:
1- is quasi- to fall mine ore body, 2- intends cliff country rock, 3- bed course, 4- filling waste stone,
5- ore, 6- cliff blasthole, 7- once fall mine blasthole, 8- secondary falling mine blasthole.
Specific embodiment
For the technical solution that the present invention is further explained, in conjunction with Figure of description, a specific embodiment of the invention is as follows:
As shown in Figure 1, the present invention provides the control blasting method that a kind of raising resuing stoping falls mine efficiency, the control Blasting method processed is that the Controlled blasting technique for falling cliff of mine twice is introduced in existing resuing stoping, and detailed process is such as Under:
Firstly, intending disk or lower wall country rock Drilling cliff big gun on cliff as shown in Fig. 2, once fall mine blasthole in mineral ore Drilling Hole once falls direct powder charge detonation in mine blasthole, implements once to fall mine shot hole blasting;
Then, as shown in figure 3, divulging information after once falling mine by enough time, then continue once falling on mine ore storage Drilling secondary falling mine blasthole implements secondary falling mine shot hole blasting, concentrating mining after explosion;
Finally, implementing cliff shot hole blasting after concentrating mining, avalanche country rock fills stope;
So circulation above process, until entire block stoping finishes.
In the above process, as shown in Figures 2 and 3, the depth of the cliff blasthole of Drilling on quasi- cliff country rock are as follows: primary Fall the secondary falling mine blasthole of Drilling during the depth and secondary falling mine for once falling mine blasthole of Drilling during mine depth it With, and secondary falling mine blast hole depth is 1.1 to 1.2 times for once falling mine blast hole depth;
In the above process, as shown in Figure 4 and Figure 5, Drilling once falls mine blasthole during the present invention once falls mine Spacing and identical, Drilling during secondary falling mine of the present invention that falls mine blasthole spacing during traditional common resuing stoping The spacing of secondary falling mine blasthole be 0.75 to 0.85 times for once falling mine blasthole spacing;
In the above process, the coefficient of charge for once falling mine blasthole that the present invention is once fallen during mine and traditional common cut The coefficient of charge that wall filling method falls mine blasthole is identical, and the coefficient of charge of the secondary falling mine blasthole during secondary falling mine of the present invention is Once fall 1.1 to 1.2 times of the coefficient of charge of mine blasthole;
In the above process, as shown in figure 4, the spacing of the cliff blasthole of Drilling is less than or equal to once on quasi- cliff country rock 2 times of mine blasthole spacing are fallen, the coefficient of charge of cliff blasthole is identical as the coefficient of charge for once falling mine blasthole.
In above-mentioned control blasting process, it should be noted that before falling mine explosion once, need disk on quasi- cliff or The cliff blasthole whole Drilling construction of lower wall country rock finishes, and then once mine and secondary falling mine is fallen followed by successively progress, with reality After existing concentrating mining, disposable avalanche country rock fills stope.
The control blasting method that mine efficiency is fallen using above-mentioned raising resuing stoping passes through the company of introducing in resuing stoping The continuous Controlled blasting technique for falling cliff of mine twice, considerably increases broken ore amount, hence it is evident that reduce barren rock mixed volume, mention Risen resuing stoping falls mine efficiency.
The safety notice of the present invention in the construction process is as follows:
1, should check Stope roof situation before constructing, be tapped, it is ensured that top plate without inbreak it is dangerous after can operation;
2, Drilling once falls mine blasthole, secondary falling mine blasthole and cliff blasthole, loads the processes such as explosive and explosion and strictly presses It designs and executes according to stope explosion;
3, other safety notices are executed according to national relevant laws and regulations.

Claims (2)

1. a kind of control blasting method for improving resuing stoping and falling mine efficiency, it is characterised in that:
The control blasting method is to fall mine explosion and a cliff explosion twice as a cycle period, and so circulation is until whole A block stoping finishes;
The detailed process of the control blasting method are as follows: disk or lower wall country rock Drilling cliff blasthole on quasi- cliff are bored in mineral ore Chisel once falls mine blasthole, implements once to fall mine shot hole blasting;Continue Drilling secondary falling mine blasthole in mineral ore, implements secondary falling mine big gun Hole explosion, concentrating mining;Implement cliff shot hole blasting, fills stope;So circulation is until entire block stoping finishes;
It once falls mine blasthole and secondary falling mine blasthole total depth is equal to cliff blast hole depth, secondary falling mine blast hole depth is once to fall 1.1 to 1.2 times of mine blast hole depth;
Once falling mine blasthole spacing and common resuing stoping, to fall mine blasthole spacing identical, and secondary falling mine blasthole spacing is once falls 0.75 to 0.85 times of mine blasthole spacing, cliff blasthole spacing, which is less than or equal to, once falls 2 times of mine blasthole spacing;
Once fall mine blast hole projectile filling coefficient and common resuing stoping identical, the secondary falling mine blast hole projectile filling that falls mine blast hole projectile filling coefficient Coefficient is 1.1 to 1.2 times for once falling mine blast hole projectile filling coefficient, and cliff blast hole projectile filling coefficient falls mine blast hole projectile filling coefficient with primary It is identical.
2. a kind of control blasting method for improving resuing stoping and falling mine efficiency as described in claim 1, it is characterised in that:
Before once falling mine explosion, the cliff blasthole whole Drilling of disk on quasi- cliff or lower wall country rock is finished;
Mine blasthole and directly powder charge detonation are once fallen in mineral ore Drilling, is falling mine ore after divulging information, then primary after once detonation Continue Drilling secondary falling mine blasthole, concentrating mining after explosion on heap;
Finally implement cliff shot hole blasting, avalanche country rock fills stope.
CN201710856936.8A 2017-09-18 2017-09-18 A kind of control blasting method for improving resuing stoping and falling mine efficiency Active CN107524444B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710856936.8A CN107524444B (en) 2017-09-18 2017-09-18 A kind of control blasting method for improving resuing stoping and falling mine efficiency

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710856936.8A CN107524444B (en) 2017-09-18 2017-09-18 A kind of control blasting method for improving resuing stoping and falling mine efficiency

Publications (2)

Publication Number Publication Date
CN107524444A CN107524444A (en) 2017-12-29
CN107524444B true CN107524444B (en) 2019-03-05

Family

ID=60736082

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710856936.8A Active CN107524444B (en) 2017-09-18 2017-09-18 A kind of control blasting method for improving resuing stoping and falling mine efficiency

Country Status (1)

Country Link
CN (1) CN107524444B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108678745A (en) * 2018-05-11 2018-10-19 长春黄金研究院有限公司 A kind of narrow vein concrete bed course scarps filling mining method
CN110617065B (en) * 2019-10-14 2021-09-07 中钢集团马鞍山矿山研究总院股份有限公司 Stope structure arrangement mode of steep-dip extremely-thin ore vein cut-wall filling mining method
CN110566206B (en) * 2019-10-14 2021-09-07 中钢集团马鞍山矿山研究总院股份有限公司 Separate mining and filling mining method for upper and lower cut walls of rock ores with steeply inclined extremely thin veins
CN114412467B (en) * 2022-01-25 2022-10-25 长沙矿山研究院有限责任公司 Top-bottom medium-length hole subsequent filling mining method for thin ore body

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102331212A (en) * 2011-09-07 2012-01-25 薛世忠 Loss and dilution controlled blasting method for open metal mine
CN103017621A (en) * 2012-11-29 2013-04-03 青海山金矿业有限公司 Blasting method for reducing depletion in steeply inclined thin ore body recovery
CN104213918A (en) * 2014-08-06 2014-12-17 中钢集团马鞍山矿山研究院有限公司 Multilayer gently-inclined extremely-narrow vein stoping blasting technology
CN105649626A (en) * 2016-01-26 2016-06-08 西安建筑科技大学 Underholing type wall-cutting cut-and-filling stoping method for mining steep ultrathin vein ore body
CN105735996A (en) * 2016-02-01 2016-07-06 中南大学 Presplitting type wall cutting and filling stoping method for thin ore vein

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102331212A (en) * 2011-09-07 2012-01-25 薛世忠 Loss and dilution controlled blasting method for open metal mine
CN103017621A (en) * 2012-11-29 2013-04-03 青海山金矿业有限公司 Blasting method for reducing depletion in steeply inclined thin ore body recovery
CN104213918A (en) * 2014-08-06 2014-12-17 中钢集团马鞍山矿山研究院有限公司 Multilayer gently-inclined extremely-narrow vein stoping blasting technology
CN105649626A (en) * 2016-01-26 2016-06-08 西安建筑科技大学 Underholing type wall-cutting cut-and-filling stoping method for mining steep ultrathin vein ore body
CN105735996A (en) * 2016-02-01 2016-07-06 中南大学 Presplitting type wall cutting and filling stoping method for thin ore vein

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
削壁充填采矿法在金厂沟梁金矿的应用实践;贾洪杰等;《黄金》;20010115;第22卷(第1期);第33-35页

Also Published As

Publication number Publication date
CN107524444A (en) 2017-12-29

Similar Documents

Publication Publication Date Title
CN107524444B (en) A kind of control blasting method for improving resuing stoping and falling mine efficiency
CN104154830B (en) Medium-length hole blasting method for underground mining
CN205561688U (en) Go up big gun hole arrangement structure to medium -length hole undercutting blasting
CN105571419B (en) Blasting method capable of effectively reducing blasting boulder yield of surface mine
CN104481539B (en) From kerve tight-face blasting caved stopes
CN105735996A (en) Presplitting type wall cutting and filling stoping method for thin ore vein
CN109209472A (en) The coal seam pressure relief anti-burst method that a kind of punching, explosion, water filling intercouple
CN103696770B (en) Underground mining upward incise kerve method
CN102182461A (en) Efficient mining method for thick metal ore body in slanting
CN107339920B (en) The method of superdeep holes presplit blasting
CN101266123B (en) Crushing station pit digging method
CN102720500A (en) Mechanized underground mining method for sharply inclined thin ore body
CN110595308B (en) Method for treating goaf by ultra-deep hole blasting of strip mine
CN105673014A (en) Method for controlling rock burst of hard roof jump mining working face
CN110879027A (en) Efficient energy-gathered blasting rapid tunneling method for half coal rock roadway
CN104594903A (en) Ore breaking method for whole-section high combination rock drilling blasting
CN106640080A (en) Deep part high-stress environment self-stabilizing arched stope arrangement mining method
CN102337893B (en) Method for processing suspension top by medium-deep hole blasting on upper and lower shoes
CN108678745A (en) A kind of narrow vein concrete bed course scarps filling mining method
CN104389604A (en) Method for forming covering layer by stope caving method
CN209230424U (en) A kind of compound burn cut
CN108362181B (en) A kind of driving recovery method of extra narrow vein ore body
CN110332865A (en) Deep high stress stope upper centripetal deep hole combined blasting method
CN104790950B (en) Optimized mining middle-deep blasthole millisecond blasting slot cutting method
CN104089548A (en) Fan-shaped arrangement blast mining method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 130012 nanhu road, Jilin, Changchun, No. 6760

Patentee after: CHANGCHUN GOLD RESEARCH INSTITUTE Co.,Ltd.

Address before: 130012 nanhu road, Jilin, Changchun, No. 6760

Patentee before: CHANGCHUN GOLD Research Institute