CN109467014A - 一种大风环境中大吨位塔吊超大荷载附墙结构 - Google Patents
一种大风环境中大吨位塔吊超大荷载附墙结构 Download PDFInfo
- Publication number
- CN109467014A CN109467014A CN201811624718.2A CN201811624718A CN109467014A CN 109467014 A CN109467014 A CN 109467014A CN 201811624718 A CN201811624718 A CN 201811624718A CN 109467014 A CN109467014 A CN 109467014A
- Authority
- CN
- China
- Prior art keywords
- tower
- tower crane
- king
- attached wall
- strong wind
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/62—Constructional features or details
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
本发明公开了一种大风环境中大吨位塔吊超大荷载附墙结构,本发明由加强钢筋网片、连接座、钢棒、锚座、精轧螺纹钢筋、附着杆、销轴组成,在主塔的塔壁两侧分别固定有连接座和锚座,附着杆两端的连接耳板分别与塔吊附着框、连接座采用销轴连接。该附墙结构承载能力大,单根附墙杆件受力可达4000kN,能够大大减少在常年大风环境中塔吊附墙的设置数量,提高主塔施工效率,解决了在大风环境,受季风、台风影响频繁环境中塔吊制约斜拉桥主塔施工工效的问题,从而大大降低大风环境对主塔施工的影响,可有效保障项目主塔工期,降低施工成本,而且该附墙结构简单、新颖、承载能力大、受力明确,安装容易,具有较好的经济效益和社会效益。
Description
技术领域
本发明涉及大桥施工设施,尤其是涉及一种常年在大风、台风环境下大吨位塔吊超大荷载附墙结构。
背景技术
随着我国经济和社会的快速发展,基础设施建设规模不断增大,桥梁建设日新月异,在自然条件恶劣,常年处于大风环境下的海洋、山区等区域大跨度斜拉桥建设也越来越多。
在大跨度斜拉桥主塔施工过程中,大吨位塔吊是一种必不可少的大型施工设施,塔吊附墙是保证塔吊结构安全和正常工作的重要结构。斜拉桥主塔修建的过程一般如下:安装塔吊,采用爬模方式施工一定节段的主塔,安装塔吊附墙,塔吊顶升,爬模施工一定节段主塔,安装塔吊附墙,塔吊顶升,爬模施工一定节段主塔,如此往复,直至主塔施工完成。
常规塔吊的附墙结构由附着框、附着杆、预埋件三大部分组成。附着框固定在塔吊标准节上;预埋件在主塔施工时进行预埋,预埋件一般采用钢板+角钢或钢板+普通钢筋两种常规形式;附着杆采用型钢或钢管形式。附着杆与附着框、预埋件之间连接采用两端销接或一端销接、一端焊接形式。每层附墙结构安装时,实测附着框与预埋件之间的距离,根据测量结果,在施工现场对附着杆的长度进行调整,然后再进行附着杆的安装。塔吊的附墙结构一般每隔5~6节主塔设置一道。
当在海上或山区等常年存在大风、季风、台风气候的地区采用常规塔吊的附墙结构时,存在以下缺点:1、由于风荷载大,尤其是在受季风、台风影响频繁的海洋环境中进行主塔施工,如按常规方式布置附墙数量,附墙结构的受力巨大,常规做法附墙结构的受力在1000kN以内,结构受力无法满足要求,附墙结构无法实现;2、采用常规附墙结构时,为了使附墙结构满足受力要求,其解决办法是增加附墙数量的同时降低塔吊自由悬臂的高度,这样将会导致频繁的进行附墙安装和塔吊顶升工作,同时上述环境下本身的有效作业时间本来就有限,又加上附墙安装和塔吊顶升占用了这有限的时间资源,塔吊如不顶升,主塔则又无法继续施工,这将极大地影响了主塔的施工效率,进而影响总工期及施工成本。
发明内容
本发明的目的在于提供一种承载能力大、能够大大减少在常年大风环境中塔吊附墙的设置数量的大风环境中大吨位塔吊超大荷载附墙结构。
本发明的目的是这样实现的:
一种大风环境下特殊塔吊超大荷载附墙结构,特征是:由加强钢筋网片、精轧螺纹钢筋、钢棒、连接座、锚座、附着杆、销轴组成,其中:加强钢筋网片安装在主塔内,加强钢筋网片为加强主塔的混凝土局部受力,精轧螺纹钢筋横穿主塔的塔壁,精轧螺纹钢筋的两端伸出主塔的塔壁外,钢棒的主体设在主塔内且钢棒靠塔吊的一端伸出主塔的塔壁外,锚座与精轧螺纹钢筋靠塔吊的一端连接并固定在主塔的塔壁上,连接座与精轧螺纹钢筋靠塔吊的一端、钢棒靠塔吊的一端连接并固定在主塔的塔壁上,在附着杆的两端均设有连接耳板,附着杆两端的连接耳板分别与塔吊附着框、连接座采用销轴连接。
连接座由Q345B材质钢板焊接而成,采用箱型结构。
钢棒采用Q345B材质钢板,连接座与钢棒之间焊接成整体一起安装。
锚座由Q345B材质钢板焊接而成,采用箱型结构。
附着杆采用Q345B材质无缝钢管,销轴采用40Cr材质。
附着杆与连接座之间存在锐角α,根据每道附墙具体布置不同,附着杆的轴力传递给连接座,分解为垂直主塔塔壁的拉力或压力、平行主塔塔壁的剪力,其中拉力由精轧螺纹钢筋承受,剪力由钢棒承受。
本发明的附墙结构承载能力大,单根附墙杆件受力可达4000kN,能够大大减少在常年大风环境中塔吊附墙的设置数量,提高主塔施工效率,解决了在大风环境,受季风、台风影响频繁环境中塔吊制约斜拉桥主塔施工工效的问题,从而大大降低大风环境对主塔施工的影响,可有效保障项目主塔工期,降低施工成本,而且该附墙结构简单、新颖、承载能力大、受力明确,安装容易,具有较好的经济效益和社会效益。
附图说明
图1为主塔塔吊附墙的总体立面布置示意图;
图2为单个塔吊附墙的平面布置示意图;
图3为单根附墙连接座端的立面示意图;
图4为图3中的A-A向示意图。
具体实施方式
下面结合实施例并对照附图对本发明作进一步详细说明。
在混凝土的主塔1的高度方向上共分三十四节,布置两台塔吊,左侧为较高的塔吊2,右侧为较矮的塔吊2,左侧的塔吊2共布置附墙结构3五道,右侧的塔吊2共布置附墙结构3四道。
一种大风环境下特殊塔吊超大荷载附墙结构,由加强钢筋网片4、精轧螺纹钢筋5、钢棒6、连接座7、锚座8、附着杆9、销轴10组成,其中:加强钢筋网片4安装在主塔1内,加强钢筋网片4为加强主塔1的混凝土局部受力,精轧螺纹钢筋5横穿主塔1的塔壁,精轧螺纹钢筋5的两端伸出主塔1的塔壁外,钢棒6的主体设在主塔1内且钢棒6靠塔吊2的一端伸出主塔1的塔壁外,锚座8与精轧螺纹钢筋5靠塔吊2的一端连接并固定在主塔1的塔壁上,连接座7与精轧螺纹钢筋5靠塔吊2的一端、钢棒6靠塔吊2的一端连接并固定在主塔1的塔壁上,连接座7与钢棒6的连接为焊接,在附着杆9的两端均设有连接耳板11,附着杆9两端的连接耳板11分别与塔吊附着框(图中未画出)、连接座7采用销轴10连接。
连接座7由Q345B材质钢板焊接而成,采用箱型结构。
钢棒6采用Q345B材质钢板,连接座7与钢棒6之间焊接成整体一起安装。
锚座8由Q345B材质钢板焊接而成,采用箱型结构。
附着杆9采用Q345B材质无缝钢管,销轴10采用40Cr材质。
附着杆9与连接座7之间存在锐角α,根据每道附墙具体布置不同,附着杆8的轴力传递给连接座7,分解为垂直主塔1塔壁的拉力或压力、平行主塔1塔壁的剪力,其中拉力由精轧螺纹钢筋5承受,剪力由钢棒6承受。
Claims (6)
1.一种大风环境下特殊塔吊超大荷载附墙结构,其特征在于:由加强钢筋网片、精轧螺纹钢筋、钢棒、连接座、锚座、附着杆、销轴组成,其中:加强钢筋网片安装在主塔内,加强钢筋网片为加强主塔的混凝土局部受力,精轧螺纹钢筋横穿主塔的塔壁,精轧螺纹钢筋的两端伸出主塔的塔壁外,钢棒的主体设在主塔内且钢棒靠塔吊的一端伸出主塔的塔壁外,锚座与精轧螺纹钢筋靠塔吊的一端连接并固定在主塔的塔壁上,连接座与精轧螺纹钢筋靠塔吊的一端、钢棒靠塔吊的一端连接并固定在主塔的塔壁上,在附着杆的两端均设有连接耳板,附着杆两端的连接耳板分别与塔吊附着框、连接座采用销轴连接。
2.根据权利要求1所述的大风环境下特殊塔吊超大荷载附墙结构,其特征在于:连接座由Q345B材质钢板焊接而成,采用箱型结构。
3.根据权利要求1所述的大风环境下特殊塔吊超大荷载附墙结构,其特征在于:钢棒采用Q345B材质钢板,连接座与钢棒之间焊接成整体一起安装。
4.根据权利要求1所述的大风环境下特殊塔吊超大荷载附墙结构,其特征在于:锚座由Q345B材质钢板焊接而成,采用箱型结构。
5.根据权利要求1所述的大风环境下特殊塔吊超大荷载附墙结构,其特征在于:附着杆采用Q345B材质无缝钢管,销轴采用40Cr材质。
6.根据权利要求1所述的大风环境下特殊塔吊超大荷载附墙结构,其特征在于:附着杆与连接座之间存在锐角α。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811624718.2A CN109467014B (zh) | 2018-12-28 | 2018-12-28 | 一种大风环境中大吨位塔吊超大荷载附墙结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811624718.2A CN109467014B (zh) | 2018-12-28 | 2018-12-28 | 一种大风环境中大吨位塔吊超大荷载附墙结构 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109467014A true CN109467014A (zh) | 2019-03-15 |
CN109467014B CN109467014B (zh) | 2020-06-30 |
Family
ID=65678244
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811624718.2A Active CN109467014B (zh) | 2018-12-28 | 2018-12-28 | 一种大风环境中大吨位塔吊超大荷载附墙结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109467014B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110316666A (zh) * | 2019-08-07 | 2019-10-11 | 上海市机械施工集团有限公司 | 一种塔吊附墙装置及塔吊附墙装置施工方法 |
CN113684758A (zh) * | 2021-09-07 | 2021-11-23 | 中国铁建大桥工程局集团有限公司 | 一种自锚式悬索桥施工辅助装置 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201703943U (zh) * | 2010-07-06 | 2011-01-12 | 中国建筑第八工程局有限公司 | 液压爬升楼梯 |
CN103375023A (zh) * | 2012-04-27 | 2013-10-30 | 广州市达蒙建筑技术有限公司 | 附着式升降脚手架 |
CN104261232A (zh) * | 2014-08-14 | 2015-01-07 | 中国建筑第八工程局有限公司 | 附着于异形断面的升降装置及其安装方法 |
CN105649334A (zh) * | 2016-01-28 | 2016-06-08 | 合肥建工集团有限公司 | 一种混凝土剪力墙塔吊附墙施工方法及其装置 |
CN106758833A (zh) * | 2016-12-16 | 2017-05-31 | 四川公路桥梁建设集团有限公司 | 一种用于小型变截面墩施工的液压爬模系统 |
JP6147621B2 (ja) * | 2013-09-10 | 2017-06-14 | 三井住友建設株式会社 | タワークレーンの支持構造およびタワークレーン装置 |
CN107697818A (zh) * | 2017-10-17 | 2018-02-16 | 郑州科润机电工程有限公司 | 一种预应力混凝土风电塔筒壁施工方法及专用施工设备 |
CN207312977U (zh) * | 2017-10-17 | 2018-05-04 | 郑州科润机电工程有限公司 | 一种适用于预应力混凝土风电塔筒壁施工的专用施工设备 |
-
2018
- 2018-12-28 CN CN201811624718.2A patent/CN109467014B/zh active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201703943U (zh) * | 2010-07-06 | 2011-01-12 | 中国建筑第八工程局有限公司 | 液压爬升楼梯 |
CN103375023A (zh) * | 2012-04-27 | 2013-10-30 | 广州市达蒙建筑技术有限公司 | 附着式升降脚手架 |
JP6147621B2 (ja) * | 2013-09-10 | 2017-06-14 | 三井住友建設株式会社 | タワークレーンの支持構造およびタワークレーン装置 |
CN104261232A (zh) * | 2014-08-14 | 2015-01-07 | 中国建筑第八工程局有限公司 | 附着于异形断面的升降装置及其安装方法 |
CN105649334A (zh) * | 2016-01-28 | 2016-06-08 | 合肥建工集团有限公司 | 一种混凝土剪力墙塔吊附墙施工方法及其装置 |
CN106758833A (zh) * | 2016-12-16 | 2017-05-31 | 四川公路桥梁建设集团有限公司 | 一种用于小型变截面墩施工的液压爬模系统 |
CN107697818A (zh) * | 2017-10-17 | 2018-02-16 | 郑州科润机电工程有限公司 | 一种预应力混凝土风电塔筒壁施工方法及专用施工设备 |
CN207312977U (zh) * | 2017-10-17 | 2018-05-04 | 郑州科润机电工程有限公司 | 一种适用于预应力混凝土风电塔筒壁施工的专用施工设备 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110316666A (zh) * | 2019-08-07 | 2019-10-11 | 上海市机械施工集团有限公司 | 一种塔吊附墙装置及塔吊附墙装置施工方法 |
CN113684758A (zh) * | 2021-09-07 | 2021-11-23 | 中国铁建大桥工程局集团有限公司 | 一种自锚式悬索桥施工辅助装置 |
CN113684758B (zh) * | 2021-09-07 | 2023-12-05 | 中国铁建大桥工程局集团有限公司 | 一种自锚式悬索桥施工辅助装置 |
Also Published As
Publication number | Publication date |
---|---|
CN109467014B (zh) | 2020-06-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103437296B (zh) | 钢管拱桥无塔扣挂三段式双肋合拢吊装施工方法 | |
CN203270457U (zh) | 一种主动加固砼系杆拱桥的吊杆锚固构造 | |
CN202881856U (zh) | 混凝土浇筑支架预压装置 | |
CN209114332U (zh) | 一种长悬挑大截面盖梁托架体系 | |
CN102168405B (zh) | 矮塔斜拉桥钢混混合y形塔施工工法 | |
CN208201656U (zh) | 一种高墩边跨现浇段反拉配重装置 | |
CN109267487A (zh) | 一种长悬挑大截面盖梁托架体系 | |
CN203903834U (zh) | 一种内爬塔式起重机 | |
CN101892636A (zh) | 一种大跨径超重连续箱梁整体顶升改造方法 | |
CN103290784A (zh) | 拱梁结合桥吊装施工方法 | |
CN108999088A (zh) | 一种斜拉桥的施工方法 | |
CN109467014A (zh) | 一种大风环境中大吨位塔吊超大荷载附墙结构 | |
CN107514135A (zh) | 一种型钢混凝土梁模板无支撑体系支模装置及其使用方法 | |
CN109592580A (zh) | 一种大风环境中大吨位塔吊超大荷载附墙结构快速安装方法 | |
CN209260578U (zh) | 悬索桥混凝土加劲梁安装的纵向临时连接结构 | |
CN202323772U (zh) | 桥梁v撑钢绞线倒挂法施工装置 | |
CN202433253U (zh) | 一种弯钩锚杆拉拔试验辅助装置 | |
CN209367703U (zh) | 一种新型的塔吊式起重机 | |
CN207537885U (zh) | 斜拉索张拉阶段的锚固机构 | |
CN207775717U (zh) | 公路桥梁施工用预应力锚具 | |
CN207210932U (zh) | 预制桥面板空间钢管混凝土桁架组合梁连接装置 | |
CN208250889U (zh) | 一种拱桥吊杆结构 | |
CN210288145U (zh) | 一种直梁式挂篮 | |
CN207131088U (zh) | 一种剪力墙支撑组件 | |
CN205618307U (zh) | 混凝土塔筒和钢塔筒之间的连接结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |