CN109457970A - 一种腹部加设操作腰线修复冷却塔外壁的施工方法 - Google Patents
一种腹部加设操作腰线修复冷却塔外壁的施工方法 Download PDFInfo
- Publication number
- CN109457970A CN109457970A CN201811558368.4A CN201811558368A CN109457970A CN 109457970 A CN109457970 A CN 109457970A CN 201811558368 A CN201811558368 A CN 201811558368A CN 109457970 A CN109457970 A CN 109457970A
- Authority
- CN
- China
- Prior art keywords
- cooling tower
- stringcourse
- hanging basket
- wirerope
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Types And Forms Of Lifts (AREA)
Abstract
一种腹部加设操作腰线修复冷却塔外壁的施工方法,属于工业冷却塔外壁修复领域。步骤:利用小型吊车将钢丝绳腰线固定在预修复的冷却塔曲线腹部最小外径位置,同时根据操作吊篮的数量在钢丝绳腰线上设置相同数量的牵引绳;在预修复的冷却塔上设置操作吊篮,利用卷扬吊绳控制上下升降,同时利用钢丝绳腰线上的牵引绳水平方向牵引移动;施工人员在操作吊篮上对预修复的冷却塔进行处理修复,对于距操作吊篮水平距离较远的部位,利用钢丝绳腰线上的牵引绳进行水平方向牵引控制移动,使施工人员能够接触到预修复的冷却塔外壁,方便处理修复;施工人员通过操作吊篮上下升降及水平移动对预修复的冷却塔外壁修复完毕。优点在于,简单易操作,且安全可靠,大大降低了施工成本。
Description
技术领域
本发明属于工业冷却塔外壁修复领域,特别是提供了一种腹部加设操作腰线修复冷却塔外壁的施工方法。
背景技术
工业冷却塔外壁由于风雨腐蚀,混凝土破损部位需要定期修复,对于外壁修复,由于冷却塔属于曲面造型,一般采用外侧搭设满堂红脚手架或者使用吊车挂吊篮的方式,以上两种方式费工、费力、费料,施工成本较庞大。
发明内容:
本发明的目的在于提供一种腹部加设操作腰线修复冷却塔外壁的施工方法,在对电厂冷却塔外壁修复时,采用了一种腹部加设操作腰线修复冷却塔外壁的施工方法,即在冷却塔曲线腹部加设一圈钢丝绳腰线,在腰线上设置与吊篮相同数量的牵引绳,并利用腰线及牵引绳控制操作吊篮对冷却塔外壁进行修复。该施工方法简单易操作,且安全可靠,不需要搭设脚手架及吊车的全程配合,节省了大量的吊车台班及人力、物力,大大降低了施工成本,为以后类似施工积累了宝贵经验。
本发明在冷却塔曲线腹部加设一圈钢丝绳腰线,在腰线上设置与吊篮相同数量的牵引绳,并利用腰线及牵引绳控制操作吊篮对冷却塔外壁进行修复,至修复完成。具体步骤如下:
第一步,利用小型吊车2将钢丝绳腰线3固定在预修复的冷却塔1曲线腹部最小外径位置,同时根据操作吊篮5的数量在钢丝绳腰线3上设置相同数量的牵引绳4(图1);
第二步,在预修复的冷却塔1上设置操作吊篮5,利用卷扬吊绳6控制上下升降,同时利用钢丝绳腰线3上的牵引绳4水平方向牵引移动(图2);
第三步,施工人员在操作吊篮5上对预修复的冷却塔1进行处理修复,对于距操作吊篮5水平距离较远的部位,利用钢丝绳腰线3上的牵引绳4进行水平方向牵引控制移动,使施工人员能够接触到预修复的冷却塔1外壁,方便处理修复(图3);
第四步,施工人员通过操作吊篮5上下升降及水平移动对预修复的冷却塔1外壁修复完毕后,拆除操作吊篮5及钢丝绳腰线3,最后形成符合外观要求的冷却塔7(图4)。
该施工方法简单易操作,且安全可靠,不需要搭设脚手架及吊车的全程配合,节省了大量的吊车台班及人力、物力,大大降低了施工成本,具有良好的经济效益。
附图说明
图1为预修复的冷却塔腹部加设钢丝绳腰线图。
图2为预修复的冷却塔外壁设置操作吊篮图。
图3为预修复的冷却塔外壁处理修复图。
图4为冷却塔外壁修复完毕,符合外观要求图。
图中,预修复的冷却塔1、小型吊车2、钢丝绳腰线3、牵引绳4、操作吊篮5、卷扬吊绳6、符合外观要求的冷却塔7。
具体实施方式
图1-图4为本发明的一种具体实施方式。具体实施方式如下:
第一步,利用小型吊车2将钢丝绳腰线3固定在预修复的冷却塔1曲线腹部最小外径位置,同时根据操作吊篮5的数量在钢丝绳腰线3上设置相同数量的牵引绳4;
第二步,在预修复的冷却塔1上设置操作吊篮5,利用卷扬吊绳6控制上下升降,同时利用钢丝绳腰线3上的牵引绳4水平方向牵引移动;
第三步,施工人员在操作吊篮5上对预修复的冷却塔1进行处理修复,对于距操作吊篮5水平距离较远的部位,利用钢丝绳腰线3上的牵引绳4进行水平方向牵引控制移动,使施工人员能够接触到预修复的冷却塔1外壁,方便处理修复;
第四步,施工人员通过操作吊篮5上下升降及水平移动对预修复的冷却塔1外壁修复完毕后,拆除操作吊篮5及钢丝绳腰线3,最后形成符合外观要求的冷却塔7。
Claims (1)
1.一种腹部加设操作腰线修复冷却塔外壁的施工方法,其特征在于,具体步骤如下:
第一步,利用小型吊车(2)将钢丝绳腰线(3)固定在预修复的冷却塔(1)曲线腹部最小外径位置,同时根据操作吊篮(5)的数量在钢丝绳腰线(3)上设置相同数量的牵引绳(4);
第二步,在预修复的冷却塔(1)上设置操作吊篮(5),利用卷扬吊绳(6)控制上下升降,同时利用钢丝绳腰线(3)上的牵引绳(4)水平方向牵引移动;
第三步,在操作吊篮(5)上对预修复的冷却塔(1)进行处理修复,对于距操作吊篮(5)水平距离较远的部位,利用钢丝绳腰线(3)上的牵引绳(4)进行水平方向牵引控制移动,使施工人员能够接触到预修复的冷却塔(1)外壁,方便处理修复;
第四步,施工人员过操作吊篮(5)上下升降及水平移动对预修复的冷却塔(1)外壁修复完毕后,拆除操作吊篮(5)及钢丝绳腰线(3),最后形成符合外观要求的冷却塔(7)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811558368.4A CN109457970A (zh) | 2018-12-19 | 2018-12-19 | 一种腹部加设操作腰线修复冷却塔外壁的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811558368.4A CN109457970A (zh) | 2018-12-19 | 2018-12-19 | 一种腹部加设操作腰线修复冷却塔外壁的施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109457970A true CN109457970A (zh) | 2019-03-12 |
Family
ID=65613963
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811558368.4A Pending CN109457970A (zh) | 2018-12-19 | 2018-12-19 | 一种腹部加设操作腰线修复冷却塔外壁的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109457970A (zh) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102807178A (zh) * | 2011-06-03 | 2012-12-05 | 江苏雄宇重工科技股份有限公司 | 倒斜角滑轨吊篮装置 |
CN103239183A (zh) * | 2013-05-24 | 2013-08-14 | 博宇(无锡)科技有限公司 | 吊篮斜面移动机构 |
CN204873353U (zh) * | 2015-07-07 | 2015-12-16 | 中国建筑第八工程局有限公司 | 倾斜吊篮装置 |
CN105298103A (zh) * | 2015-10-09 | 2016-02-03 | 宁波建乐建筑装潢有限公司 | 外倾式吊篮施工装置 |
CN205023653U (zh) * | 2015-10-14 | 2016-02-10 | 北京国岩华北技术检测有限公司 | 一种应用于自然通风双曲线冷却塔内壁施工的设备 |
JP2018143476A (ja) * | 2017-03-06 | 2018-09-20 | 株式会社東芝 | 無胴綱検知装置及びその方法 |
-
2018
- 2018-12-19 CN CN201811558368.4A patent/CN109457970A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102807178A (zh) * | 2011-06-03 | 2012-12-05 | 江苏雄宇重工科技股份有限公司 | 倒斜角滑轨吊篮装置 |
CN103239183A (zh) * | 2013-05-24 | 2013-08-14 | 博宇(无锡)科技有限公司 | 吊篮斜面移动机构 |
CN204873353U (zh) * | 2015-07-07 | 2015-12-16 | 中国建筑第八工程局有限公司 | 倾斜吊篮装置 |
CN105298103A (zh) * | 2015-10-09 | 2016-02-03 | 宁波建乐建筑装潢有限公司 | 外倾式吊篮施工装置 |
CN205023653U (zh) * | 2015-10-14 | 2016-02-10 | 北京国岩华北技术检测有限公司 | 一种应用于自然通风双曲线冷却塔内壁施工的设备 |
JP2018143476A (ja) * | 2017-03-06 | 2018-09-20 | 株式会社東芝 | 無胴綱検知装置及びその方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103603504B (zh) | 超高层建筑机电大口径立管随主体进度吊装施工的方法 | |
CN105442865B (zh) | 一种高耸烟囱逐段拆除方法及其设备 | |
CN205171975U (zh) | 基于bim技术的风管安装平台 | |
CN204185120U (zh) | 移动式设备就位小车 | |
CN204311461U (zh) | 滑屉式伸缩钢箱预应力钢管支撑短节 | |
CN203654702U (zh) | 一种钢筋混凝土烟囱施工操作平台 | |
CN109457970A (zh) | 一种腹部加设操作腰线修复冷却塔外壁的施工方法 | |
CN105438982A (zh) | 高炉热风炉炉箅子的快速更换方法 | |
CN104058333B (zh) | 一种地下核电站反应堆厂房环形吊车大梁吊装方法 | |
CN203437842U (zh) | 管道焊接平台 | |
CN102730574A (zh) | 基于建筑全寿命周期建筑部品外墙导入的屋顶起吊设备 | |
CN202055507U (zh) | 一种脱硫塔检修平台 | |
CN204873680U (zh) | 一种便携移动式建筑起吊机装置 | |
CN104018657A (zh) | 一种采用水平滑移平台施工高大挑檐的方法 | |
CN204549879U (zh) | 一种拆除竖炉导风墙的装置 | |
CN206550561U (zh) | 封闭竖井内逐根竖向提升式大型管道焊接安装结构 | |
CN203905436U (zh) | 钢烟囱环形安装平台 | |
CN203594215U (zh) | 高空大面积作业平台半自动提升装置 | |
CN102320525A (zh) | 一种单梁式悬臂吊 | |
CN102277957B (zh) | 一种脱硫塔检修平台 | |
CN104030190B (zh) | 立式大口径管道安装同步提升平台 | |
CN206203763U (zh) | 自行式楼面吊装装置 | |
CN206570361U (zh) | 一种大型转炉炉衬上修修砌装置 | |
CN203922591U (zh) | 立式大口径管道安装同步提升平台 | |
CN104652804A (zh) | 一种在高炉内自由升降的操作平台及搭建方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190312 |
|
WD01 | Invention patent application deemed withdrawn after publication |