CN109424962A - Garbage combustion device - Google Patents

Garbage combustion device Download PDF

Info

Publication number
CN109424962A
CN109424962A CN201810967178.1A CN201810967178A CN109424962A CN 109424962 A CN109424962 A CN 109424962A CN 201810967178 A CN201810967178 A CN 201810967178A CN 109424962 A CN109424962 A CN 109424962A
Authority
CN
China
Prior art keywords
rubbish
amount
supply
combustion device
garbage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810967178.1A
Other languages
Chinese (zh)
Inventor
佐佐木浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ebara Environmental Plant Co Ltd
Original Assignee
Ebara Environmental Plant Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ebara Environmental Plant Co Ltd filed Critical Ebara Environmental Plant Co Ltd
Publication of CN109424962A publication Critical patent/CN109424962A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G5/00Incineration of waste; Incinerator constructions; Details, accessories or control therefor
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G5/00Incineration of waste; Incinerator constructions; Details, accessories or control therefor
    • F23G5/44Details; Accessories
    • F23G5/442Waste feed arrangements
    • F23G5/444Waste feed arrangements for solid waste
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G5/00Incineration of waste; Incinerator constructions; Details, accessories or control therefor
    • F23G5/50Control or safety arrangements

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Incineration Of Waste (AREA)
  • Fluidized-Bed Combustion And Resonant Combustion (AREA)

Abstract

The present invention provides a kind of garbage combustion device, by identifying the rubbish fallen and the rubbish not fallen, can more accurately calculate the supply amount of rubbish.There are incinerator (100) fluidized bed incinerator (20), rubbish to supply machine (10), range determination portion (42) and processing unit (70).Fluidized bed incinerator (20) makes incineration firing.Rubbish supplies machine (10) and supplies rubbish to fluidized bed incinerator (20).The delay rubbish for supplying non-delay rubbish in the rubbish that machine (10) are supplied to fluidized bed incinerator (20), falling to fluidized bed incinerator (20) using range determination portion (42) and processing unit (70) identification from rubbish and not fallen to fluidized bed incinerator (20).

Description

Garbage combustion device
Technical field
The present invention relates to garbage combustion devices.
Background technique
The waste incineration of burning disposal is carried out in waste uneven and flammable to urban waste, industrial waste etc. In device, burned to as the rubbish for being incinerated object, furthermore, it is desirable to by when burning the harmful substance that is discharged inhibit at Minimum limit.In addition, in the facility for being provided with boiler, it is desirable that using the higher UTILIZATION OF VESIDUAL HEAT IN of efficiency as target.In order to make this two Person meets, it is necessary to be the facility that extra air investment incinerator is not realized to completely burned with lower oxygen concentration.
The reason is that if excessive Cryogenic air is put into incinerator, ignition temperature drop in order to improve oxygen concentration Low and generate imperfect combustion, harmful substance increases or efficiency reduces.In addition, if increasing air capacity, the electric power of air blower at This rising, and exhausted air quantity increases.If increasing air capacity, useful metal is more aoxidized, and accordingly, there exist the recycling of metal A possibility that recycling cost increase.On the contrary, oxygen concentration is too low if reducing air capacity excessively, then the production of harmful CO is generated Raw amount increases such problems.
Shape, the size of urban waste, industrial waste etc. are multifarious, and various substances twine network together.All the time, There is known various rubbish feed systems (the rubbish supply units such as rubbish supply machine), if substantially distinguishing, there is broken rubbish Rubbish and carry out the system of rubbish supply and carry out system the two systems of rubbish supply with no crumbling method.With no crumbling method The system of rubbish supply is carried out compared with broken and carry out the system of rubbish supply, is substantially influenced by rubbish character.That is, by The size of the rubbish of supply is varied, and rubbish supplies the discharge characteristic of machine (rubbish supply unit) significantly by the shadow of its character It rings.
For example, rubbish supply machine be screw rod (screw) form in the case where, can following formula find out conveying weight.In Q In=60 × Φ × π × D × D/4 × S × N × γ formula, the outer diameter of D=helical blade, the screw pitch of S=screw thread, Φ=section effect Rate, the revolving speed of N=screw rod, γ=specific gravity (conveyer calculating method Zhen Dao fourth of the twelve Earthly Branches Taro writes engineering Book Publishing).In the formula, Section efficiency and specific gravity change because of substance.Thus, using screw rod transmission urban waste etc., conveying capacity is significantly It is influenced by rubbish character.
In addition, there is the case where rubbish bigger than screw diameter is put into, to swallowing up for screw rod without broken The case where being obstructed, carrying out screw rod transmission with constant basis is impaired.Moreover, being deposited in the case where rubbish is fallen from the end of screw rod In following situation: rubbish twines network each other, becomes bulk, does not fall easily.Also, pendency is fallen quickly in the groove portion for falling mouth.
These problems are the peculiar problems such as urban waste, industrial waste that shape is widely varied, especially in nothing It is more significant in the case where broken.Generally as the fluidized bed incinerator of garbage combustion device since the starting of burning is easy, combustion The result of burning ash obtained is dry and clean, therefore, the incinerator suitable for urban waste.But, due to burning velocity compared with Fastly, so the variation of the quantity of refuse of investment can significantly influence the variation of burning.As its countermeasure, the flowing of flow media is carried out Slowization of change, the faster rubbish supply amount control of the response that brightness in furnace is utilized, the control of auxiliary air amount.
In order to reduce quantity of refuse variation influence, most preferably inhibit the variation of rubbish supply amount, for this purpose, as to from rubbish , there is stream documented by such as Japanese Unexamined Patent Publication 2000-356334 bulletin in the method that the rubbish that rubbish supply machine is fallen is measured Change bed incinerator.In the fluidized bed type incinerator, can observe rubbish from rubbish supply machine rubbish outlet The position of situation under clan is equipped with television camera.It is fallen using television camera to dangling from the outlet of rubbish supply machine Under rubbish shot, utilize image procossing (binaryzation of image) to calculate the center of gravity and area of rubbish taken.In this way One, it utilizes the center of gravity of calculated rubbish and area to calculate and separates each of rubbish when falling from the outlet of rubbish supply machine A amount.Using the movement speed of center of gravity and the product of area as the amount of rubbish.It can be according to the amount of the rubbish calculated, to rubbish Rubbish supply amount, primary air amount (moving air amount), auxiliary air amount are controlled.
This method calculates the area of the rubbish fallen from the outlet pendency of rubbish feedway.The rubbish of pendency is sometimes temporary When be stranded in the outlet of rubbish feedway.There are the following problems: the rubbish along delay can not be identified using the binaryzation of image The rubbish that the surface layer of rubbish is fallen can not accurately hold supply amount.For example, existing on the bedding of white in same color White garbage can not examine the rubbish fallen in the case where the bedding of white is detained, white garbage is fallen on it It surveys.In the image information that color, brightness etc. are obtained by television camera, identical (the identical face of image information can not be identified Color or identical brightness etc.) rubbish fallen and the rubbish not fallen.In Japanese Unexamined Patent Publication 2000-356334 bulletin, in phase In the case where rubbish with color, the rubbish fallen and the rubbish not fallen cannot be distinguished from.The rubbish of same color the case where Under, absolutely not consider to be individually recognizable the rubbish fallen and the rubbish not fallen.As a result, accurate rubbish can not be calculated Amount.
Existing technical literature
Patent document
Patent document 1: Japanese Unexamined Patent Publication 2000-356334 bulletin
Summary of the invention
A form of the invention is made into eliminate such problems point, and its purpose is to provide a kind of rubbish to burn Device is burnt, which can more accurately calculate by being individually recognizable the rubbish fallen and the rubbish not fallen The supply amount of rubbish.
To solve the above-mentioned problems, in the 1st form, use such as flowering structure: a kind of garbage combustion device, feature exist In the garbage combustion device includes combustion section, can make incineration firing;Rubbish supply unit is used to supply to the combustion section To the rubbish;And portion is individually identified, it can be individually recognizable and be supplied to the combustion section from the rubbish supply unit Multiple rubbish, the multiple rubbish being identified individually include the non-delay rubbish fallen to the combustion section and not The delay rubbish fallen to the combustion section.
In the present embodiment, have and be individually recognizable the non-delay rubbish fallen to combustion section and not to burning clan Under delay rubbish portion is individually identified, therefore, combined with such as prior arts such as Japanese Unexamined Patent Publication 2000-356334 bulletin When getting up, the amount of the non-delay rubbish only fallen to combustion section can be calculated.As a result, it is possible to more accurately calculate the confession of rubbish To amount.For example, non-delay rubbish can be only individually recognizable and selected out of television camera is exported image information, for Selected non-delay rubbish is applicable in the calculation method of the area of rubbish shown in Japanese Unexamined Patent Publication 2000-356334 bulletin, calculates The amount of rubbish out.Here, in this case, the amount of rubbish is the area of rubbish or falling for volume and the rubbish The product of speed.In addition, in the speed of fall of rubbish is in a certain range so as to be considered constant in the case where, rubbish Amount is the area or volume of rubbish.The area or volume of rubbish are the rubbish from the mechanism of the measurement rubbish such as television camera Outer surface projected area or rubbish outer surface volume.
It is further possible to pass through the following theory that portion Yu the unfavorable image information exported with television camera will be individually identified Bright method combination, and the method different from the method for Japanese Unexamined Patent Publication 2000-356334 bulletin is utilized to calculate non-delay rubbish Amount.
In the 2nd form, such as flowering structure is used: according to the garbage combustion device of the 1st form, which is characterized in that described Portion is individually identified with range determination portion, the range determination portion can be measured to be supplied from the rubbish supply unit to the combustion section The distance between the rubbish given and the range determination portion, the portion of being individually identified have processing unit, and the processing unit will From the rubbish supply unit into the rubbish that the combustion section supplies, described distance with time going by and change The rubbish is identified as the non-delay rubbish, by the distance with time going by and the indeclinable rubbish is identified as The delay rubbish.
In the 3rd form, such as flowering structure is used: according to the garbage combustion device of the 1st or the 2nd form, which is characterized in that The garbage combustion device has the amount of a falling calculation section, described in which calculates and identified as the portion of being individually identified The non-amount for being detained rubbish.
In the 4th form, such as flowering structure is used: according to the garbage combustion device of the 3rd form, which is characterized in that the rubbish Rubbish incinerator have the 1st supply control part, the 1st supply control part based on the calculating it is described it is non-be detained rubbish amount, The rubbish supplied from the rubbish supply unit to the combustion section is controlled in the mode for keeping the non-amount for being detained rubbish constant The amount of rubbish.
In the 5th form, such as flowering structure is used: according to the garbage combustion device of the 4th form, which is characterized in that described Rubbish supply unit includes rubbish supply machine, by the rubbish supplied from the rubbish supply unit to the combustion section to institute State combustion section conveying;With scraping machine, immediately configured after rubbish supply machine, scraping by rubbish supply machine conveying Lai The rubbish and conveyed to the combustion section, the 1st supply control part controls the rubbish supply machine and/or the scraping Machine, thus the amount for the rubbish that control is supplied from the rubbish supply unit to the combustion section.
In the 6th form, use such as flowering structure: according to the garbage combustion device of the 1st to any of 4th form, Be characterized in that, the garbage combustion device have hold-up calculation section, the hold-up calculation section calculate from the rubbish supply unit to The hold-up of the rubbish of the combustion section supply.
In the present embodiment, the hold-up of the rubbish supplied to combustion section can be held.The hold-up of rubbish is to fall Speed is the steady state value non-amount for being detained rubbish below and the sum of the amount for being detained rubbish.It, can by holding the hold-up of rubbish The control of rubbish supply unit is changed according to the hold-up of rubbish.The outlet of the hold-up, i.e. rubbish supply unit of rubbish can be reduced Therefore the hold-up of the rubbish at place can make more stableization of burning.The reason is that it is detained the amount of rubbish due to that can reduce, Therefore the destabilization burnt caused by being plunked down by delay rubbish can be reduced.
Shape, material, the size of rubbish are diversified, moreover, various rubbish twine network each other, in rubbish supply unit The delay of temporary rubbish is generated at outlet (outlet of rubbish feedway).As a result, to the rubbish of the supplies such as fluidized bed incinerator The hold-up of rubbish changes, and becomes the stabilized main cause for interfering burning.According to the present embodiment, it burns more stableization.
In the 7th form, use such as flowering structure: according to garbage combustion device documented by the 6th form, feature exists There is the 2nd supply control part in, the garbage combustion device, the hold-up of the 2nd supply control part based on the calculating, When the hold-up is pre-determined specified amount or more, the rubbish supply unit is controlled, reduces the hold-up.
In the 8th form, such as flowering structure is used: according to the garbage combustion device of the 7th form, which is characterized in that described Rubbish supply unit includes rubbish supply machine, by the rubbish supplied from the rubbish supply unit to the combustion section to institute State combustion section conveying;With scraping machine, close to the rubbish supply machine after configure, scraping by the rubbish supply machine convey Lai The rubbish and conveyed to the combustion section, the 2nd supply control part controls the rubbish supply machine and/or the scraping Machine, thus the amount for the rubbish that control is supplied from the rubbish supply unit to the combustion section.
In the 9th form, use such as flowering structure, according to the garbage combustion device of the 3rd to any of 8th form, It is characterized in that, which has air control unit, the non-delay rubbish of the air control unit based on the calculating The amount of rubbish calculates the requirement of auxiliary air required for the non-burning for being detained rubbish, to control to the combustion section The supply amount of the auxiliary air of supply.
In the 10th form, use such as flowering structure: according to the garbage combustion device of the 1st to any of 9th form, It is characterized in that, the garbage combustion device includes speed calculation section, and calculating is identified described non-by the delay identification part It is detained the speed of fall of rubbish;Determination unit determines whether the generation of suspension combustion based on the speed of fall calculated;With And mixing part is in the rubbish supply unit when the determination unit is judged to producing suspension combustion and supplies rubbish The stirring of the rubbish in the rubbish pit slot of rubbish.
In the present embodiment, the non-speed of fall for being detained rubbish can be calculated.Falling for rubbish can be detained according to non- Speed determines that for example whether there is or not the generations of suspension combustion.In the case where producing judgement result as suspension combustion, or outstanding In the case where determining result as a possibility that floating burning generation is high, according to the stirring for determining result progress rubbish supply unit. Lighter rubbish is mixed with heavier rubbish using stirring, and rubbish is made averagely to become weight.The non-speed of fall for being detained rubbish becomes Greatly, the generation of unburned part can be reduced.This depends on following reason.
Shape, material, the size of rubbish are diversified, in addition, various rubbish twine network each other, become and interfere burning Stabilized main cause.Especially, it is supplied if being readily able to the rubbish to swim to fluidized bed incinerator, lighter rubbish does not exist Siege burns but is easy to burn in the top (dilute-phase zone) of siege.Siege is high temperature, and dilute-phase zone is relatively low temperature, It is easy to cause imperfect combustion.Accordingly, there exist the generations of unburned part to become more such problems.
In the 11st form, use such as flowering structure: according to the garbage combustion device of the 1st to the 10th any one form, It is characterized in that, the garbage combustion device includes incombustible identification part, identifies incombustible;With non-ignitable object amount calculation section, calculate The amount of the incombustible identified out.
In the present embodiment, the amount of incombustible can be calculated.If incombustible exceedingly lodges in siege, generation is located at The flowing of the flow media of siege is bad.Flow media is used to conduct heat to rubbish, since the flowing of flow media is bad, not to rubbish Rubbish heat transfer, is easy to cause imperfect combustion.Therefore, it needs to select incombustible from siege in operation.From fluidized combustion When furnace selects incombustible, the flow media selected simultaneously returns again to fluidized bed incinerator.When returning, flow media Pass through in the piping being set to outside combustion furnace.At this point, generating heat dissipation from flow media, flow media is cooled.Flowing is situated between Matter, which also has, maintains heat accumulation function as high temperature for siege.Since flow media is cooled, fluidized bed incinerator The main reason for thermal efficiency reduces, and becoming the efficiency for the power generation that waste heat is utilized reduces.According to the present embodiment, it can reduce and want Therefore the mass of flow medium selected can reduce thermal losses, be able to ascend generating efficiency.
In the 12nd form, such as flowering structure is used: according to the garbage combustion device of the 11st form, which is characterized in that institute Stating garbage combustion device is fluidized bed incinerator, and the garbage combustion device has the amount of selecting calculation section, the amount of the selecting calculation section The non-ignitable object amount based on the calculating calculates the amount of selecting for the flow media that be discharged from the fluidized bed incinerator.
In the 13rd form, according to the garbage combustion device of the 1st to any of 11st form, which is characterized in that described Garbage combustion device is fluidized bed incinerator.
In the 14th form, according to the garbage combustion device of the 1st to any of 11st form, which is characterized in that described Garbage combustion device is grate type incinerator.
Detailed description of the invention
Fig. 1 is the integrally-built figure for indicating the fluidized bed incinerator of one embodiment of the present invention.
Fig. 2 is the figure for indicating the structure of rubbish supply unit of the fluidized bed incinerator of one embodiment of the present invention.
Fig. 3 is the top view of rubbish feed screw viewed from above.
Fig. 4 is the figure for illustrating the calculation method of volume.
Specific embodiment
Hereinafter, the embodiments of the present invention will be described with reference to the drawings.In addition, in each of the following embodiments, phase Same or comparable component marks identical appended drawing reference, and the repetitive description thereof will be omitted.As one embodiment of the present invention, in Fig. 1 In show by the present invention be suitable for fluidized bed incinerator garbage combustion device example.In addition, the present invention also can Suitable for the garbage combustion device with such as grate type incinerator (layer burner) other than fluidized bed incinerator.
The fluidized bed incinerator 20 of garbage combustion device 100 shown in FIG. 1 has fluidized bed portion 21 and dilute-phase zone (free Board) portion 22.In fluidized bed portion 21, from moving air of the lower part of quartz sand etc. (flow media) supply after pressurized, store Quartz sand of heat etc. flows and forms fluidized bed.Rubbish burns in fluidized bed portion 21.The combustion reaction of rubbish is in fluidized bed portion It does not finish in 21, therefore, to being set to 22 feeding secondary air of dilute-phase zone portion on 21 top of fluidized bed portion, and keeps unburned part complete Full burning.Fluidized bed portion 21 and dilute-phase zone portion 22 constitute the combustion section that can make incineration firing.In fluidized bed incinerator 20 In, control moving air amount, supplies the supply amount of the rubbish of machine from rubbish and controls burning auxiliary air amount.
Fig. 1 is the integrally-built figure for indicating to have the incinerator 100 of fluidized bed incinerator.As illustrated, make For the conveying mechanism of rubbish, the rubbish supply machine 10 for having rubbish feed screw 11 has been used.Rubbish supplies machine 10 will be from hopper 12 convey to the rubbish that fluidized bed incinerator 20 supplies to fluidized bed incinerator 20.Put into the rubbish 13 of hopper 12 to by The rubbish feed screw 11 that motor 14 drives conveys.Rubbish 13 is further arranged at the broken of the discharge unit of rubbish supply machine 10 The scraping screw rod 16 of broken discharge machine 15 is broken.Later, it is supplied via the groove portion 17 as investment access to fluidized bed incinerator 20 It gives.Hopper 12 and rubbish supply machine 10 are constituted for the rubbish supply unit to combustion section supply rubbish.Broken discharge machine 15 is to scrape Take machine, which immediately configures after rubbish supply machine 10, scraping by rubbish supply machine 10 conveying Lai rubbish and to fluidisation Bed incinerator 20 conveys.
Fluidized bed incinerator 20 is also equipped with flow media and selects other than having fluidized bed portion 21, dilute-phase zone portion 22 Device 23 etc..Moving air is supplied from air blower 31 via regulating valve 32 to fluidized bed portion 21, and auxiliary air is by from air blower 33 supply via regulating valve 34 to dilute-phase zone portion 22.The combustion of the rubbish in fluidized bed incinerator 20 is put by groove portion 17 It burns, burning gases carry out recuperation of heat by boiler 35.Later, burning gases are removed coal dust by bag hose 36, from Chimney 37 is discharged to atmosphere.
Fluidized bed incinerator 20 has range determination portion 42, which is set in visual field comprising conduct The position of the groove portion 17 of the investment access of the discharge unit and rubbish of rubbish supply machine 10 (enters visual field in the rubbish that groove portion 17 is fallen Position).Range determination portion 42 can measure the rubbish supplied from rubbish supply machine 10 to fluidized bed incinerator 20 and distance The distance between determination part 42.Processing unit 70 is entered measured distance.Processing unit 70 will be from rubbish based on the distance inputted Know boundary line between in the rubbish that rubbish supply machine 10 is supplied to fluidized bed incinerator 20, continuous data and non-continuous data Not Wei rubbish boundary line.Non-continuous data refer to for example due to from range determination portion 42 when rubbish, the shape of rubbish There are difference in height to from range determination portion 42 when rubbish, the distance between rubbish and range determination portion 42 become not connect Continuous data.
At a distance from being identified as between the rubbish of boundary line with time going by and change in the case where, by the rubbish Rubbish is identified as non-delay rubbish, will apart from time going by and indeclinable rubbish be identified as be detained rubbish, identify as a result, Non- delay rubbish and delay rubbish.Range determination portion 42 and processing unit 70 be configured to be individually recognizable from rubbish supply machine 10 to Non- delay rubbish, Yi Jiwei in multiple rubbish that fluidized bed incinerator 20 supplies, fallen to fluidized bed incinerator 20 Portion is individually identified in the delay rubbish fallen to fluidized bed incinerator 20.The multiple rubbish being individually recognizable include to combustion section The non-delay rubbish fallen and the delay rubbish not fallen to combustion section.Then illustrate range determination portion 42 and processing unit 70 Details.
Information relevant to the non-delay rubbish identified from processing unit 70 is sent to processing unit 43.Utilize processing The rubbish amount of the falling calculation section 43a of device 43 calculates the amount of falling of the non-delay rubbish identified by the portion of being individually identified.It will calculate Result is exported to control unit 39 out.In addition it is also possible to be that rubbish calorific value calculation section 43b is set to the rubbish amount of falling and is calculated The back segment of portion 43a calculates the amount of falling and rubbish of rubbish using the rubbish amount of falling calculation section 43a and rubbish calorific value calculation section 43b The calorific value of rubbish exports the calculating result of two sides to control unit 39.
Output of the control unit 39 based on the amount of falling calculation section 43a drives rubbish to supply spiral shell to via revolution speed control device 40 The revolving speed of the motor 14 of bar 11 is controlled.In addition, output of the control unit 39 based on the amount of falling calculation section 43a, broken by driving The revolving speed of the motor 18 of the scraping screw rod 16 of broken discharge machine 15 is controlled into defined revolving speed.Control unit 39 utilizes motor 14 The revolving speed of revolving speed control and motor 18 controls, and the input amount of rubbish 13 is controlled in the mode for keeping the non-amount for being detained rubbish constant.
The details of determination part 42 and processing unit 70 of adjusting the distance is illustrated.As long as range determination portion 42 can measure from Rubbish supplies the distance between the rubbish that machine 10 is supplied to fluidized bed incinerator 20 and range determination portion 42, it will be able to use and appoint The device of meaning mode.For example, there is the dimension distance of acquirement 3 for being referred to as TOF mode (Time Of Flight: the flight time of light) The method of information.It is according to TOF mode, then three-dimensional and in real time with such as 50FPS (frames per second: frame/second) Obtain 3 dimension range informations.It can obtain each in the shooting such as depth, height, shape, positional relationship until object space Information.
In TOF mode, passed using the high speeds such as LED, laser light source, the cmos image for obtaining range image data Sensor.Light by each the real time measure according to for example, about 20,000 points of each pixel from high speed light source light projector to rubbish etc. touches Time for returning to rubbish etc., obtain range image.While measuring target object as a result, three-dimensionally, output is obtained Information.The light of institute's light projector is in pulse type high speed scintillation.Use the range image camera of cmos image sensor using phase Potential difference method measures the degree of the phase delay of the reflected light from rubbish etc., to carry out distance measuring.
Phase difference method utilizes following content: when distance is 0m, the phase delay of reflected light (that is, with the light of institute light projector it Between phase difference) be 0 °, if phase difference becomes larger, distance becomes remote.The light for being set as delaying 1 pulse has 360 ° of phase difference. For example, the reflected light for being set as half pulse of delay and receiving has 180 ° of phase difference.In the method for metering phase difference, relatively Phase is set to be staggered bit by bit in the phase of light projector pulse to carry out light.With such as 0 °, 90 °, 180 °, 270 ° of phase difference Carry out light.Make to change it in the charge accumulation and equalization of each phase institute light and be compared.0 °, 90 °, 180 °, In the case where 270 ° of phase difference, by 4 values phase adduction obtained divided by 4.
Illustrate the case where carrying out light with such as 0 °, 180 ° of the two phase differences.If to the pixel detected with 0 ° of phase difference (pixel A) and the output of pixel (pixel B) detected with 180 ° of phase difference are compared, if then rubbish be in away from high speed light source away from From the position for 0m, then 100% voltage is generated in the output of pixel A, does not generate voltage in pixel B.The output is with away from height The distance of fast light source is separate and changes, with apart from separate, the pixel set in a manner of being detected when phase difference is larger Output becomes larger.
Since the output of the different pixel of phase difference is different, to speculate phase difference, distance is calculated according to phase difference.Example Such as, for 270 ° of phase difference of output corresponding with remote object is in, object is in more remote output more Greatly.In fact, the phase difference (that is, remote) of 360 ° of wholes can not be only coped with two phase differences, therefore, in each photographed frame In, by be set to 0 °, 90 °, 180 °, 4 pixels close on the cmos image sensor of 270 ° of phase difference be set as 1 group, to 4 The output of pixel is compared, it is ensured that the measurement accuracy of distance.
The 3 dimension range informations between the rubbish as measure object and range determination portion 42 are obtained by range determination portion 42 After, processing unit 70 will in the rubbish that supplied to fluidized bed incinerator 20 according to 3 dimension range informations using the following method , with the distance between range determination portion 42 with time going by and the rubbish that changes is identified as non-delay rubbish.It is specific and Speech, processing unit 70 tie up 3 dimensions range information (asking poor) before range informations subtract 1 frame from the 3 of a certain moment.Passing through subtraction And in the 3 dimension range informations obtained, only 3 dimension range information presentation relevant to mobile rubbish, the i.e. rubbish that falls centainly with On value.3 dimension range information relevant to the rubbish not moved, the i.e. rubbish that does not fall does not change in time or has micro- Small change, therefore, subtraction as a result, being presented zero or certain the following value.
Based on the point for the point and the certain the following value of expression for indicating more than a certain amount of value, processing unit 70 identifies the rubbish fallen The boundary of (non-delay rubbish), the i.e. non-profile for being detained rubbish.For example, as shown in Fig. 2, non-delay rubbish 82 and delay if it exists Rubbish 80, then processing unit 70 can identify the profile of the non-delay rubbish 82 from the direction in range determination portion 42.
Processing unit 70 sends 3 dimension range informations of the non-delay rubbish 82 for identifying profile to processing unit 43.Below Indicate an example of the process flow by the non-delay rubbish 82 carried out of the amount of the falling calculation section 43a in processing unit 43.It is right Non- delay rubbish 82 after profile is identified carries out the calculating of the volume in profile as shown in Figure 4 respectively.Fig. 4 is root The case where non-delay rubbish 82 is cuboid is identified as according to the non-3 dimension range informations for being detained rubbish 82.Z-axis is gravity direction, x Axis, y-axis are horizontally oriented.In Fig. 4, x, y, z be respectively x-axis, y-axis, z-axis direction non-delay rubbish 82 length.X-axis, y Axis, z-axis constitute 3 dimension orthogonal coordinate systems.In the case of figure 4, it is x × y × z that the non-volume for being detained rubbish 82, which calculates,.
The non-shape for being detained rubbish 82 can also be approximately cylinder, prism, circular cone, pyramid etc. by the amount of falling calculation section 43a And find out volume.Alternatively, it is also possible to which volume is subdivided into 3 dimension elements according to the non-3 dimension range informations for being detained rubbish 82, and pass through Approximate calculation executes the volume integral of 3 dimensions.Then, for 1 frame of the 3 dimension range informations at a certain moment and the 3 dimension range information Captured non-delay rubbish 82 afterwards, is handled the most like object of its feature as identical non-delay rubbish 82.Example Such as, the processing that the most similar object of volume is regarded as to same object etc. is carried out.The reason is that in 3 acquired dimension range informations In the case where inside there are multiple non-delay rubbish 82, need to distinguish each non-delay rubbish 82 and calculate speed of fall etc..
Then, make difference, the i.e. moving distance of each non-position for being detained rubbish 82 multiplied by the volume calculated.Its reason exists In the product of volume and moving distance is considered the non-amount for being detained rubbish 82.Find out the product of these volumes and moving distance summation, The summation of the i.e. non-amount for being detained rubbish 82.From the amount of falling calculation section 43a by the signal for falling quantity of refuse after numeralization to control Portion 39 exports.
Speed of fall is the vertical speed downward of each non-position of centre of gravity for being detained rubbish 82, when this can be used as per unit Between moving distance calculate.In the present embodiment, the amount of rubbish refers to, for speed more than certain speed of fall Non- delay rubbish 82, the product of the volume and speed of fall in the region surrounded by the profile determined by range determination portion 42 it is total With.In addition, the amount of rubbish can also be set in the case where thinking that the mobility scale of speed of fall of non-delay rubbish 82 is relatively narrow For it is to the non-delay rubbish 82 with speed more than certain speed of fall relevant, determined by range determination portion 42 The summation of the volume in the region that profile surrounds.
In the present embodiment, control unit 39 is the amount based on the non-delay rubbish 82 calculated, so that non-delay rubbish The 1st confession that the amount of rubbish supply from rubbish supply machine 10 to fluidized bed incinerator 20 is controlled of the constant mode of amount To control unit and the 2nd supply control part.Control unit 39 controls rubbish supply machine 10 and/or scraping machine, so that control is supplied from rubbish To the amount for the rubbish that machine 10 is supplied to fluidized bed incinerator 20.Moreover, control unit 39 control to adjust valve 32 and regulating valve 34 from And control combustion air amount.In addition it is also possible to be provided separately the 1st supply control part and the 2nd supply control part.
The motor 18 of the scraping screw rod 16 of broken discharge machine 15 is driven to carry out inverter control by inverter panel 45.Separately Outside, the rotary shaft of setting scraping screw rod 16 mobile cylinder 41 and hydraulic device 44, can utilize 44 pairs of scraping spiral shells of hydraulic device The rotary shaft position of bar 16 is adjusted.The rotary shaft position of scraping screw rod 16 is based on the instruction of control unit 39 by hydraulic device 44 and cylinder 41 and be adjusted, displacement is detected by axis displacement transducer 46, and to control unit 39 feed back.
Amount of the control unit 39 based on the non-delay rubbish 82 calculated, with the mode control for keeping the non-amount for being detained rubbish 82 constant The revolving speed of scraping machine processed.It, being capable of thing for the relationship between the non-amount for being detained rubbish 82 and the revolving speed for the scraping machine that should be set Test is first passed through to find out.Alternatively, it is also possible to find out the relationship previously according to the service data of past fluidized bed incinerator 20.
As shown in figure 3, rubbish supply machine 10 has two opposite rubbish feed screws 11 of parallel and screw thread, can adjust Its whole axle base.Fig. 3 is the top view of rubbish feed screw 11 viewed from above.The position of one screw rod 11a is relative to rubbish It is fixed that rubbish supplies machine 10.Screw rod 11a is rotated by motor 14a.Another screw rod 11b is set on pedestal 72.Pedestal 72 It is set on the pedestal of incinerator 100 by guide rail (not shown).It can be made using cylinder and hydraulic device ((not shown)) Pedestal 72 is moved along guide rail to close to the direction 76 in the direction of screw rod 11a 74 and separate screw rod 11a.
Control unit 39 can utilize the position of hydraulic device adjustment screw 11b.The rotary shaft position of screw rod 11b is based on control The instruction in portion 39 is adjusted by hydraulic device and cylinder, and displacement is detected by axis displacement transducer 78, and anti-to control unit 39 Feedback.
Amount of the control unit 39 based on the non-delay rubbish 82 calculated, is controlled in the mode for keeping the supply amount of rubbish 13 constant The revolving speed of rubbish supply machine 10.It is turn of increase rubbish supply machine 10 in setting value situation below in the supply amount of rubbish 13 Speed reduces the revolving speed of rubbish supply machine 10 in the case where the supply amount of rubbish 13 is setting value or more.
In addition, amount of the control unit 39 based on the non-delay rubbish 82 calculated, calculates the auxiliary air amount of needs, to adjusting Valve 34 is adjusted and controls auxiliary air amount.For the pass between auxiliary air amount and the aperture of the regulating valve that should be set 34 System can be found out by test in advance.Alternatively, it is also possible to be asked previously according to the service data of past fluidized bed incinerator 20 The relationship out.
Then, the control of the rubbish feedway of the hold-up based on rubbish is illustrated.Control unit 39 is based on being calculated The hold-up of rubbish out expands the screw shaft of rubbish feedway in the case where the hold-up of rubbish becomes more than a certain amount of situation Between distance, promoted rubbish feedway in filling rate, fall the rubbish being detained.
In this case, the hold-up of rubbish is the delay rubbish 80 determined in range determination portion 42 Amount and speed of fall be certain non-the sum of amount for being detained rubbish 82 below.For example, processing unit 43 can be as follows Find out the hold-up of rubbish.By in the already described method for finding out " speed of fall is more than a certain amount of non-amount for being detained rubbish 82 " In find out speed of fall and be the amount of certain rubbish below, so that obtaining speed of fall is certain below non-to be detained rubbish 82 Amount.
The amount for being detained rubbish 80 can be found out as follows.Rubbish entirety and distance are being achieved by range determination portion 42 Between determination part 42 3 dimension range informations (this be and equipment, non-delays rubbish 82 and delay the entirety of rubbish 80 relevant 3 Tie up range information.Referred to as " Global Information ".) after, processing unit 70 can identify non-delay rubbish 82 using already described method Profile.In addition, processing unit 70 obtains in advance and is stored with 3 dimension range information relevant to the background of rubbish (that is, with fixed The relevant 3 dimension range information of equipment: it is known as " background information ")." background information " is subtracted from " Global Information ", moreover, will be by non- The region that the profile of delay rubbish 82 surrounds is set as outside the object calculated.Tie up range informations in 3 of non-zero in remaining region 3 dimension range information relevant to rubbish 80 is detained.According to the information, with non-delay rubbish 82 the case where in the same manner as find out volume. Volume is to be detained the amount of rubbish 80.
Hold-up for rubbish and the relationship between the screw rod axle base for the rubbish feedway that should be set, can It is found out in advance by test.Alternatively, it is also possible to find out the pass previously according to the service data of past fluidized bed incinerator 20 System.
Control unit 39 is carried out control as follows based on the hold-up of the rubbish calculated: the hold-up of rubbish become centainly with In the case where upper, the revolving speed of scraping machine is promoted, or scraping machine is made to scrape be detained rubbish close to rubbish feedway.Rubbish Hold-up and the scraping machine that should be set revolving speed between relationship can in advance by test find out.Alternatively, it is also possible to pre- The relationship is first found out according to the service data of past fluidized bed incinerator 20.
Then, control relevant to the generation whether there is or not suspension combustion is illustrated.Processing unit 43 has as has been described There is range determination portion 42 and calculates the function of the speed calculation section of the speed of fall of the non-delay rubbish 82 identified by processing unit 70 Energy.Processing unit 43 determines whether the generation of suspension combustion according to speed of fall.Processing unit 43 (determination unit) is based on being calculated Speed of fall determine whether the generation of suspension combustion.Calculate such as speed of fall non-delay rubbish 82 slower than freely falling Amount.When the amount is specified value or more, processing unit 43 is judged to producing suspension combustion.
Incinerator 100 has blender 86 (mixing part), which is determined as in processing unit 43 When producing suspension combustion, it is in the stirring of the rubbish into the rubbish pit slot 84 that rubbish supply machine 10 supplies rubbish.Rubbish Rubbish 13 is controlled and conveyed from rubbish pit slot 84 to blender 86 by loop wheel machine 88 by control unit 39.It is stirred being placed in blender 86 After, rubbish 13 is returned to rubbish pit slot 84.After loop wheel machine 88 can also convey stirring from rubbish pit slot 84 to hopper 12 Rubbish 13.
The reasons why being placed in blender 86 and being stirred is as described below.Shape, material, the size of rubbish are varied , various rubbish twine network each other, become the stabilized main cause for interfering burning.If be especially readily able to the rubbish to swim to Fluidized bed incinerator 20 supplies, then there are the following problems: not burning in fluidized bed portion 21, is easy to burn in dilute-phase zone portion 22, not The generation of combustion amount becomes more.Therefore, the generation that suspension combustion is determined whether according to the speed of fall of rubbish is carried out according to judgement result The stirring of rubbish pit slot 84.The generation of unburned part can be reduced using stirring.
Then, control relevant to the amount of selecting of the flow media based on non-ignitable object amount is illustrated.Firstly, to non-ignitable The identification of object amount and the calculating of non-ignitable object amount are illustrated.Garbage combustion device 100 is in order to identify that incombustible can include camera shooting Machine 90 carries out color camera;With processing unit 70, the processing according to the color image recognition incombustible taken is carried out.It takes the photograph Camera 90 and processing unit 70 constitute incombustible identification part.Processing unit 43 (non-ignitable object amount calculation section) calculates the incombustible identified Amount.Moreover, processing unit 43 is also further based upon the non-ignitable object amount calculating calculated should be discharged from fluidized bed incinerator Flow media the amount of selecting the amount of selecting calculation section.
The identification of incombustible carries out as follows.Hereinafter, being illustrated to the case where incombustible is metal.For non-ignitable The case where object is other than metal, also can the characteristics such as shape using similar method based on incombustible or color identified.
In the case where incombustible is metal, identified using brightness.Video camera 90 is to by red (Red), green (Green), 2 existing dimensions of blue (Blue) this 3 color table, i.e. plane color animation is shot.Video camera 90 can not be energy Enough obtain the video camera of 3 dimension range informations.Processing unit 70 calculates brightness according to the color image taken.Brightness can by with Under formula according to each ingredient of RGB calculate.Brightness=0.299 × R+0.587 × G+0.114 × B, here, brightness is to utilize Face three attributes of color (form and aspect, lightness, chroma) shows the brightness in the Meng Saier colour system of color.It, can also be with as brightness Using the brightness in other colour systems.Alternatively, it is also possible to calculate brightness using the formula different from above formula.
The rubbish that the brightness calculated is in the range of a certain value by processing unit 70 is identified as the gold with metallic luster Belong to rubbish, difference metal garbage and other objects are (that is, be distinguished as in addition to this other for object like above to a certain degree Object).It, can be by learning, i.e. past data determine for deciding whether the range of the value of the brightness for metal.It will Identify brightness difference point (point on the boundary line between metal garbage and nonmetallic rubbish) it is connected to each other made of line be The profile of metal.
Processing unit 43 finds out the area or volume in the region surrounded by profile.Area can be found out according only to profile. If can also find out volume using the information in range determination portion 42.It both can be according only to area, i.e., by the summation of area make For incombustible amount and calculate the amount of the incombustible identified, the amount of incombustible can also be calculated according to volume.Use volume Method can more accurately calculate the amount of incombustible.In addition, when calculating the amount of incombustible, as has been described, it is also contemplated that The speed of incombustible.That is, can also be using the product of the area of incombustible or volume and the speed of incombustible as the amount of incombustible.
In addition, can be carried out according to information relevant to color in the case where specific metal has specific color The identification of metal.Specifically, video camera 90 is to the dynamic of the existing colour of red (Red), green (Green), blue (Blue) this 3 color table Picture is shot.It is metal that each ingredient of RGB be in the color recognition in the range of a certain value for each pixel by processing unit 70 Gloss, difference metal and other objects.For decide whether be the value of each ingredient of the RGB of metal range, by learning, i.e. Past data determine.The point that the difference of each ingredient of RGB can be identified between adjacent point (is located at metal and non-gold Point on the boundary line of category) it is connected to each other made of line be metal profile.
For processing unit 43 (amount of selecting calculation section) based on the non-ignitable object amount calculated, calculating should from fluidized bed incinerator 20 The amount of selecting of the flow media of discharge.It, can for the relationship between the non-ignitable object amount calculated and the amount of selecting of flow media It is found out in advance by test.Alternatively, it is also possible to find out the pass previously according to the service data of past fluidized bed incinerator 20 System.
Control unit 39 carries out the control that flow media selects device 23 based on the amount of selecting calculated.Flow media selects dress The control for setting 23 is that flow media selects the actuation time of device 23 and acts the control of start time.By selecting flow media Device 23 acts out, carries out selecting and (selecting discharge) for flow media.For the amount of selecting calculated and the movement that should be set Relationship between control can be found out by test in advance.Alternatively, it is also possible to previously according to past fluidized bed incinerator 20 Service data find out the relationship.
Flow media selects progress as follows.Flow media is selected by being set to fluidized bed incinerator 20 The flow media of bottom selects the progress of device 23.Flow media select device 23 in order to will remain in furnace glass, sheet metal, Incombustible as pottery etc. is continuous or intermittently takes out to outside furnace, is set to fluidized bed incinerator 20.Incombustible and stream Dynamic medium is discharged to outside furnace for the time being together, and only incombustible is sorted machine screening, and (is not schemed using flow media circulator Show) recycle flow media into furnace again.Thereby, it is possible to continue good liquidation state.
The movement for further selecting device 23 to flow media is illustrated.Make from being set to fluidized bed incinerator 20 The mixture of incombustible and flow media that the incombustible outlet (not shown) of bottom is fallen is mobile to sorting machine.This implementation The flow media of mode selects device 23 with screw rod pressing machine, makes to fall from incombustible outlet using screw rod pressing machine Mixture is moved to sorting machine.Sorting machine makes flow media select the mixture separation that the conveying of device 23 comes from from flow media. The sorting machine of present embodiment separates flow media from mixture using sieve.Flow media circulator will be in sorting machine The flow media being separated is transported to the top of fluidized bed incinerator 20, puts into from top to fluidized bed incinerator 20 It is interior.When selecting flow media, act screw rod pressing machine.When not selecting flow media, stop screw rod pressing machine.
More than, the example of embodiments of the present invention is illustrated, but the embodiment of above-mentioned invention is for holding The readily understood present invention, is not intended to limit the present invention.The present invention without departing from its main purpose in the case of, can change, improve, and It and in the present invention certainly include its equivalent way.In addition, at least part of range for being able to solve above-mentioned problem, Or in at least part of range having effect, each component documented by claims and specification can be carried out Arbitrary combination is omitted.

Claims (14)

1. a kind of garbage combustion device comprising:
Combustion section can make incineration firing;
Rubbish supply unit is used to supply the rubbish to the combustion section;
Portion is individually identified, the multiple rubbish supplied from the rubbish supply unit to the combustion section can be individually recognizable Rubbish,
The multiple rubbish being identified individually include the non-delay rubbish fallen to the combustion section and not to the combustion Burn the delay rubbish under clan.
2. garbage combustion device according to claim 1, which is characterized in that
The portion of being individually identified has range determination portion, and the range determination portion can be measured from the rubbish supply unit to described The distance between the rubbish of combustion section supply and the range determination portion,
The portion of being individually identified has processing unit, the institute that the processing unit will be supplied from the rubbish supply unit to the combustion section State in rubbish, the described distance with time going by and the rubbish that changes is identified as the non-delay rubbish, will be described Distance with time going by and the indeclinable rubbish is identified as the delay rubbish.
3. garbage combustion device according to claim 1 or 2, which is characterized in that
The garbage combustion device has the amount of falling calculation section, and the amount of falling calculation section calculating is identified by the portion of being individually identified The non-amount for being detained rubbish.
4. garbage combustion device according to claim 3, which is characterized in that
The garbage combustion device has the 1st supply control part, the non-delay rubbish of the 1st supply control part based on the calculating The amount of rubbish is supplied from the rubbish supply unit to the combustion section with controlling the non-constant mode of amount for being detained rubbish The amount of the rubbish.
5. garbage combustion device according to claim 4, which is characterized in that
The rubbish supply unit includes rubbish supply machine, will be from the rubbish supply unit to described in combustion section supply Rubbish is conveyed to the combustion section;With scraping machine, immediately configured after the rubbish supply machine, scraping is supplied by the rubbish The next rubbish of machine conveying is simultaneously conveyed to the combustion section,
1st supply control part controls the rubbish supply machine and/or the scraping machine, so that control is supplied from the rubbish The amount for the rubbish that portion is supplied to the combustion section.
6. garbage combustion device according to any one of claim 1 to 4, which is characterized in that
The garbage combustion device has hold-up calculation section, which calculates from the rubbish supply unit to the combustion The hold-up of the rubbish of burning portion supply.
7. garbage combustion device according to claim 6, which is characterized in that
The garbage combustion device have the 2nd supply control part, the hold-up of the 2nd supply control part based on the calculating, When the hold-up is pre-determined specified amount or more, the rubbish supply unit is controlled, reduces the hold-up.
8. garbage combustion device according to claim 7, which is characterized in that
The rubbish supply unit includes rubbish supply machine, will be from the rubbish supply unit to described in combustion section supply Rubbish is conveyed to the combustion section;With scraping machine, immediately configured after the rubbish supply machine, scraping is supplied by the rubbish The next rubbish of machine conveying is simultaneously conveyed to the combustion section,
2nd supply control part controls the rubbish supply machine and/or the scraping machine, so that control is supplied from the rubbish The amount for the rubbish that portion is supplied to the combustion section.
9. the garbage combustion device according to any one of claim 3 to 8, which is characterized in that
The garbage combustion device has air control unit, the non-delay rubbish of the air control unit based on the calculating Amount, calculates the requirement of auxiliary air required for the non-burning for being detained rubbish, and controls to combustion section supply The supply amount of the auxiliary air.
10. garbage combustion device according to any one of claim 1 to 9, which is characterized in that
The garbage combustion device includes speed calculation section, calculates the non-delay identified by the portion of being individually identified The speed of fall of rubbish;Determination unit determines whether the generation of suspension combustion based on the speed of fall calculated;And Mixing part is in the rubbish supply unit when the determination unit is judged to producing suspension combustion and supplies rubbish Rubbish pit slot in the rubbish stirring.
11. garbage combustion device according to any one of claim 1 to 10, which is characterized in that
The garbage combustion device includes incombustible identification part, identifies incombustible;With non-ignitable object amount calculation section, institute is calculated The amount of the incombustible identified.
12. garbage combustion device according to claim 11, which is characterized in that
The garbage combustion device is fluidized bed incinerator, and the garbage combustion device has the amount of selecting calculation section, the amount of selecting The non-ignitable object amount of the calculation section based on the calculating calculates the choosing for the flow media that be discharged from the fluidized bed incinerator Output.
13. garbage combustion device according to any one of claim 1 to 11, which is characterized in that
The garbage combustion device is fluidized bed incinerator.
14. garbage combustion device according to any one of claim 1 to 11, which is characterized in that
The garbage combustion device is grate type incinerator.
CN201810967178.1A 2017-08-24 2018-08-23 Garbage combustion device Pending CN109424962A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2017160794A JP7009114B2 (en) 2017-08-24 2017-08-24 Garbage incinerator
JP2017-160794 2017-08-24

Publications (1)

Publication Number Publication Date
CN109424962A true CN109424962A (en) 2019-03-05

Family

ID=65514717

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810967178.1A Pending CN109424962A (en) 2017-08-24 2018-08-23 Garbage combustion device

Country Status (2)

Country Link
JP (1) JP7009114B2 (en)
CN (1) CN109424962A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7539249B2 (en) * 2020-04-08 2024-08-23 荏原環境プラント株式会社 Fluidized bed incinerator

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08193712A (en) * 1995-01-19 1996-07-30 Babcock Hitachi Kk Incombustible discharge controller
JP2000121024A (en) * 1998-10-20 2000-04-28 Ebara Corp Method and apparatus for supplying unhomogenous combustible matter
JP2006275443A (en) * 2005-03-30 2006-10-12 Kurimoto Ltd Waste material supplying device
JP2010071542A (en) * 2008-09-18 2010-04-02 Jfe Engineering Corp Refuse supplying device
JP2010283443A (en) * 2009-06-02 2010-12-16 Panasonic Corp Solid-state imaging apparatus, and method of manufacturing the same
CN201980616U (en) * 2011-03-29 2011-09-21 河南丰博自动化有限公司 Material blanking anti-blocking device
FR2970470A1 (en) * 2011-01-19 2012-07-20 Heuliez Sas Waste container, has armature comprising actuating unit to rotate pulley sectors for winding and unwinding flexible cables along guide tracks of corresponding sectors to close and open trap doors for emptying container

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3058609B2 (en) * 1997-11-12 2000-07-04 日本碍子株式会社 Method and apparatus for monitoring the situation inside a fluidized-bed furnace
JPH11257630A (en) * 1998-03-11 1999-09-21 Hitachi Zosen Corp Method and apparatus for feeding waste in combustion system
JP2000283443A (en) 1999-03-29 2000-10-13 Mitsubishi Heavy Ind Ltd Device and method for measuring refuse layer in refuse incinerator

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08193712A (en) * 1995-01-19 1996-07-30 Babcock Hitachi Kk Incombustible discharge controller
JP2000121024A (en) * 1998-10-20 2000-04-28 Ebara Corp Method and apparatus for supplying unhomogenous combustible matter
JP2006275443A (en) * 2005-03-30 2006-10-12 Kurimoto Ltd Waste material supplying device
JP2010071542A (en) * 2008-09-18 2010-04-02 Jfe Engineering Corp Refuse supplying device
JP2010283443A (en) * 2009-06-02 2010-12-16 Panasonic Corp Solid-state imaging apparatus, and method of manufacturing the same
FR2970470A1 (en) * 2011-01-19 2012-07-20 Heuliez Sas Waste container, has armature comprising actuating unit to rotate pulley sectors for winding and unwinding flexible cables along guide tracks of corresponding sectors to close and open trap doors for emptying container
CN201980616U (en) * 2011-03-29 2011-09-21 河南丰博自动化有限公司 Material blanking anti-blocking device

Also Published As

Publication number Publication date
JP2019039587A (en) 2019-03-14
JP7009114B2 (en) 2022-01-25

Similar Documents

Publication Publication Date Title
JP5361595B2 (en) Combustion object processing system, processing method, and combustion furnace combustion control system using the same, supplied to combustion furnace
CN106269576A (en) A kind of Automatic Selection System of Waste Rock from Coal Bulk and method
WO2019124768A1 (en) Sintering operation control apparatus and method therefor
JP6519034B2 (en) Powder percentage measuring device and powder percentage measuring system
JP5336530B2 (en) Raw material firing apparatus and raw material firing method
CN109424962A (en) Garbage combustion device
PL202889B1 (en) Method for monitoring a thermodynamic process
CN106526223A (en) Synchronous measuring apparatus and method for gas-phase velocity field and solid-phase velocity field
US4621583A (en) System for controlling a bark-fired boiler
CN111094851B (en) Heat value estimation method, heat value estimation device, and refuse storage facility
JP2017039066A (en) Waste treatment equipment and method
US11994287B2 (en) Method for operating a furnace unit
JP2008255438A (en) Two-dimensional simulating apparatus, simulating method and method for operating blast furnace
JP2000197855A (en) Method and apparatus for color-selecting grain
JP2003254526A (en) Garbage supply heat quantity measuring device and garbage supply control device
KR101316911B1 (en) Apparatus for controlling density of sintered ore and method for controlling density of sintered ore using the same
JP6673799B2 (en) Exhaust gas control apparatus and exhaust gas control method for gasification and melting furnace plant
JP6673800B2 (en) Exhaust gas control apparatus and exhaust gas control method for gasification and melting furnace plant
EA032073B1 (en) Suspension smelting furnace and method for monitoring performance of a burner of a suspension smelting furnace
WO2023171293A1 (en) Image inspection device, machine learning device, image inspection method, and image inspection program
JP4751033B2 (en) Raw material firing equipment
JP2021165616A (en) Fluidized bed incinerator
JP7445058B1 (en) Combustion equipment system and combustion control method
WO2022230356A1 (en) Prediction device, prediction method, prediction program, facility control device, facility control method, and control program
JP2689551B2 (en) Burnout point detection method for garbage incinerator

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
AD01 Patent right deemed abandoned
AD01 Patent right deemed abandoned

Effective date of abandoning: 20220311