CN109284919A - A kind of project cost project management system - Google Patents
A kind of project cost project management system Download PDFInfo
- Publication number
- CN109284919A CN109284919A CN201811066405.XA CN201811066405A CN109284919A CN 109284919 A CN109284919 A CN 109284919A CN 201811066405 A CN201811066405 A CN 201811066405A CN 109284919 A CN109284919 A CN 109284919A
- Authority
- CN
- China
- Prior art keywords
- project
- task
- level
- receiving
- module
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- Operations Research (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Marketing (AREA)
- Educational Administration (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of project cost project management systems, its drip irrigation device includes project input terminal, central processing module, task processing auditing module and memory module, it is additionally provided with project tracking module, the first auditing module, supervision module and java standard library simultaneously, data processing task can be assigned to each project automatically and undertake department, it avoids project delay caused by assigning because of manpower and assigns mistake, improve project cost project management level.
Description
Technical field
The present invention relates to engineering information management fields, more specifically, it relates to a kind of project cost project management system.
Background technique
Project cost is the important evidence of engineering financing analysis and economic evaluation, and project cost project management is engineering management
The important process of construction, to the project management of project cost can effectively control engineering management construction in each stage investment.
Construction Cost Data amount is big at present, and analysis indexes are more, and a large amount of manpower is needed to be assigned to data processing task respectively
A project undertakes department, is on the one hand easy because task assignment causes project delay not in time;On the other hand it is easy because of people
It malfunctions in power allocation process and task is caused to assign fault, to influence task processing progress, there are inconveniences.
Summary of the invention
In view of the deficiencies of the prior art, the present invention intends to provide a kind of project cost project management system,
Data processing task can be assigned to each project automatically and undertake department, avoid project delay caused by assigning because of manpower and divided
Send mistake.
To achieve the above object, the present invention provides the following technical scheme that
A kind of project cost project management system, comprising:
Project input terminal is used for the incoming traffic contents of a project;It, will be in project when business department receives the new contents of a project
Hold and input the contents of a project through project input terminal after arranging, then exports task start signal;
Central processing module is connected to project input terminal, for receiving task start signal;When receiving task start signal
Afterwards, output task processing audit request signal;
Task handles auditing module, is connected to central processing module, for receiving the task processing for undertaking department from projects
Audit request signal;After receiving task processing audit request signal, auditing result signal is exported;
Memory module is connected to central processing module and task processing module, carrys out auditing result signal for receiving;When receiving
When auditing result signal, task processing result and auditing result are stored respectively.
By using above-mentioned technical proposal, when business department receives the new contents of a project, after the contents of a project are arranged
The contents of a project are inputted through project input terminal, then export task start signal;It is opened when central processing module receives task
When dynamic signal, the contents of a project are respectively sent to setting by task processing grade and undertake department in disparity items by central processing module
Task receive terminal;After projects undertake department, and the contents of a project are disposed, it is set and undertakes department in projects
Task handles outlet terminal output task processing audit request signal;When task processing auditing module receives task processing audit
When request signal, the processing result that examining department undertakes department to projects at different levels is audited, and output storage is asked after audit
Seek signal;Data processing task is assigned to the automation that each project undertakes department to realize, avoids assigning because of manpower and make
At project delay and assign mistake, improve project management efficiency.
Preferably, the project input terminal includes several project segment input terminals, it is respectively used to input same project
The contents of a project of lower disparity items section.
It is convenient to press disparity items section cuit content by using above-mentioned technical proposal, it avoids because the contents of a project are excessive
And repeatedly input or omit input.
Preferably, the central processing module includes:
Task receives terminal, project input terminal is connected to, for receiving project enabling signal and the contents of a project;When reception is taken office
When enabling signal of being engaged in, the contents of a project are distributed to the other project of different task process level by contents of a project rank and undertake department place
Position;
Task handles outlet terminal, undertakes department position in disparity items by task processing grade setting, and be connected to and appoint
Business processing auditing module, for exporting task processing audit request signal.
By using above-mentioned technical proposal, when tasks at different levels, which receive terminal, receives task start signal, tasks at different levels
It receives terminal to receive the contents of a project, projects at different levels undertake after task is disposed by department and export task processing result
Auditing module is handled to task, and through task processing outlet terminal output task processing audit request signal.
Preferably, the task processing auditing module includes:
Level-one checks unit, and the level-one including level-one examining department position is arranged in requests to receive terminal and level-one review is defeated
Terminal out, level-one request receive terminal and are connected to task processing outlet terminal, for receiving task processing audit request signal;One
Grade review outlet terminal is for exporting second level review request signal;It requests reception terminal to receive task processing audit when level-one to ask
When seeking signal, level-one checks outlet terminal output second level and checks request signal;
Second level checks unit, including setting requests to receive terminal and second level review output in second level examining department position second level
Terminal, second level request receive terminal and are connected to level-one review unit, and second level review outlet terminal is for exporting request signal storage;
When second level requests reception terminal to receive second level review request signal, second level checks outlet terminal and exports request signal storage.
By using above-mentioned technical proposal, when level-one requests reception terminal to receive task processing audit request signal,
Level-one request receives terminal and shows the processing result that projects undertake department, carries out with rear stage examining department to processing result
Audit, and level-one is checked into result and is uploaded to second level review unit through level-one review outlet terminal, and exports second level review request
Letter;When second level requests reception terminal to receive second level review request signal, second level request receives terminal and level-one is checked result
It is shown, level-one review result is checked by subsequent second level examining department, and second level review result is checked through second level defeated
Terminal is uploaded to memory module out, and exports request signal storage;Go out when can reduce review by the way that two-stage review module is arranged
Existing fault avoids engineering waste to reduce cost planning unnecessary.
Preferably, the memory module includes:
Data memory unit is connected to task processing outlet terminal and second level review outlet terminal;Believe when receiving storage request
Number when, to projects undertake department processing result store;
Result storage unit is checked, level-one review outlet terminal and second level review outlet terminal are connected to, it is multiple for storing level-one
Core result and second level check result;When receiving request signal storage, review result is stored.
By using above-mentioned technical proposal, data and review result are stored respectively, facilitated after project to item
Mesh carries out review, is handled in time the problem.
Preferably, a kind of project cost project management system further includes project tracking module, the project tracking mould
Block includes:
Start unit is tracked, second level review outlet terminal is connected to, when receiving request signal storage, tracking scheduling unit will
Review result is shown, and exports tracking enabling signal;
Scheduling unit is tracked, tracking start unit is connected to, for receiving tracking enabling signal;When receiving tracking enabling signal
When, output tracking alarm signal, and tracking time and tracking result will be shown.
By using above-mentioned technical proposal, can make business tracking department in time to the projects such as project remaining fund subsequent content into
Row tracking, to guarantee that project normally completes.
Preferably, a kind of project cost project management system further includes being connected to the first audit of project input terminal
Module examines the contents of a project through first when first auditing module is received from the contents of a project of project input terminal
Core display terminal is shown, the first auditing result is then delivered to second level review unit.
By using above-mentioned technical proposal, the first examining department carries out assessment audit to the project that business department accesses, when
It audits obstructed out-of-date then project not to set up the project, to avoid that the wasting of resources caused by carrying out can not be continued because of project.
Preferably, a kind of project cost project management system further includes that the task that is connected to distributes module and task processing
The supervision module of module, the supervision module include:
Task distributes time quantum, is connected to task and receives terminal, for receiving the contents of a project;When receiving the contents of a project,
The time is distributed to the contents of a project to store;
Task handles time quantum, is connected to the task audit terminal that projects undertake department, for receiving processing result audit
Request signal;When receiving processing result audit request signal, the task processing time is stored;
Task handles alarm unit, is connected to central processing module, task distributes time quantum and task processing time quantum, use
It is warned in the task processing time;When receiving the contents of a project, time quantum is distributed to task and task handles the time
Unit is detected, and by the contents of a project distribute the time and task processing the time be compared, when task processing time quantum it is big
When the contents of a project distribute the time, project pre-warning signal is exported.
By using above-mentioned technical proposal, is first distributed to task the time and stored, started simultaneously at and the time is handled to task
Unit is detected and is supervised, and the contents of a project are then distributed the time and the task processing time is compared, when task processing
Between unit be greater than the contents of a project when distributing the time, export project pre-warning signal, it is overdue and delay work to avoid the project processing time
Phase.
Preferably, a kind of project cost project management system further includes java standard library, the java standard library for inputting and
Engineering specification is stored, when the first auditing module receives the contents of a project, java standard library shows engineering specification, subsequent first
Examining department audits the contents of a project according to the standard in java standard library.
By using above-mentioned technical proposal, it can facilitate and the contents of a project are audited, avoid the wasting of resources.
Preferably, a kind of project cost project management system further includes task evaluation module, the task examines mould
Block includes:
Project check unit is connected to the first auditing module, for receiving the first auditing result;When receiving the first auditing result
When, the first auditing result is stored;
Project processing examination unit, is connected to task processing alarm unit, for receiving pre-warning signal;When receiving project early warning
When signal, the time is distributed to task and the task processing time stores.
PROJECT TRACKING examines unit, is connected to tracking scheduling unit, for receiving tracking time and tracking result.When connecing
When receiving tracking alarm signal, tracking time and tracking result are stored.
It, can be respectively to project quality, project disposition and PROJECT TRACKING situation by using above-mentioned technical proposal
It is examined, to improve project management efficiency.
In conclusion the invention has the following advantages:
1, by establishing project cost project management system, it can be realized data processing task and be assigned to each project undertaking department
Automation, avoid because manpower assign caused by project delay and assign mistake, improve project management efficiency;
2, by setting memory module, engineering data and review result can be stored, it is convenient that review is carried out to project, from
And the problem is handled in time;
3, by setting supervision module, it can exercise supervision to project treatment process, improve project treatment effeciency;
4, it by the first auditing module of setting, can be avoided because project can not continue the wasting of resources caused by carrying out.
Attached drawing mark: 1, project input terminal;2, central processing module;3, task handles auditing module;4, memory module;
5, PROJECT TRACKING module;6, supervision module;7, evaluation module;8, the first auditing module;9, java standard library.
Detailed description of the invention
Fig. 1 is a kind of circuit diagram of project cost project management system;
Fig. 2 is the circuit diagram of memory module, supervision module and PROJECT TRACKING module.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
A kind of project cost project management system, comprising:
Project input terminal 1 is used for the incoming traffic contents of a project;When business department receives the new contents of a project, by project
Content inputs the contents of a project through project input terminal 1 after arranging, and then exports task start signal;
Central processing module 2 is connected to project input terminal 1, for receiving task start signal;Believe when receiving task start
After number, output task processing audit request signal;
Task handles auditing module 3, is connected to central processing module 2, for receiving at the task that projects undertake department
Reason audit request signal;After receiving task processing audit request signal, auditing result signal is exported;
Memory module 4 is connected to central processing module 2 and task processing module, carrys out auditing result signal for receiving;Work as reception
When to auditing result signal, task processing result and auditing result are stored respectively.
When business department receives the new contents of a project, business department the contents of a project are arranged after through project input terminal
1 inputs the contents of a project, then exports task start signal;
When central processing module 2 receives task start signal, the contents of a project are handled grade by task by central processing module 2
It is respectively sent to that the task reception terminal that disparity items undertakes department is arranged in;Department is undertaken when projects to handle the contents of a project
After, it is set and undertakes the task processing outlet terminal output task processing audit request signal of department in projects;
When task processing auditing module 3 receives task processing audit request signal, examining department is to project undertaking at different levels portion
The processing result of door is audited, and request signal storage is exported after audit;Data processing task is assigned to realize
Each project undertakes the automation of department, avoids project delay caused by assigning because of manpower and assigns mistake, improves project pipe
Manage efficiency.
Optimization, as shown in Fig. 2, due to often there are multiple project segments under a project, project input terminal 1 is wrapped
Multiple project segment input terminals are included, to facilitate by disparity items section cuit content, avoid repeating because the contents of a project are excessive
Input is omitted in input.
Optimization, as shown in Fig. 2, since the professional skill that task processing difficulty and project undertake department is not quite similar,
It includes that level-one task receives terminal, second task receives the multistage task such as terminal and receives terminal, different brackets that task, which receives terminal,
Task receive terminal be separately positioned on different disposal rank project management department undertake department, so as to improve project processing effect
Rate has saved the processing energy of staff.
Further, as shown in Fig. 2, task processing auditing module 3 includes:
Level-one checks unit, and the level-one including level-one examining department position is arranged in requests to receive terminal and level-one review is defeated
Terminal out, level-one request receive terminal and are connected to task processing outlet terminal, for receiving task processing audit request signal;One
Grade review outlet terminal is for exporting second level review request signal;It requests reception terminal to receive task processing audit when level-one to ask
When seeking signal, level-one checks outlet terminal output second level and checks request signal;
Second level checks unit, including setting requests to receive terminal and second level review output in second level examining department position second level
Terminal, second level request receive terminal and are connected to level-one review unit, and second level review outlet terminal is for exporting request signal storage;
When second level requests reception terminal to receive second level review request signal, second level checks outlet terminal and exports request signal storage.
When level-one requests reception terminal to receive task processing audit request signal, level-one request receives terminal will be every
The processing result that mesh undertakes department is shown, is audited with rear stage examining department to processing result, and level-one is checked result
It is uploaded to second level review unit through level-one review outlet terminal, and exports second level review request letter;When second level requests to receive terminal
When receiving second level review request signal, second level request receives terminal and shows level-one review result, subsequent second level audit
Level-one review result is checked by department, and second level is checked result and is uploaded to memory module 4 through second level review outlet terminal,
And export request signal storage;The fault occurred when review can be reduced by the way that two-stage review module is arranged, must not to reduce
The cost planning wanted avoids engineering waste.
As shown in Fig. 2, memory module 4 includes:
Data memory unit is connected to task processing outlet terminal and second level review outlet terminal;Believe when receiving storage request
Number when, to projects undertake department processing result store;
Result storage unit is checked, level-one review outlet terminal and second level review outlet terminal are connected to, it is multiple for storing level-one
Core result and second level check result;When receiving request signal storage, review result is stored.By respectively to data
It is stored with review result, review is carried out to project after facilitating project, to handled in time the problem.
As shown in Fig. 2, a kind of project cost project management system further includes project tracking module, project tracking module packet
Include: tracking start unit is connected to second level review outlet terminal, and when receiving request signal storage, tracking scheduling unit will
Review result is shown, and exports tracking enabling signal;
Scheduling unit is tracked, tracking start unit is connected to, for receiving tracking enabling signal;When receiving tracking enabling signal
When, output tracking alarm signal, and tracking time and tracking result will be shown.
By the way that project tracing module 5 is arranged, business tracking department can be made in time to the projects subsequent content such as project remaining fund
It is tracked, to guarantee that project normally completes.
As shown in Figure 1, a kind of project cost project management system further includes being connected to the first audit of project input terminal 1
Module 8, when the first auditing module 8 is received from the contents of a project of project input terminal 1, by the contents of a project through the first audit
Display terminal is shown, the first auditing result is then delivered to second level review unit.When business department accesses new project
When, the first examining department first carries out assessment audit to the project of business department's access, and obstructed out-of-date when auditing, which refuses
Project verification, to avoid that the wasting of resources caused by carrying out can not be continued because of project.
As shown in Fig. 2, a kind of project cost project management system further includes that the task that is connected to distributes module and task processing
The supervision module 6 of module, supervision module 6 include:
Task distributes time quantum, is connected to task and receives terminal, for receiving the contents of a project;When receiving the contents of a project,
The time is distributed to the contents of a project to store;
Task handles time quantum, is connected to the task audit terminal that projects undertake department, for receiving processing result audit
Request signal;When receiving processing result audit request signal, the task processing time is stored;
Task handle alarm unit, be connected to central processing module 2, task distributes time quantum and task processing time quantum,
For being warned to the task processing time;When receiving the contents of a project, when distributing time quantum and task processing to task
Between unit detected, and by the contents of a project distribute the time and task processing the time be compared, when task handle time quantum
When distributing the time greater than the contents of a project, project pre-warning signal is exported.
When task, which distributes time quantum, receives the contents of a project, task distribute time quantum first to task distribute the time into
Row storage starts simultaneously at and task processing time quantum is detected and supervised, the contents of a project are then distributed time and task
The processing time is compared, and when task processing time quantum, which is greater than the contents of a project, distributes the time, exports project pre-warning signal, with
It avoids the project processing time overdue and delays the duration.
As shown in Figure 1, a kind of project cost project management system further includes java standard library, java standard library is for inputting and storing work
Journey standard, when the first auditing module 8 receives the contents of a project, java standard library shows engineering specification, subsequent first audit
Department audits the contents of a project according to the standard in java standard library, to avoid the wasting of resources.
As shown in Fig. 2, a kind of project cost project management system further includes task evaluation module 7, the task examines mould
Block 7 includes:
Project check unit is connected to the first auditing module 8, for receiving the first auditing result;When receiving the first audit knot
When fruit, the first auditing result is stored;
Project processing examination unit, is connected to task processing alarm unit, for receiving pre-warning signal;When receiving project early warning
When signal, the time is distributed to task and the task processing time stores;
PROJECT TRACKING examines unit, is connected to tracking scheduling unit, for receiving tracking time and tracking result.When receiving
When tracking alarm signal, tracking time and tracking result are stored.
Evaluation module 7 can respectively examine project quality, project disposition and PROJECT TRACKING situation, thus
Improve project management efficiency.
The present invention can reduce manual operation by establishing project cost project management system, improve project management efficiency;
By the way that memory module 4 is arranged, engineering data and review result can be stored, it is convenient that review is carried out to project, thus right
The problem is handled in time;By the way that supervision module 6 is arranged, it can exercise supervision to project treatment process, improve item
Mesh treatment effeciency.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, those skilled in the art
Member can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but as long as at this
All by the protection of Patent Law in the scope of the claims of invention.
Claims (10)
1. a kind of project cost project management system, it is characterized in that: including:
Project input terminal (1) is set to each business department position, is used for the incoming traffic contents of a project;Work as business department
After project input terminal (1) cuit content, task start signal is exported;
Central processing module (2) is connected to project input terminal (1), for receiving task start signal;When the task of receiving opens
After dynamic signal, output task processing audit request signal;
Task handles auditing module (3), is connected to central processing module (2), for receiving task processing audit request signal;When
After receiving task processing audit request signal, request signal storage is exported;
Memory module (4) is connected to central processing module (2) and task processing auditing module (3), for receiving at task
Manage the request signal storage of auditing module (3);When receiving request signal storage, task processing result and audit are tied respectively
Fruit is stored.
2. a kind of project cost project management system according to claim 1, it is characterized in that: the project input terminal
(1) include several project segment input terminals, be respectively used to the contents of a project of disparity items section under input same project.
3. a kind of project cost project management system according to claim 1, it is characterized in that: the central processing module
(2) include:
Task receives terminal, project input terminal (1) is connected to, for receiving the contents of a project and task start signal;Work as reception
When to task enabling signal, the contents of a project are distributed to the other project of different task process level by contents of a project rank and undertake department
Position;
Task handles outlet terminal, is separately positioned on the other project of different task process level and undertakes department position, and connects
Auditing module (3) are handled in task, for exporting task processing audit request signal.
4. a kind of project cost project management system according to claim 1, it is characterized in that: task processing audit mould
Block (3) includes:
Level-one checks unit, and the level-one including level-one examining department position is arranged in requests to receive terminal and level-one review is defeated
Terminal out, level-one request receive terminal and are connected to task processing outlet terminal, for receiving task processing audit request signal;One
Grade review outlet terminal is for exporting second level review request signal;It requests reception terminal to receive task processing audit when level-one to ask
When seeking signal, level-one checks outlet terminal output second level and checks request signal;
Second level checks unit, including setting requests to receive terminal and second level review output in second level examining department position second level
Terminal, second level request receive terminal and are connected to level-one review unit, and second level review outlet terminal is for exporting request signal storage;
When second level requests reception terminal to receive second level review request signal, second level checks outlet terminal and exports request signal storage.
5. a kind of project cost project management system according to claim 1, it is characterized in that: the memory module (4) is wrapped
It includes:
Data memory unit is connected to task processing outlet terminal and second level review outlet terminal;Believe when receiving storage request
Number when, to projects undertake department processing result store;
Result storage unit is checked, level-one review outlet terminal and second level review outlet terminal are connected to, it is multiple for storing level-one
Core result and second level check result;When receiving request signal storage, review result is stored.
6. a kind of project cost project management system according to claim 1, it is characterized in that: a kind of project cost item
Mesh management system further includes project tracking module, and the project tracking module includes:
Start unit is tracked, second level review outlet terminal is connected to, when receiving request signal storage, tracking scheduling unit will
Review result is shown through tracking display terminal, and exports tracking enabling signal;
Scheduling unit is tracked, tracking start unit is connected to, for receiving tracking enabling signal;When receiving tracking enabling signal
When, output tracking alarm signal, and tracking time and tracking result are shown.
7. a kind of project cost project management system according to claim 1, it is characterized in that: a kind of project cost item
Mesh management system further includes being connected to the first auditing module (8) of project input terminal (1), when first auditing module (8)
When receiving the contents of a project from project input terminal (1), the contents of a project are shown through the first audit display terminal, with
The first auditing result is delivered to second level review unit afterwards.
8. a kind of project cost project management system according to claim 1, it is characterized in that: a kind of project cost item
Mesh management system further includes the supervision module (6) that the task that is connected to distributes module and task processing module, the supervision module (6)
Include:
Task distributes time quantum, is connected to task and receives terminal, for receiving the contents of a project;When receiving the contents of a project,
The time is distributed to the contents of a project to store;
Task handles time quantum, is connected to the task audit terminal that projects undertake department, for receiving processing result audit
Request signal;When receiving processing result audit request signal, the task processing time is stored;
Task handles alarm unit, is connected to central processing module (2), task distributes time quantum and the task processing time is single
Member, for being warned to the task processing time;After receiving the contents of a project, project pre-warning signal is exported.
9. a kind of project cost project management system according to claim 1, it is characterized in that: a kind of project cost item
Mesh management system further includes java standard library, and the java standard library is for inputting and storing engineering specification, when the first auditing module (8) receive
When to the contents of a project, java standard library shows engineering specification.
10. a kind of project cost project management system described in -9 according to claim 1, it is characterized in that: a kind of engineering is made
Valence project management system further includes task evaluation module (7), and the task evaluation module (7) includes:
Project check unit is connected to the first auditing module (8), for receiving the first auditing result;When receiving the first audit
When as a result, the first auditing result is stored;
Project processing examination unit, is connected to task processing alarm unit, for receiving pre-warning signal;When receiving project early warning
When signal, the time is distributed to task and the task processing time stores;
PROJECT TRACKING examines unit, is connected to tracking scheduling unit, for receiving tracking time and tracking result;When receiving
When tracking alarm signal, tracking time and tracking result are stored.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811066405.XA CN109284919A (en) | 2018-09-13 | 2018-09-13 | A kind of project cost project management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811066405.XA CN109284919A (en) | 2018-09-13 | 2018-09-13 | A kind of project cost project management system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109284919A true CN109284919A (en) | 2019-01-29 |
Family
ID=65181029
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811066405.XA Pending CN109284919A (en) | 2018-09-13 | 2018-09-13 | A kind of project cost project management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109284919A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110216788A (en) * | 2019-07-15 | 2019-09-10 | 广州瀚阳工程咨询有限公司 | A kind of Intelligentized control method of bridge subsection precasting yard |
CN110378672A (en) * | 2019-07-18 | 2019-10-25 | 广东建瀚工程管理有限公司 | A kind of project cost system |
CN111754058A (en) * | 2019-03-29 | 2020-10-09 | 上海忆尧信息技术有限公司 | Project management system based on project audit |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105373885A (en) * | 2015-11-10 | 2016-03-02 | 国网福建省电力有限公司 | Electric power engineering design review and technical economic evaluation information system |
CN106991562A (en) * | 2017-03-22 | 2017-07-28 | 广东华联建设投资管理股份有限公司 | A kind of cost progress becomes more meticulous system |
CN107944809A (en) * | 2016-10-12 | 2018-04-20 | 北京地厚云图科技有限公司 | Design alteration, engineering negotiation or Site visa-an important chain task exchange method and device |
CN108335080A (en) * | 2018-01-25 | 2018-07-27 | 广州建衡工程咨询有限公司 | A kind of Construction Audit system and implementation method |
CN108364193A (en) * | 2018-01-25 | 2018-08-03 | 广州建衡工程咨询有限公司 | A kind of construction project cost auditing method and system |
CN108388980A (en) * | 2018-02-07 | 2018-08-10 | 深圳群伦项目管理有限公司 | A kind of project cost data management system |
-
2018
- 2018-09-13 CN CN201811066405.XA patent/CN109284919A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105373885A (en) * | 2015-11-10 | 2016-03-02 | 国网福建省电力有限公司 | Electric power engineering design review and technical economic evaluation information system |
CN107944809A (en) * | 2016-10-12 | 2018-04-20 | 北京地厚云图科技有限公司 | Design alteration, engineering negotiation or Site visa-an important chain task exchange method and device |
CN106991562A (en) * | 2017-03-22 | 2017-07-28 | 广东华联建设投资管理股份有限公司 | A kind of cost progress becomes more meticulous system |
CN108335080A (en) * | 2018-01-25 | 2018-07-27 | 广州建衡工程咨询有限公司 | A kind of Construction Audit system and implementation method |
CN108364193A (en) * | 2018-01-25 | 2018-08-03 | 广州建衡工程咨询有限公司 | A kind of construction project cost auditing method and system |
CN108388980A (en) * | 2018-02-07 | 2018-08-10 | 深圳群伦项目管理有限公司 | A kind of project cost data management system |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111754058A (en) * | 2019-03-29 | 2020-10-09 | 上海忆尧信息技术有限公司 | Project management system based on project audit |
CN110216788A (en) * | 2019-07-15 | 2019-09-10 | 广州瀚阳工程咨询有限公司 | A kind of Intelligentized control method of bridge subsection precasting yard |
CN110216788B (en) * | 2019-07-15 | 2021-03-30 | 瀚阳国际工程咨询有限公司 | Intelligent control method for bridge segment prefabricating field |
CN110378672A (en) * | 2019-07-18 | 2019-10-25 | 广东建瀚工程管理有限公司 | A kind of project cost system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109284919A (en) | A kind of project cost project management system | |
WO2019001126A1 (en) | Task management method and device, computer device and storage medium | |
CN110163474A (en) | A kind of method and apparatus of task distribution | |
CN107391268A (en) | service request processing method and device | |
CN107424338A (en) | A kind of control method of express delivery cabinet, apparatus and system | |
CN107832901A (en) | Method for allocating tasks, device, terminal device and storage medium | |
CN110399533A (en) | Funds flow querying method and device | |
CN108712488A (en) | A kind of data processing method based on block chain, device, block catenary system | |
CN109508344A (en) | Business datum querying method, device, electronic equipment and storage medium | |
CN109885452A (en) | Method for monitoring performance, device and terminal device | |
CN107026877A (en) | The method and apparatus that resource is managed in cloud platform | |
CN110569298A (en) | data docking and visualization method and system | |
CN109768879A (en) | The determination method, apparatus and server of target service server | |
CN107918864A (en) | Electronic insurance policy generation method, device, computer equipment and storage medium | |
CN110163473A (en) | A kind of monitoring method and equipment of Task Progress | |
CN109658003A (en) | A kind of property facility equipment management system and method | |
CN107861811A (en) | Mission bit stream transmission method, device and computer equipment in Workflow system | |
CN107633342A (en) | A kind of legal advice management system and its management method | |
CN108183933A (en) | Information push method, apparatus and system, electronic equipment and computer storage media | |
CN108763389A (en) | The integration method and device of data, storage medium, terminal | |
CN111246226A (en) | Management method and system for new media platform | |
CN106502796A (en) | A kind of software development test platform, system and using method | |
CN107705003A (en) | Insurance products delivery management method, apparatus, computer equipment and storage medium | |
CN109102245A (en) | A kind of processing method of approval process, system and device | |
CN111311078A (en) | Rent work order distribution method, system, electronic equipment and readable storage medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190129 |
|
RJ01 | Rejection of invention patent application after publication |