CN109284919A - A kind of project cost project management system - Google Patents

A kind of project cost project management system Download PDF

Info

Publication number
CN109284919A
CN109284919A CN201811066405.XA CN201811066405A CN109284919A CN 109284919 A CN109284919 A CN 109284919A CN 201811066405 A CN201811066405 A CN 201811066405A CN 109284919 A CN109284919 A CN 109284919A
Authority
CN
China
Prior art keywords
project
task
level
receiving
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811066405.XA
Other languages
Chinese (zh)
Inventor
张文明
刘冰
薛卫亭
石陈
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Dongsen Project Management Co Ltd
Original Assignee
Shenzhen Dongsen Project Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Dongsen Project Management Co Ltd filed Critical Shenzhen Dongsen Project Management Co Ltd
Priority to CN201811066405.XA priority Critical patent/CN109284919A/en
Publication of CN109284919A publication Critical patent/CN109284919A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of project cost project management systems, its drip irrigation device includes project input terminal, central processing module, task processing auditing module and memory module, it is additionally provided with project tracking module, the first auditing module, supervision module and java standard library simultaneously, data processing task can be assigned to each project automatically and undertake department, it avoids project delay caused by assigning because of manpower and assigns mistake, improve project cost project management level.

Description

A kind of project cost project management system
Technical field
The present invention relates to engineering information management fields, more specifically, it relates to a kind of project cost project management system.
Background technique
Project cost is the important evidence of engineering financing analysis and economic evaluation, and project cost project management is engineering management The important process of construction, to the project management of project cost can effectively control engineering management construction in each stage investment.
Construction Cost Data amount is big at present, and analysis indexes are more, and a large amount of manpower is needed to be assigned to data processing task respectively A project undertakes department, is on the one hand easy because task assignment causes project delay not in time;On the other hand it is easy because of people It malfunctions in power allocation process and task is caused to assign fault, to influence task processing progress, there are inconveniences.
Summary of the invention
In view of the deficiencies of the prior art, the present invention intends to provide a kind of project cost project management system, Data processing task can be assigned to each project automatically and undertake department, avoid project delay caused by assigning because of manpower and divided Send mistake.
To achieve the above object, the present invention provides the following technical scheme that
A kind of project cost project management system, comprising:
Project input terminal is used for the incoming traffic contents of a project;It, will be in project when business department receives the new contents of a project Hold and input the contents of a project through project input terminal after arranging, then exports task start signal;
Central processing module is connected to project input terminal, for receiving task start signal;When receiving task start signal Afterwards, output task processing audit request signal;
Task handles auditing module, is connected to central processing module, for receiving the task processing for undertaking department from projects Audit request signal;After receiving task processing audit request signal, auditing result signal is exported;
Memory module is connected to central processing module and task processing module, carrys out auditing result signal for receiving;When receiving When auditing result signal, task processing result and auditing result are stored respectively.
By using above-mentioned technical proposal, when business department receives the new contents of a project, after the contents of a project are arranged The contents of a project are inputted through project input terminal, then export task start signal;It is opened when central processing module receives task When dynamic signal, the contents of a project are respectively sent to setting by task processing grade and undertake department in disparity items by central processing module Task receive terminal;After projects undertake department, and the contents of a project are disposed, it is set and undertakes department in projects Task handles outlet terminal output task processing audit request signal;When task processing auditing module receives task processing audit When request signal, the processing result that examining department undertakes department to projects at different levels is audited, and output storage is asked after audit Seek signal;Data processing task is assigned to the automation that each project undertakes department to realize, avoids assigning because of manpower and make At project delay and assign mistake, improve project management efficiency.
Preferably, the project input terminal includes several project segment input terminals, it is respectively used to input same project The contents of a project of lower disparity items section.
It is convenient to press disparity items section cuit content by using above-mentioned technical proposal, it avoids because the contents of a project are excessive And repeatedly input or omit input.
Preferably, the central processing module includes:
Task receives terminal, project input terminal is connected to, for receiving project enabling signal and the contents of a project;When reception is taken office When enabling signal of being engaged in, the contents of a project are distributed to the other project of different task process level by contents of a project rank and undertake department place Position;
Task handles outlet terminal, undertakes department position in disparity items by task processing grade setting, and be connected to and appoint Business processing auditing module, for exporting task processing audit request signal.
By using above-mentioned technical proposal, when tasks at different levels, which receive terminal, receives task start signal, tasks at different levels It receives terminal to receive the contents of a project, projects at different levels undertake after task is disposed by department and export task processing result Auditing module is handled to task, and through task processing outlet terminal output task processing audit request signal.
Preferably, the task processing auditing module includes:
Level-one checks unit, and the level-one including level-one examining department position is arranged in requests to receive terminal and level-one review is defeated Terminal out, level-one request receive terminal and are connected to task processing outlet terminal, for receiving task processing audit request signal;One Grade review outlet terminal is for exporting second level review request signal;It requests reception terminal to receive task processing audit when level-one to ask When seeking signal, level-one checks outlet terminal output second level and checks request signal;
Second level checks unit, including setting requests to receive terminal and second level review output in second level examining department position second level Terminal, second level request receive terminal and are connected to level-one review unit, and second level review outlet terminal is for exporting request signal storage; When second level requests reception terminal to receive second level review request signal, second level checks outlet terminal and exports request signal storage.
By using above-mentioned technical proposal, when level-one requests reception terminal to receive task processing audit request signal, Level-one request receives terminal and shows the processing result that projects undertake department, carries out with rear stage examining department to processing result Audit, and level-one is checked into result and is uploaded to second level review unit through level-one review outlet terminal, and exports second level review request Letter;When second level requests reception terminal to receive second level review request signal, second level request receives terminal and level-one is checked result It is shown, level-one review result is checked by subsequent second level examining department, and second level review result is checked through second level defeated Terminal is uploaded to memory module out, and exports request signal storage;Go out when can reduce review by the way that two-stage review module is arranged Existing fault avoids engineering waste to reduce cost planning unnecessary.
Preferably, the memory module includes:
Data memory unit is connected to task processing outlet terminal and second level review outlet terminal;Believe when receiving storage request Number when, to projects undertake department processing result store;
Result storage unit is checked, level-one review outlet terminal and second level review outlet terminal are connected to, it is multiple for storing level-one Core result and second level check result;When receiving request signal storage, review result is stored.
By using above-mentioned technical proposal, data and review result are stored respectively, facilitated after project to item Mesh carries out review, is handled in time the problem.
Preferably, a kind of project cost project management system further includes project tracking module, the project tracking mould Block includes:
Start unit is tracked, second level review outlet terminal is connected to, when receiving request signal storage, tracking scheduling unit will Review result is shown, and exports tracking enabling signal;
Scheduling unit is tracked, tracking start unit is connected to, for receiving tracking enabling signal;When receiving tracking enabling signal When, output tracking alarm signal, and tracking time and tracking result will be shown.
By using above-mentioned technical proposal, can make business tracking department in time to the projects such as project remaining fund subsequent content into Row tracking, to guarantee that project normally completes.
Preferably, a kind of project cost project management system further includes being connected to the first audit of project input terminal Module examines the contents of a project through first when first auditing module is received from the contents of a project of project input terminal Core display terminal is shown, the first auditing result is then delivered to second level review unit.
By using above-mentioned technical proposal, the first examining department carries out assessment audit to the project that business department accesses, when It audits obstructed out-of-date then project not to set up the project, to avoid that the wasting of resources caused by carrying out can not be continued because of project.
Preferably, a kind of project cost project management system further includes that the task that is connected to distributes module and task processing The supervision module of module, the supervision module include:
Task distributes time quantum, is connected to task and receives terminal, for receiving the contents of a project;When receiving the contents of a project, The time is distributed to the contents of a project to store;
Task handles time quantum, is connected to the task audit terminal that projects undertake department, for receiving processing result audit Request signal;When receiving processing result audit request signal, the task processing time is stored;
Task handles alarm unit, is connected to central processing module, task distributes time quantum and task processing time quantum, use It is warned in the task processing time;When receiving the contents of a project, time quantum is distributed to task and task handles the time Unit is detected, and by the contents of a project distribute the time and task processing the time be compared, when task processing time quantum it is big When the contents of a project distribute the time, project pre-warning signal is exported.
By using above-mentioned technical proposal, is first distributed to task the time and stored, started simultaneously at and the time is handled to task Unit is detected and is supervised, and the contents of a project are then distributed the time and the task processing time is compared, when task processing Between unit be greater than the contents of a project when distributing the time, export project pre-warning signal, it is overdue and delay work to avoid the project processing time Phase.
Preferably, a kind of project cost project management system further includes java standard library, the java standard library for inputting and Engineering specification is stored, when the first auditing module receives the contents of a project, java standard library shows engineering specification, subsequent first Examining department audits the contents of a project according to the standard in java standard library.
By using above-mentioned technical proposal, it can facilitate and the contents of a project are audited, avoid the wasting of resources.
Preferably, a kind of project cost project management system further includes task evaluation module, the task examines mould Block includes:
Project check unit is connected to the first auditing module, for receiving the first auditing result;When receiving the first auditing result When, the first auditing result is stored;
Project processing examination unit, is connected to task processing alarm unit, for receiving pre-warning signal;When receiving project early warning When signal, the time is distributed to task and the task processing time stores.
PROJECT TRACKING examines unit, is connected to tracking scheduling unit, for receiving tracking time and tracking result.When connecing When receiving tracking alarm signal, tracking time and tracking result are stored.
It, can be respectively to project quality, project disposition and PROJECT TRACKING situation by using above-mentioned technical proposal It is examined, to improve project management efficiency.
In conclusion the invention has the following advantages:
1, by establishing project cost project management system, it can be realized data processing task and be assigned to each project undertaking department Automation, avoid because manpower assign caused by project delay and assign mistake, improve project management efficiency;
2, by setting memory module, engineering data and review result can be stored, it is convenient that review is carried out to project, from And the problem is handled in time;
3, by setting supervision module, it can exercise supervision to project treatment process, improve project treatment effeciency;
4, it by the first auditing module of setting, can be avoided because project can not continue the wasting of resources caused by carrying out.
Attached drawing mark: 1, project input terminal;2, central processing module;3, task handles auditing module;4, memory module; 5, PROJECT TRACKING module;6, supervision module;7, evaluation module;8, the first auditing module;9, java standard library.
Detailed description of the invention
Fig. 1 is a kind of circuit diagram of project cost project management system;
Fig. 2 is the circuit diagram of memory module, supervision module and PROJECT TRACKING module.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
A kind of project cost project management system, comprising:
Project input terminal 1 is used for the incoming traffic contents of a project;When business department receives the new contents of a project, by project Content inputs the contents of a project through project input terminal 1 after arranging, and then exports task start signal;
Central processing module 2 is connected to project input terminal 1, for receiving task start signal;Believe when receiving task start After number, output task processing audit request signal;
Task handles auditing module 3, is connected to central processing module 2, for receiving at the task that projects undertake department Reason audit request signal;After receiving task processing audit request signal, auditing result signal is exported;
Memory module 4 is connected to central processing module 2 and task processing module, carrys out auditing result signal for receiving;Work as reception When to auditing result signal, task processing result and auditing result are stored respectively.
When business department receives the new contents of a project, business department the contents of a project are arranged after through project input terminal 1 inputs the contents of a project, then exports task start signal;
When central processing module 2 receives task start signal, the contents of a project are handled grade by task by central processing module 2 It is respectively sent to that the task reception terminal that disparity items undertakes department is arranged in;Department is undertaken when projects to handle the contents of a project After, it is set and undertakes the task processing outlet terminal output task processing audit request signal of department in projects;
When task processing auditing module 3 receives task processing audit request signal, examining department is to project undertaking at different levels portion The processing result of door is audited, and request signal storage is exported after audit;Data processing task is assigned to realize Each project undertakes the automation of department, avoids project delay caused by assigning because of manpower and assigns mistake, improves project pipe Manage efficiency.
Optimization, as shown in Fig. 2, due to often there are multiple project segments under a project, project input terminal 1 is wrapped Multiple project segment input terminals are included, to facilitate by disparity items section cuit content, avoid repeating because the contents of a project are excessive Input is omitted in input.
Optimization, as shown in Fig. 2, since the professional skill that task processing difficulty and project undertake department is not quite similar, It includes that level-one task receives terminal, second task receives the multistage task such as terminal and receives terminal, different brackets that task, which receives terminal, Task receive terminal be separately positioned on different disposal rank project management department undertake department, so as to improve project processing effect Rate has saved the processing energy of staff.
Further, as shown in Fig. 2, task processing auditing module 3 includes:
Level-one checks unit, and the level-one including level-one examining department position is arranged in requests to receive terminal and level-one review is defeated Terminal out, level-one request receive terminal and are connected to task processing outlet terminal, for receiving task processing audit request signal;One Grade review outlet terminal is for exporting second level review request signal;It requests reception terminal to receive task processing audit when level-one to ask When seeking signal, level-one checks outlet terminal output second level and checks request signal;
Second level checks unit, including setting requests to receive terminal and second level review output in second level examining department position second level Terminal, second level request receive terminal and are connected to level-one review unit, and second level review outlet terminal is for exporting request signal storage; When second level requests reception terminal to receive second level review request signal, second level checks outlet terminal and exports request signal storage.
When level-one requests reception terminal to receive task processing audit request signal, level-one request receives terminal will be every The processing result that mesh undertakes department is shown, is audited with rear stage examining department to processing result, and level-one is checked result It is uploaded to second level review unit through level-one review outlet terminal, and exports second level review request letter;When second level requests to receive terminal When receiving second level review request signal, second level request receives terminal and shows level-one review result, subsequent second level audit Level-one review result is checked by department, and second level is checked result and is uploaded to memory module 4 through second level review outlet terminal, And export request signal storage;The fault occurred when review can be reduced by the way that two-stage review module is arranged, must not to reduce The cost planning wanted avoids engineering waste.
As shown in Fig. 2, memory module 4 includes:
Data memory unit is connected to task processing outlet terminal and second level review outlet terminal;Believe when receiving storage request Number when, to projects undertake department processing result store;
Result storage unit is checked, level-one review outlet terminal and second level review outlet terminal are connected to, it is multiple for storing level-one Core result and second level check result;When receiving request signal storage, review result is stored.By respectively to data It is stored with review result, review is carried out to project after facilitating project, to handled in time the problem.
As shown in Fig. 2, a kind of project cost project management system further includes project tracking module, project tracking module packet Include: tracking start unit is connected to second level review outlet terminal, and when receiving request signal storage, tracking scheduling unit will Review result is shown, and exports tracking enabling signal;
Scheduling unit is tracked, tracking start unit is connected to, for receiving tracking enabling signal;When receiving tracking enabling signal When, output tracking alarm signal, and tracking time and tracking result will be shown.
By the way that project tracing module 5 is arranged, business tracking department can be made in time to the projects subsequent content such as project remaining fund It is tracked, to guarantee that project normally completes.
As shown in Figure 1, a kind of project cost project management system further includes being connected to the first audit of project input terminal 1 Module 8, when the first auditing module 8 is received from the contents of a project of project input terminal 1, by the contents of a project through the first audit Display terminal is shown, the first auditing result is then delivered to second level review unit.When business department accesses new project When, the first examining department first carries out assessment audit to the project of business department's access, and obstructed out-of-date when auditing, which refuses Project verification, to avoid that the wasting of resources caused by carrying out can not be continued because of project.
As shown in Fig. 2, a kind of project cost project management system further includes that the task that is connected to distributes module and task processing The supervision module 6 of module, supervision module 6 include:
Task distributes time quantum, is connected to task and receives terminal, for receiving the contents of a project;When receiving the contents of a project, The time is distributed to the contents of a project to store;
Task handles time quantum, is connected to the task audit terminal that projects undertake department, for receiving processing result audit Request signal;When receiving processing result audit request signal, the task processing time is stored;
Task handle alarm unit, be connected to central processing module 2, task distributes time quantum and task processing time quantum, For being warned to the task processing time;When receiving the contents of a project, when distributing time quantum and task processing to task Between unit detected, and by the contents of a project distribute the time and task processing the time be compared, when task handle time quantum When distributing the time greater than the contents of a project, project pre-warning signal is exported.
When task, which distributes time quantum, receives the contents of a project, task distribute time quantum first to task distribute the time into Row storage starts simultaneously at and task processing time quantum is detected and supervised, the contents of a project are then distributed time and task The processing time is compared, and when task processing time quantum, which is greater than the contents of a project, distributes the time, exports project pre-warning signal, with It avoids the project processing time overdue and delays the duration.
As shown in Figure 1, a kind of project cost project management system further includes java standard library, java standard library is for inputting and storing work Journey standard, when the first auditing module 8 receives the contents of a project, java standard library shows engineering specification, subsequent first audit Department audits the contents of a project according to the standard in java standard library, to avoid the wasting of resources.
As shown in Fig. 2, a kind of project cost project management system further includes task evaluation module 7, the task examines mould Block 7 includes:
Project check unit is connected to the first auditing module 8, for receiving the first auditing result;When receiving the first audit knot When fruit, the first auditing result is stored;
Project processing examination unit, is connected to task processing alarm unit, for receiving pre-warning signal;When receiving project early warning When signal, the time is distributed to task and the task processing time stores;
PROJECT TRACKING examines unit, is connected to tracking scheduling unit, for receiving tracking time and tracking result.When receiving When tracking alarm signal, tracking time and tracking result are stored.
Evaluation module 7 can respectively examine project quality, project disposition and PROJECT TRACKING situation, thus Improve project management efficiency.
The present invention can reduce manual operation by establishing project cost project management system, improve project management efficiency; By the way that memory module 4 is arranged, engineering data and review result can be stored, it is convenient that review is carried out to project, thus right The problem is handled in time;By the way that supervision module 6 is arranged, it can exercise supervision to project treatment process, improve item Mesh treatment effeciency.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, those skilled in the art Member can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but as long as at this All by the protection of Patent Law in the scope of the claims of invention.

Claims (10)

1. a kind of project cost project management system, it is characterized in that: including:
Project input terminal (1) is set to each business department position, is used for the incoming traffic contents of a project;Work as business department After project input terminal (1) cuit content, task start signal is exported;
Central processing module (2) is connected to project input terminal (1), for receiving task start signal;When the task of receiving opens After dynamic signal, output task processing audit request signal;
Task handles auditing module (3), is connected to central processing module (2), for receiving task processing audit request signal;When After receiving task processing audit request signal, request signal storage is exported;
Memory module (4) is connected to central processing module (2) and task processing auditing module (3), for receiving at task Manage the request signal storage of auditing module (3);When receiving request signal storage, task processing result and audit are tied respectively Fruit is stored.
2. a kind of project cost project management system according to claim 1, it is characterized in that: the project input terminal (1) include several project segment input terminals, be respectively used to the contents of a project of disparity items section under input same project.
3. a kind of project cost project management system according to claim 1, it is characterized in that: the central processing module (2) include:
Task receives terminal, project input terminal (1) is connected to, for receiving the contents of a project and task start signal;Work as reception When to task enabling signal, the contents of a project are distributed to the other project of different task process level by contents of a project rank and undertake department Position;
Task handles outlet terminal, is separately positioned on the other project of different task process level and undertakes department position, and connects Auditing module (3) are handled in task, for exporting task processing audit request signal.
4. a kind of project cost project management system according to claim 1, it is characterized in that: task processing audit mould Block (3) includes:
Level-one checks unit, and the level-one including level-one examining department position is arranged in requests to receive terminal and level-one review is defeated Terminal out, level-one request receive terminal and are connected to task processing outlet terminal, for receiving task processing audit request signal;One Grade review outlet terminal is for exporting second level review request signal;It requests reception terminal to receive task processing audit when level-one to ask When seeking signal, level-one checks outlet terminal output second level and checks request signal;
Second level checks unit, including setting requests to receive terminal and second level review output in second level examining department position second level Terminal, second level request receive terminal and are connected to level-one review unit, and second level review outlet terminal is for exporting request signal storage; When second level requests reception terminal to receive second level review request signal, second level checks outlet terminal and exports request signal storage.
5. a kind of project cost project management system according to claim 1, it is characterized in that: the memory module (4) is wrapped It includes:
Data memory unit is connected to task processing outlet terminal and second level review outlet terminal;Believe when receiving storage request Number when, to projects undertake department processing result store;
Result storage unit is checked, level-one review outlet terminal and second level review outlet terminal are connected to, it is multiple for storing level-one Core result and second level check result;When receiving request signal storage, review result is stored.
6. a kind of project cost project management system according to claim 1, it is characterized in that: a kind of project cost item Mesh management system further includes project tracking module, and the project tracking module includes:
Start unit is tracked, second level review outlet terminal is connected to, when receiving request signal storage, tracking scheduling unit will Review result is shown through tracking display terminal, and exports tracking enabling signal;
Scheduling unit is tracked, tracking start unit is connected to, for receiving tracking enabling signal;When receiving tracking enabling signal When, output tracking alarm signal, and tracking time and tracking result are shown.
7. a kind of project cost project management system according to claim 1, it is characterized in that: a kind of project cost item Mesh management system further includes being connected to the first auditing module (8) of project input terminal (1), when first auditing module (8) When receiving the contents of a project from project input terminal (1), the contents of a project are shown through the first audit display terminal, with The first auditing result is delivered to second level review unit afterwards.
8. a kind of project cost project management system according to claim 1, it is characterized in that: a kind of project cost item Mesh management system further includes the supervision module (6) that the task that is connected to distributes module and task processing module, the supervision module (6) Include:
Task distributes time quantum, is connected to task and receives terminal, for receiving the contents of a project;When receiving the contents of a project, The time is distributed to the contents of a project to store;
Task handles time quantum, is connected to the task audit terminal that projects undertake department, for receiving processing result audit Request signal;When receiving processing result audit request signal, the task processing time is stored;
Task handles alarm unit, is connected to central processing module (2), task distributes time quantum and the task processing time is single Member, for being warned to the task processing time;After receiving the contents of a project, project pre-warning signal is exported.
9. a kind of project cost project management system according to claim 1, it is characterized in that: a kind of project cost item Mesh management system further includes java standard library, and the java standard library is for inputting and storing engineering specification, when the first auditing module (8) receive When to the contents of a project, java standard library shows engineering specification.
10. a kind of project cost project management system described in -9 according to claim 1, it is characterized in that: a kind of engineering is made Valence project management system further includes task evaluation module (7), and the task evaluation module (7) includes:
Project check unit is connected to the first auditing module (8), for receiving the first auditing result;When receiving the first audit When as a result, the first auditing result is stored;
Project processing examination unit, is connected to task processing alarm unit, for receiving pre-warning signal;When receiving project early warning When signal, the time is distributed to task and the task processing time stores;
PROJECT TRACKING examines unit, is connected to tracking scheduling unit, for receiving tracking time and tracking result;When receiving When tracking alarm signal, tracking time and tracking result are stored.
CN201811066405.XA 2018-09-13 2018-09-13 A kind of project cost project management system Pending CN109284919A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811066405.XA CN109284919A (en) 2018-09-13 2018-09-13 A kind of project cost project management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811066405.XA CN109284919A (en) 2018-09-13 2018-09-13 A kind of project cost project management system

Publications (1)

Publication Number Publication Date
CN109284919A true CN109284919A (en) 2019-01-29

Family

ID=65181029

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811066405.XA Pending CN109284919A (en) 2018-09-13 2018-09-13 A kind of project cost project management system

Country Status (1)

Country Link
CN (1) CN109284919A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110216788A (en) * 2019-07-15 2019-09-10 广州瀚阳工程咨询有限公司 A kind of Intelligentized control method of bridge subsection precasting yard
CN110378672A (en) * 2019-07-18 2019-10-25 广东建瀚工程管理有限公司 A kind of project cost system
CN111754058A (en) * 2019-03-29 2020-10-09 上海忆尧信息技术有限公司 Project management system based on project audit

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105373885A (en) * 2015-11-10 2016-03-02 国网福建省电力有限公司 Electric power engineering design review and technical economic evaluation information system
CN106991562A (en) * 2017-03-22 2017-07-28 广东华联建设投资管理股份有限公司 A kind of cost progress becomes more meticulous system
CN107944809A (en) * 2016-10-12 2018-04-20 北京地厚云图科技有限公司 Design alteration, engineering negotiation or Site visa-an important chain task exchange method and device
CN108335080A (en) * 2018-01-25 2018-07-27 广州建衡工程咨询有限公司 A kind of Construction Audit system and implementation method
CN108364193A (en) * 2018-01-25 2018-08-03 广州建衡工程咨询有限公司 A kind of construction project cost auditing method and system
CN108388980A (en) * 2018-02-07 2018-08-10 深圳群伦项目管理有限公司 A kind of project cost data management system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105373885A (en) * 2015-11-10 2016-03-02 国网福建省电力有限公司 Electric power engineering design review and technical economic evaluation information system
CN107944809A (en) * 2016-10-12 2018-04-20 北京地厚云图科技有限公司 Design alteration, engineering negotiation or Site visa-an important chain task exchange method and device
CN106991562A (en) * 2017-03-22 2017-07-28 广东华联建设投资管理股份有限公司 A kind of cost progress becomes more meticulous system
CN108335080A (en) * 2018-01-25 2018-07-27 广州建衡工程咨询有限公司 A kind of Construction Audit system and implementation method
CN108364193A (en) * 2018-01-25 2018-08-03 广州建衡工程咨询有限公司 A kind of construction project cost auditing method and system
CN108388980A (en) * 2018-02-07 2018-08-10 深圳群伦项目管理有限公司 A kind of project cost data management system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111754058A (en) * 2019-03-29 2020-10-09 上海忆尧信息技术有限公司 Project management system based on project audit
CN110216788A (en) * 2019-07-15 2019-09-10 广州瀚阳工程咨询有限公司 A kind of Intelligentized control method of bridge subsection precasting yard
CN110216788B (en) * 2019-07-15 2021-03-30 瀚阳国际工程咨询有限公司 Intelligent control method for bridge segment prefabricating field
CN110378672A (en) * 2019-07-18 2019-10-25 广东建瀚工程管理有限公司 A kind of project cost system

Similar Documents

Publication Publication Date Title
CN109284919A (en) A kind of project cost project management system
WO2019001126A1 (en) Task management method and device, computer device and storage medium
CN110163474A (en) A kind of method and apparatus of task distribution
CN107391268A (en) service request processing method and device
CN107424338A (en) A kind of control method of express delivery cabinet, apparatus and system
CN107832901A (en) Method for allocating tasks, device, terminal device and storage medium
CN110399533A (en) Funds flow querying method and device
CN108712488A (en) A kind of data processing method based on block chain, device, block catenary system
CN109508344A (en) Business datum querying method, device, electronic equipment and storage medium
CN109885452A (en) Method for monitoring performance, device and terminal device
CN107026877A (en) The method and apparatus that resource is managed in cloud platform
CN110569298A (en) data docking and visualization method and system
CN109768879A (en) The determination method, apparatus and server of target service server
CN107918864A (en) Electronic insurance policy generation method, device, computer equipment and storage medium
CN110163473A (en) A kind of monitoring method and equipment of Task Progress
CN109658003A (en) A kind of property facility equipment management system and method
CN107861811A (en) Mission bit stream transmission method, device and computer equipment in Workflow system
CN107633342A (en) A kind of legal advice management system and its management method
CN108183933A (en) Information push method, apparatus and system, electronic equipment and computer storage media
CN108763389A (en) The integration method and device of data, storage medium, terminal
CN111246226A (en) Management method and system for new media platform
CN106502796A (en) A kind of software development test platform, system and using method
CN107705003A (en) Insurance products delivery management method, apparatus, computer equipment and storage medium
CN109102245A (en) A kind of processing method of approval process, system and device
CN111311078A (en) Rent work order distribution method, system, electronic equipment and readable storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190129

RJ01 Rejection of invention patent application after publication