CN110378672A - A kind of project cost system - Google Patents
A kind of project cost system Download PDFInfo
- Publication number
- CN110378672A CN110378672A CN201910651223.7A CN201910651223A CN110378672A CN 110378672 A CN110378672 A CN 110378672A CN 201910651223 A CN201910651223 A CN 201910651223A CN 110378672 A CN110378672 A CN 110378672A
- Authority
- CN
- China
- Prior art keywords
- module
- file
- unit
- project
- valuation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000007689 inspection Methods 0.000 claims abstract description 25
- 238000010276 construction Methods 0.000 claims abstract description 12
- 238000012795 verification Methods 0.000 claims abstract description 12
- 238000012545 processing Methods 0.000 claims description 8
- 238000005516 engineering process Methods 0.000 abstract description 2
- 238000012552 review Methods 0.000 description 6
- 230000006870 function Effects 0.000 description 4
- 238000012550 audit Methods 0.000 description 2
- 238000007726 management method Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000003321 amplification Effects 0.000 description 1
- 238000012790 confirmation Methods 0.000 description 1
- 238000012937 correction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000013101 initial test Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000003199 nucleic acid amplification method Methods 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce
- G06Q30/02—Marketing; Price estimation or determination; Fundraising
- G06Q30/0201—Market modelling; Market analysis; Collecting market data
- G06Q30/0206—Price or cost determination based on market factors
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Strategic Management (AREA)
- Engineering & Computer Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Human Resources & Organizations (AREA)
- General Business, Economics & Management (AREA)
- Finance (AREA)
- Marketing (AREA)
- Development Economics (AREA)
- Physics & Mathematics (AREA)
- Accounting & Taxation (AREA)
- General Physics & Mathematics (AREA)
- Economics (AREA)
- Theoretical Computer Science (AREA)
- Data Mining & Analysis (AREA)
- Tourism & Hospitality (AREA)
- General Health & Medical Sciences (AREA)
- Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention relates to project cost systems technology fields, it is desirable to provide a kind of project cost system, its key points of the technical solution are that including login module, project verification module, editor module, inspection module and export module;Login module is for verifying the identity of operator;Project verification module is used to establish the essential information situation of project, creates valuation file;Editor module is used to edit the inventory type content and quota content of valuation file, improves valuation file;Inspection module is for checking the construction budget result of the valuation file in editor module, judging the result of construction budget and saving the valuation file examined;Export module is used to export the valuation file in inspection module.The present invention is suitable for project cost.
Description
Technical field
The present invention relates to project cost systems technology fields, more specifically, it relates to a kind of project cost system.
Background technique
Project cost refers to that the total construction price for completing an engineering, i.e. expected or actually required full payment are total
With the generally previous work of use valuation software completion project cost.
Due in project cost inventory content and quota numerical value be gone according to the experience of operator it is determining, to working
Personnel individual's competency profiling is very high, needs a large amount of professional knowledge, such as civil engineering, installation, municipal administration, repairerment, gardens, water conservancy, people
The content and spot management experience abundant of anti-, electric power etc., but even there is also mistakes by experience expert very rich
Leakage or the situation for calculating inaccuracy, so budget result needs are tested.
Confirmation when review mainly to bill of quantities, rate, comprehensive unit price or bid contrul valence, it is first for being completed
The Engineering Settlement book of step audit carries out the reconfirmation process of project cost.By carrying out comprehensive, system inspection to engineering project
And review, existing mistake and problem, are allowed to more reasonably determine project cost, reach effective during timely correction valuation
The purpose of ground control engineering cost guarantees the realization of project management by objectives.
And existing valuation software can not test to the budget result of project cost, need by manual review or
Commission third party audits, and heavy workload is inconvenient.
Summary of the invention
The object of the present invention is to provide a kind of project cost system, has and initial test is carried out to the budget result of project cost
The function of card alleviates the workload of manual review, easy to operate.
Above-mentioned technical purpose of the invention has the technical scheme that a kind of project cost system, packet
Include login module, project verification module, editor module, inspection module and export module;
The login module is for verifying the identity of operator;
The project verification module is used to establish the essential information situation of project, creates valuation file;
The editor module is used to edit the inventory type content and quota content of valuation file, improves valuation file;
The inspection module judges engineering for checking the construction budget result of the valuation file in the editor module
The result of budget simultaneously saves the valuation file examined;
The export module is used to export the valuation file in the inspection module.
By using above-mentioned technical proposal, operator carries out authentication, ability after being verified by login module
Into in project verification module, enters system to avoid irrelevant personnel, improve the safety of system;Operator's root in project verification module
Enter editor module after filling out the essential information situation of project according to actual conditions choosing, and to the inventory of work cost in editor module
Content and quota profession carry out choosing and fill out, and establish valuation file;Inspection module checks the valuation file of editor module later,
The reasonability and accuracy of judge construction budget result simultaneously save the valuation file examined;It exports and examines in export module again
Valuation file, and then project cost system has the function that just verifying is carried out to the budget result of project cost, alleviates manually
The workload of review, it is easy to operate.
Preferably, the inspection module includes shopping list typing unit, comparing unit and mark unit, and the buying is clear
The procurement information of each engineering project is stored in single typing unit, the comparing unit makes the valuation file in the editor module
Data compared one by one with the procurement information data in the shopping list typing unit;
When the procurement information data valuated in shopping list typing unit described in the data fit of file in the editor module
When, the valuation file content in the editor module remains unchanged;
When the data of the valuation file in the editor module do not meet the procurement information number in the shopping list typing unit
According to when, the mark unit is labeled processing to the comparison content of the valuation file in the editor module.
By using above-mentioned technical proposal, comparing unit by editor module valuation file data and shopping list typing
Procurement information data in unit are compared one by one, when the data in valuation file are not met in shopping list typing unit
When procurement information data, mark unit is labeled processing to the comparison content of the valuation file in editor module, to play pair
The budget result of project cost carries out the purpose just verified, meanwhile, mark processing plays a warning role, to remind in terms of staff
There may be the place of problem on value document, find the problem in time.
Preferably, the procurement information in the shopping list typing unit include the purchase area of article of buying, type,
Quantity and monovalent data, the data sample of the article of buying at least there are two.
By using above-mentioned technical proposal, the data sample of the article of buying at least there are two so that the buying object of typing
The data of product are more reasonable, more representative, are conducive to the inspection accuracy for improving inspection module.
Preferably, the comparing unit carries out statistic of classification to the content of procurement information, then finds out all kinds of bought articles
The variance yields of unit price, the unit price and variance yields of the nearest bought articles of binding time determine all kinds of bought articles of each department
Monovalent range, using the comparison other of the data as the valuation file in the editor module.
By using above-mentioned technical proposal, comparing unit is all kinds of to finding out again after the data progress statistic of classification of bought articles
The monovalent variance yields of bought articles, to obtain the monovalent fluctuation range of all kinds of bought articles in each department, and as editor's mould
The data reference object of valuation file in block, judgment criteria is more reasonable, is conducive to the inspection accuracy for improving inspection module.
Preferably, the comparing unit calculates the variance yields of the unit price of all kinds of bought articles at least twice.
By using above-mentioned technical proposal, the variance yields of the unit price of all kinds of bought articles is calculated at least twice, with
It reduces and calculates error, make to calculate more acurrate.
Preferably, procurement staff periodically carries out increase update to the procurement information in the shopping list typing unit.
By using above-mentioned technical proposal, the data in shopping list typing unit are regularly updated, and make the number of procurement information
It is more bonded reality according to sample, judgment criteria is more reasonable, is conducive to the inspection accuracy for improving inspection module.
Preferably, the output end of the comparing unit is electrically connected with the alarm unit for issuing warning light, when described
When the data of valuation file in editor module do not meet the procurement information data in the shopping list typing unit, the ratio
Control signal is exported to the alarm unit compared with unit, the alarm unit issues warning light.
By using above-mentioned technical proposal, when the data of valuation file do not meet the letter of the buying in shopping list typing unit
When ceasing data, comparing unit exports control signal to alarm unit, and alarm unit issues warning light, to play police to staff
It is shown as using, reminds on staff's valuation file there may be the place of problem, find the problem in time.
Preferably, further include specification module, the rule of industry standard file and location are stored in the specification module
Determine file, the specification module is clicked by mouse, chooses the regulation for needing industry standard filename to be shown or location
Filename can consult the particular content of the regulation file of industry standard file or location.
By using above-mentioned technical proposal, the regulation text of industry standard file and location is stored in specification module
Part, staff click specification module using mouse, choose the regulation for needing industry standard filename to be shown or location
Filename, to consult when in use for staff, staff turns over documents without lookup manually, easy to operate.
In conclusion the invention has the following advantages:
1, project cost system, which has, carries out the function of just verifying to the budget result of project cost, alleviates the work of manual review
It measures, it is easy to operate;
2, when the data in file of valuating do not meet the procurement information data in shopping list typing unit, unit is marked to volume
The comparison content for collecting the valuation file in module is labeled processing, to play the budget result progress just verifying to project cost
Purpose, meanwhile, mark processing plays a warning role, to remind staff to valuate on file there may be the place of problem,
It finds the problem in time;
3, purchase data sample at least there are two so that the data of the bought articles of typing more rationally, it is more representative;
4, comparing unit handles the data of bought articles, to obtain the unit price fluctuation model of all kinds of bought articles in each department
It encloses, so that the data reference of valuation file is more reasonable in editor module;
5, comparing unit at least calculates variance yields twice, to reduce calculating error, makes to calculate more acurrate;
6, the data in shopping list typing unit regularly update, and the data sample of procurement information is made more to be bonded reality, judge mark
It is quasi- more reasonable;
7, when the data for file of valuating do not meet the procurement information data in shopping list typing unit, alarm unit issues police
Show light, warns staff;
8, the regulation file of the industry standard file and location that store in specification module is consulted for staff, staff
It turns over documents without searching manually, it is easy to operate.
Detailed description of the invention
Fig. 1 is a kind of the functional block diagram of project cost system.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
It referring to Fig.1, is a kind of project cost system disclosed by the invention, including login module, project verification module, Bian Jimo
Block, inspection module, specification module and export module.
Login module verifies the identity of operator.
Project verification module establishes the essential information situation of project, and operator selects according to the actual conditions of project and fills out project
Essential information situation, new construction project select valuation model.
The regulation file of industry standard file and location is stored in specification module.
Editor module includes the inventory type content and quota content of project cost, operator's entry item title, choosing
It selects inventory and selects corresponding quota profession, with newly-built valuation file.
Operator clicks specification module by mouse, and choosing needs industry standard filename to be shown or location
Filename is provided, in conjunction with the regulation file of industry standard file and location in specification module, editor's valuation file.
In editor module, the engineering characteristics of project, including engineering type, structure type, type of foundation, building spy are improved
Sign, construction area etc. adjust the classification in area, and newly-built serial number, title, calculating basis, rate etc. fill in item, and converge in expense
Corresponding expense is established in total, the inventory content and quota profession of project cost is filled in, improves valuation file.
Editor module can check whether selected inventory quota is correct, can modify project name, energy according to actual needs
The file or specification of supplementary explanation project reference, the probable cost that can check engineering, the profit value that quota can be modified.
Inspection module checks the construction budget result of the valuation file in editor module, judges the knot of construction budget
Fruit simultaneously saves the valuation file examined.
Inspection module includes shopping list typing unit, comparing unit and mark unit.
The procurement information of each engineering project is stored in shopping list typing unit, operator is in shopping list typing list
Typing procurement data in member, the procurement information of shopping list typing unit typing include the purchase area of the article of buying, type,
Quantity and monovalent data etc., the Various types of data sample of the article of buying at least there are two.Buying in shopping list typing unit
Information periodically increases update.
The model STC89C52RC of comparing unit.Comparing unit carries out statistic of classification to the content of procurement information.Same
In the monovalent sample of one regional same class bought articles, the variance yields of the unit price of all kinds of bought articles is found out.The calculating of variance yields
It at least carries out twice.
The unit price of the bought articles nearest using the time calculates the fluctuation range of unit price according to variance yields as reference value,
And time nearest monovalent fluctuation range is determined as to the monovalent value range of the similar bought articles of areal.
The data of the monovalent value ranges of the similar bought articles of areal as the valuation file in editor module
Comparison other.
The data and the procurement information number in shopping list typing unit that comparing unit makes the valuation file in editor module
It is compared according to by same kind;
When the procurement information data in the data fit shopping list typing unit of the valuation file in editor module, Bian Jimo
Valuation file content in block remains unchanged;
When the data of the valuation file in editor module do not meet the procurement information data in shopping list typing unit, mark
Unit is labeled processing to the comparison content of the valuation file in editor module.
It is selected in export module and exports the valuation file in inspection module.
The output end of comparing unit is electrically connected with the alarm unit for issuing warning light, and alarm unit includes LED light,
The output end of comparing unit connects LED light through triode.
When the data of the valuation file in editor module do not meet the procurement information data in shopping list typing unit,
Comparing unit exports control signal to LED light, and through triode amplification output to LED light, LED light issues warning light.
The implementation principle of the present embodiment are as follows:
Operator inputs account and password in the window, and after being verified, interface is entered in project verification module by login module.
According to the type of project, operator's new construction project selectes valuation model, and interface enters volume by project verification module
It collects in module.
Operator selects the essential information situation for project of filling out, entry item title, choosing according to the actual conditions of engineering project
Inventory and corresponding quota profession are selected, valuation file is created.
The engineering characteristics for improving project, adjust the classification in area, and newly-built serial number, title, calculating basis, rate etc. are filled in
, and corresponding expense is established in expense summarizes, the inventory content and quota profession of project cost are filled in, valuation text is improved
Part.
Inspection module checks the construction budget result of the valuation file in editor module, in conjunction with shopping list typing
Element memory contains the monovalent value range of the procurement information of each engineering project and the similar bought articles of areal, makes to edit
The data of valuation file in module are compared with the procurement information data in shopping list typing unit by same kind.
When the valuation file in editor module data not equal in shopping list typing unit procurement information data or
When person is located at except the fluctuation range of the procurement information data in shopping list typing unit, unit is marked in editor module
The comparison content of valuation file is labeled processing, meanwhile, comparing unit exports control signal to LED light, amplifies through triode
To LED light, LED light issues warning light for output.
It is to be tested to finish, the valuation file examined is saved in editor module.
It is selected in export module and exports the valuation file in inspection module.
And then project cost system has the function that just verifying is carried out to the budget result of project cost, alleviates artificial multiple
The workload of core, it is easy to operate, meanwhile, there may be the places of problem to be labeled to valuation file for system, plays prompting work
The effect made personnel, staff is made to find the problem in time.
The embodiment of present embodiment is presently preferred embodiments of the present invention, not limits protection of the invention according to this
Range, therefore: the equivalence changes that all structures under this invention, shape, principle are done, should all be covered by protection scope of the present invention it
It is interior.
Claims (8)
1. a kind of project cost system, it is characterized in that: including login module, project verification module, editor module, inspection module and export
Module;
The login module is for verifying the identity of operator;
The project verification module is used to establish the essential information situation of project, creates valuation file;
The editor module is used to edit the inventory type content and quota content of valuation file, improves valuation file;
The inspection module judges engineering for checking the construction budget result of the valuation file in the editor module
The result of budget simultaneously saves the valuation file examined;
The export module is used to export the valuation file in the inspection module.
2. a kind of project cost system according to claim 1, it is characterized in that: the inspection module includes shopping list record
Enter unit, comparing unit and mark unit, the procurement information of each engineering project, institute are stored in the shopping list typing unit
State comparing unit make in the editor module valuation file data and the shopping list typing unit in procurement information
Data are compared one by one;
When the procurement information data valuated in shopping list typing unit described in the data fit of file in the editor module
When, the valuation file content in the editor module remains unchanged;
When the data of the valuation file in the editor module do not meet the procurement information number in the shopping list typing unit
According to when, the mark unit is labeled processing to the comparison content of the valuation file in the editor module.
3. a kind of project cost system according to claim 2, it is characterized in that: adopting in the shopping list typing unit
Purchase area, type, quantity and the monovalent data of the article that information includes buying are purchased, the data sample of the article of buying is at least
Two.
4. a kind of project cost system according to claim 3, it is characterized in that: the comparing unit is in procurement information
Hold and carry out statistic of classification, then finds out the variance yields of the unit price of all kinds of bought articles, the unit price of the nearest bought articles of binding time
And variance yields, the monovalent range of all kinds of bought articles of each department is determined, using as the valuation file in the editor module
The comparison other of data.
5. a kind of project cost system according to claim 4, it is characterized in that: the comparing unit is to all kinds of bought articles
Unit price variance yields calculated at least twice.
6. a kind of project cost system according to claim 3, it is characterized in that: procurement staff is periodically to the shopping list
Procurement information in typing unit carries out increase update.
7. a kind of project cost system according to claim 2, it is characterized in that: the output end of the comparing unit electrically connects
It is connected to the alarm unit for issuing warning light, when the data of the valuation file in the editor module do not meet the buying clearly
When procurement information data in single typing unit, the comparing unit exports control signal, the warning to the alarm unit
Unit issues warning light.
8. a kind of project cost system according to claim 1, it is characterized in that: further include specification module, it is described to illustrate mould
It is stored with the regulation file of industry standard file and location in block, the specification module is clicked by mouse, chooses needs
The industry standard filename of display or the regulation filename of location, can consult the rule of industry standard file or location
Determine the particular content of file.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910651223.7A CN110378672A (en) | 2019-07-18 | 2019-07-18 | A kind of project cost system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910651223.7A CN110378672A (en) | 2019-07-18 | 2019-07-18 | A kind of project cost system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110378672A true CN110378672A (en) | 2019-10-25 |
Family
ID=68253886
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910651223.7A Pending CN110378672A (en) | 2019-07-18 | 2019-07-18 | A kind of project cost system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110378672A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111695833A (en) * | 2020-06-22 | 2020-09-22 | 陕西国防工业职业技术学院 | Engineering cost risk prediction and assessment method |
CN112734369A (en) * | 2020-12-31 | 2021-04-30 | 大为国际工程咨询有限公司 | Engineering cost management system based on big data |
CN112734384A (en) * | 2021-01-13 | 2021-04-30 | 广东普信项目管理有限公司 | Engineering cost management method and device, computer equipment and storage medium |
CN112767040A (en) * | 2021-01-26 | 2021-05-07 | 广联达科技股份有限公司 | Method and device for generating project pricing file, computer equipment and storage medium |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109284919A (en) * | 2018-09-13 | 2019-01-29 | 深圳市栋森工程项目管理有限公司 | A kind of project cost project management system |
CN109377156A (en) * | 2018-09-13 | 2019-02-22 | 深圳市栋森工程项目管理有限公司 | A kind of project cost project checking method |
CN109472642A (en) * | 2018-11-09 | 2019-03-15 | 国网湖南省电力有限公司 | The editing of electricity power engineering cost and inventory application system based on working drawing budget management |
-
2019
- 2019-07-18 CN CN201910651223.7A patent/CN110378672A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109284919A (en) * | 2018-09-13 | 2019-01-29 | 深圳市栋森工程项目管理有限公司 | A kind of project cost project management system |
CN109377156A (en) * | 2018-09-13 | 2019-02-22 | 深圳市栋森工程项目管理有限公司 | A kind of project cost project checking method |
CN109472642A (en) * | 2018-11-09 | 2019-03-15 | 国网湖南省电力有限公司 | The editing of electricity power engineering cost and inventory application system based on working drawing budget management |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111695833A (en) * | 2020-06-22 | 2020-09-22 | 陕西国防工业职业技术学院 | Engineering cost risk prediction and assessment method |
CN112734369A (en) * | 2020-12-31 | 2021-04-30 | 大为国际工程咨询有限公司 | Engineering cost management system based on big data |
CN112734384A (en) * | 2021-01-13 | 2021-04-30 | 广东普信项目管理有限公司 | Engineering cost management method and device, computer equipment and storage medium |
CN112767040A (en) * | 2021-01-26 | 2021-05-07 | 广联达科技股份有限公司 | Method and device for generating project pricing file, computer equipment and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110378672A (en) | A kind of project cost system | |
CA2741883C (en) | Methods and systems for determining the environmental impact of a consumer's actual resource consumption | |
CN102985890B (en) | Energy saves measurement, adjustment and monetization system and method | |
CN102509181B (en) | Computer network system for enterprise purchasing management | |
CN108932589A (en) | A kind of IT application in enterprises project implementation management system | |
US20040015271A1 (en) | Methods and systems for the evaluation of power generating facilities | |
CN106779996A (en) | Business data method for digging and system in a kind of supply chain finance | |
CN105719070A (en) | Electronic auxiliary reviewing method and system | |
CN106846072A (en) | A kind of electric business platform O&M method and system | |
CN113034190B (en) | Nuclear price management system for engineering project | |
CN111681054A (en) | Intelligent pricing method for project cost list | |
CN107967522A (en) | A kind of power grid technological transformation overhaul engineering Cost Management System and its control method | |
US20150227992A1 (en) | Building Optimization Platform And Web-Based Invoicing System | |
US10740828B2 (en) | Method and system for web-based inventory control and automatic order calculator | |
CN107527284A (en) | A kind of assessment method of the compound reference based on customs's data and finance data | |
CN111612523A (en) | Evaluation method and evaluation system for construction engineering cost operation | |
Doane et al. | Household preference for interruptible rate options and the revealed value of service reliability | |
JP2003186950A (en) | Construction work management device and method | |
CN108647793B (en) | Intelligent management and control platform for installation and maintenance quality | |
KR20060010284A (en) | System for real time controlling driving data of power plant | |
CN108876179A (en) | A kind of enterprise's Reliability evaluation method and system based on big data | |
CN107451745A (en) | A kind of foundation key element of architectural engineering base number of a tender preparation method and the preparation method | |
CN114266128A (en) | Atmospheric environment assessment system and method based on cloud platform | |
KR100473195B1 (en) | supporting system for decision making in field of construction and method thereof | |
CN110955363B (en) | Method and system for improving outdoor operation efficiency of power transmission |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191025 |
|
RJ01 | Rejection of invention patent application after publication |