CN109281320A - Gunite concrete synovial membrane constructing device and method for foundation pit side wall construction of leveling blanket - Google Patents

Gunite concrete synovial membrane constructing device and method for foundation pit side wall construction of leveling blanket Download PDF

Info

Publication number
CN109281320A
CN109281320A CN201811433098.4A CN201811433098A CN109281320A CN 109281320 A CN109281320 A CN 109281320A CN 201811433098 A CN201811433098 A CN 201811433098A CN 109281320 A CN109281320 A CN 109281320A
Authority
CN
China
Prior art keywords
side wall
foundation pit
lifting component
gunite concrete
constructing device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811433098.4A
Other languages
Chinese (zh)
Other versions
CN109281320B (en
Inventor
李玉峰
宋中华
柳伟
雷明锋
钟文京
李勇泉
罗文�
谭芝文
张毫毫
戴卫科
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central South University
China Construction Fifth Engineering Bureau Co Ltd
China Construction Tunnel Construction Co Ltd
Original Assignee
Central South University
China Construction Fifth Engineering Bureau Co Ltd
China Construction Tunnel Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central South University, China Construction Fifth Engineering Bureau Co Ltd, China Construction Tunnel Construction Co Ltd filed Critical Central South University
Priority to CN201811433098.4A priority Critical patent/CN109281320B/en
Publication of CN109281320A publication Critical patent/CN109281320A/en
Application granted granted Critical
Publication of CN109281320B publication Critical patent/CN109281320B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention belongs to construction of shotcrete technical fields, it is related to a kind of gunite concrete synovial membrane constructing device and method for foundation pit side wall construction of leveling blanket, which includes lifting component, form element, control system and the rack platform with level leveling function;Control system is placed on rack platform;Lifting component is disposed longitudinally on rack platform;Form element setting is on lifting component and perpendicular with horizontal plane;Control system is connected with lifting component and form element respectively;Lifting component drives form element to carry out lift work.The gunite concrete synovial membrane constructing device and method for foundation pit side wall construction of leveling blanket that the present invention provides a kind of processes is simple, construction efficiency is high and construction cost is low.

Description

Gunite concrete synovial membrane constructing device and method for foundation pit side wall construction of leveling blanket
Technical field
The invention belongs to construction of shotcrete technical field, it is related to a kind of synovial membrane constructing device and construction method, especially It is related to a kind of gunite concrete synovial membrane constructing device and method for foundation pit side wall construction of leveling blanket.
Background technique
With the propulsion of Urbanization in China, the development and utilization of the underground space has entered the stage of flourishing, more next More building foundation pit, Metro station excavation engineering are widely used in engineering practice.Engineering-environment locating for underground engineering, It determines that waterproof is to ensure that the key of underground engineering quality and operation security, and influences one of the key link of waterproof construction effect It is the basal plane processing before waterproof layer is laid with.It is currently, anti-in underground engineering side wall to ensure that waterproof layer is laid with the flatness of basal plane It is often first levelling to basal plane progress using form concrete when water is constructed, re-lay waterproof layer.But it is influenced by space is applied (screed-coat thickness about 5-10cm, narrow space), which often has speed of application is slow, of poor quality, labour cost is high etc. Deficiency, therefore, there is an urgent need to design and propose a kind of new constructing device and method, reach easy to operate, construction efficiency is high, at This reasonable purpose.
Summary of the invention
In order to solve the above technical problems in background technology, simple, construction effect that the present invention provides a kind of processes The gunite concrete synovial membrane constructing device and method for foundation pit side wall construction of leveling blanket that rate is high and construction cost is low.
To achieve the goals above, the present invention adopts the following technical scheme:
A kind of gunite concrete synovial membrane constructing device for foundation pit side wall construction of leveling blanket, it is characterised in that: the use In the gunite concrete synovial membrane constructing device of foundation pit side wall construction of leveling blanket include lifting component, form element, control system with And the rack platform with level leveling function;The control system is placed on rack platform;The lifting component is longitudinally disposed On rack platform;The form element setting is on lifting component and perpendicular with horizontal plane;The control system respectively with Lifting component and form element are connected;The lifting component drives form element to carry out lift work.
Preferably, rack platform of the present invention includes upper mounting plate layer, middle podium level, lower platform layer, rotation rolling Wheel and telescopic rod;The upper mounting plate layer, middle podium level and lower platform layer are parallel to each other;The bottom of the lower platform layer is set It is equipped with rotation roller;Telescopic rod is provided with before the rotation roller and lower platform layer;The rotation roller is with self-locking function 360 ° of horizontal plane rotation rollers of energy;The control system is placed in lower platform layer upper surface;The lifting component setting is upper flat The same side of platform layer, middle podium level and lower platform layer;The lifting component be disposed longitudinally on lower platform layer and respectively with it is upper Podium level and middle podium level are connected.
Preferably, lifting component of the present invention includes groove steel rail, haulage cable, fixed pulley and electricity Machine;The fixed pulley is placed in the outer edge of upper mounting plate layer;The motor is connected with control system to be placed on lower platform layer;It is described Groove steel rail is two;Two groove steel rails are oppositely arranged and are connected respectively with upper mounting plate layer, middle podium level and lower platform layer; One end of the haulage cable is connected to the motor, and the other end is connected around fixed pulley with form element;The form element card It holds between two groove steel rails;The motor drives form element along the axial movement of groove steel rail by haulage cable.
Preferably, form element of the present invention includes sliding support, telescopic rod, gun stand and template; The sliding support is in frame-type;The haulage cable is connected after bypassing fixed pulley with sliding support;The sliding support setting It is being held between two groove steel rails and can be along the axial movement of groove steel rail;Telescopic rod is provided on the sliding support simultaneously It is connected by telescopic rod with template;The template is by telescopic rod adjustment vertical position and perpendicular with horizontal plane;The spray gun Bracket is arranged on sliding support;Spray gun is provided on the gun stand;The spray gun is connected with control system.
Preferably, sliding support of the present invention includes cross bar, vertical bar and co-axial rollers;The cross bar and Vertical bar is two respectively;Frame structure is integrally formed in two cross bars and two vertical bars;The haulage cable bypasses fixed pulley It is connected afterwards with the cross bar in top position;The end of the cross bar is provided with co-axial rollers;The co-axial rollers are held in two And it can be along the axial movement of groove steel rail between root groove steel rail;The middle part of two vertical bars and cross bar in bottom position Middle part is respectively arranged with telescopic rod;The gun stand is set on the cross bar of top position.
Preferably, gun stand of the present invention includes the adjustable curved bar of square, horizontal slide rail and spray gun bottom Seat;The adjustable curved bar of square is connected with the cross bar and horizontal slide rail for being in top position respectively;The spray gun pedestal is set It can be slided in horizontal slide rail and freely along the axial direction of horizontal slide rail.
Preferably, spray gun pedestal of the present invention includes idler wheel and the fixture that is connected with idler wheel;The idler wheel It is placed in horizontal slide rail and can be slided freely along the axial direction of horizontal slide rail;Spray gun is provided at the top of the fixture;The template Top be held in the card slot on fixture.
Preferably, template of the present invention includes rectangular steel plates, oblique steel plate and side plate;The rectangular steel plates Both sides be respectively arranged with side plate;Oblique steel plate is provided at the top of the rectangular steel plates;The sliding support passes through flexible Bar is connected with rectangular steel plates;The rectangular steel plates are by telescopic rod adjustment vertical position and perpendicular with horizontal plane;It is described oblique Steel plate is held in the card slot on fixture;The length of the horizontal slide rail is slightly larger than the length at the top of rectangular steel plates.
Preferably, control system of the present invention includes input panel, programmable controller and outlet line; Input panel is provided on the programmable controller;The programmable controller by outlet line respectively with motor and spray Rifle is connected.
A kind of applying based on the gunite concrete synovial membrane constructing device as described above for foundation pit side wall construction of leveling blanket Work method, it is characterised in that: the construction method the following steps are included:
1) by constructing device described in the mobile claim of rotation roller extremely to job position, and pass through rotation roller Self-locking function fixes constructing device, and the posture of rack platform is adjusted by telescopic rod, keeps groove steel rail in a vertical state;
2) form element is transferred to spray plane by lifting component, and adjusts the posture of template by telescopic rod, made Template meets design requirement at a distance from by spray plane, while being in plumbness;It is horizontal sliding by the adjustable curved bar adjustment of square Rail position is adapted horizontal slide rail and template;
3) determining sprayable amount of concrete and unit height are measured by input panel input in advance and wait for pneumatically placed concrete Spatial volume;
4) spray gun is installed and opens power supply after the fixture of spray gun pedestal, start motor and gunite concrete preparation and conveying Equal corollary equipments, artificial hand steered spray gun pedestal reciprocatingly slide along horizontal slide rail, realize by the uniform charity of spray plane gunite concrete;
5) as gunite concrete gradually applies spray, form element is matchingly stepped up by lifting component, until to Operation surface construction is sprayed to complete.
The present invention substitutes existing form concrete using vertical synovial membrane shotcrete technology mode, there is following advantage:
1) rack platform designed by the present invention and form element group are integral, have the function of traveling and formwork, Ji Nengbian Prompt running fix, and the template installation procedure in existing form concrete construction technology can be exempted, template consumption is saved, before shortening Preparation of construction time phase;
2) lifting component and use construction of shotcrete technique designed substitutes existing form concrete construction work Skill, takes full advantage of the short advantage of gunite concrete gelling time, and realization applies that spray is synchronous with formwork, works continuously, and ensure that mixed Solidifying soil surface smoothness, accelerates speed of application;
3) form concrete technique is substituted using shotcrete technology, effectively utilizes height when construction of shotcrete Wind impact force is pressed, the density of small space inner concrete filling is ensured, eliminates the process of vibrating in form concrete technique, Improve construction efficiency.
4) control system designed is easy to operate, and thinking is clear.
Detailed description of the invention
Below in conjunction with the example diagram in the embodiment of the present invention, the technical solution of the embodiment of the present invention is carried out clear, complete Ground description, it should be apparent that, the accompanying drawings in the following description is only a part of the embodiments of the present invention, rather than whole implementation Example.Based on the embodiments of the present invention, those of ordinary skill in the art is obtained without making creative work All embodiments are obtained, shall fall within the protection scope of the present invention.
Fig. 1 is the whole of the gunite concrete synovial membrane constructing device provided by the present invention for foundation pit side wall construction of leveling blanket Body structural schematic diagram;
Fig. 2 is the structural schematic diagram of support platform of the present invention;
Fig. 3 is the structural schematic diagram of lifting component of the present invention;
Fig. 4 is the structural schematic diagram of installation site of the form element of the present invention in support platform;
Fig. 5 is the structural schematic diagram of sliding support of the present invention;
Fig. 6 is the side structure schematic view of form element of the present invention;
Fig. 7 is the structural schematic diagram of template of the present invention;
Fig. 8 is the structural schematic diagram of control system of the present invention;
Fig. 9 is that the gunite concrete synovial membrane constructing device provided by the present invention for foundation pit side wall construction of leveling blanket is being applied The schematic diagram in working hour;
In figure:
1- rack platform;11- upper mounting plate layer;Podium level in 12-;13- lower platform layer;14- rotation roller;15- is scalable Bar;2- lifting component;21- groove steel rail;22- haulage cable;23- fixed pulley;24- motor;3- form element;31- sliding Bracket;311- cross bar;312- vertical bar;313- co-axial rollers;32- telescopic rod;33- gun stand;331- square is adjustable curved bar; 332- horizontal slide rail;333- spray gun pedestal;3331- idler wheel;3332- fixture;34- template;341- rectangular steel plates;342- oblique steel Plate;343- side plate;4- control system;41- input panel;42- programmable controller;43- outlet line.
Specific embodiment
In the following, embodiments of the present invention are described in further detail with reference to the drawings and specific embodiments but not as this The restriction of invention.
In the description of the present invention, it should be noted that the side of the instructions such as term "left", "right", "upper", "lower", "bottom" Position or positional relationship are to be based on the orientation or positional relationship shown in the drawings, it is only for are retouched convenient for the description present invention and simplification It states, rather than refers in particular to or imply that signified element must have specific orientation, be constructed and operated in a specific orientation, therefore cannot It is interpreted as limitation of the present invention.
Such as FIG. 1 to FIG. 8, a kind of gunite concrete synovial membrane constructing device for foundation pit side wall construction of leveling blanket, comprising: branch Body panel 1, each base part, walking and position for loading device are fixed;Lifting component 2, the power side for template lifting Formula and source;Form element 3 guarantees that concrete surface is smooth for forming gunite concrete filling space with by spray plane;Control System 4, for controlling the traveling speed of lifting component 2 and form element 3.
Such as Fig. 1 and Fig. 2, rack platform 1 is a trapezoid space steel frame construction, divides upper, middle and lower-ranking, upper mounting plate layer 11, in Podium level 12 is operation layer, for human assistance operation, inspection platform in work progress;Lower platform layer 13 is mechanical floor, is used for Carry lifting component 3 and the relevant apparatus assembly of control system 4;It is arranged at 1 bottom of rack platform, four socle with self-locking function 360 ° of horizontal plane rotation rollers 14, for the movement of fore-stock platform 1 of constructing and in place;On rotation roller 14 and rack platform 1 Portion's structure is fixedly connected using telescopic rod 15, for the rear horizontal attitude adjustment in place of rack platform 1.
Such as Fig. 1 and Fig. 3, lifting component 2 is by two vertical groove steel rails 21, haulage cable 22, fixed pulley 23 and motor 24 compositions, the power mode gone up and down for form element 3 and source;The vertical welding of groove steel rail 21 and rack platform 1 by by Spray plane side, and notch is opposite;The upper mounting plate layer 11 that fixed pulley 23 is fixed on rack platform 1 is located between two parties;Motor 24 is fixed on bracket On 13 platform of lower platform layer of platform 1;22 one end of haulage cable is fixed on form element 3, another after passing through fixed pulley 23 End is wound on 24 rotor of motor.
Such as Fig. 1, Fig. 4, Fig. 5, Fig. 6 and Fig. 7, form element 3 is by sliding support 31, telescopic rod 32,33 and of gun stand Template 34 forms;Sliding support 31 is welded by 2 cross bar 311 and 2 piece vertical bars 312, in rectangular layout;The end of cross bar 311 End is provided with co-axial rollers 313, and is slidably connected by the co-axial rollers 313 with groove steel rail 21;Upper cross in cross bar 311 It is fixedly connected in the middle part of bar with one end of haulage cable 22;Telescopic rod 32 is 3, under one end is respectively welded in cross bar 311 The middle part of cross bar and 2 vertical bars 312, the other end are welded in the back side of template 34;Telescopic rod 32 can be in vertical vertical plane direction It is upper flexible, to realize the adjustment of 34 position of template and posture;Gun stand 33 is by the adjustable curved bar 331 of square, horizontal slide rail 332 It is formed with spray gun pedestal 333;Square is adjustable, and curved bar 331 can realize the horizontal extension of vertical vertical plane, and horizontal ends are welded in In the middle part of 311 cross tube of cross bar in sliding support 31, vertical end is welded in the middle part of horizontal slide rail 332;Horizontal slide rail 332 is slot Steel type formula, opening upwards;Spray gun pedestal 333 is a vertical bar, and bottom is welded with idler wheel 3331, is vertically installed on horizontal slide rail It in 332 notch, and Free water can smoothly be moved in notch, top is welded with fixture 3332, for installing spray gun;Template 34 by The rectangular steel plates 341 that are vertically arranged, the oblique steel plate 342 being in tilted layout and with the vertically arranged side plate 343 of rectangular steel plates 341 Composition, and by spray plane and is completed section and collectively constitutes to pneumatically placed concrete space.
Such as Fig. 1 and Fig. 8, control system 4 is made of input panel 41, programmable controller 42 and outlet line 43;Input Panel 41 is mainly used for inputting unit time sprayable amount of concrete and unit height waits for pneumatically placed concrete spatial volume;It is programmable Controller 42 is mainly used for the promotion speed according to input data calculation processing lifting component 2;Outlet line 43 is by based on Obtained promotion speed is exported to motor 24, to control the promotion speed of lifting component 2.
Such as Fig. 9, the present invention also provides a kind of gunite concrete synovial membrane construction parties for foundation pit side wall construction of leveling blanket Method, comprising the following steps:
1) equipment is in place: consolidating by 14 mobile device of rotation roller to job position, and by the self-locking function of idler wheel Locking equipment is further adjusted the posture of rack platform 1 by telescopic rod 15, keeps groove steel rail 21 in a vertical state;
2) it adjusts template: the decentralization of form element 3 extremely being risen at spray plane by lifting component 2, and is adjusted by telescopic rod 32 The posture of template 34 makes template 34 meet design requirement at a distance from by spray plane, while being in plumbness;Further, pass through Square is adjustable, and curved bar 331 adjusts 332 position of horizontal slide rail, is adapted it with template;
3) determining sprayable amount of concrete and unit input control parameter: are measured by the input of input panel 41 in advance Height is to pneumatically placed concrete spatial volume;
4) spray is applied in starting: spray gun being installed and opens power supply on the fixture 3332 with spray gun pedestal 333, starts motor 24 and spray Penetrate the corollary equipments such as concrete preparation and conveying, artificial hand steered spray gun pedestal 333 reciprocatingly slides along horizontal slide rail 332, realize by The uniform charity of spray plane gunite concrete;
5) template is promoted: as gunite concrete gradually applies spray, matchingly stepping up template portion by lifting component 2 Part 3 is shut down until operation surface construction to be painted is completed.
The not detailed place of the present invention is routine techniques known in those skilled in the art.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and structure Think of is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (10)

1. a kind of gunite concrete synovial membrane constructing device for foundation pit side wall construction of leveling blanket, it is characterised in that: described to be used for The gunite concrete synovial membrane constructing device of foundation pit side wall construction of leveling blanket includes lifting component (2), form element (3), control system System (4) and the rack platform (1) with level leveling function;The control system (4) is placed on rack platform (1);It is described Lifting component (2) is disposed longitudinally on rack platform (1);The form element (3) be arranged on lifting component (2) and with level Face is perpendicular;The control system (4) is connected with lifting component (2) and form element (3) respectively;The lifting component (2) Form element (3) are driven to carry out lift work.
2. the gunite concrete synovial membrane constructing device according to claim 1 for foundation pit side wall construction of leveling blanket, special Sign is: the rack platform (1) includes upper mounting plate layer (11), middle podium level (12), lower platform layer (13), rotation roller (14) And telescopic rod (15);The upper mounting plate layer (11), middle podium level (12) and lower platform layer (13) are parallel to each other;Under described The bottom of podium level (13) is provided with rotation roller (14);Being provided with before the rotation roller (14) and lower platform layer (13) can Telescopic rod (15);The rotation roller (14) is 360 ° of horizontal plane rotation rollers with self-locking function;The control system (4) is set In lower platform layer (13) upper surface;The lifting component (2) is arranged in upper mounting plate layer (11), middle podium level (12) and lower platform The same side of layer (13);The lifting component (2) be disposed longitudinally on lower platform layer (13) and respectively with upper mounting plate layer (11) with And middle podium level (12) is connected.
3. the gunite concrete synovial membrane constructing device according to claim 2 for foundation pit side wall construction of leveling blanket, special Sign is: the lifting component (2) includes groove steel rail (21), haulage cable (22), fixed pulley (23) and motor (24); The fixed pulley (23) is placed in the outer edge of upper mounting plate layer (11);The motor (24) is connected with control system (4) to be placed in down On podium level (13);The groove steel rail (21) is two;Two groove steel rails (21) be oppositely arranged and respectively with upper mounting plate layer (11), middle podium level (12) and lower platform layer (13) are connected;One end of the haulage cable (22) is connected with motor (24), The other end is connected around fixed pulley (23) with form element (3);The form element (3) be held in two groove steel rails (21) it Between;The motor (24) drives form element (3) along the axial movement of groove steel rail (21) by haulage cable (22).
4. the gunite concrete synovial membrane constructing device according to claim 3 for foundation pit side wall construction of leveling blanket, special Sign is: the form element (3) includes sliding support (31), telescopic rod (32), gun stand (33) and template (34);Institute Sliding support (31) are stated in frame-type;The haulage cable (22) is connected with sliding support (31) afterwards around fixed pulley (23);Institute Sliding support (31) setting is stated to be held between two groove steel rails (21) and can be along the axial movement of groove steel rail (21);Institute It states and is provided with telescopic rod (32) on sliding support (31) and is connected by telescopic rod (32) with template (34);The template (34) is logical Cross telescopic rod (32) adjustment vertical position and perpendicular with horizontal plane;The gun stand (33) is arranged in sliding support (31) On;Spray gun is provided on the gun stand (33);The spray gun is connected with control system (4).
5. the gunite concrete synovial membrane constructing device according to claim 4 for foundation pit side wall construction of leveling blanket, special Sign is: the sliding support (31) includes cross bar (311), vertical bar (312) and co-axial rollers (313);The cross bar (311) And vertical bar (312) is two respectively;Frame structure is integrally formed in two cross bars (311) and two vertical bars (312);It is described to lead Draw wirerope (22) to be connected with the cross bar (311) in top position afterwards around fixed pulley (23);The end of the cross bar (311) It is provided with co-axial rollers (313);The co-axial rollers (313) are held between two groove steel rails (21) and can be along groove steel rails (21) axial movement;It is respectively arranged in the middle part of the middle part of two vertical bars (312) and the cross bar (311) in bottom position Telescopic rod (32);The gun stand (33) is set on the cross bar (311) of top position.
6. the gunite concrete synovial membrane constructing device according to claim 5 for foundation pit side wall construction of leveling blanket, special Sign is: the gun stand (33) includes the adjustable curved bar of square (331), horizontal slide rail (332) and spray gun pedestal (333);The adjustable curved bar of square (331) respectively be in top position cross bar (311) and horizontal slide rail (332) phase Even;The spray gun pedestal (333) is placed in horizontal slide rail (332) and can slide freely along the axial direction of horizontal slide rail (332).
7. the gunite concrete synovial membrane constructing device according to claim 6 for foundation pit side wall construction of leveling blanket, special Sign is: the spray gun pedestal (333) includes idler wheel (3331) and the fixture (3332) being connected with idler wheel (3331);The rolling Wheel (3331) is placed in horizontal slide rail (332) and can slide freely along the axial direction of horizontal slide rail (332);The fixture (3332) Top is provided with spray gun;It is held at the top of the template (34) in the card slot on fixture (3332).
8. the gunite concrete synovial membrane constructing device according to claim 7 for foundation pit side wall construction of leveling blanket, special Sign is: the template (34) includes rectangular steel plates (341), oblique steel plate (342) and side plate (343);The rectangular steel plates (341) both sides are respectively arranged with side plate (343);Oblique steel plate (342) are provided at the top of the rectangular steel plates (341); The sliding support (31) is connected by telescopic rod (32) with rectangular steel plates (341);The rectangular steel plates (341) pass through telescopic rod (32) vertical position and perpendicular with horizontal plane is adjusted;The oblique steel plate (342) is held in the card slot on fixture (3332); The length of the horizontal slide rail (332) is slightly larger than the length at the top of rectangular steel plates (341).
9. the gunite concrete synovial membrane constructing device according to claim 8 for foundation pit side wall construction of leveling blanket, special Sign is: the control system includes input panel (41), programmable controller (42) and outlet line (43);It is described to compile Input panel (41) are provided on range controller (42);The programmable controller (42) by outlet line (43) respectively with electricity Machine (24) and spray gun are connected.
10. a kind of constructed based on the gunite concrete synovial membrane as claimed in claim 9 for foundation pit side wall construction of leveling blanket is filled The construction method set, it is characterised in that: the construction method the following steps are included:
1) by rotation roller (14) mobile constructing device as claimed in claim 9 extremely to job position, and pass through rotation roller (14) the fixed constructing device of self-locking function makes groove steel rail by the posture of telescopic rod (15) adjustment rack platform (1) (21) in a vertical state;
2) form element (3) decentralization is extremely risen at spray plane by lifting component (2), and passes through telescopic rod (32) adjustment template (34) Posture, so that template (34) is met design requirement at a distance from by spray plane, while being in plumbness;Pass through the adjustable song of square Bar (331) adjusts horizontal slide rail (332) position, is adapted horizontal slide rail (332) and template (34);
3) determining sprayable amount of concrete and unit height are measured by input panel (41) input in advance and wait for pneumatically placed concrete Spatial volume;
4) spray gun is installed and opens power supply afterwards with the fixture (3332) of spray gun pedestal (333), start motor (24) and injection coagulation The corollary equipments such as soil preparation and conveying, artificial hand steered spray gun pedestal (333) reciprocatingly slide along horizontal slide rail (332), and realization is sprayed The uniform charity of face gunite concrete;
5) as gunite concrete gradually applies spray, form element (3) matchingly are stepped up by lifting component (2), until Operation surface construction to be painted is completed.
CN201811433098.4A 2018-11-28 2018-11-28 Shotcrete sliding film construction device and method for foundation pit side wall leveling layer construction Active CN109281320B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811433098.4A CN109281320B (en) 2018-11-28 2018-11-28 Shotcrete sliding film construction device and method for foundation pit side wall leveling layer construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811433098.4A CN109281320B (en) 2018-11-28 2018-11-28 Shotcrete sliding film construction device and method for foundation pit side wall leveling layer construction

Publications (2)

Publication Number Publication Date
CN109281320A true CN109281320A (en) 2019-01-29
CN109281320B CN109281320B (en) 2024-01-30

Family

ID=65173812

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811433098.4A Active CN109281320B (en) 2018-11-28 2018-11-28 Shotcrete sliding film construction device and method for foundation pit side wall leveling layer construction

Country Status (1)

Country Link
CN (1) CN109281320B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114215067A (en) * 2021-11-12 2022-03-22 中铁十六局集团电气化工程有限公司 Concrete injection device for foundation pit wall reinforcement
WO2022191684A1 (en) 2021-03-09 2022-09-15 Valters Artis A device, a system and a method for levelling a wall or similar vertical surface

Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3022562A (en) * 1960-04-07 1962-02-27 C S Card Iron Works Co Tunnel form
CH584599A5 (en) * 1975-05-02 1977-02-15 Meynadier & Cie Ag Mixer for continuous mixing of spraying concrete - has mixing tank supply system metering devices with common control system
US4278046A (en) * 1978-04-19 1981-07-14 Carrier Drysys Limited Paint spraying apparatus
DE3737472A1 (en) * 1987-11-05 1989-05-18 Kloeckner Becorit Ind Backfilling apparatus for roadway support machines
JPH01318699A (en) * 1988-06-17 1989-12-25 Taisei Corp Spraying robot for concrete
JPH0224495A (en) * 1988-07-14 1990-01-26 Teruo Shinohara Tunnel covering work using spraying concrete
JPH0280797A (en) * 1988-09-19 1990-03-20 Kajima Corp Formwork for concrete spraying
JPH06294298A (en) * 1993-04-09 1994-10-21 Konoike Constr Ltd Device for lining tunnel with concrete
EP0713956A1 (en) * 1994-11-24 1996-05-29 Jean-Claude Mazurat Method and apparatus for lining a tunnel with concrete cast in situ
JPH0913884A (en) * 1995-06-29 1997-01-14 Maeda Corp Primary lining method for tunnel
JPH09132779A (en) * 1995-11-06 1997-05-20 Kawasaki Steel Corp Apparatus for mending wall of coke oven
JPH1158240A (en) * 1997-08-26 1999-03-02 Fukuyama Kyodo Kiko Kk Shot blasting device for decorating concrete board
CN2926394Y (en) * 2006-04-06 2007-07-25 同济大学 Fast wall constructing apparatus
CN101096111A (en) * 2006-06-28 2008-01-02 周德祥 Concrete mould spraying machine
CN102704949A (en) * 2012-06-14 2012-10-03 中交四航局第一工程有限公司 No-pull rod side wall construction method for underground tunnel and formwork trolley for construction
US8301306B1 (en) * 2010-07-20 2012-10-30 Blasters, Llc Control system for machine that cleans drums of ready mixed concrete trucks
CN103556817A (en) * 2013-11-14 2014-02-05 广州鑫桥建筑劳务有限公司 Side wall concrete construction method employing side wall trolley
CN206047931U (en) * 2016-07-29 2017-03-29 广东工业大学 A kind of shot-peening workbench
CN209144821U (en) * 2018-11-28 2019-07-23 中建隧道建设有限公司 Gunite concrete synovial membrane constructing device for foundation pit side wall construction of leveling blanket

Patent Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3022562A (en) * 1960-04-07 1962-02-27 C S Card Iron Works Co Tunnel form
CH584599A5 (en) * 1975-05-02 1977-02-15 Meynadier & Cie Ag Mixer for continuous mixing of spraying concrete - has mixing tank supply system metering devices with common control system
US4278046A (en) * 1978-04-19 1981-07-14 Carrier Drysys Limited Paint spraying apparatus
DE3737472A1 (en) * 1987-11-05 1989-05-18 Kloeckner Becorit Ind Backfilling apparatus for roadway support machines
JPH01318699A (en) * 1988-06-17 1989-12-25 Taisei Corp Spraying robot for concrete
JPH0224495A (en) * 1988-07-14 1990-01-26 Teruo Shinohara Tunnel covering work using spraying concrete
JPH0280797A (en) * 1988-09-19 1990-03-20 Kajima Corp Formwork for concrete spraying
JPH06294298A (en) * 1993-04-09 1994-10-21 Konoike Constr Ltd Device for lining tunnel with concrete
EP0713956A1 (en) * 1994-11-24 1996-05-29 Jean-Claude Mazurat Method and apparatus for lining a tunnel with concrete cast in situ
JPH0913884A (en) * 1995-06-29 1997-01-14 Maeda Corp Primary lining method for tunnel
JPH09132779A (en) * 1995-11-06 1997-05-20 Kawasaki Steel Corp Apparatus for mending wall of coke oven
JPH1158240A (en) * 1997-08-26 1999-03-02 Fukuyama Kyodo Kiko Kk Shot blasting device for decorating concrete board
CN2926394Y (en) * 2006-04-06 2007-07-25 同济大学 Fast wall constructing apparatus
CN101096111A (en) * 2006-06-28 2008-01-02 周德祥 Concrete mould spraying machine
US8301306B1 (en) * 2010-07-20 2012-10-30 Blasters, Llc Control system for machine that cleans drums of ready mixed concrete trucks
CN102704949A (en) * 2012-06-14 2012-10-03 中交四航局第一工程有限公司 No-pull rod side wall construction method for underground tunnel and formwork trolley for construction
CN103556817A (en) * 2013-11-14 2014-02-05 广州鑫桥建筑劳务有限公司 Side wall concrete construction method employing side wall trolley
CN206047931U (en) * 2016-07-29 2017-03-29 广东工业大学 A kind of shot-peening workbench
CN209144821U (en) * 2018-11-28 2019-07-23 中建隧道建设有限公司 Gunite concrete synovial membrane constructing device for foundation pit side wall construction of leveling blanket

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022191684A1 (en) 2021-03-09 2022-09-15 Valters Artis A device, a system and a method for levelling a wall or similar vertical surface
CN114215067A (en) * 2021-11-12 2022-03-22 中铁十六局集团电气化工程有限公司 Concrete injection device for foundation pit wall reinforcement

Also Published As

Publication number Publication date
CN109281320B (en) 2024-01-30

Similar Documents

Publication Publication Date Title
CN107119715B (en) A kind of application method of pipe gallery entirety mould bases
CN107327128A (en) One kind white washed wall device
CN209144821U (en) Gunite concrete synovial membrane constructing device for foundation pit side wall construction of leveling blanket
CN103939114B (en) A kind of outstanding rail chassis lining construction method
CN104234012B (en) A kind of concrete loose rock dam ultra-long concrete sliding formwork body and construction method thereof
CN206205391U (en) A kind of metope scrapes slurry plastered work device and metope is scraped slurry and plastered robot
CN111350259B (en) Construction method of assembled slip-form cast-in-situ drainage ditch
CN207453408U (en) A kind of automatic plastering machine of adjust automatically plastering scope and pressure
CN109281320A (en) Gunite concrete synovial membrane constructing device and method for foundation pit side wall construction of leveling blanket
CN107237482A (en) A kind of automatic plastering machine
CN104196215A (en) Pasting machine
CN106121208A (en) A kind of full-automatic floor tile machine
CN208135764U (en) A kind of pipeline hanging device without spin
CN207513115U (en) A kind of white washed wall device
CN217151964U (en) A operation platform truck that is used for hole stake method to prop up originally and detain arch and backfill whole construction
CN101812919B (en) Multi-directional wall surface plastering machine
CN204780626U (en) Automatic bridging system
CN202391084U (en) Flat-scraping operating vehicle
CN102758519B (en) Building numerical control rendering motor machine
CN218912905U (en) Novel split shell-discarding combined template trolley
CN215443098U (en) Beam plate axillary angle template support reinforcing apparatus
CN212453510U (en) Portable wall plastering equipment for wall plastering and screeding
CN220539637U (en) Concrete spraying trowelling trolley for tunnel primary support
CN218562906U (en) Gypsum basic unit is from levelling ground construction with fixed point leveling device
CN207017083U (en) A kind of adjustable for height combined trolley guide rail

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant