CN109235481A - A kind of construction method preventing lifting by frost for transmission line of electricity column foundation - Google Patents
A kind of construction method preventing lifting by frost for transmission line of electricity column foundation Download PDFInfo
- Publication number
- CN109235481A CN109235481A CN201811227519.8A CN201811227519A CN109235481A CN 109235481 A CN109235481 A CN 109235481A CN 201811227519 A CN201811227519 A CN 201811227519A CN 109235481 A CN109235481 A CN 109235481A
- Authority
- CN
- China
- Prior art keywords
- transmission line
- column foundation
- foundation
- steel cylinder
- straight column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Foundations (AREA)
Abstract
本发明公开了一种用于输电线路直柱基础防止冻拔的施工方法。包括:开挖基坑,输电线路直柱基础底座置于永冻土层,将直柱基础下部基础底座迅速回填;将按照直柱基础尺寸预先制作好的内侧焊接有万向轮的外侧钢筒套装在直柱基础上部;外侧钢筒套装完毕后,对外侧钢筒下部与直柱基础底座间的缝隙进行密封,密封后从上部向套装在直柱基础上的外侧钢筒及在其内侧焊接的万向轮形成的间隙内缓慢均匀的注入润滑剂;润滑剂注入完成后,迅速回填土方。本发明的施工方法,解决了在冻土的冻胀作用下,由于向上的冻拔力和多次冻融循环导致直柱基础上部被冻拔破坏的问题。实现了防止冻拔与施工一体化,具有效率高、施工速度快等优点,应用前景广泛。
The invention discloses a construction method for preventing freezing and pulling of a straight column foundation of a transmission line. Including: excavating the foundation pit, placing the base of the straight column foundation of the transmission line in the permafrost layer, and quickly backfilling the foundation base at the lower part of the straight column foundation; prefabricated according to the size of the straight column foundation and welding the inner side of the outer steel cylinder with the universal wheel Set on the upper part of the vertical column foundation; after the outer steel cylinder is set, seal the gap between the lower part of the outer steel cylinder and the base of the vertical column foundation, and then weld from the upper part to the outer steel cylinder set on the vertical column foundation and on the inside of it. Slowly and evenly inject lubricant into the gap formed by the universal wheel; after the lubricant injection is completed, quickly backfill the soil. The construction method of the present invention solves the problem that the upper part of the vertical column foundation is damaged by freezing and pulling due to the upward freezing pulling force and multiple freeze-thaw cycles under the action of frost heaving of the frozen soil. It realizes the integration of preventing freezing and pulling and construction, and has the advantages of high efficiency and fast construction speed, and has wide application prospects.
Description
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201811227519.8A CN109235481A (en) | 2018-10-22 | 2018-10-22 | A kind of construction method preventing lifting by frost for transmission line of electricity column foundation |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201811227519.8A CN109235481A (en) | 2018-10-22 | 2018-10-22 | A kind of construction method preventing lifting by frost for transmission line of electricity column foundation |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN109235481A true CN109235481A (en) | 2019-01-18 |
Family
ID=65080853
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201811227519.8A Pending CN109235481A (en) | 2018-10-22 | 2018-10-22 | A kind of construction method preventing lifting by frost for transmission line of electricity column foundation |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN109235481A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111648413A (en) * | 2020-06-10 | 2020-09-11 | 内蒙古大学 | A device for anti-freezing and pulling out of pile foundation |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR20080069335A (en) * | 2007-01-23 | 2008-07-28 | 한국건설기술연구원 | Fixation method of fixing force acting on foundation piles of permafrost |
| CN102877448A (en) * | 2012-10-24 | 2013-01-16 | 中铁西北科学研究院有限公司 | Deformation monitoring datum point device applicable to permafrost regions and method for mounting deformation monitoring datum point device |
| CN103306290A (en) * | 2012-03-27 | 2013-09-18 | 中国电力科学研究院 | Quick re-freezing and backfilling construction method for foundation ground of tower foundation in frozen ground area |
| CN105442626A (en) * | 2015-12-23 | 2016-03-30 | 中国电力工程顾问集团西北电力设计院有限公司 | Composite inclined column expansion foundation structure applied to power transmission line in permafrost region |
| CN108385673A (en) * | 2018-03-14 | 2018-08-10 | 兰州有色冶金设计研究院有限公司 | Miniature top filling ball sleeve pile pile and its construction method |
-
2018
- 2018-10-22 CN CN201811227519.8A patent/CN109235481A/en active Pending
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR20080069335A (en) * | 2007-01-23 | 2008-07-28 | 한국건설기술연구원 | Fixation method of fixing force acting on foundation piles of permafrost |
| CN103306290A (en) * | 2012-03-27 | 2013-09-18 | 中国电力科学研究院 | Quick re-freezing and backfilling construction method for foundation ground of tower foundation in frozen ground area |
| CN102877448A (en) * | 2012-10-24 | 2013-01-16 | 中铁西北科学研究院有限公司 | Deformation monitoring datum point device applicable to permafrost regions and method for mounting deformation monitoring datum point device |
| CN105442626A (en) * | 2015-12-23 | 2016-03-30 | 中国电力工程顾问集团西北电力设计院有限公司 | Composite inclined column expansion foundation structure applied to power transmission line in permafrost region |
| CN108385673A (en) * | 2018-03-14 | 2018-08-10 | 兰州有色冶金设计研究院有限公司 | Miniature top filling ball sleeve pile pile and its construction method |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111648413A (en) * | 2020-06-10 | 2020-09-11 | 内蒙古大学 | A device for anti-freezing and pulling out of pile foundation |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104533434B (en) | Construction method of rectangular ultra-shallow covered soil tunnel | |
| WO2020248596A1 (en) | Protection structure for preventing ground heave caused by tunnel grouting reinforcement and grouting method | |
| CN110158649B (en) | A construction method for adjacent underground pipelines during caisson subsidence construction | |
| CN101250868B (en) | Precipitation prepressing association motive power induration deep densification method | |
| CN103696376A (en) | Concrete foundation-free highway culvert for permafrost region | |
| CN103527847B (en) | Pipe burying structure capable of reducing pipe top vertical loads and construction method for pipe burying structure | |
| CN102926378A (en) | Conductive composite vacuum soft soil reinforcing prepressing method | |
| CN105926636A (en) | Freezing bottom-sealing construction method for deep foundation pit | |
| CN110889163A (en) | A method for controlling wide cracks in coal mining subsidence in loess hilly area | |
| CN108239989B (en) | Environment-friendly collapsible loess foundation structure and treatment method thereof | |
| CN106869946A (en) | Make bottom frozen construction method in a kind of sand-pebble layer tunneling subway station | |
| CN110306595A (en) | A co-construction structure and construction method of a power utility gallery and a flood wall | |
| CN202577363U (en) | H-shaped steel joint structure of underground diaphragm wall | |
| CN109235481A (en) | A kind of construction method preventing lifting by frost for transmission line of electricity column foundation | |
| CN215858114U (en) | Open caisson integrated configuration to existing pipeline transformation that dams | |
| CN103046534B (en) | Method for improving bearing capacity of foundation | |
| CN205116201U (en) | Open caisson construction equipment | |
| CN210127498U (en) | Permafrost region pile foundation anti-freezing-pulling structure | |
| CN104947653B (en) | For the decompression method of vibrator pipe sinking cast-in-place pile construction in saturation mud | |
| CN102304913A (en) | LCSG (Long-Concrete Short-Gravel) pile and vacuum prepressing combined processing method and device for soft soil foundation | |
| CN109742715B (en) | Arrangement structure of electric power pipe trench after transition and modification and electric power pipe trench transition and modification method | |
| CN207891907U (en) | A kind of environment-friendly type collapsible loess foundation structure | |
| CN206467651U (en) | Rectangular concrete pile for building piping lane side wall | |
| CN209585134U (en) | The light platform structure of frost damage prevention | |
| CN204375987U (en) | The little resistance ground network of main equipment |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| TA01 | Transfer of patent application right |
Effective date of registration: 20210622 Address after: 810000 77 Haiyan Road, Chengxi District, Xining City, Qinghai Province Applicant after: QINGHAI GEOLOGICAL ENVIRONMENT MONITORING STATION Applicant after: Qinghai nonferrous Third Geological Exploration Institute Applicant after: QINGHAI NORMAL University Applicant after: QINGHAI INSTITUTE OF HYDROGEOLOGY AND ENGINEERING Address before: No.18, Wusi West Road, Chengxi District, Xining City, Qinghai Province 810000 Applicant before: QINGHAI GEOLOGICAL ENVIRONMENT MONITORING STATION Applicant before: POWERCHINA QINGHAI ELECTRIC POWER DESIGN INSTITUTE Co.,Ltd. Applicant before: QINGHAI GEOLOGICAL SURVEY INSTITUTE Applicant before: QINGHAI INSTITUTE OF HYDROGEOLOGY AND ENGINEERING |
|
| TA01 | Transfer of patent application right | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190118 |
|
| RJ01 | Rejection of invention patent application after publication |