CN104533434B - Construction method of rectangular ultra-shallow covered soil tunnel - Google Patents

Construction method of rectangular ultra-shallow covered soil tunnel Download PDF

Info

Publication number
CN104533434B
CN104533434B CN201410837475.6A CN201410837475A CN104533434B CN 104533434 B CN104533434 B CN 104533434B CN 201410837475 A CN201410837475 A CN 201410837475A CN 104533434 B CN104533434 B CN 104533434B
Authority
CN
China
Prior art keywords
tunnel
ultra
covered
pile
shield
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410837475.6A
Other languages
Chinese (zh)
Other versions
CN104533434A (en
Inventor
张付林
黄德中
李刚
朱雁飞
叶俊能
黄�俊
陈旭光
张�杰
顾嫣
李培楠
刘新科
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Metro Group Co., Ltd.
Shanghai tunneling shield Engineering Co., Ltd
Shanghai Tunnel Engineering Co Ltd
Original Assignee
Shanghai Tunneling Shield Engineering Co Ltd
NINGBO METRO GROUP CO Ltd
Shanghai Tunnel Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Tunneling Shield Engineering Co Ltd, NINGBO METRO GROUP CO Ltd, Shanghai Tunnel Engineering Co Ltd filed Critical Shanghai Tunneling Shield Engineering Co Ltd
Priority to CN201410837475.6A priority Critical patent/CN104533434B/en
Publication of CN104533434A publication Critical patent/CN104533434A/en
Application granted granted Critical
Publication of CN104533434B publication Critical patent/CN104533434B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/0607Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield being provided with devices for lining the tunnel, e.g. shuttering
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Civil Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a construction method of a rectangular ultra-shallow covered soil tunnel. The method comprises the steps that before a tunnel is excavated, one row of cast-in place piles are arranged on two sides of a tunnel side boundary in the tunnel axial direction in the crossing range of ultra-shallow covered soil respectively; high pressure jet grouting piles are arranged in a reinforcing area defined by the two rows of cast-in place piles and the top of the tunnel; concrete anti-floating plates are casted at the tops of the cast-in place piles and the high pressure jet grouting piles. Anti-floating strengthening construction is performed before, when and after a rectangular shield crosses the ultra-shallow covered soil respectively, compared with a conventional measure that only anti-floating is performed when the rectangular shield crosses the ultra-shallow covered soil, the construction method of the rectangular ultra-shallow covered soil tunnel has better anti-floating strengthening strength and can solve the difficulties that tunnel floating is large, ground disturbance is fierce, and the shield posture is difficult to control under the rectangular shield ultra-shallow covered soil condition.

Description

The construction method in ultra-shallow earth-covered class rectangle tunnel
Technical field
The present invention relates to a kind of construction method in class rectangle tunnel, more particularly to a kind of structure in ultra-shallow earth-covered class rectangle tunnel Construction method.
Background technology
With the propulsion of Subway Network in China process, the construction in the planning and designing of subway station, especially transfer stop is advised Draw, need the utilization ratio for considering the underground space, while several circuits interlock up and down in transfer stop, necessarily there is a line Road buried depth is shallower, when shield is tunneled near this kind of subway station, the construction operating mode even ultra-shallow earth-covered by shallow earthing is faced.An ultra shallow Earthing operating mode (shield top earthing<0.6D, D be circular shield diameter) under the conditions of carry out shield-tunneling construction, shield is there is always and is pushed away Enter the difficult problems such as, shield attitude big to stratum disturbing influence be wayward.Using rectangular shield in ultra-shallow earth-covered working condition (shield Top earthing<0.6H, H be rectangular shield height) under ground disturbance it is more difficult with shield attitude.
Have at present for the construction method under circular shield and the ultra-shallow earth-covered operating mode of double-O-tube shield, such as Gu Chunhua, Wu Huiming, Wu Liecheng et al. is being applied for a patent《Double-circular shield shallow earthing construction method》(200610116617.5) disclose one kind in be directed to Double-O-tube shield tunnel shallow earthing construction method.It includes:Firstth, early-stage preparations:Construction enveloping field;Section of jurisdiction is carried out in bed shallow covering Preloading;Pipeline protection;Secondth, tracking and monitoring;3rd, shallow earthing construction:Fltting speed;Screw machine rotating speed;Its end soil pressure;Shield The back slip casting of structure front;Back slip casting;Pipe sheet assembling;TBM's position control;Tunnel anti-floating;Surface uplift control before otch;The 4th, later-stage secondary slip casting is passed through, one is formed in the outside of section of jurisdiction 20 and is enclosed anti-floating ruggedized construction 21, realize anti-floating, as shown in Figure 1;The 5th, emergency measure:Ground grout is processed.
But it is still blank for the construction technology under the ultra-shallow earth-covered operating mode of rectangular shield, and existing circular and double-O-tube shield Ultra-shallow earth-covered construction method is not suitable for rectangular shield construction, it is impossible to solve tunnel upward floating under the ultra-shallow earth-covered operating mode of rectangular shield Greatly, ground disturbance is violent, a shield attitude difficult problem rambunctious.
The content of the invention
The technical problem to be solved is to provide a kind of construction method in ultra-shallow earth-covered class rectangle tunnel, can solve Certainly tunnel upward floating is big, ground disturbance is violent under the ultra-shallow earth-covered operating mode of class rectangle shield, a shield attitude difficult problem rambunctious.
To realize above-mentioned technique effect, the invention discloses a kind of ultra-shallow earth-covered reinforcement means of class rectangle shield, including:
Before tunnel excavation, in ultra-shallow earth-covered acrossing range, set respectively in tunnel sideline both sides along tunnel axis direction Put a gang drill hole pouring pile;
Enclose to set in the two gang drills hole pouring pile and tunnel top and lay in the reinforcing area to be formed high-pressure rotary jet grouting pile;
In the cast-in-situ bored pile and the top casting concrete anti-floating plate of the high-pressure rotary jet grouting pile.
The ultra-shallow earth-covered reinforcement means of the class rectangle shield is further improved by, and arranges described in tunnel sideline both sides Cast-in-situ bored pile, including:
In the construction drill bored concrete pile in the range of the both sides 5m of tunnel sideline respectively, the stake footpath of the cast-in-situ bored pile is Φ 600mm, and the stake footpath for being smaller than twice cast-in-situ bored pile of adjacent two cast-in-situ bored piles;
The cast-in-situ bored pile is drilled into into depth at least above tunnel bottom depth 5m.
The ultra-shallow earth-covered reinforcement means of the class rectangle shield is further improved by, and lays in the reinforcing area high Pressure rotary-spraying stake, including:
It is described from earth's surface to high-pressure rotary jet grouting pile of constructing in the depth bounds of tunnel top 500mm in reinforcing area The stake footpath of high-pressure rotary jet grouting pile is 500mm;
According to ultra-shallow earth-covered Soil Parameters, the quantity and spacing of the high-pressure rotary jet grouting pile are set, after ensureing to reinforce Bearing Capacity of Composite Foundation eigenvalue is more than or equal to 130KPa.
The invention also discloses a kind of construction method in ultra-shallow earth-covered class rectangle tunnel, including:
A, before class rectangle shield crossing is ultra-shallow earth-covered ultra-shallow earth-covered strengthening construction is carried out, including:
In ultra-shallow earth-covered acrossing range, row hole drilling perfusion is respectively provided with tunnel sideline both sides along tunnel axis direction Stake;
Enclose to set in the two gang drills hole pouring pile and tunnel top and lay in the reinforcing area to be formed high-pressure rotary jet grouting pile;
In the cast-in-situ bored pile and the top casting concrete anti-floating plate of the high-pressure rotary jet grouting pile;
B, the ultra-shallow earth-covered construction of class rectangle shield crossing is carried out, in ultra-shallow earth-covered acrossing range measure of anti float is implemented;
D, after class rectangle shield crossing is ultra-shallow earth-covered, micro-disturbance hoop grouting and reinforcing is carried out to tunnel.
The construction method in the ultra-shallow earth-covered class rectangle tunnel is further improved by, and the measure of anti float includes:
(1) tunnel subsidence monitoring point is arranged at the construction field (site) in advance, and according to the monitoring result of tunnel subsidence monitoring point, Preloading is carried out using steel ingot block in agent on crack resistance of concrete kickboard, in tunnel duct piece;
(2) control of soil pressure control, shield driving speed and thrust is carried out during shield driving;
(3) slip casting is synchronized using the anti-floating serosity for possessing high shear strength during shield driving, and implements tunnel Tracking grouting construction in road;
(4) the assembled pressure of section of jurisdiction is controlled during pipe sheet assembling;
(5) reinforcing is attached between cyclization tunnel duct piece, cyclization tunnel integral rigidity is improved.
The construction method in the ultra-shallow earth-covered class rectangle tunnel is further improved by, and in tunnel sideline both sides institute is arranged Cast-in-situ bored pile is stated, including:
In the construction drill bored concrete pile in the range of the both sides 5m of tunnel sideline respectively, the stake footpath of the cast-in-situ bored pile is Φ 600mm, and the stake footpath for being smaller than twice cast-in-situ bored pile of adjacent two cast-in-situ bored piles;
The cast-in-situ bored pile is drilled into into depth at least above tunnel bottom depth 5m.
The construction method in the ultra-shallow earth-covered class rectangle tunnel is further improved by, and lays in the reinforcing area High-pressure rotary jet grouting pile, including:
It is described from earth's surface to high-pressure rotary jet grouting pile of constructing in the depth bounds of tunnel top 500mm in reinforcing area The stake footpath of high-pressure rotary jet grouting pile is 500mm;
According to ultra-shallow earth-covered Soil Parameters, the quantity and spacing of the high-pressure rotary jet grouting pile are set, after ensureing to reinforce Bearing Capacity of Composite Foundation eigenvalue is more than or equal to 130KPa.
The invention also discloses a kind of ultra-shallow earth-covered ruggedized construction of rectangular shield, including:
First reinforcing area, is arranged at the both sides in the sideline in the tunnel along tunnel axis direction, and the first of the both sides Cast-in-situ bored pile is laid with reinforcing area;
Second reinforcing area, is arranged between earth's surface and tunnel top, and high pressure rotation is laid with second reinforcing area Spray stake;
Agent on crack resistance of concrete kickboard, the agent on crack resistance of concrete kickboard is located at first reinforcing area and the second reinforcing area top Portion;
3rd reinforcing area, is arranged in the outside of tunnel duct piece, the 3rd reinforcing area and is filled with anti-floating serosity.
The ultra-shallow earth-covered ruggedized construction of the rectangular shield is further improved by, and the cast-in-situ bored pile is respectively arranged at In the range of the both sides 5m of tunnel sideline, the stake footpath of the cast-in-situ bored pile is Φ 600mm, and adjacent two cast-in-situ bored piles The stake footpath of twice cast-in-situ bored pile is smaller than, the depth of the cast-in-situ bored pile is at least above tunnel bottom depth 5m.
The ultra-shallow earth-covered ruggedized construction of the rectangular shield is further improved by, and the stake footpath of the high-pressure rotary jet grouting pile is 500mm, is arranged at from earth's surface in the depth bounds of tunnel top 500mm.
The present invention is as a result of above technical scheme so as to have the advantages that:
By using rectangular shield pass through it is ultra-shallow earth-covered before, during and after three phases all carry out anti-floating strengthening construction respectively, Compare it is traditional it is only ultra-shallow earth-covered to shield crossing during carry out measure of anti float, it is strong that there is the present invention more preferable anti-floating to reinforce Degree, can solve the problem that for the tunnel upward floating under the ultra-shallow earth-covered operating mode of rectangular shield it is big, ground disturbance is violent, the difficult control of shield attitude A difficult problem;
By in the tunnel sideline both sides of ultra-shallow earth-covered through section, tunnel top and tunnel duct piece outer rim arranging the respectively First, second, third reinforcing area, and cast-in-situ bored pile is set in the first reinforcing area, in the second reinforcing area, high pressure rotation is set Spray stake, fills anti-floating serosity in the 3rd reinforcing area, constitutes whole anti-uplift ruggedized construction, three reinforcing areas of Proper Match Position and reinforcing order, preferably anti-floating consolidation effect, and easy construction can be reached, be conducive to improve shield-tunneling construction effect Rate.
Description of the drawings
Fig. 1 is the structure schematic diagram of traditional ultra-shallow earth-covered Rectangular Tunnel.
Fig. 2 is ultra-shallow earth-covered class rectangle tunnel reinforcement structural representation of the invention.
Fig. 3 is the ultra-shallow earth-covered front ultra-shallow earth-covered ruggedized construction top view of class rectangle shield crossing of the present invention.
Fig. 4 be class rectangle shield crossing of the present invention it is ultra-shallow earth-covered after ultra-shallow earth-covered ruggedized construction schematic diagram.
Fig. 5~7 are the ultra-shallow earth-covered front ruggedized construction construction process figures of class rectangle shield crossing of the present invention.
Fig. 8 is the ultra-shallow earth-covered section of jurisdiction slip casting point position arrangement of class rectangle shield crossing of the present invention.
Specific embodiment
Below in conjunction with the accompanying drawings and specific embodiment the present invention is further detailed explanation.
The present invention ultra-shallow earth-covered class rectangle tunnel construction method mainly include class rectangle shield crossing it is ultra-shallow earth-covered before, In, the construction of the anti-floating of rear three phases, the ultra-shallow earth-covered strengthening construction before especially passing through solves class rectangle shield an ultra shallow Tunnel upward floating is big under earthing operating mode, ground disturbance is violent, a shield attitude difficult problem rambunctious, is follow-up ultra-shallow earth-covered crossing construction There is provided the basis for meeting working condition.
Referring initially to the ultra-shallow earth-covered plus consolidation shown in Fig. 2 and Fig. 3, before the class rectangle shield crossing of the present invention is ultra-shallow earth-covered Structure is mainly made up of the first reinforcing area 11, the second reinforcing area 12 and agent on crack resistance of concrete kickboard 13.
Wherein, the first reinforcing area 11 is arranged at the both sides of the sideline L2 in tunnel 10 along tunnel axis L1 directions, both sides A gang drill hole pouring pile 110 is laid with respectively in first reinforcing area 11.Cast-in-situ bored pile 110 is respectively arranged at apart from tunnel 10 In the range of the 5m of sideline L2 both sides, the stake footpath of cast-in-situ bored pile 110 is adjacent two in Φ 600mm, and every gang drill hole pouring pile 110 The stake footpath for being smaller than twice cast-in-situ bored pile of cast-in-situ bored pile 110, the depth of cast-in-situ bored pile 110 is at least above tunnel bottom Portion's depth 5m.
Second reinforcing area 12 is arranged between earth's surface and tunnel top, and in the second reinforcing area 12 high-pressure rotary-spray is laid with Stake 120, the stake footpath of high-pressure rotary jet grouting pile 120 is 500mm, is arranged at from earth's surface extremely in the depth bounds of tunnel top 500mm, And according to ultra-shallow earth-covered Soil Parameters (soft or hard degree), the quantity and spacing of high-pressure rotary jet grouting pile are set, after ensureing to reinforce Bearing Capacity of Composite Foundation eigenvalue is more than or equal to 130KPa.
The thickness of agent on crack resistance of concrete kickboard 13 is 700mm, is poured in the top of cast-in-situ bored pile 110 and high-pressure rotary jet grouting pile 120, And combine closely with cast-in-situ bored pile 110 and high-pressure rotary jet grouting pile 120.Cover so as to constitute class rectangle shield crossing an ultra shallow of the present invention Ultra-shallow earth-covered ruggedized construction before soil.
In conjunction with shown in Fig. 4, the class rectangle shield of the present invention is then adopted when passing through ultra-shallow earth-covered and further after passing through Anti-floating serosity is injected to outside shield duct piece 15 so that form one in the outer rim of shield duct piece 15 and enclose the 3rd reinforcing area 14.So as to structure Into the ultra-shallow earth-covered whole anti-uplift ruggedized construction of class rectangle shield of the present invention.
Coordinate shown in Fig. 5~7, the ultra-shallow earth-covered construction of class rectangle shield of the present invention mainly includes:
A, before class rectangle shield crossing is ultra-shallow earth-covered ultra-shallow earth-covered strengthening construction is carried out, specifically included:
(1) as shown in figure 5, in ultra-shallow earth-covered acrossing range, dividing in the sideline both sides of tunnel 10 along the axis direction of tunnel 10 First reinforcing area 11 is not set, and a gang drill hole pouring pile 110 of constructing respectively in the first reinforcing area of both sides is further wrapped Include:
In the construction drill bored concrete pile 110 in the range of the both sides 5m of tunnel sideline respectively, the stake footpath of cast-in-situ bored pile 110 is Adjacent two cast-in-situ bored piles 110 is smaller than twice cast-in-situ bored pile 110 in Φ 600mm, and every gang drill hole pouring pile 110 Stake footpath;
The cast-in-situ bored pile is drilled into into depth at least above tunnel bottom depth 5m.
(2) set in the second reinforcing area 12 to be formed as shown in fig. 6, enclosing in two gang drill hole pouring piles 110 and tunnel top High-pressure rotary jet grouting pile 120 is laid, is further included:
In the second reinforcing area 12, construct to the soil body 23 in the depth bounds of tunnel top 500mm from earth's surface High-pressure rotary jet grouting pile 120, the stake footpath of high-pressure rotary jet grouting pile 120 is 500mm;
According to ultra-shallow earth-covered Soil Parameters (soft or hard degree), the quantity and spacing of high-pressure rotary jet grouting pile 120 are set, to ensure Bearing Capacity of Composite Foundation eigenvalue after reinforcing is more than or equal to 130KPa.
(3) as shown in fig. 7, pouring ground concrete anti-floating plate at the top of cast-in-situ bored pile 120 and high-pressure rotary jet grouting pile 110 13, the thickness of agent on crack resistance of concrete kickboard 13 is 700mm, agent on crack resistance of concrete kickboard 13 and cast-in-situ bored pile 110 and high-pressure rotary jet grouting pile 120 Tight connects.
B, the ultra-shallow earth-covered construction of class rectangle shield crossing is carried out, in ultra-shallow earth-covered acrossing range measure of anti float is implemented, should Measure of anti float is further included:
(1) under controlling the ultra-shallow earth-covered operating mode of class rectangle shield, shield driving speed controlling is in 1~2cm/min;
(2) shield driving process soil pressure control is controlled using top soil pressure, improves ultra-shallow earth-covered construction soil pressure control sensitive Degree, top soil pressure control regards soil property situation, and silt clay layer is controlled in 0.15MPa ± 0.02MPa;
(3) slip casting is synchronized using the anti-floating serosity for possessing high shear strength during shield driving, using multiple spot Slip casting, based on Stress control, supplemented by synchronous grouting amount, prevents synchronous grouting hypertonia from bringing larger soil disturbance or ground Slurry phenomenon is worn in face, and, respectively such as table 1 below, table 2, table 3, slip casting point position is arranged such as synchronous grouting proportioning, performance parameter and grouting parameter Shown in Fig. 8
The synchronous grouting match ratio of table 1
Sand Flyash Bentonite HD dry powder Water reducer Extender Water
860 560 100 25 3 20 360
The synchronous grouting performance indications of table 2
The synchronous grouting construction parameter of table 3
(4) steel plate reinforcement by connection is carried out to every piece of section of jurisdiction between cyclization tunnel duct piece, improves cyclization tunnel integral rigidity, it is to avoid Localized tunnel duct piece float upward and cause Structural Test of Tunnel Segments faulting of slab ends, breakage, seepage;
(5) tunnel subsidence monitoring point is arranged at the construction field (site) in advance, and according to the monitoring result of tunnel subsidence monitoring point, Preloading is carried out using steel ingot block in agent on crack resistance of concrete kickboard, in tunnel duct piece, tunnel upper, tunnel internal loading is improved;
(6) shield driving speed and gross thrust are reduced during shield driving, it is to avoid significantly rectify a deviation, the gradient of keeping under strict control is entangled Partially, effectively less shield entangles assembled control;
(7) pipe sheet assembling process turns down assembled pressure, strengthens to jack stroke during ultra-shallow earth-covered section of pipe sheet assembling Monitoring, it is to avoid occur vexed pushing away risk;
(8) situation is monitored according to shield machine jack stroke after assembly terminates and determines jack usage quantity;
(9) tracking grouting construction in tunnel is implemented during Shield Construction Method Used, range of grouting is 10 rings after shield tail.
D, after class rectangle shield crossing is ultra-shallow earth-covered, carry out micro-disturbance hoop grouting and reinforcing to tunnel, reinforcing thickness is 1m outside tunnel, completes construction.
The present invention the ultra-shallow earth-covered construction method of class rectangle shield by using before class rectangle shield crossing is ultra-shallow earth-covered, In, rear three phases all carry out anti-floating strengthening construction respectively, compare it is traditional it is only ultra-shallow earth-covered to shield crossing during carry out Measure of anti float, the present invention has more preferable anti-floating fastening strength, can solve the problem that under the ultra-shallow earth-covered operating mode of class rectangle shield Tunnel upward floating is big, ground disturbance is violent, a shield attitude difficult problem rambunctious;
By in the tunnel sideline both sides of ultra-shallow earth-covered through section, tunnel top and tunnel duct piece outer rim arranging the respectively First, second, third reinforcing area, and cast-in-situ bored pile is set in the first reinforcing area, in the second reinforcing area, high pressure rotation is set Spray stake, fills anti-floating serosity in the 3rd reinforcing area, constitutes whole anti-uplift ruggedized construction, three reinforcing areas of Proper Match Position and reinforcing order, preferably anti-floating consolidation effect, and easy construction can be reached, be conducive to improve shield-tunneling construction effect Rate.
The present invention is described in detail above in association with drawings and Examples, those skilled in the art can basis Described above makes many variations example to the present invention.Thus, some of embodiment details should not constitute limitation of the invention, The present invention is by the scope defined using appended claims as protection scope of the present invention.

Claims (4)

1. a kind of construction method in ultra-shallow earth-covered class rectangle tunnel, it is characterised in that include:
A, before class rectangle shield crossing is ultra-shallow earth-covered ultra-shallow earth-covered strengthening construction is carried out, including:
In ultra-shallow earth-covered acrossing range, a gang drill hole pouring pile is respectively provided with tunnel sideline both sides along tunnel axis direction;
Enclose to set in the two gang drills hole pouring pile and tunnel top and lay in the reinforcing area to be formed high-pressure rotary jet grouting pile;
In the cast-in-situ bored pile and the top casting concrete anti-floating plate of the high-pressure rotary jet grouting pile, and make the concrete anti-floating Plate links integral with the top of the cast-in-situ bored pile and the high-pressure rotary jet grouting pile;
B, the ultra-shallow earth-covered construction of class rectangle shield crossing is carried out, in ultra-shallow earth-covered acrossing range measure of anti float is implemented;In class square Synchronized to outside the shield duct piece of class rectangle shield using the anti-floating serosity for possessing high shear strength during shape shield driving Slip casting, forms one and encloses the 3rd reinforcing area in shield duct piece outer rim;The synchronous grouting of anti-floating serosity adopts multiple spot slip casting, with pressure Based on control, supplemented by synchronous grouting amount, prevent synchronous grouting hypertonia from causing soil disturbance or ground to wear slurry phenomenon;
C, after class rectangle shield crossing is ultra-shallow earth-covered, micro-disturbance hoop grouting and reinforcing is carried out to tunnel.
2. the construction method in ultra-shallow earth-covered class rectangle tunnel as claimed in claim 1, it is characterised in that the measure of anti float bag Include:
(1) tunnel subsidence monitoring point is arranged at the construction field (site) in advance, and according to the monitoring result of tunnel subsidence monitoring point, in coagulation Preloading is carried out using steel ingot block on native anti-floating plate, in tunnel duct piece;
(2) control of soil pressure control, shield driving speed and thrust is carried out during shield driving;
(3) slip casting is synchronized using the anti-floating serosity for possessing high shear strength during shield driving, and is implemented in tunnel Tracking grouting is constructed;
(4) the assembled pressure of section of jurisdiction is controlled during pipe sheet assembling;
(5) reinforcing is attached between cyclization tunnel duct piece, cyclization tunnel integral rigidity is improved.
3. the construction method in ultra-shallow earth-covered class rectangle tunnel as claimed in claim 1, it is characterised in that in tunnel sideline both sides The cast-in-situ bored pile is set, including:
In the construction drill bored concrete pile in the range of the both sides 5m of tunnel sideline respectively, the stake footpath of the cast-in-situ bored pile is Φ 600mm, and the stake footpath for being smaller than twice cast-in-situ bored pile of adjacent two cast-in-situ bored piles;
The cast-in-situ bored pile is drilled into into depth at least above tunnel bottom depth 5m.
4. the construction method in ultra-shallow earth-covered class rectangle tunnel as claimed in claim 1, it is characterised in that in the reinforcing area Interior laying high-pressure rotary jet grouting pile, including:
In reinforcing area, from earth's surface to high-pressure rotary jet grouting pile of constructing in the depth bounds of tunnel top 500mm, the high pressure The stake footpath of rotary churning pile is 500mm;
According to ultra-shallow earth-covered Soil Parameters, the quantity and spacing of the high-pressure rotary jet grouting pile are set, it is compound after reinforcing to ensure Characteristic value of foundation bearing capacity is more than or equal to 130KPa.
CN201410837475.6A 2014-12-28 2014-12-28 Construction method of rectangular ultra-shallow covered soil tunnel Active CN104533434B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410837475.6A CN104533434B (en) 2014-12-28 2014-12-28 Construction method of rectangular ultra-shallow covered soil tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410837475.6A CN104533434B (en) 2014-12-28 2014-12-28 Construction method of rectangular ultra-shallow covered soil tunnel

Publications (2)

Publication Number Publication Date
CN104533434A CN104533434A (en) 2015-04-22
CN104533434B true CN104533434B (en) 2017-05-03

Family

ID=52849034

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410837475.6A Active CN104533434B (en) 2014-12-28 2014-12-28 Construction method of rectangular ultra-shallow covered soil tunnel

Country Status (1)

Country Link
CN (1) CN104533434B (en)

Families Citing this family (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104895122B (en) * 2015-06-03 2018-01-02 中铁第四勘察设计院集团有限公司 A kind of construction method of shield tunnel
WO2016192320A1 (en) * 2015-06-03 2016-12-08 中铁第四勘察设计院集团有限公司 Continuous beam type anti-floating structure of shield tunnel
CN105240036B (en) * 2015-10-20 2017-11-17 重庆交通大学 The horizontal massif method for tunnel construction handled to pre-reinforcement
CN105370306B (en) * 2015-10-20 2018-09-04 重庆交通大学 The massif tunnel excavation construction method of vertical pre-reinforcement processing
CN105240018B (en) * 2015-10-30 2018-09-18 中铁上海工程局集团有限公司 Construction of Silo device and method
CN105571768B (en) * 2016-01-04 2018-08-03 安徽理工大学 A kind of shallow tunnel Calculating method of earth pressure based on displacement monitoring result
CN106368711A (en) * 2016-10-12 2017-02-01 中建局集团第六建筑有限公司 Ultra-shallow buried rectangular large-section four-step underground excavation construction method
CN108005129A (en) * 2017-09-28 2018-05-08 中国矿业大学(北京) A kind of safeguard structure system and method for controlling tunnel vertical deformation
CN108301842B (en) * 2018-03-13 2023-10-13 中铁建大桥工程局集团第二工程有限公司 Fixing device for controlling shield tunnel segment to float upwards and construction method
CN108517893A (en) * 2018-03-28 2018-09-11 中铁上海工程局集团有限公司 A kind of big cross section push pipe suitable under the conditions of shallow earthing wears river construction method
CN108978645A (en) * 2018-08-21 2018-12-11 中铁九局集团第四工程有限公司 Rich water sandy gravel shallow embedding riverbed uplift pile anti-floating plate reinforced construction method is worn under shield
CN109706909B (en) * 2019-02-21 2024-08-23 郑州市市政工程总公司 Structure foundation reinforcing structure for underground shield underpass and construction method thereof
CN110118090B (en) * 2019-06-13 2024-03-22 河南理工大学 Protective structure for preventing earth surface bulge caused by tunnel grouting reinforcement
CN110700853A (en) * 2019-10-31 2020-01-17 中铁十八局集团第三工程有限公司 Shallow soil covering shield tunnel reinforcing method based on weak stratum
CN111305857A (en) * 2020-03-13 2020-06-19 上海隧道工程有限公司 Construction method for forming round tunnel by penetrating similar-rectangular shield over ultra-shallow earth
CN111734448B (en) * 2020-06-22 2022-05-17 上海隧道工程有限公司 Structure and method for reinforcing vertical channel between underground space structure and shield tunnel
CN113139218B (en) * 2021-03-25 2022-08-02 中铁建华南建设有限公司 Method and device for drawing outer diameter side line of shield segment and computer equipment
CN113389557A (en) * 2021-06-25 2021-09-14 中铁第五勘察设计院集团有限公司 Isolation structure of side-passing bridge pile of shield tunnel and shield tunnel structure assembly
CN113565525A (en) * 2021-08-28 2021-10-29 中铁上海工程局集团有限公司 Construction protection system and construction method for newly-built shield tunnel super-close ultra-shallow buried upper-span existing tunnel
CN113685190B (en) * 2021-08-28 2024-02-09 华东交通大学 Reinforcing system for shield to penetrate shallow soft clay and construction method
CN113863940A (en) * 2021-09-10 2021-12-31 中建三局基础设施建设投资有限公司 Construction method for starting and receiving shallow earth covering of ultra-large-diameter slurry shield to prevent heaving
CN114060040A (en) * 2021-11-11 2022-02-18 上海市基础工程集团有限公司 Horizontal T-joint construction method for directly jacking pipe into shield tunnel
CN114352315B (en) * 2021-11-29 2023-11-28 北京恒祥宏业基础加固技术有限公司 Grouting method suitable for restraining shield segment from floating upwards in water-rich area

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2942653B2 (en) * 1992-02-14 1999-08-30 日本鉱機株式会社 Primary tunnel lining method and Messel shield machine used in the method
CN200985518Y (en) * 2006-12-20 2007-12-05 上海市第一建筑有限公司 Portal type anti floating structure
JP5117369B2 (en) * 2008-12-17 2013-01-16 鹿島建設株式会社 Underpass construction method
CN101899977B (en) * 2010-02-04 2012-11-28 上海隧道工程股份有限公司 Ultra-shallow earth-covered subway shield traversing operation tunnel construction method of
CN102839674B (en) * 2012-09-19 2015-09-09 中国水电顾问集团华东勘测设计研究院 Support of Foundation Pit Excavation structure and construction method thereof on proximal head well shield tunnel
CN103628507B (en) * 2013-11-19 2015-12-02 厦门水务集团有限公司 Push pipe passes through the shallow earthing anti-floating construction method in seabed

Also Published As

Publication number Publication date
CN104533434A (en) 2015-04-22

Similar Documents

Publication Publication Date Title
CN104533434B (en) Construction method of rectangular ultra-shallow covered soil tunnel
CN104612160B (en) A kind of next-door neighbour&#39;s existing building pit maintenance soil structure and construction method
CN104500082B (en) In Tunneling by mining method, shield receives construction method
CN105696427A (en) Construction method for reinforcing newly-built railway karst foundation and roadbed structure thereof
CN103924987B (en) A kind of SMW engineering method stake tunnel shielding portal seepage-proof structure and construction method thereof
CN207891895U (en) Walkway shaft excavation supporting construction
CN102979531B (en) Reinforce construction method and the structure of large-scale rock slope deep weak structural plane
CN202117686U (en) Surrounding rock advanced support structure for railway tunnel at deep-buried watery and weak stratums
CN102606167A (en) Settlement control construction method for transverse grouting guide pipe of shallow underground excavation tunnel
CN204401385U (en) A kind of road structure processing Deep Thick Soft Ground karst foundation
CN204253056U (en) A kind of shield machine export &amp; import reinforcing structure
CN102286984A (en) Water-stop curtain and construction method thereof
CN106869969A (en) A kind of excavation supporting construction method of soft rock large section tunnel
CN211340827U (en) Structure for newly building bridge by passing through existing bridge piles in subway tunnel
CN104499479A (en) Dig-hole pile construction method based on penetration of sand gravel backfilling layer
CN206308569U (en) It is a kind of to reinforce the road structure for punishing the solution cavity that underlies
CN205907679U (en) Cast -in -place strength core stirring stake
CN104532714B (en) Roadbed structure for treating deep soft soil karst foundation
CN207033463U (en) Mine shield handing-over tunnel folded type joint design in the middle part of marine site
CN107268600A (en) Grouting strengthening method, pipe jacking construction method and application
CN101481911A (en) Construction method for special underground continuous wall
CN211500658U (en) Shallow tunnel supporting construction that nearly connects that buries suitable for sand ground
CN203796288U (en) Water seepage prevention structure used for shield entrance door employing SMW piles
CN104712341B (en) Bed shallow covering shield driving stratum consolidation system and its construction method
CN204940298U (en) A kind of Composite Enclosure Structure of base pit engineering

Legal Events

Date Code Title Description
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Zhang Fulin

Inventor after: Li Peinan

Inventor after: Liu Xinke

Inventor after: Huang Dezhong

Inventor after: Li Gang

Inventor after: Zhu Yanfei

Inventor after: Ye Junneng

Inventor after: Huang Jun

Inventor after: Chen Xuguang

Inventor after: Zhang Jie

Inventor after: Gu Yan

Inventor before: Huang Dezhong

Inventor before: Li Gang

Inventor before: Zhu Yanfei

Inventor before: Huang Jun

Inventor before: Chen Xuguang

Inventor before: Zhang Jie

Inventor before: Gu Yan

Inventor before: Li Peinan

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20151021

Address after: 315101 No. 3399 Nanjing Road, Zhejiang, Ningbo

Applicant after: Ningbo Metro Group Co., Ltd.

Applicant after: SHANGHAI TUNNEL ENGINEERING CO., LTD.

Applicant after: Shanghai tunneling shield Engineering Co., Ltd

Address before: 200232 Shanghai city Xuhui District Wanping Road No. 1099 5 floor

Applicant before: SHANGHAI TUNNEL ENGINEERING CO., LTD.

Applicant before: SHANGHAI TUNNEL ENGINEERING CO., LTD.

Applicant before: Shanghai tunneling shield Engineering Co., Ltd

GR01 Patent grant
GR01 Patent grant