CN200985518Y - Portal type anti floating structure - Google Patents
Portal type anti floating structure Download PDFInfo
- Publication number
- CN200985518Y CN200985518Y CN 200620049257 CN200620049257U CN200985518Y CN 200985518 Y CN200985518 Y CN 200985518Y CN 200620049257 CN200620049257 CN 200620049257 CN 200620049257 U CN200620049257 U CN 200620049257U CN 200985518 Y CN200985518 Y CN 200985518Y
- Authority
- CN
- China
- Prior art keywords
- pile
- gate
- type float
- float structure
- structure according
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model relates to a floating-resistent structure in the subway tunnel, and provides a gate-shape floating-resistent structure, which is characterized in an uplift pile, a plate of the foundation ditch as well as the connection between the uplift pile and the plate of the foundation ditch in both sides of the subway tunnel. The utility model forms a whole by making use of the uplift pile and the plate of the foundation ditch in both sides of the subway tunnel, and effectively curbs the float in the tunnel due to the removal of the upper foundation ditch when the tunnel is under application and construction so as to safeguard the operation of the tunnel by using the drilling caisson pile as the uplift pile.
Description
Technical field
The utility model relates to and belongs to the subway tunnel float Structure.
Background technology
At present, fast development along with urban construction, need construct at underground tunnel upper, build the sunk type square as needs at underground tunnel upper, after the building completion that the subway tunnel upper is built, the foundation ditch of underground tunnel upper need be unloaded, as do not have reliable measure, to cause the subway tunnel come-up, directly influence the safe operation of subway tunnel.And at present not at the design and construction technology of underground tunnel upper unloading to the tunnel anti-floating, therefore, a kind of foundation ditch unloading of underground tunnel upper is provided after, prevent the float Structure of subway tunnel come-up, be that institute of relevant department is very expected.
Summary of the invention
The utility model technical issues that need to address are to disclose a kind of gate-type float Structure, to satisfy the needs of relevant department.
Gate-type float Structure of the present utility model comprises the uplift pile and the base plate of foundation pit that are arranged on the subway tunnel both sides, and the upper end of uplift pile is connected with base plate of foundation pit.
The utility model forms integral body by the uplift pile and the base plate of foundation pit of both sides, tunnel, can effectively control the tunnel between construction and operating period because of the come-up after the tunnel upper foundation ditch unloading, operation plays a very good protection to tunnel safety.The utility model through test, has fully reflected practicality of the present invention and reliability by the monitored data that subway tunnel is guarded, obtained, and also embodies creativeness and the technological precedence advantage of the utility model in this area.
Description of drawings
Fig. 1 is the schematic diagram of the utility model one embodiment.
Fig. 2 is the schematic diagram of another embodiment of the utility model
The specific embodiment
Fig. 1 is a bored pile gate-type float Structure, and wherein uplift pile is a bored pile 1.Bored pile 1 is arranged on subway tunnel 3 both sides, and stake top reinforcing bar 4 anchors in the base plate of foundation pit 2, and bored pile 1 constitutes integral structure with base plate of foundation pit 2, forms the gate-type float Structure.
According to the preferred scheme of the utility model, the diameter of said bored pile 1 is 600~1000mm, and bored pile 1 length is 10~30m, and bored pile 1 spacing is 2~4m, bored pile 1 is 500~600mm apart from the distance of subway tunnel 3, and the pile body verticality is 1/100~1/300.
Fig. 2 is worker's method stake gate-type float Structure, and wherein uplift pile is an agitation pile 5, agitation pile pile body interpolation H shaped steel 8, and the 8 top shaped steel web perforates of H shaped steel are installed with dowel 9 in the hole, and dowel 9 anchors into base plate of foundation pit 2, forms the gate-type float Structure with base plate of foundation pit 2.2 times soil bodys of base plate of foundation pit adopt cement mixing pile to reinforce, and form to add solid, adopt churning to replenish reinforcing at the soil body that adds between solid and subway tunnel 3 tops.The relative dimensions data of agitation pile 5 are similar to bored pile 1, do not repeat them here.
Claims (9)
1. the gate-type float Structure is characterized in that, comprises the uplift pile that is arranged on the subway tunnel both sides, and the upper end of uplift pile is connected with base plate of foundation pit.
2. gate-type float Structure according to claim 1 is characterized in that, uplift pile is a bored pile, and stake top reinforcing bar anchors in the base plate of foundation pit, and bored pile and base plate of foundation pit constitute integral structure.
3. gate-type float Structure according to claim 1 and 2 is characterized in that, the diameter of said uplift pile is 600~1000mm.
4. gate-type float Structure according to claim 1 and 2 is characterized in that, uplift pile length is 10~30m.
5. gate-type float Structure according to claim 1 and 2 is characterized in that, the uplift pile spacing is 2~4m.
6. gate-type float Structure according to claim 1 and 2 is characterized in that, uplift pile is 500~600mm apart from the distance of subway tunnel.
7. gate-type float Structure according to claim 1 and 2 is characterized in that, the pile body verticality is 1/100~1/300.
8. gate-type float Structure according to claim 1 is characterized in that, uplift pile is an agitation pile, agitation pile pile body interpolation H shaped steel, the shaped steel web perforate of H shaped steel top is installed with dowel in the hole, dowel anchors into base plate of foundation pit, forms the gate-type float Structure with base plate of foundation pit.
9. gate-type float Structure according to claim 8 is characterized in that, the soil body adopts cement mixing pile to reinforce under the structure base plate, forms to add solid, adopts churning to replenish reinforcing at the soil body that adds between solid and the subway tunnel top.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200620049257 CN200985518Y (en) | 2006-12-20 | 2006-12-20 | Portal type anti floating structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200620049257 CN200985518Y (en) | 2006-12-20 | 2006-12-20 | Portal type anti floating structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN200985518Y true CN200985518Y (en) | 2007-12-05 |
Family
ID=38914976
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200620049257 Expired - Fee Related CN200985518Y (en) | 2006-12-20 | 2006-12-20 | Portal type anti floating structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN200985518Y (en) |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101408024B (en) * | 2008-11-11 | 2012-05-30 | 广州市设计院 | Undercrossing subway tunnel pit supporting and protecting structure of high-rise building or super high-rise building |
CN101333816B (en) * | 2008-08-06 | 2012-08-15 | 青岛海川建设集团有限公司 | Determination method of mixing proportion for anti-floating anchor rod grouting construction in underground water-enriched geological condition |
CN104533434A (en) * | 2014-12-28 | 2015-04-22 | 上海隧道工程股份有限公司 | Construction method of rectangular ultra-shallow covered soil tunnel |
CN104532849A (en) * | 2014-12-25 | 2015-04-22 | 重庆大学 | Excavation method for foundation pit above operation railway tunnel |
CN104594920A (en) * | 2014-11-28 | 2015-05-06 | 浙江省建筑设计研究院 | Method and device for preventing tunnel from floating |
CN104895122A (en) * | 2015-06-03 | 2015-09-09 | 中铁第四勘察设计院集团有限公司 | Continuous beam type anti-floating structure of shield tunnel |
CN105040746A (en) * | 2015-08-26 | 2015-11-11 | 济南轨道交通集团有限公司 | Frame type isolation protection system and construction method thereof |
CN105240018A (en) * | 2015-10-30 | 2016-01-13 | 中铁上海工程局集团有限公司 | Vertical shaft construction device and method |
CN105350582A (en) * | 2015-10-29 | 2016-02-24 | 周兆弟 | Protective structure of underground pipe gallery |
CN105735369A (en) * | 2016-03-03 | 2016-07-06 | 上海市政工程设计研究总院(集团)有限公司 | Anti-floating method for existing tunnel |
WO2016192320A1 (en) * | 2015-06-03 | 2016-12-08 | 中铁第四勘察设计院集团有限公司 | Continuous beam type anti-floating structure of shield tunnel |
CN112962671A (en) * | 2021-02-22 | 2021-06-15 | 中国建筑第八工程局有限公司 | Urban operation subway heave control structure and control method thereof |
CN113685190A (en) * | 2021-08-28 | 2021-11-23 | 华东交通大学 | Reinforcing system for shield to penetrate through shallow soft clay and construction method |
-
2006
- 2006-12-20 CN CN 200620049257 patent/CN200985518Y/en not_active Expired - Fee Related
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101333816B (en) * | 2008-08-06 | 2012-08-15 | 青岛海川建设集团有限公司 | Determination method of mixing proportion for anti-floating anchor rod grouting construction in underground water-enriched geological condition |
CN101408024B (en) * | 2008-11-11 | 2012-05-30 | 广州市设计院 | Undercrossing subway tunnel pit supporting and protecting structure of high-rise building or super high-rise building |
CN104594920B (en) * | 2014-11-28 | 2016-08-24 | 浙江省建筑设计研究院 | Prevent the method and device of tunnel upward floating |
CN104594920A (en) * | 2014-11-28 | 2015-05-06 | 浙江省建筑设计研究院 | Method and device for preventing tunnel from floating |
CN104532849A (en) * | 2014-12-25 | 2015-04-22 | 重庆大学 | Excavation method for foundation pit above operation railway tunnel |
CN104533434A (en) * | 2014-12-28 | 2015-04-22 | 上海隧道工程股份有限公司 | Construction method of rectangular ultra-shallow covered soil tunnel |
CN104895122A (en) * | 2015-06-03 | 2015-09-09 | 中铁第四勘察设计院集团有限公司 | Continuous beam type anti-floating structure of shield tunnel |
WO2016192320A1 (en) * | 2015-06-03 | 2016-12-08 | 中铁第四勘察设计院集团有限公司 | Continuous beam type anti-floating structure of shield tunnel |
CN105040746A (en) * | 2015-08-26 | 2015-11-11 | 济南轨道交通集团有限公司 | Frame type isolation protection system and construction method thereof |
CN105350582A (en) * | 2015-10-29 | 2016-02-24 | 周兆弟 | Protective structure of underground pipe gallery |
CN105240018A (en) * | 2015-10-30 | 2016-01-13 | 中铁上海工程局集团有限公司 | Vertical shaft construction device and method |
CN105240018B (en) * | 2015-10-30 | 2018-09-18 | 中铁上海工程局集团有限公司 | Construction of Silo device and method |
CN105735369A (en) * | 2016-03-03 | 2016-07-06 | 上海市政工程设计研究总院(集团)有限公司 | Anti-floating method for existing tunnel |
CN112962671A (en) * | 2021-02-22 | 2021-06-15 | 中国建筑第八工程局有限公司 | Urban operation subway heave control structure and control method thereof |
CN113685190A (en) * | 2021-08-28 | 2021-11-23 | 华东交通大学 | Reinforcing system for shield to penetrate through shallow soft clay and construction method |
CN113685190B (en) * | 2021-08-28 | 2024-02-09 | 华东交通大学 | Reinforcing system for shield to penetrate shallow soft clay and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN200985518Y (en) | Portal type anti floating structure | |
CN101560770B (en) | Novel deep building foundation pit supporting system | |
CN103321244B (en) | Sand foundation existing building sets up the construction method of basement | |
CN110158582A (en) | A method of trestle steel pipe pile is set on intectate riverbed | |
CN103669365A (en) | External diagonal-pulling and internal diagonal-bracing herringbone foundation pit supporting pile and construction method thereof | |
CN105525619A (en) | Occlusive pipe curtain for bored tunnel in water-rich stratum and construction method of occlusive pipe curtain | |
CN109811779A (en) | A kind of prefabricated open caisson section of jurisdiction and open caisson construction method | |
CN201459756U (en) | Hanging-type construction ceiling coil vertical shaft | |
CN105421477A (en) | Construction method for tower crane foundation | |
CN105064711B (en) | Method for constructing underground garage between residential buildings | |
CN102220764B (en) | Construction method of deep foundation pit bracing system | |
CN203613568U (en) | Anti-floating cement soil pile and anti-floating anchor rod combined anti-floating system | |
CN203307824U (en) | Supporting structure of high-rise building foundation pit | |
CN205917713U (en) | Truss -like steel pipe slip casting pile foundation | |
CN102493439A (en) | Building fundamental pile constructional element | |
CN205576957U (en) | Stake end pilework | |
CN202017214U (en) | Power pole tower base for frozen soil foundation | |
CN201202120Y (en) | Mixing pile foundation pit supporting structure | |
CN203583468U (en) | Anti-floating pile with built-in non-metallic reinforcement | |
CN205399410U (en) | Dig first slip casting club -footed pile of drilling soon | |
CN209584855U (en) | Bridge major diameter precast concrete tubular column basis | |
CN112962617A (en) | Comprehensive pipe gallery foundation pit supporting method for weathered rock stratum area | |
CN206289633U (en) | A kind of foundation ditch flexible supporting structure | |
CN103195053B (en) | A kind of construction method of the piling strtucture with stake shoulder | |
CN112832287A (en) | Inclined retaining wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |