CN203160222U - Device for monitoring ground subsidence sites - Google Patents

Device for monitoring ground subsidence sites Download PDF

Info

Publication number
CN203160222U
CN203160222U CN 201320106865 CN201320106865U CN203160222U CN 203160222 U CN203160222 U CN 203160222U CN 201320106865 CN201320106865 CN 201320106865 CN 201320106865 U CN201320106865 U CN 201320106865U CN 203160222 U CN203160222 U CN 203160222U
Authority
CN
China
Prior art keywords
hole
steel ring
hole body
aperture
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320106865
Other languages
Chinese (zh)
Inventor
杨昆鹏
孙贵华
张海波
高雪涛
廖孟鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Civil Engineering Co Ltd filed Critical China Construction Civil Engineering Co Ltd
Priority to CN 201320106865 priority Critical patent/CN203160222U/en
Application granted granted Critical
Publication of CN203160222U publication Critical patent/CN203160222U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

A device for monitoring ground subsidence sites comprises a monitoring rod (3) which is arranged in a detection hole (5), wherein the diameter of an orifice of the detection hole is larger than that of a hole body; the depth of the hole body is larger than 1m, the depth of the orifice is larger than 50 mm, the inner wall of the orifice is lined with a steel ring (2), and the steel ring (2) is covered with a heat cover (1); the head cover (1) is flush with the ground, and one side of the head cover (1) and one side of the steel ring (2) are connected through a connecting piece (7); the bottom of the detection hole is filled with 100-150 mm of low grade concrete (6); the monitoring rod (3) is inserted in the center of the hole body, and the hole body is filled with fine sand (4); and the monitoring rod (3) is vertically arranged, the lower end of the monitoring rod (3) is embedded into the low grade concrete (6), and the head part of the monitoring rod (3) is located in the orifice and is lower than the head cover (1). The device can timely and accurately reflect actual subsidence conditions of the ground, and defects that a conventional ground monitoring device is complicated in structure and inconvenient to use are overcome.

Description

The Ground Subsidence Monitoring point apparatus
Technical field
The utility model relates to a kind of Ground Subsidence Monitoring point apparatus, particularly is applied to a kind of Ground Subsidence Monitoring point apparatus in building operations and subway work field.
Background technology
Locate extensively distributing weak soil in that China is riverine, along the lake etc., along with Chinese Urbanization degree ground improves, urban land is increasing, thereby carries out above the soil that forces a part of building operations project to have to form reclaiming land from a lake.The characteristics of soft foundation are that natural moisture content is big, air space ratio is big, compression coefficient is high, intensity is low and have engineering geological properties such as creep properties that engineering geological conditions is relatively poor, must take practicable technical measures.For soft foundation, what generally take at present is pile foundation based process mode.This mode can both be received good effect for foundation bearing force intensity and settlement request, but often be difficult to control for the top surface settlement that soft foundation causes, excessive sedimentation may make ponding Cheng Chi in the place, ground, even causes the cracking destruction of machinery equipment, crane runway and water, electricity and gas pipe-line system.Known Ground Subsidence Monitoring point apparatus complex structure, installation inconvenience are not suitable for characteristics such as building operations duration anxiety.
The utility model content
Existing surface settlement device is expensive in order to overcome, complex structure, awkward deficiency, and the utility model provides a kind of easy for installation, Ground Subsidence Monitoring point apparatus that the degree of accuracy is high.
The technical scheme that its technical problem that solves the utility model adopts is:
A kind of Ground Subsidence Monitoring point, comprise that is inserted a monitoring rod that detects in the hole, it is characterized in that: the aperture in described detection hole is bigger than hole body diameter, the hole body degree of depth is greater than 1m, the aperture degree of depth is greater than 50mm, the aperture inwall is lined with a steel ring, adds above the steel ring to be stamped top cover, and described top cover is concordant with ground, top cover is connected by connector in a side with steel ring, the hole inner bottom part in described detection hole is filled with the weak concrete of 100~150mm, and the center of hole body is inserted with a monitoring rod, is filled with fine sand in the hole body, described monitoring rod is perpendicular to be put, submerge in the weak concrete in its lower end, its head is positioned at the aperture, is lower than top cover.
The diameter 150mm in the aperture in described detection hole, the aperture degree of depth is 50~80mm, and the diameter of hole body is 100mm, and the hole body degree of depth is deeper than more than the maximum frozen soil layer absolute altitude 300mm.
Described monitoring rod is that diameter is the reinforcing bar of Φ 20mm, its top be shaped as through the polishing circular arc.
The connector of described top cover and steel ring is to open bolt or hinge.
The beneficial effects of the utility model are as follows:
For protecting the reinforcing bar monitoring point not by vehicle or artificial destruction, a steel ring is laid in the upper end, and steel ring is added a cover protection.Top cover and steel ring adopt connector to be connected, can prevent that vehicle etc. from causing top cover to be shifted.
The utility model is imbedded the monitoring point in the undisturbed soil by boring, and the false situation of data of having avoided the road surface, top may exist duricrust etc. to cause is to guarantee to reflect in time, accurately the actual sedimentation situation on ground.And simple in structure, easy for installation, the degree of accuracy is high, has overcome traditional ground monitoring device complex structure, awkward deficiency.
The utility model can be widely used in the Ground Subsidence Monitoring on the building operations project that soft foundation is carried out, and the Ground Subsidence Monitoring of subway engineering etc.
Description of drawings
Reference numeral: 1-top cover, 2-steel ring, 3-monitoring rod, 4-fine sand, 5-detect hole, 6-weak concrete, 7-connector.
Fig. 1 is structural representation of the present utility model.
The specific embodiment
Below in conjunction with drawings and Examples the utility model is further specified.
A kind of Ground Subsidence Monitoring point, comprise that is inserted a monitoring rod 3 that detects in the hole 5, it is characterized in that: the aperture in described detection hole is bigger than hole body diameter, the hole body degree of depth is greater than 1m, the aperture degree of depth is greater than 50mm, the aperture inwall is lined with a steel ring 2, adds above the steel ring 2 to be stamped top cover 1, and described top cover 1 is concordant with ground, top cover 1 is connected by connector 7 in a side with steel ring 2, the hole inner bottom part in described detection hole is filled with the weak concrete 6 of 100~150mm, and the center of hole body is inserted with a monitoring rod 3, is filled with fine sand 4 in the hole body, described monitoring rod 3 perpendicular putting, submerge in the weak concrete 6 in its lower end, its head is positioned at the aperture, is lower than top cover 1.
The diameter 150mm in the aperture in described detection hole, the aperture degree of depth is 50~80mm, and the diameter of hole body is 100mm, and the hole body degree of depth is deeper than more than the maximum frozen soil layer 5 absolute altitude 300mm.
Described monitoring rod 3 is that diameter is the reinforcing bar of Φ 20mm, its top be shaped as through the polishing circular arc.
Described top cover 1 is to open bolt or hinge with the connector 7 of steel ring 2.
Embodiment is referring to shown in Figure 1, a kind of Ground Subsidence Monitoring point, and key step is: it is dark at first to adopt 150mm water to bore boring 50~80mm, adopt Φ 100mm water to bore boring then, hole depth is not less than 1m, guaranteeing going deep into undisturbed soil at the bottom of the hole, and is deeper than more than the maximum frozen soil layer absolute altitude 300mm.Get surflaes in the clear opening, insert 100~150mm weak concrete 6 in the hole, insert the Φ 20mm reinforcing bar 3 of processing in advance then, the upper end is polished into circular arc type, and the top mark height is in about the 50mm of ground.After treating that reinforcing bar is firm, remainder is closely knit with fine sand 4 fillings in the hole, and the steel bar end part is not filled, so that monitoring.
For protecting monitoring rod 3 not by vehicle or artificial destruction, a steel ring 2 is laid in the upper end, adds a cover protection.Top cover 1 adopts connectors 7 to be connected with anti-steel ring 2, can prevent that vehicle etc. from causing top cover 1 to be shifted.
This device is imbedded the monitoring point in the undisturbed soil by boring, and the false situation of data of having avoided the road surface, top may exist duricrust etc. to cause is to guarantee to reflect in time, accurately the actual sedimentation situation on ground.

Claims (4)

1. Ground Subsidence Monitoring point apparatus, comprise that is inserted a monitoring rod (3) that detects in the hole (5), it is characterized in that: the aperture in described detection hole (5) is bigger than hole body diameter, the hole body degree of depth is greater than 1m, the aperture degree of depth is greater than 50mm, the aperture inwall is lined with a steel ring (2), add above the steel ring (2) and be stamped top cover (1), described top cover (1) is concordant with ground, top cover (1) is connected by connector (7) in a side with steel ring (2), the hole inner bottom part in described detection hole (5) is filled with the weak concrete (6) of 100~150mm, and the center of hole body is inserted with a monitoring rod (3), is filled with fine sand (4) in the hole body, described monitoring rod (3) is perpendicular to be put, submerge in the weak concrete (6) in its lower end, its head is positioned at the aperture, is lower than top cover (1).
2. Ground Subsidence Monitoring point apparatus according to claim 1 is characterized in that: the diameter 150mm in the aperture in described detection hole (5), and the aperture degree of depth is 50~80mm, and the diameter of hole body is 100mm, and the hole body degree of depth is deeper than more than the maximum frozen soil layer absolute altitude 300mm.
3. Ground Subsidence Monitoring point apparatus according to claim 1, it is characterized in that: described monitoring rod (3) is that diameter is the reinforcing bar of Φ 20mm, its top be shaped as circular arc through polishing.
4. Ground Subsidence Monitoring point apparatus according to claim 1 is characterized in that: described top cover (1) is to open bolt or hinge with the connector (7) of steel ring (2).
CN 201320106865 2013-03-11 2013-03-11 Device for monitoring ground subsidence sites Expired - Fee Related CN203160222U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320106865 CN203160222U (en) 2013-03-11 2013-03-11 Device for monitoring ground subsidence sites

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320106865 CN203160222U (en) 2013-03-11 2013-03-11 Device for monitoring ground subsidence sites

Publications (1)

Publication Number Publication Date
CN203160222U true CN203160222U (en) 2013-08-28

Family

ID=49021418

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320106865 Expired - Fee Related CN203160222U (en) 2013-03-11 2013-03-11 Device for monitoring ground subsidence sites

Country Status (1)

Country Link
CN (1) CN203160222U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106871866A (en) * 2017-03-24 2017-06-20 中国水利水电第八工程局有限公司 A kind of excavation face bottom sinking deformation monitoring device and its application method
CN110485383A (en) * 2019-07-31 2019-11-22 中国一冶集团有限公司 A kind of weak regional sluice plate comes to nothing monitoring device and monitoring method
CN111174755A (en) * 2020-01-09 2020-05-19 青岛市勘察测绘研究院 Expansive soil area plane elevation measurement control point device and installation method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106871866A (en) * 2017-03-24 2017-06-20 中国水利水电第八工程局有限公司 A kind of excavation face bottom sinking deformation monitoring device and its application method
CN106871866B (en) * 2017-03-24 2023-06-13 中国水利水电第八工程局有限公司 Excavation surface bottom settlement deformation monitoring device and application method thereof
CN110485383A (en) * 2019-07-31 2019-11-22 中国一冶集团有限公司 A kind of weak regional sluice plate comes to nothing monitoring device and monitoring method
CN111174755A (en) * 2020-01-09 2020-05-19 青岛市勘察测绘研究院 Expansive soil area plane elevation measurement control point device and installation method
CN111174755B (en) * 2020-01-09 2022-02-15 青岛市勘察测绘研究院 Expansive soil area plane elevation measurement control point device and installation method

Similar Documents

Publication Publication Date Title
CN101781991B (en) Double-well type reinforcement method of shield arrival or starting end and double-well type shield arrival method
CN101230570A (en) Layered multitime pressure regulating pulp conditioning casting method
CN102162239A (en) Soft soil foundation treated by chemical-solution-combined injection electroosmosis method and construction method of soft soil foundation
CN205557609U (en) Adopt water tank for piling deep dull and stereotyped loading test device that carries device
CN204199335U (en) A kind of pressure release well reducing PHC tube pile construction soil compaction effect
CN101749026A (en) Grid reinforcing method of shield receiving or starting end head and shield receiving method
CN106149673B (en) Collapsible loess deep is soaked heavy-tamping method in advance
CN203160222U (en) Device for monitoring ground subsidence sites
CN106088115A (en) The method increasing Stability of Soil of High Side Slopes
CN204228155U (en) A kind of shallow-depth-excavation tunnel construction land tenure table settlement monitoring point buries structure underground
CN205280054U (en) Telescopic settlement monitoring point device
CN202672149U (en) Height controller for underwater concrete grouting pile
CN106677203A (en) Prefabricated anchoring base for frozen soil foundation and installation method
CN204510351U (en) A kind of recharge well structure
CN204780975U (en) A four return circuit terminal steel pipe poles are drawn and are dug compound basis of anchor log for medium voltage electric distribution circuit
CN203008925U (en) Shield barrier-free launching apparatus
CN204609897U (en) A kind of pipe curtain freezing process supporting and protection structure
CN203583501U (en) Deep-layer shear resistant device capable of preventing rock sliding
CN102116019A (en) Method for rapidly treating soft foundation through high vacuum densification
CN205012333U (en) Recoverable FRP stock with enlarged footing
CN208366344U (en) A kind of ground settlement assembly type measurement mark
CN201158818Y (en) Anti-corrosion anchor bar with centering slurry guiding tube
CN204532367U (en) A kind of underground bracket stake
CN201809776U (en) Batter post chuck pile foundation
CN206359878U (en) A kind of pile foundation of light section steel structure bridge

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA CONSTRUCTION EIGHTH ENGINEERING DIVISION CO.

Free format text: FORMER OWNER: CHINA CONSTRUCTION CIVIL CONSTRUCTION CORP.

Effective date: 20141217

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 100070 FENGTAI, BEIJING TO: 200122 PUDONG NEW AREA, SHANGHAI

TR01 Transfer of patent right

Effective date of registration: 20141217

Address after: 200122 Pudong New Area Century Avenue, Shanghai, No. 27, layer 1568

Patentee after: China Construction Eighth Engineering Division Co., Ltd.

Address before: 100070 Beijing, Fengtai District, South Fourth Ring Road West, No. 188 (zone sixteen), building No. 12

Patentee before: China Building Civil Construction Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130828

Termination date: 20190311

CF01 Termination of patent right due to non-payment of annual fee