CN203008925U - Shield barrier-free launching apparatus - Google Patents

Shield barrier-free launching apparatus Download PDF

Info

Publication number
CN203008925U
CN203008925U CN 201220408630 CN201220408630U CN203008925U CN 203008925 U CN203008925 U CN 203008925U CN 201220408630 CN201220408630 CN 201220408630 CN 201220408630 U CN201220408630 U CN 201220408630U CN 203008925 U CN203008925 U CN 203008925U
Authority
CN
China
Prior art keywords
shield
end well
glass fiber
well
enclosing structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220408630
Other languages
Chinese (zh)
Inventor
朱玉明
刘军
胡嵩
孟庆龙
张润钊
耿益坤
王武京
高家瑞
杨森林
刘铮
刘乐天
张永军
李平平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Municipal Construction Co Ltd
Original Assignee
Beijing Municipal Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Municipal Construction Co Ltd filed Critical Beijing Municipal Construction Co Ltd
Priority to CN 201220408630 priority Critical patent/CN203008925U/en
Application granted granted Critical
Publication of CN203008925U publication Critical patent/CN203008925U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model relates to a shield barrier-free launching apparatus which comprises an end well, a steel lantern ring, a shield tunneling machine, glass fiber ribs and a well end enclosing structure, wherein the end well is vertically arranged; the steel lantern ring is horizontally inserted into the end well; the shield tunneling machine is received in the steel lantern ring; the end well enclosing structure is disposed at one side of the end well; and the glass fiber ribs are arranged in the well end enclosing structure to form a glass fiber rib area. Through sleeving the steel lantern ring on the shield tunneling machine and arranging glass fiber ribs on the well end enclosing structure, the shield launching process of the shield barrier-free launching apparatus provided by the utility model is fast, safe and low in cost, no work of manually breaking down reinforced concrete of the end well enclosing structure is needed, and thus the shield barrier-free launching apparatus is notable in economic and social benefits.

Description

The accessible device that starts of a kind of shield structure
[technical field]
The utility model relates to a kind of shield structure device, is specifically related to the accessible device that starts of a kind of shield structure, belongs to the building machinery technical field.
[background technology]
" shield construction " is a kind of higher set of tunneling construction method of mechanization and automaticity, and since the sixties in 20th century, western developed country is applied to this technology the construction of city underground and large size city outlet tunnel in a large number.China recent years also begins to adopt this top technology in Construction of City Tunnel, to substitute the original fluting open cut that falls behind or shallow burial hidden digging construction.
Shield launching is a very important link of shield construction.There is following drawback in the shield launching technology at present: (1) end well is reinforced difficulty: purpose is the stability that increases place, the hole soil body, makes stake (wall) body cut the rear hole soil body and does not cave in, and reinforcing scope is generally 9m*6m.The reinforcing of shield end well at present generally has following several method, high-pressure rotary spraying method, Deep Mixing Method, grouting and reinforcing method, freezing process, element stake (wall) method etc., these methods all have certain compliance in the shallow embedding situation, in the situation that buried depth is larger, the effect of these methods is difficult to guarantee, that is to say that these methods are difficult to adapt to high hydraulic pressure, high soil pressure and the harder condition of soil property, particularly some areas are met ovum erratic boulder, underground water sometimes in the Pekinese.(2) cutting stake (wall) body difficulty, is the stage of risk maximum in cutting process.Before address, at the portal place owing to there being stake (wall) body to prop up the soil body that is keeping off thereafter, in case cut pile body, the soil body exposes, the equilibrium state on stratum, termination is broken, if soil mass property is relatively poor or have underground water to exist, the hole soil body is caved in, thereby cause surface subsidence, serious meeting causes personnel casualty accidents; For buried situation, not only difficulty is large, long in time limit to cut the thick temporary lining steel concrete diaphragm wall that reaches nearly 1.5m, and risk is larger.
Therefore, for solving the problems of the technologies described above, necessaryly provide a kind of accessible device that starts of structure improved shield structure that has, to overcome described defective of the prior art.
[utility model content]
For addressing the above problem, the purpose of this utility model is to provide a kind of Stability Analysis of Structures, the accessible device that starts of shield structure that easy to use and cost is low.
For achieving the above object, the technical scheme that the utility model is taked is: the accessible device that starts of a kind of shield structure, and it comprises end well, steel collar, shield machine, glass fiber muscle and end well space enclosing structure; Wherein, described end well is vertical setting; Described steel collar level is inserted in end well; Described shield machine is contained in steel collar; Described end well space enclosing structure is positioned at a side of end well; Described glass fiber muscle is arranged in and forms a glass fiber muscle district in the end well space enclosing structure.
The accessible device that starts of shield structure of the present utility model further is set to: the diameter in described glass fiber muscle district is greater than the diameter of steel collar.
Compared with prior art, the utlity model has following beneficial effect: the accessible device that starts of shield structure of the present utility model is by sheathed steel collar on shield machine, arrange the glass fiber muscle on the end well space enclosing structure, thereby make that shield structure process has that speed is fast, safety, cost is low, do not need manually to abolish end well space enclosing structure steel concrete, economic benefit, social benefit are very obvious.
[description of drawings]
Fig. 1 is the structural representation of the accessible device that starts of shield structure of the present utility model.
[specific embodiment]
See also shown in Figure of description 1, the utility model is the accessible device that starts of a kind of shield structure, and it is comprised of several parts such as end well 1, steel collar 2, shield machine 3, glass fiber muscle 4 and end well space enclosing structures 5.
Wherein, described end well 1 is vertical setting.Described steel collar 2 levels are inserted in end well 1.
Described shield machine 3 is contained in steel collar 2.
Described end well space enclosing structure 5 is positioned at a side of end well 1.Described glass fiber muscle 4 is arranged in and forms a glass fiber muscle district in end well space enclosing structure 5.The diameter in described glass fiber muscle district is greater than the diameter of steel collar 2.
The accessible device setting principle that starts of shield structure of the present utility model is as follows: by sheathed steel collar 2 on shield machine 3, arrange glass fiber muscle 4 on end well space enclosing structure 5, locate thereby make shield machine be easy to the shield structure, and at end well 1 place, the hole soil body that do not need reinforcement.
The above specific embodiment is only the preferred embodiment of this creation, not in order to limiting this creation, all in this creation spirit and principle within make any modification, be equal to replacement, improvement etc., within all should being included in the protection domain of this creation.

Claims (2)

1. the accessible device that starts of shield structure, is characterized in that: comprise end well, steel collar, shield machine, glass fiber muscle and end well space enclosing structure; Wherein, described end well is vertical setting; Described steel collar level is inserted in end well; Described shield machine is contained in steel collar; Described end well space enclosing structure is positioned at a side of end well; Described glass fiber muscle is arranged in and forms a glass fiber muscle district in the end well space enclosing structure.
2. the accessible device that starts of shield structure as claimed in claim 1 is characterized in that: the diameter in described glass fiber muscle district is greater than the diameter of steel collar.
CN 201220408630 2012-08-17 2012-08-17 Shield barrier-free launching apparatus Expired - Fee Related CN203008925U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220408630 CN203008925U (en) 2012-08-17 2012-08-17 Shield barrier-free launching apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220408630 CN203008925U (en) 2012-08-17 2012-08-17 Shield barrier-free launching apparatus

Publications (1)

Publication Number Publication Date
CN203008925U true CN203008925U (en) 2013-06-19

Family

ID=48600531

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220408630 Expired - Fee Related CN203008925U (en) 2012-08-17 2012-08-17 Shield barrier-free launching apparatus

Country Status (1)

Country Link
CN (1) CN203008925U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103924980A (en) * 2014-04-24 2014-07-16 上海隧道工程股份有限公司 Obstacle removing construction method
CN103982194A (en) * 2014-06-04 2014-08-13 北京建筑大学 Method for barrier-free starting of shield tunneling machine
CN112901176A (en) * 2020-12-24 2021-06-04 南昌轨道交通集团有限公司 Shield tunneling machine passing method capable of reducing disturbance

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103924980A (en) * 2014-04-24 2014-07-16 上海隧道工程股份有限公司 Obstacle removing construction method
CN103924980B (en) * 2014-04-24 2016-09-07 上海隧道工程有限公司 Remove obstacles construction method
CN103982194A (en) * 2014-06-04 2014-08-13 北京建筑大学 Method for barrier-free starting of shield tunneling machine
CN112901176A (en) * 2020-12-24 2021-06-04 南昌轨道交通集团有限公司 Shield tunneling machine passing method capable of reducing disturbance

Similar Documents

Publication Publication Date Title
CN102493822B (en) Method for performing curtain grouting construction on tunnel by water rich fault influence zone
CN104694746B (en) A kind of method of ion adsorption type re in_situ leaching and leaching ore deposit system thereof
CN104234062B (en) A kind of in-situ ionic rare earth soaks the method for ore deposit stope preventing land slide
CN101781991B (en) Double-well type reinforcement method of shield arrival or starting end and double-well type shield arrival method
CN204266220U (en) A kind of plugging device of precipitation well in foundation pit
CN103233738B (en) Comprehensive weakening method of top coal of heavy-pitch super high seam
CN204312099U (en) Tunnel Gushing based on environmental protection prevents and treats system
KR101525431B1 (en) Borehole boring method using detachable joint before excavation
CN106703044B (en) One kind stream modeling shape rinse fill soft stratum slope combination supporting method
CN202117686U (en) Surrounding rock advanced support structure for railway tunnel at deep-buried watery and weak stratums
CN104806267A (en) Shield end socket reinforcing system of scree soil layer advance large pipe roof and construction method thereof
CN102777185A (en) Inclined well shaft construction technology
CN103742157A (en) Method of newly building underground space under ground by pipe jacking method
CN203008925U (en) Shield barrier-free launching apparatus
CN101614126A (en) A kind of job practices of directly cutting guard post for tunnel end well by shield machine
CN104612722B (en) Tunnel gate strengthening method for starting and arriving of annular shield or annular pushing pipe
CN104863588A (en) Advanced pier column pre-arranging gob-side entry retaining method
CN204570652U (en) A kind of karst strata rock-steady structure
CN202108045U (en) Sleeve pipe with anchor rod penetrating through underground continuous wall
CN204941551U (en) A kind of subway station of Curve Pipe Jacking supporting and protection structure enlarging shield-tunneling construction
CN204609897U (en) A kind of pipe curtain freezing process supporting and protection structure
CN204646251U (en) The shield end reinforcement system of a kind of land pebble stratum super-front large pipe shed
CN204780975U (en) A four return circuit terminal steel pipe poles are drawn and are dug compound basis of anchor log for medium voltage electric distribution circuit
CN204000836U (en) A kind of structure for the ground stabilization of shield end well surrounding building
CN203160222U (en) Device for monitoring ground subsidence sites

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130619

Termination date: 20130817