CN103924980B - Remove obstacles construction method - Google Patents

Remove obstacles construction method Download PDF

Info

Publication number
CN103924980B
CN103924980B CN201410168225.8A CN201410168225A CN103924980B CN 103924980 B CN103924980 B CN 103924980B CN 201410168225 A CN201410168225 A CN 201410168225A CN 103924980 B CN103924980 B CN 103924980B
Authority
CN
China
Prior art keywords
freezing
consolidation
passage
obstacles
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410168225.8A
Other languages
Chinese (zh)
Other versions
CN103924980A (en
Inventor
王永佳
宁寅
李凌航
黄德中
李刚
唐卫
娄根达
黄�俊
吴列成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai tunneling shield Engineering Co., Ltd
Shanghai Tunnel Engineering Co Ltd
Original Assignee
Shanghai Tunneling Shield Engineering Co Ltd
Shanghai Tunnel Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Tunneling Shield Engineering Co Ltd, Shanghai Tunnel Engineering Co Ltd filed Critical Shanghai Tunneling Shield Engineering Co Ltd
Priority to CN201410168225.8A priority Critical patent/CN103924980B/en
Publication of CN103924980A publication Critical patent/CN103924980A/en
Application granted granted Critical
Publication of CN103924980B publication Critical patent/CN103924980B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention provides one to remove obstacles construction method, comprise the following steps: detecting obstacles thing information and position before (1) construction, for confirming the consolidation by freezing region that comprises barrier;(2) horizontal freezing is used to construct in described consolidation by freezing region so that described consolidation by freezing region is freezed so that the soil body in consolidation by freezing region forms Frozen Soil Cylinder;(3) treat that in described consolidation by freezing region, the thickness of Frozen Soil Cylinder reaches tunneling requirement, use tunneling method for constructing in mine to excavate passage, dig to Obstacle Position and described barrier is removed by described passage.Compared with prior art, the method has the beneficial effect that without removing obstacles in the case of taking ground space, and has fewer environmental impacts, and integrality and usability to original structure will not constitute destruction, and the duration also will not be affected by extraneous factor.

Description

Remove obstacles construction method
Technical field
The invention belongs to Tunnel Engineering technical field, be specifically related to one and remove obstacles construction method.
Background technology
Along with the continuous development and utilization of urban underground space, in urban rail transit construction, constructing tunnel meets with The situation meeting barrier gets more and more, and this barrier is generally pipeline, pile foundation etc., removes these barriers Often become the engineering constraint duration, increase construction risk and the principal element of surrounding enviroment impact, the most such as What quickly, safely, effectively processes these barriers just becomes the problem that engineering circles is widely paid close attention to.
At present, barrier removes the form that commonly used ground is pulled out, and removes obstacles to construct and commonly use full circle swinging in ground Rig carries out pile pulling and removes obstacles, and need to take space of planes significantly, for traffic, the social environment of urban area Affect bigger;Manufacture ground construction dust, living environment around is affected bigger by noise;Ground is removed obstacles right The integrality of original underground structure and usability cause certain destruction;Construction period is affected by the external environment Relatively big, such as the rainy day etc..
Summary of the invention
It is an object of the invention to the defect overcome existing for prior art, now provide one to remove obstacles construction party Method, has abandoned original ground removal method, after using horizontal freezing to be reinforced by this Land in Regional Land, and knot Barrier is removed by the mode that conjunction Mining Method tunneling is constructed, thus solves employing ground removal method to former The destruction having the integrality of underground structure and usability to cause, decreases the impact on surrounding environment, and adds Fast construction speed.
The invention provides one to remove obstacles construction method, comprise the following steps: detection barrier before (1) construction Hinder thing information and position, comprise the consolidation by freezing region of barrier for confirmation;(2) freeze described Reinforcing area uses horizontal freezing to construct so that described consolidation by freezing region is freezed so that freezing to add Gu the soil body in region forms Frozen Soil Cylinder;(3) thickness of Frozen Soil Cylinder in described consolidation by freezing region is treated Degree reaches tunneling requirement, uses tunneling method for constructing in mine to excavate passage, digs described to Obstacle Position Barrier is removed by described passage.
Preferably, in step (1), detecting obstacles thing use electromagnetic induction method, geological radar method, Any one or a few method in high-density electric and shallow layer seismic imaging technology method.
Preferably, in step (2), described horizontal freezing includes: first beat consolidation by freezing region If boring, in hole lay freezing pipe, install refrigeration station, to be installed in place after, then by freezing pipe defeated Send hypothermic saline to carry out heat exchange, absorb the heat around described freezing pipe, make described consolidation by freezing region Temperature reduces, so that the freezing soil in described consolidation by freezing region forms Frozen Soil Cylinder.
Preferably, the temperature range of the described hypothermic saline carried by described freezing pipe is-28 to-30 Between DEG C.
Preferably, in step (3), mine tunneling method for constructing includes: dig a portal, excavates passage, Gib, and the soil body outward transport that will dig out is set up in described passage, until excavating Obstacle Position, Removing obstacles thing, and transported by passage.
Preferably, before excavation passage, a safety protective door need to be installed, then excavate open test pit, for really Recognize open test pit freezing efficiency, confirm qualified after just can excavate passage.
Preferably, in step (3), after barrier is removed, the structure of the passage soil body need to be carried out also Former, the soil body dug out is backfilled into described passage, remove gib, and built-in slip casting pipe simultaneously, return When being filled to hole, closure hole is also pulled out freezing pipe, is filled slip casting by built-in slip casting pipe.
Preferably, after slip casting to be filled is basically completed, then consolidation by freezing region is carried out forced thaw and melts Heavy slip casting.
The one that the present invention provides is removed obstacles construction method, has abandoned existing ground and has removed obstacles form of construction work, has turned Remove obstacles construction for underground, first use horizontal freezing that the planning passage that need to excavate to barrier is frozen Knot, after confirming consolidation by freezing effect, then uses mine tunneling method for constructing, excavates passage, and removing obstacles Thing, can be without removing obstacles in the case of taking ground space in conjunction with two kinds of methods, and effect on environment Less, integrality and usability to original structure will not constitute destruction, and the duration also will not be by extraneous factor Impact.
Accompanying drawing explanation
Fig. 1 is that the present invention removes obstacles the flow process frame diagram of construction method.
Detailed description of the invention
For the benefit of the understanding to the structure of the present invention, illustrates below in conjunction with drawings and Examples.
Fig. 1 is that the present invention removes obstacles the flow process frame diagram of construction method.
Shown in Fig. 1, the construction method of removing obstacles that the present invention provides, comprise the steps:
Step S1: detecting obstacles thing information and position before construction, for confirming to comprise freezing of barrier Reinforcing area.Detecting obstacles thing generally use electromagnetic induction method, geological radar method, high-density electric, with And any one method in shallow layer seismic imaging technology method, owing to the utilization of electromagnetic induction method limits less, than It is relatively flexible, so the present embodiment is preferably electromagnetic induction method.
Step S2: described consolidation by freezing region use horizontal freezing construct so that described in freeze Knot reinforcing area freezes so that the soil body in consolidation by freezing region forms Frozen Soil Cylinder.
The concrete operations of horizontal freezing are: first consolidation by freezing region is set boring, execute by boring Work figure arranges boring, and position, the hole deviation of boring not should be greater than 50mm, and the aperture of boring is 127mm.Freeze The actual drilling depth in hole answers the big 0.5m of wall projected depth.The deflection of boring should control within 8 ‰, pore-forming Maximum spacing is not more than 2m.Being laid with freezing pipe in boring, further, this freezing pipe selects wall The thick φ 108 low-carbon (LC) seamless steel pipe not less than 7mm, single pipe length 2m to 4m, between freezing pipe It is connected by screwed connection, then is aided with manual welding, repair welding.Then on consolidation by freezing areas adjacent ground Installing refrigeration station, freezing station equipment mainly includes power distribution cabinet, refrigerator, brine tank, brine pump, clear Water pump, cooling tower and clear water reserviors etc., equipment is installed and is carried out by the requirement of equipment operating manual.To be installed After in place, then carry out heat exchange by freezing pipe transporting low temperature salt solution, absorb the heat around freezing pipe, Consolidation by freezing regional temperature is made to reduce, so that freezing soil forms freezing curtain in consolidation by freezing region.Logical The described hypothermic saline temperature range of often freezing pipe conveying controls between-28~-30 degrees Celsius, typically After seven days, consolidation by freezing regional temperature is reduced to-20 degrees centigrade.Use the useful of horizontal freezing Effect is that the soil strength freezed is high, excavates passage, can accomplish water-tight in Frozen Soil body, for In-cavity construction is created a favorable environment, and construction safety, not by place, earth's surface and depth limit, to ring around Border impact is less, is particularly suitable for city proper underground construction.
Step S3: treat that in described consolidation by freezing region, the thickness of Frozen Soil Cylinder reaches tunneling requirement, uses Tunneling method for constructing in mine excavates passage, digs to Obstacle Position and is removed by described barrier.
Concretely comprising the following steps of mine tunneling method for constructing: install a safety protective door, in positive freezing process, Will judge whether frost wall is handed over circle and reach design thickness according to observed temperature data, thermometric judges frost wall Friendship is enclosed and is reached design thickness and carries out excavating open test pit again, in confirmation frost wall after the hydraulic pressure of soil layer basic imporosity The most formally excavate.When formally excavating, first cut portal, excavate passage, stablizing according to frost wall Property, enter and safeguard frozen state, safeguard that solidification point is-28 ° of C.Gib is set up in passage, And the soil body outward transport that will dig out, until excavating Obstacle Position, removing obstacles thing, and transported by passage.
Step S4: after barrier cleaning thoroughly, soil body backfill ground settlement and tunnel gone out, backfill is logical The road soil body, removes gib, simultaneously built-in slip casting pipe in backfill passage, when being backfilled to hole, Use armored concrete closure portal, pull out freezing pipe and stop consolidation by freezing, filled by built-in slip casting pipe Slip casting, in order to reduce ground loss, after slip casting to be filled is basically completed, then is carried out consolidation by freezing region Thaw and thaw settlement grouting, when melting for the frozen water prevented in consolidation by freezing region, cause soil body thaw collapse, Destroy original soil structures.
The general principle of the present invention is: arranges horizontal frozen hole around tunnel, and circulates in freezing hole Hypothermic saline, makes the aquifer water-bearing stratum near freezing hole freeze, and forms intensity high, the frost wall that closure is good, Then Mining Method is used to carry out tunnel excavation and construction under the protection of frost wall.The present invention's is main Sequence of construction is: preparation of construction, freezing hole construction, installs simultaneously and freezes refrigeration system, installs and freeze salt Water system and monitoring system, actively freeze, and examination is dug, tunnel piercing and gib, removing obstacles thing, The backfill soil body, fills slip casting, thaw settlement grouting.
The one that the present invention provides is removed obstacles construction method, has abandoned existing ground and has removed obstacles form of construction work, Transfer underground to remove obstacles construction, first use horizontal freezing that the planning passage that need to excavate to barrier is carried out Actively freeze, after confirming consolidation by freezing effect, then use mine tunneling method for constructing, excavation passage, and clearly Except barrier, can be without removing obstacles in the case of taking ground space in conjunction with two kinds of methods, and to ring Border impact is less, and integrality and usability to original structure will not constitute destruction, and the duration also will not be by outward Boundary's factor impact.
Above in association with accompanying drawing embodiment, the present invention is described in detail, those skilled in the art According to the above description the present invention can be made many variations example.Thus, some details in embodiment should not Constitute limitation of the invention, the present invention by the scope that defines using appended claims as protection model Enclose.

Claims (7)

1. a construction method of removing obstacles, it is characterised in that comprise the following steps:
(1) detecting obstacles thing information and position before construction, comprise the consolidation by freezing region of barrier for confirmation;
(2) horizontal freezing is used to construct in described consolidation by freezing region so that described consolidation by freezing region is freezed so that the soil body in consolidation by freezing region forms Frozen Soil Cylinder;
(3) treat that in described consolidation by freezing region, the thickness of Frozen Soil Cylinder reaches tunneling requirement, tunneling method for constructing in mine is used to excavate passage, dig to Obstacle Position and described barrier is removed by described passage, after barrier is removed, the structure of the passage soil body need to be reduced, the soil body dug out be backfilled into described passage, remove gib simultaneously, and built-in slip casting pipe, when being backfilled to hole, closure hole is also pulled out freezing pipe, is filled slip casting by built-in slip casting pipe.
Construction method of removing obstacles the most according to claim 1, it is characterized in that, in step (1), detecting obstacles thing uses electromagnetic induction method, geological radar method, high-density electric and shallow layer seismic imaging technology method or uses any combination in electromagnetic induction method, geological radar method, high-density electric and shallow layer seismic imaging technology method.
Construction method of removing obstacles the most according to claim 1, it is characterized in that, in step (2), described horizontal freezing includes: first consolidation by freezing region is set boring, lays freezing pipe in hole, refrigeration station is installed, to be installed in place after, then carry out heat exchange by freezing pipe transporting low temperature salt solution, absorb the heat around described freezing pipe, described consolidation by freezing regional temperature is made to reduce, so that the freezing soil in described consolidation by freezing region forms Frozen Soil Cylinder.
Construction method of removing obstacles the most according to claim 3, it is characterised in that the temperature range of the described hypothermic saline carried by described freezing pipe is between-28 to-30 DEG C.
Construction method of removing obstacles the most according to claim 1, it is characterized in that, in step (3), mine tunneling method for constructing includes: hole door, excavates passage, sets up gib in described passage, and the soil body outward transport that will dig out, until excavating Obstacle Position, removing obstacles thing, and transported by passage.
Construction method of removing obstacles the most according to claim 5, it is characterised in that excavation passage before, a safety protective door need to be installed, then excavate open test pit, for confirm open test pit freezing efficiency, confirm qualified after just can excavate passage.
Construction method of removing obstacles the most according to claim 6, it is characterised in that also include: after slip casting to be filled is basically completed, then consolidation by freezing region is thawed and thaw settlement grouting.
CN201410168225.8A 2014-04-24 2014-04-24 Remove obstacles construction method Active CN103924980B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410168225.8A CN103924980B (en) 2014-04-24 2014-04-24 Remove obstacles construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410168225.8A CN103924980B (en) 2014-04-24 2014-04-24 Remove obstacles construction method

Publications (2)

Publication Number Publication Date
CN103924980A CN103924980A (en) 2014-07-16
CN103924980B true CN103924980B (en) 2016-09-07

Family

ID=51143346

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410168225.8A Active CN103924980B (en) 2014-04-24 2014-04-24 Remove obstacles construction method

Country Status (1)

Country Link
CN (1) CN103924980B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106761792B (en) * 2017-01-20 2019-01-25 武汉市市政建设集团有限公司 A kind of full-sleeve full-rotation drill sleeve and shield cutter front obstacle sweep-out method
CN107060800A (en) * 2017-03-09 2017-08-18 广东水电二局股份有限公司 A kind of shield-tunneling construction huge stone handling construction method
CN107740596A (en) * 2017-11-30 2018-02-27 中建三局第建设工程有限责任公司 A kind of non-open cut Demolition Construction method of underground structure being drilled into
CN111058850B (en) * 2019-11-13 2021-05-28 上海隧道工程有限公司 Underground obstacle freezing, detecting and clearing method
CN112502715A (en) * 2020-11-08 2021-03-16 上海市隧道工程轨道交通设计研究院 Temporary plugging and reinforcing method for end of shield tunnel

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2685570Y (en) * 2004-03-08 2005-03-16 广东省基础工程公司 Pipe-jacking tunneller
CN201125733Y (en) * 2007-12-20 2008-10-01 中铁十二局集团有限公司 Deep drilled shaft concrete filling device
CN101418567A (en) * 2007-10-22 2009-04-29 上海隧道工程股份有限公司 Protective cutting construction method for tunnel segment
CN103075161A (en) * 2013-01-16 2013-05-01 中铁隧道集团有限公司 Quick underground obstacle clearing method for slurry shield construction
CN203008925U (en) * 2012-08-17 2013-06-19 北京市政建设集团有限责任公司 Shield barrier-free launching apparatus

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2685570Y (en) * 2004-03-08 2005-03-16 广东省基础工程公司 Pipe-jacking tunneller
CN101418567A (en) * 2007-10-22 2009-04-29 上海隧道工程股份有限公司 Protective cutting construction method for tunnel segment
CN201125733Y (en) * 2007-12-20 2008-10-01 中铁十二局集团有限公司 Deep drilled shaft concrete filling device
CN203008925U (en) * 2012-08-17 2013-06-19 北京市政建设集团有限责任公司 Shield barrier-free launching apparatus
CN103075161A (en) * 2013-01-16 2013-05-01 中铁隧道集团有限公司 Quick underground obstacle clearing method for slurry shield construction

Also Published As

Publication number Publication date
CN103924980A (en) 2014-07-16

Similar Documents

Publication Publication Date Title
CN103924980B (en) Remove obstacles construction method
CN107676097B (en) A kind of high hydraulic pressure soft soil layer HFE composite shield originating method
CN108035335B (en) Method for constructing shaft type underground parking garage by freezing method
CN107524459B (en) Freezing water stop structure and method for vertical shaft and transverse passage of subway underground excavation station
CN205975649U (en) Freezing pipe curtain steel pipe supporting construction
JP6594003B2 (en) Freezing method and freezing device for shield tunnel construction
CN105908765B (en) For protecting the open trench tunnel water sealing structure and construction method of groundwater environment
CN106837389B (en) A kind of Underground Subway Station vertical shaft and transverse passage-way freeze water-stopping method
CN104806253B (en) A kind of construction method punched between rectangular top pipe passage
CN104088652B (en) A kind of pipe interlude horizontal dynamic controlling freezes water-stop method
CN108843328A (en) A kind of Metro Connection Passage excavation construction support construction method
CN112647956B (en) Construction method for short-distance underpass subway station of water-rich composite stratum shield
CN106121686B (en) Underground excavation tunnel water stop structure for protecting groundwater environment and construction method thereof
CN105863646A (en) Freezing construction method in steel pipe curtain of large-section subsurface tunnel
CN109296371A (en) MJS method and horizontal freezing joint reinforcement pressure-bearing rich water arenaceous stratum overlap the system and its construction method that section is worn under station
CN105937397A (en) Segmented excavation freezing method reinforcing construction method for deep tunnel
Hu et al. Application of liquid nitrogen freezing to recovery of a collapsed shield tunnel
CN107191675A (en) Rail yard electrified sectionses pipeline laying construction engineering method
CN104675405B (en) Rectangular pipe jacking machine tunnel entering auxiliary structure and construction method
Hu et al. Ground freezing application of intake installing construction of an underwater tunnel
CN103527205A (en) Shield underwater oblique crossing hole entering construction method
CN106968259A (en) A kind of underground three-dimensional garage crater wall structure frozen construction method
CN106351675A (en) Total-depth curtain freezing and water stopping system of water and sand rich sandy gravel formation deeply-buried station excavated in concealed mode
CN205975648U (en) Freezing pipe curtain steel pipe
CN208396715U (en) A kind of leading pilot tunnel of running tunnel freezes water sealing structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20151123

Address after: 200232 Shanghai city Xuhui District Wanping Road No. 1099 5 floor

Applicant after: SHANGHAI TUNNEL ENGINEERING CO., LTD.

Applicant after: SHANGHAI TUNNEL ENGINEERING CO., LTD.

Applicant after: Shanghai tunneling shield Engineering Co., Ltd

Address before: 200082 No. 118, Dalian Road, Shanghai, Yangpu District

Applicant before: Shanghai Tunnel Engineering Co., Ltd.

Applicant before: Shanghai tunneling shield Engineering Co., Ltd

C14 Grant of patent or utility model
GR01 Patent grant