Prior art keywords
freezing
underground
garage
construction method
dimensional garage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201710406345.0A
Other languages
Chinese (zh)
Inventor
张强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710406345.0A priority Critical patent/CN106968259A/en
Publication of CN106968259A publication Critical patent/CN106968259A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water
    • E02D19/14Restraining of underground water by damming or interrupting the passage of underground water by freezing the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ

Abstract

A kind of underground three-dimensional garage crater wall structure frozen construction method, its Specific construction step is:A, basis can utilize ground areas and garage capacity design underground garage geometry form and size;B, using each freezing borehole of drilling machine construction, when drilling reaches freezing pipe is installed after projected depth;C, using suitable Freezing Station refrigerating capacity and freeze liquid temperature degree to frost wall carry out freeze safeguard;D, freeze the soil body inside crater wall to underground three-dimensional garage scope and carry out excavation section by section and initial support;E, waterproof layer, and secondary supporting structure of constructing are laid on the inside of initial support structure;F, in freezing pipe interior circulation high-temp liquid frost wall is thawed, removes freezing pipe, to after initial support structural walls, the defrosting soil body and freezing hole carry out grouting filling and reinforcing;The construction method technological process is simple and easy to apply, with low cost, high safety, and space needed for construction is small, and construction speed is fast, with wide applicability.

Description

A kind of underground three-dimensional garage crater wall structure frozen construction method
Technical field
The invention belongs to underground structrue engineering construction method technical field, more particularly to a kind of underground three-dimensional garage crater wall knot Structure frozen construction method.
Background technology
With the fast development of national economy and the level of urbanization, domestic automobile recoverable amount sharp increase, and major part is old Old cell is not enough due to remote the looking forward or upwards property of early stage design, and the parking stall or garage of limited quantity have only been reserved on ground, has not been configured down Garage parking, but limited ground parking position can not meet the cities and towns storing cycle demand of sustainable growth, especially big and medium-sized cities Disorderly to stop to leave about problem especially serious for the vehicle of old cell near school, cause traffic congestion in cell, Frequent Accidents, vehicle and A series of problems, such as personnel's trip is difficult.
Underground three-dimensional garage has the advantages that floor space is small, do not influence ground environment, parking capacity big, is that solution is old The difficult effective ways of residential quarter (especially Dense crowd cell) storing cycle.But between most of old cell structures Away from smaller, public using narrow space, and ground structures load drastically influence hole in underground three-dimensional garage digging process The stability of wall construction.To ensure that underground three-dimensional garage excavates crater wall soil stabilization, conventional method is outside excavation face contour line The artificial structure such as the stake of side construction maintenance or ground-connecting-wall, but the safe excavation depth that can ensure that of this method be usually no more than 30~ 50m, and larger ground construction space is needed, for public domain is narrow and small, earth formation is weak, stratum watery strong and periphery For built-up complex engineering geology and engineering-environment, its safe excavation depth is more shallow, even if increased care structural strength And dynamics, it is possible to causing in digging process crater wall and bottom plate infiltration water, ground cracking, structures to tilt or cave in etc. engineering Accident.Therefore, traditional supporting construction and construction method are difficult to meet modern society to Large Copacity, big depth and complex engineering The demand of underground three-dimensional garage Security Construction under matter environment.
The content of the invention
It is an object of the invention to provide a kind of underground three-dimensional garage crater wall structure frozen construction method, it is ensured that underground stereo car Crater wall Stability Analysis of Structures in the digging process of storehouse, prevents that excavating crater wall and bottom plate oozes water burst, increases underground garage cutting depth, enhancing ground Lower garage the complex engineering environment such as rich water, weakness, narrow space applicability, so as to improve Urban Underground land resources utilization Rate, alleviates urban ground parking difficult.
The technical solution adopted for the present invention to solve the technical problems is:A kind of underground three-dimensional garage crater wall structure is freezed to apply Work method, its Specific construction step is:A, basis can utilize ground areas and garage capacity design underground garage geometry shape Formula and size, design Frozen wall thickness, initial support structure, secondary supporting structure and freezing parameterses by force analysis, work as hole When effectively natural water-resisting floor being not present in the range of the wall depth of freezing, an artificial bottom plate water proof of being constructed below garage bottom plate Layer;B, using each freezing borehole of drilling machine construction, when drilling reaches freezing pipe is installed after projected depth;C, utilize Freezing Station and circulation System circulates sharp freezing liquid in each freezing pipe, and the freezing pipe periphery soil body is freezed, up to freezing for adjacent freezing hole Sharp side Jiao Quan, Frozen wall thickness and temperature reach design load, then use suitable Freezing Station refrigerating capacity and freeze liquid temperature degree pair Frost wall carries out freezing to safeguard;D, freeze the soil body inside crater wall to underground three-dimensional garage scope and carry out excavation section by section, present segment After the completion of soil excavation, initial support structure of being constructed on the inside of frost wall, the other sections soil bodys and application are excavated successively, and its is first Supporting construction, initial support is carried out using identical method to garage bottom plate;E, on the inside of initial support structure waterproof layer is laid, And secondary supporting structure of constructing;F, in freezing pipe interior circulation high-temp liquid frost wall is thawed, freezing pipe is removed, to first After supporting construction wall, the defrosting soil body and freezing hole carry out grouting filling and reinforcing, especially supporting construction infiltration position.
Beneficial effect of the present invention:The construction method technological process is simple and easy to apply, with low cost, high safety, needed for construction Space is small, and construction speed is fast, with wide applicability;This method guarantees that crater wall structure in underground three-dimensional garage digging process It is stable, prevent that excavating crater wall and bottom plate oozes water burst, increases underground garage cutting depth, enhance underground garage in rich water, soft The applicability of the complex engineering environment such as weak, narrow space, so as to improve Urban Underground land resources utilization rate, alleviates city Ground parking is difficult.
Brief description of the drawings:
Fig. 1 is the frozen construction underground three-dimensional garage crater wall longitudinal sectional drawing of the present invention.
Fig. 2 is the frozen construction underground three-dimensional garage crater wall transverse cross-sectional view of the present invention.
Fig. 3 is the natural water-resisting floor schematic diagram of frozen construction underground three-dimensional garage crater wall of the present invention.
Fig. 4 is the artificial water-resisting floor schematic diagram of frozen construction underground three-dimensional garage crater wall of the present invention.
Fig. 5 is the freezing pipe schematic diagram of the present invention.
In figure:1. freezing pipe;2. frost wall;3. initial support structure;4. waterproof layer;5. secondary supporting structure;6. it is natural Water-resisting floor;7. artificial water-resisting floor;11. water inlet;12. delivery port.
Embodiment:
A kind of underground three-dimensional garage crater wall structure frozen construction method, its Specific construction step is:
A, Shanghai cell square can need to build 100 ground using a circularly band of the planar range for radius R=11m Lower parking stall, parks 4 car calculating, underground garage depth 62.5m, borehole wall headroom radius is R=by every layer height 2.5m, individual layer 8m.There is a natural water barrier in 80~90m depths, ground is without obvious preloading, stratum clay natural density 2800kg/m3、- Uniaxial compressive strength 2.0MPa at 20 DEG C.Maximum vertical stress 1.75MPa, horizontal stress 0.58MPa, according to safety coefficient 1.5 Determine Frozen wall thickness 1.0m, initial support concrete thickness 0.45m, waterproof layer select PVC plastic splash guard, secondary supporting Concrete thickness 0.55m.Because natural water barrier is deeper, expense is greatly increased when the depth of freezing is more than 80m, therefore, 63~ Using churning method one artificial water barrier of construction in 68m depth boundses, depth of freezing 70m, individual pen freeze tube pitch 1.0m, frost wall - 20 DEG C of temperature.
B, using each freezing borehole of QDG-200 drilling machine constructions, drilling is located at the circumference at garage center, radius R=10m On, bore diameter 101mm installs freezing pipe when drilling reaches 70m, freezing pipe by diameter 5cm water injection pipe and diameter 91mm Return pipe composition.
C, using Freezing Station circulating brine is cooled to -50 DEG C, using pumping circulation system in each freezing pipe water inlet pipe Hypothermic saline is injected, salt solution is then returned to Freezing Station by outlet pipe, by hypothermic saline and to freezing pipe periphery soil body heat Exchange is freezed to the freezing pipe periphery soil body, until the freezing front of the soil body hands over circle, the thickness of frost wall between adjacent freezing hole 1.0m and -20 DEG C are respectively reached with temperature, then frost wall is carried out using suitable Freezing Station refrigerating capacity to freeze to safeguard.
D, freeze the soil body inside crater wall to underground three-dimensional garage scope and carry out excavation section by section by the high 2.0m of section, excavate radius R After the completion of the secondary soil excavation of=9m present segments under the protective effect of frost wall, initial support concrete of being constructed on the inside of frost wall Structure, after its intensity reaches the 70% of maximum intensity, excavates the next section soil body and applies its initial support structure successively;Adopt With identical method first concrete supporting structure is excavated and is applied to subsequent segment time and garage bottom plate.
E, the laying PVC plastic splash guard on the inside of initial support structure, and in bottom slab concreting secondary supporting concrete, use Slip-form construction borehole wall secondary supporting concrete.
F, in 50 DEG C of high temperature salt solution of freezing pipe interior circulation brine temp, frost wall is thawed, remove freezing pipe, to first After secondary supporting construction wall, the defrosting soil body and freezing hole carry out grouting filling and reinforcing, especially supporting construction infiltration position, until The borehole wall is without infiltration.

Claims (8)

1. a kind of underground three-dimensional garage crater wall structure frozen construction method, its Specific construction steps characteristic is as follows:A, basis can profits With ground areas and garage capacity design underground garage geometry form and size, wall thickness is freezed by force analysis design Degree, initial support structure, secondary supporting structure and freezing parameterses, are not present effectively natural bottom plate in the range of the crater wall depth of freezing During water barrier, an artificial water-resisting floor of being constructed below garage bottom plate;B, using each freezing borehole of drilling machine construction, when drilling reaches Freezing pipe is installed after to projected depth;C, using Freezing Station and the circulatory system sharp freezing liquid is circulated in each freezing pipe, to freezing The knot pipe periphery soil body is freezed, until the freezing front of adjacent freezing hole hands over circle, Frozen wall thickness and temperature to meet design load, Then frost wall is carried out to freeze to safeguard with liquid temperature degree is freezed using suitable Freezing Station refrigerating capacity;D, to underground three-dimensional garage model Enclose and freeze soil body progress excavation section by section inside crater wall, after the completion of the secondary soil excavation of present segment, first branch of being constructed on the inside of frost wall Protection structure, is excavated the other sections soil bodys and applies its initial support structure, garage bottom plate is carried out using identical method successively Initial support;E, waterproof layer, and secondary supporting structure of constructing are laid on the inside of initial support structure;It is f, high in freezing pipe interior circulation Geothermal liquid thaws to frost wall, removes freezing pipe, to after initial support structural walls, the defrosting soil body and freezing hole carry out slip casting Filling and reinforcing, especially supporting construction infiltration position.
2. a kind of underground three-dimensional garage crater wall structure frozen construction method according to claim 1, it is characterised in that:It is described Frost wall freezing method includes any means of freezing and forms Freezing stratum as rapid band.
3. a kind of underground three-dimensional garage crater wall structure frozen construction method according to claim 1, it is characterised in that:It is described Underground three-dimensional garage section can be random geometry and size.
4. a kind of underground three-dimensional garage crater wall structure frozen construction method according to claim 1, it is characterised in that:It is described Freezing pipe can be random length and spacing in freezing parameterses, and need to enter that garage bottom is natural or artificial water-resisting floor.
5. a kind of underground three-dimensional garage crater wall structure frozen construction method according to claim 1, it is characterised in that:It is described Freezing pipe can be any good heat conducting material tubing.
6. a kind of underground three-dimensional garage crater wall structure frozen construction method according to claim 1, it is characterised in that:It is described It can be the liquid that any low temperature does not solidify to freeze liquid.
7. a kind of underground three-dimensional garage crater wall structure frozen construction method according to claim 1, it is characterised in that:It is described Initial support structure and secondary supporting structure can be any material with supporting intensity and structure.
8. a kind of underground three-dimensional garage crater wall structure frozen construction method according to claim 1, it is characterised in that:It is described Waterproof layer can be any material with impervious function.
CN201710406345.0A 2017-06-01 2017-06-01 A kind of underground three-dimensional garage crater wall structure frozen construction method Withdrawn CN106968259A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710406345.0A CN106968259A (en) 2017-06-01 2017-06-01 A kind of underground three-dimensional garage crater wall structure frozen construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710406345.0A CN106968259A (en) 2017-06-01 2017-06-01 A kind of underground three-dimensional garage crater wall structure frozen construction method

Publications (1)

Publication Number Publication Date
CN106968259A true CN106968259A (en) 2017-07-21

Family

ID=59327473

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710406345.0A Withdrawn CN106968259A (en) 2017-06-01 2017-06-01 A kind of underground three-dimensional garage crater wall structure frozen construction method

Country Status (1)

Country Link
CN (1) CN106968259A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108035335A (en) * 2017-09-30 2018-05-15 中煤第五建设有限公司 A kind of construction freezing method well shaft type underground parking garage method
US20180363315A1 (en) * 2015-12-18 2018-12-20 Yong Man Lee Vehicle repair dock

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03257298A (en) * 1990-03-06 1991-11-15 Takenaka Komuten Co Ltd Construction method of large-depth large-scale underground space by ground freezing method and ground freezing pipe therefor
CN101634148A (en) * 2009-08-05 2010-01-27 朱奎 Soil nailing wall foundation pit support and construction method
CN102839670A (en) * 2011-06-22 2012-12-26 上海市政工程设计研究总院(集团)有限公司 Shallow foundation pit freezing enclosure and construction method thereof
CN105040710A (en) * 2015-07-04 2015-11-11 朱奎 Support structure for bilge well construction
CN204959768U (en) * 2015-09-15 2016-01-13 中国民航大学 A underground structure for airport

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03257298A (en) * 1990-03-06 1991-11-15 Takenaka Komuten Co Ltd Construction method of large-depth large-scale underground space by ground freezing method and ground freezing pipe therefor
CN101634148A (en) * 2009-08-05 2010-01-27 朱奎 Soil nailing wall foundation pit support and construction method
CN102839670A (en) * 2011-06-22 2012-12-26 上海市政工程设计研究总院(集团)有限公司 Shallow foundation pit freezing enclosure and construction method thereof
CN105040710A (en) * 2015-07-04 2015-11-11 朱奎 Support structure for bilge well construction
CN204959768U (en) * 2015-09-15 2016-01-13 中国民航大学 A underground structure for airport

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20180363315A1 (en) * 2015-12-18 2018-12-20 Yong Man Lee Vehicle repair dock
US10612259B2 (en) * 2015-12-18 2020-04-07 Yong Man Lee Vehicle repair dock
CN108035335A (en) * 2017-09-30 2018-05-15 中煤第五建设有限公司 A kind of construction freezing method well shaft type underground parking garage method

Similar Documents

Publication Publication Date Title
CN104675403B (en) A kind of underground space construction method and supporting construction
CN108035335B (en) Method for constructing shaft type underground parking garage by freezing method
CN102678174B (en) Arrangement method of tunnel drainage system passing through permafrost region and non-frozen ground region
CN104074525B (en) Full-face pouring, rectangular horizontal are freezed and pipe canopy joint reinforcement structure and method
CN103015402B (en) Construction method for inhibiting frost heaving and thaw collapse of horizontally frozen end through cement-soil reinforcement method
CN205025498U (en) Han qu tunnel drainage system
CN102996178B (en) A kind of drainage system of tunnel in cold regions
CN104131575A (en) Plugging and drainage method for dam foundation on karst highly developed stratum
CN105297742A (en) Structure and method of water stopping support of underground space
CN104963334A (en) Construction method for utilizing grouting freezing pipe to reinforce and freeze contact passage to restrain frost heaving and thaw collapsing
CN102839670A (en) Shallow foundation pit freezing enclosure and construction method thereof
CN207109475U (en) It is close to mountain high-filled subgrade stabilization and Deformation control structure
CN103541762B (en) A kind of High aititude severe cold rich water tunnel faces the antifreeze water discharge method of combination forever
CN102733405B (en) A kind of Permafrost Area is for reducing frozen soils temperature and the method stoped to charge for remittance in foundation ditch
CN104762955B (en) A kind of Belled Pile construction method based on freezing process
CN104727834A (en) Summer-time face excavation construction method for high and cold permafrost ultra-long highway tunnel
CN104099943A (en) Underground diaphragm wall and deserted underground civil air defense engineering intersection processing method
CN108825247B (en) External inclination side wall horizontal bottom-making basin-shaped freezing water stop construction method for 8 pilot tunnel PBA construction method
CN109184754A (en) A kind of tunnel water handling Disease Processing method and system
CN205260041U (en) Method of freezing supporting construction is spouted soon to level
CN109236367A (en) A kind of tunnel structure and its frozen construction method with antiseepage drain function
CN202690131U (en) Tunnel water discharging system penetrating through long-lasting frozen soil areas and non-frozen soil areas
CN206448286U (en) It is a kind of to be used to reduce the radial system of grey field dam seepage line
CN103924980B (en) Remove obstacles construction method
CN106968259A (en) A kind of underground three-dimensional garage crater wall structure frozen construction method

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20170721

WW01 Invention patent application withdrawn after publication