CN205025498U - Han qu tunnel drainage system - Google Patents
Han qu tunnel drainage system Download PDFInfo
- Publication number
- CN205025498U CN205025498U CN201520631604.6U CN201520631604U CN205025498U CN 205025498 U CN205025498 U CN 205025498U CN 201520631604 U CN201520631604 U CN 201520631604U CN 205025498 U CN205025498 U CN 205025498U
- Authority
- CN
- China
- Prior art keywords
- tunnel
- blind pipe
- ditch
- lateral sulcus
- deeply
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model relates to a han qu tunnel drainage system. Freezing all appears in severe cold area tunnel lateral sulcus and central ditch easily, freezes threat driving safety after leading to swelling to the railway roadbed the ditch in. The utility model discloses a drainage lateral sulcus, bury central ditch and drainage blind pipe deeply, the drainage lateral sulcus vertically sets up both sides in the tunnel, and the outlet is stretched out to railway roadbed side wall body to longitudinal separation, burying central ditch deeply and vertically setting up in the inverted arch below, the lower part sets up in C20 concrete foundation, and upper portion sets up the seepy material, the anchor of drainage blind pipe hoop is in the lining cutting back at tunnel arch wall position, and the seepy material is stretched into to the bottom. The utility model discloses set up the central ditch of burying deeply in tunnel invert below, the center is buried the ditch deeply and is located below the depth of freezing, the phenomenon of freezing can not appear, and tunnel lining ponding behind one's back directly emits into in the center buries the ditch deeply through the blind pipe, no longer emit into the tunnel lateral sulcus in, can prevent that the emergence of driving safety accident from appearing threatening after frozen in lateral sulcus or central ditch.
Description
Technical field
The utility model belongs to traffic tunnel field of engineering technology, is specifically related to a kind of tunnel in cold area drainage system.
Background technology
Drainage system in current tunnel is primarily of draining blind pipe, draining lateral sulcus, Central drain composition, drainage procedure is as follows: tunnel lining ponding behind enters in tunnel lateral sulcus by blind pipe, then by pre-buried gutter, the water of lateral sulcus is introduced Central drain, finally by Central drain, water is drained into outside hole.But in severe cold area, because temperature is lower, freezing all easily appears in lateral sulcus and Central drain, cause the swelling in ditch to freeze to railway roadbed, threaten traffic safety.In addition, if the construction quality of Central drain does not pass a test, be easy to cause tunnel to be filled and occur disease, affect railway roadbed further and produce disease, can traffic safety be threatened equally.
Summary of the invention
The purpose of this utility model is to provide a kind of tunnel in cold area drainage system, prevents the tunnel ditch of severe cold area from occurring disease.
The technical scheme that the utility model adopts is:
A kind of tunnel in cold area drainage system, is characterized in that:
Comprise draining lateral sulcus, buried Central drain and draining blind pipe;
Draining lateral sulcus is longitudinally arranged at both sides in tunnel, and longitudinal separation stretches out spilled water hole to railway roadbed side wall body;
Buried Central drain is longitudinally arranged at below inverted arch, and bottom is arranged at C20 concrete foundation, and top arranges seepy material;
Draining blind pipe hoop is anchored at the lining cutting at tunnel arch wall position behind, and seepy material is stretched in bottom.
Buried Central drain is reinforced concrete sewer pipe.
Draining blind pipe adopts anchor studs and splash guard fillet to be anchored at arch wall position and just props up on face, and anchoring spacing is about 50cm;
Draining blind pipe has PVC protection tube at inverted arch position cover, and termination is directly introduced in the Deeply buried ditch seepy material of center.
Seepy material is made up of the small crushed stone of φ 0.4-0.6cm, the gravel pebbles of φ 3-5cm, the block stone of φ >=15cm, and backfill order is followed successively by small crushed stone, gravel pebbles, block stone from top to bottom.
Draining blind pipe is HDPE mono-shell hole-punched bellows.
The utility model has the following advantages:
The utility model eliminates traditional Central drain, is provided with center Deeply buried ditch below tunnel invert, and center Deeply buried ditch is positioned at below the depth of frost penetration, there will not be icing phenomenon.Tunnel lining behind ponding directly enters in the Deeply buried ditch of center by blind pipe, and no longer enter in tunnel lateral sulcus, tunnel lateral sulcus is the row's of being used for railway roadbed water for cleaning only.Adopt this drainage system, can prevent lateral sulcus or Central drain from occurring the rear generation threatening traffic safety accident of freezing.
Accompanying drawing explanation
Fig. 1 is cross-sectional drawing of the present utility model.
In figure, 1-draining lateral sulcus, the buried Central drain of 2-, 3-draining blind pipe, 4-spilled water hole, 5-reinforced concrete sewer pipe, 6-C20 concrete foundation, 7-seepy material, 8-PVC protection tube.
Detailed description of the invention
Below in conjunction with detailed description of the invention, the utility model is described in detail.
A kind of tunnel in cold area drainage system that the utility model relates to, comprises draining lateral sulcus 1, buried Central drain 2 and draining blind pipe 3.
Draining lateral sulcus 1 row of being mainly used to tunnel railway roadbed ponding, be longitudinally arranged at both sides in tunnel, longitudinal separation stretches out spilled water hole 4 to railway roadbed side wall body.
Ponding after the lining cutting of buried Central drain 2 row of being used for is reinforced concrete sewer pipe 5, and be longitudinally arranged at below inverted arch, bottom is arranged at C20 concrete foundation 6, and top arranges seepy material 7.Seepy material 7 is made up of the small crushed stone of φ 0.4-0.6cm, the gravel pebbles of φ 3-5cm, the block stone of φ >=15cm, and backfill order is followed successively by small crushed stone, gravel pebbles, block stone from top to bottom.
Draining blind pipe 3 is HDPE mono-shell hole-punched bellows; hoop is anchored at the lining cutting at tunnel arch wall position behind; adopting anchor studs and splash guard fillet to be anchored at arch wall position just props up on face; anchoring spacing is about 50cm; at inverted arch position, cover has PVC protection tube 8, and termination is directly introduced in center Deeply buried ditch seepy material 7.
During construction, be first anchored on a first face with anchor studs and splash guard fillet by draining blind pipe 3, center Deeply buried ditch 2 of then constructing, the draining blind pipe 3 at inverted arch position overlaps PVC protection tube 8 after-pouring in concrete.
Content of the present utility model is not limited to cited by embodiment, and the conversion of those of ordinary skill in the art by reading the utility model manual to any equivalence that technical solutions of the utility model are taked, is claim of the present utility model and contains.
Claims (3)
1. a tunnel in cold area drainage system, is characterized in that:
Comprise draining lateral sulcus (1), buried Central drain (2) and draining blind pipe (3);
Draining lateral sulcus (1) is longitudinally arranged at both sides in tunnel, and longitudinal separation stretches out spilled water hole (4) to railway roadbed side wall body;
Buried Central drain (2) is longitudinally arranged at below inverted arch, and bottom is arranged at C20 concrete foundation (6), and top arranges seepy material (7);
Draining blind pipe (3) hoop is anchored at the lining cutting at tunnel arch wall position behind, and seepy material (7) is stretched in bottom;
Buried Central drain (2) is reinforced concrete sewer pipe (5);
Draining blind pipe (3) adopts anchor studs and splash guard fillet to be anchored at arch wall position and just props up on face, and anchoring spacing is about 50cm;
Draining blind pipe (3) has PVC protection tube (8) at inverted arch position cover, and termination is directly introduced in center Deeply buried ditch seepy material (7).
2. a kind of tunnel in cold area drainage system according to claim 1, is characterized in that:
Seepy material (7) is made up of the small crushed stone of φ 0.4-0.6cm, the gravel pebbles of φ 3-5cm, the block stone of φ >=15cm, and backfill order is followed successively by small crushed stone, gravel pebbles, block stone from top to bottom.
3. a kind of tunnel in cold area drainage system according to claim 2, is characterized in that:
Draining blind pipe (3) is HDPE mono-shell hole-punched bellows.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520631604.6U CN205025498U (en) | 2015-08-21 | 2015-08-21 | Han qu tunnel drainage system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520631604.6U CN205025498U (en) | 2015-08-21 | 2015-08-21 | Han qu tunnel drainage system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205025498U true CN205025498U (en) | 2016-02-10 |
Family
ID=55258039
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520631604.6U Active CN205025498U (en) | 2015-08-21 | 2015-08-21 | Han qu tunnel drainage system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205025498U (en) |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105986836A (en) * | 2016-06-14 | 2016-10-05 | 中铁隧道勘测设计院有限公司 | Single-line railway tunnel substrate waterproof and drainage reinforcing system |
CN106523028A (en) * | 2017-01-05 | 2017-03-22 | 中铁工程设计咨询集团有限公司 | Tunnel center drainage pipe and laying method thereof |
CN106988767A (en) * | 2017-04-06 | 2017-07-28 | 铁道第三勘察设计院集团有限公司 | The Support System in Soft Rock Tunnels supporting construction of buried Central drain |
CN107012791A (en) * | 2017-03-22 | 2017-08-04 | 中交公局厦门工程有限公司 | Tunnel-Type Anchorage of Suspension Bridge waterproof and water drainage system is with building construction method |
CN107201908A (en) * | 2017-06-16 | 2017-09-26 | 中铁五局集团有限公司 | A kind of construction method of the regional buried Central drain in tunnel of bitter cold |
CN107401413A (en) * | 2017-08-29 | 2017-11-28 | 中铁第勘察设计院集团有限公司 | Tunnel structure for expansive stratum |
CN108005688A (en) * | 2017-12-27 | 2018-05-08 | 中铁二院工程集团有限责任公司 | The external dewatering type lining cutting of buried lateral sulcus and its drainage system |
CN108005679A (en) * | 2017-12-27 | 2018-05-08 | 中铁二院工程集团有限责任公司 | A kind of dumbbell shape tunnel bottom liner structure with bilateral collection gallery |
CN108019220A (en) * | 2017-12-12 | 2018-05-11 | 成都汇智远景科技有限公司 | The intelligent transportation tunnel of buried structure in casing |
CN108316952A (en) * | 2018-04-09 | 2018-07-24 | 铁科创恒新材料科技有限公司 | Extremely frigid zones tunnel insulation waterproof and water drainage system |
CN108361065A (en) * | 2018-05-07 | 2018-08-03 | 中铁工程设计咨询集团有限公司 | A kind of tunnel inverted arch filling discharge structure |
CN109973147A (en) * | 2019-03-08 | 2019-07-05 | 中铁十九局集团第三工程有限公司 | A kind of vcehicular tunnel drainage groove applies method |
CN111271118A (en) * | 2020-03-30 | 2020-06-12 | 中铁二院工程集团有限责任公司 | Drainage structure suitable for reconstruction of tunnel bottom structure of karst tunnel and construction method thereof |
CN111764961A (en) * | 2020-06-08 | 2020-10-13 | 中国铁道科学研究院集团有限公司铁道建筑研究所 | Railway tunnel drainage structure and construction process thereof |
-
2015
- 2015-08-21 CN CN201520631604.6U patent/CN205025498U/en active Active
Cited By (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105986836A (en) * | 2016-06-14 | 2016-10-05 | 中铁隧道勘测设计院有限公司 | Single-line railway tunnel substrate waterproof and drainage reinforcing system |
CN105986836B (en) * | 2016-06-14 | 2018-12-14 | 中铁隧道勘测设计院有限公司 | A kind of single-track railway tunnel substrate guarded drainage strengthen the system |
CN106523028A (en) * | 2017-01-05 | 2017-03-22 | 中铁工程设计咨询集团有限公司 | Tunnel center drainage pipe and laying method thereof |
CN107012791A (en) * | 2017-03-22 | 2017-08-04 | 中交公局厦门工程有限公司 | Tunnel-Type Anchorage of Suspension Bridge waterproof and water drainage system is with building construction method |
CN106988767A (en) * | 2017-04-06 | 2017-07-28 | 铁道第三勘察设计院集团有限公司 | The Support System in Soft Rock Tunnels supporting construction of buried Central drain |
CN107201908A (en) * | 2017-06-16 | 2017-09-26 | 中铁五局集团有限公司 | A kind of construction method of the regional buried Central drain in tunnel of bitter cold |
CN107201908B (en) * | 2017-06-16 | 2023-10-31 | 中铁五局集团有限公司 | Construction method for deep-buried central ditch of tunnel in severe cold region |
CN107401413A (en) * | 2017-08-29 | 2017-11-28 | 中铁第勘察设计院集团有限公司 | Tunnel structure for expansive stratum |
CN108019220A (en) * | 2017-12-12 | 2018-05-11 | 成都汇智远景科技有限公司 | The intelligent transportation tunnel of buried structure in casing |
CN108005679A (en) * | 2017-12-27 | 2018-05-08 | 中铁二院工程集团有限责任公司 | A kind of dumbbell shape tunnel bottom liner structure with bilateral collection gallery |
CN108005688A (en) * | 2017-12-27 | 2018-05-08 | 中铁二院工程集团有限责任公司 | The external dewatering type lining cutting of buried lateral sulcus and its drainage system |
CN108316952A (en) * | 2018-04-09 | 2018-07-24 | 铁科创恒新材料科技有限公司 | Extremely frigid zones tunnel insulation waterproof and water drainage system |
CN108316952B (en) * | 2018-04-09 | 2024-04-09 | 中国铁道科学研究院集团有限公司铁道建筑研究所 | Tunnel heat-preservation and drainage-prevention system in alpine region |
CN108361065A (en) * | 2018-05-07 | 2018-08-03 | 中铁工程设计咨询集团有限公司 | A kind of tunnel inverted arch filling discharge structure |
CN108361065B (en) * | 2018-05-07 | 2024-01-19 | 中铁工程设计咨询集团有限公司 | Tunnel inverted arch filling drainage structure |
CN109973147A (en) * | 2019-03-08 | 2019-07-05 | 中铁十九局集团第三工程有限公司 | A kind of vcehicular tunnel drainage groove applies method |
CN111271118A (en) * | 2020-03-30 | 2020-06-12 | 中铁二院工程集团有限责任公司 | Drainage structure suitable for reconstruction of tunnel bottom structure of karst tunnel and construction method thereof |
CN111271118B (en) * | 2020-03-30 | 2024-06-04 | 中铁二院工程集团有限责任公司 | Drainage structure suitable for reconstruction of karst tunnel bottom structure and construction method thereof |
CN111764961A (en) * | 2020-06-08 | 2020-10-13 | 中国铁道科学研究院集团有限公司铁道建筑研究所 | Railway tunnel drainage structure and construction process thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205025498U (en) | Han qu tunnel drainage system | |
CN102678174B (en) | Arrangement method of tunnel drainage system passing through permafrost region and non-frozen ground region | |
CN105927272B (en) | Bottom plate anchors restricted type tunnel lining structure | |
CN103147453B (en) | Permafrost tunnel face-upward slope and cut slope cut drainage system and construction method thereof | |
CN204960952U (en) | Tunnel structure with hoop heat preservation rubble french drain | |
WO2021109537A1 (en) | Ultra-long tunnel sewage disposing and separation drainage structure suitable for cold regions | |
CN205013017U (en) | Severe cold district tunnel heat preservation lining cutting structure | |
CN102434175A (en) | Tunnel lining self waterproof drainage system | |
CN202483588U (en) | Self water-proof drainage system of tunnel lining | |
CN103541762B (en) | A kind of High aititude severe cold rich water tunnel faces the antifreeze water discharge method of combination forever | |
CN107587881A (en) | A kind of composite lining structure and construction technology for permafrost tunnel | |
CN203393530U (en) | Anti-floating lightweight high-fill embankment structure | |
CN203741666U (en) | Roadbed structure for preventing cut-fill section of highway in cold region from frost boiling | |
CN203145030U (en) | Water cut-off and drainage system for permafrost tunnel side upward slope and cutting slope | |
CN107201908A (en) | A kind of construction method of the regional buried Central drain in tunnel of bitter cold | |
CN205296212U (en) | Geogrid adds muscle counterfort retaining wall | |
CN102996178A (en) | Drainage system for tunnel in severe cold region | |
CN109183848B (en) | A kind of Tunnel Design and building method | |
CN108533316A (en) | A kind of full packet pressure release waterproof/drainage structure in tunnel | |
CN203498721U (en) | Three-dimensional drainage roadbed structure preventing damage by water of road in cold region | |
CN205115938U (en) | Road bed freeze injury of high and cold district is synthesized and is punished structure | |
CN105200881A (en) | Construction method for comprehensive treatment structure for subgrade frost damage in high cold region | |
CN202690131U (en) | Tunnel water discharging system penetrating through long-lasting frozen soil areas and non-frozen soil areas | |
CN102425175B (en) | Reinforcement protective structure of large spoil disposal area in mountainous area | |
CN108729927B (en) | A kind of existing tunnel reorganization and expansion is the mid-board construction method of multiple-arch tunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |