CN109193464A - On-load replaces fuse switch and bypasses drainage device - Google Patents

On-load replaces fuse switch and bypasses drainage device Download PDF

Info

Publication number
CN109193464A
CN109193464A CN201811286911.XA CN201811286911A CN109193464A CN 109193464 A CN109193464 A CN 109193464A CN 201811286911 A CN201811286911 A CN 201811286911A CN 109193464 A CN109193464 A CN 109193464A
Authority
CN
China
Prior art keywords
vertical bar
lead wire
insulating sleeve
insulation
cross
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811286911.XA
Other languages
Chinese (zh)
Inventor
冷昌霖
苟剑
李扬帆
袁伟明
罗明杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Sichuan Electric Power Co Ltd
Original Assignee
State Grid Sichuan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Sichuan Electric Power Co Ltd filed Critical State Grid Sichuan Electric Power Co Ltd
Priority to CN201811286911.XA priority Critical patent/CN109193464A/en
Publication of CN109193464A publication Critical patent/CN109193464A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H9/00Emergency protective circuit arrangements for limiting excess current or voltage without disconnection
    • H02H9/02Emergency protective circuit arrangements for limiting excess current or voltage without disconnection responsive to excess current

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Electric Cable Installation (AREA)

Abstract

The invention discloses on-load replacement fuse switches to bypass drainage device, including insulating sleeve bracket and the insulation lead wire for being set in insulating sleeve internal stent, the insulating sleeve bracket includes the vertical bar being vertically arranged, the lower end of vertical bar is vertically connected with lower beam, the upper end of vertical bar is vertically connected with the upper boom with vertical bar in the setting of 135 ° of angles, the middle part of vertical bar is vertically connected with cross bar, cross-arm fixed hook is connected on one end end on cross bar far from vertical bar, cross-arm fixed hook is equipped with clamping screw, the insulation lead wire is each passed through the upper boom of insulating sleeve bracket with winding method, vertical bar and lower beam, the both ends of insulation lead wire are connected with penetrating cable clamp.Insulation lead wire is built in insulating sleeve by bypass drainage device of the invention, forms double insulation protection, is avoided carrying out a large amount of insulation masking to neighbouring electrical body or grounding body in operation process, is reduced operation time-consuming, also reduce operating personnel's labor intensity.

Description

On-load replaces fuse switch and bypasses drainage device
Technical field
The present invention relates to a kind of bypass drainage devices, and in particular to on-load replaces fuse switch bypass drainage dress It sets.
Background technique
Currently, when carrying out on-load replacement fuse switch operation, it is necessary first to which livewire work personnel carry out necessary Then insulation masking measure is shorted the upper and lower pile crown and its lead of fuse using the bypass of livewire work special isolation drainage thread, It is finished to change of fuse, after detection is through-flow normally, then removes insulation lead wire and restore to operate normally.Since conventional insulator draws Streamline line footpath is larger, length is longer, it is difficult to be reliably fixed, be easy to cause to slide because of swing, cause route or equipment to stop transport, therefore Need to carry out masking of insulating on a large scale.In addition, the upper and lower pile crown connecting lead wire of fuse is aerial insulated wire, installation bypass It needs to exploit insulating layer using cutter before insulation lead wire, causes flow chart cumbersome.So using conventional insulator drainage thread band It is very big that load replaces fuse switch operating risk, and time-consuming for operation, and working efficiency is lower.
Summary of the invention
That the technical problem to be solved by the present invention is to conventional insulator drainage thread line footpaths is larger, length is longer, it is difficult to reliable solid It is fixed, it is easy to cause to slide because of swing, causes route or equipment to stop transport, operating risk is very big, and time-consuming for operation, working efficiency It is lower to have connection, and it is an object of the present invention to provide on-load replacement fuse switch bypasses drainage device, fix reliably, it is simplified to make The advantages of industry process reduces operating risk, reduces operation time-consuming, improves working efficiency.
The present invention is achieved through the following technical solutions:
On-load replaces fuse switch and bypasses drainage device, including insulating sleeve bracket and is set in insulating sleeve branch Insulation lead wire inside frame, the insulating sleeve bracket include the vertical bar being vertically arranged, and the lower end of vertical bar is vertically connected with lower beam, The upper end of vertical bar be vertically connected with vertical bar be in 135 ° of angles setting upper boom, vertical bar, lower beam and upper boom be hollow shape structure and It is interconnected, the middle part of vertical bar is vertically connected with cross bar, is connected with cross-arm fixed hook on one end end far from vertical bar on cross bar, horizontal Carry on a shoulder pole fixed hook be equipped with clamping screw, the insulation lead wire be each passed through with winding method insulating sleeve bracket upper boom, Vertical bar and lower beam, the both ends of insulation lead wire are connected with penetrating cable clamp, and vertical bar, lower beam and upper boom all use insulating materials.
Insulation lead wire is built in insulating sleeve by bypass drainage device of the invention, is formed double insulation protection, is avoided A large amount of insulation masking is carried out to neighbouring electrical body or grounding body in operation process, reduces operation time-consuming, also reduces operation Personnel labor intensity.Meanwhile insulating sleeve bracket also acts supporting role to soft insulating drainage thread, can effectively solve the problem that soft Matter insulation lead wire is difficult to the problem of being reliably fixed, and ensure that operation safety distance, has connection, fixed reliable, simplified operation The advantages of process reduces operating risk, reduces operation time-consuming, improves working efficiency.Insulation lead wire is realized using penetrating cable clamp With the connection of the upper and lower pile crown insulator pin of fuse, eliminates lead wire insulation layer and strip link, and then improve operating efficiency; It also solves the problems, such as to may cause insulation lead wire landing because of swing simultaneously, compared with using conventional insulator drainage thread, reduce Operating risk.
In use, livewire work personnel pass through cross-arm fixed hook first hangs over installation fuse switch for package unit Cross-arm on, the clamping screw of cross-arm fixed hook is tightened after adjusting job position, keeps device fixed reliable, from insulation sleeve Pull out the both ends of the insulation lead wire of winding in pipe holder at upper boom and lower rod port respectively, installation penetrating cable clamp will insulation drainage The both ends of line are connected with upper and lower pile crown insulator pin respectively, and the insulating layer of insulator pin outer wall is clipped broken by penetrating cable clamp, thus The conducting between insulation lead wire and upper and lower pile crown insulator pin is fast implemented, lead wire insulation layer is eliminated and strips link, in turn Improve operating efficiency;Then it just detects through-flow whether good, and sets insulation masking;Fuse switch replacement finishes Afterwards, it removes penetrating cable clamp and the insulation lead wire of pull-out winding is placed in insulating sleeve bracket, loosen cross-arm fixed hook Clamping screw removes package unit and insulation masking, terminates operation.
Using 90 ° of connectors and locking blind nut connection between vertical bar and lower beam, 45 ° of connectors and lock are used between vertical bar and upper boom Tight blind nut connection, is connected between the side wall of vertical bar and the end of cross bar using plum blossom connector;Three tie points i.e. on vertical bar are adopted It, in this way can be by rotating this 3 with 3 artis (respectively 90 ° of connectors, 45 ° of connectors, plum blossom connector) of achievable rotation Artis makes upper boom, cross bar and lower beam realize that 360 ° of rotation is adjusted, so as to obtain enough working spaces and operation Path is applicable to the operation field of electrical device layout complexity on a variety of bars;The multi-joint activity of insulating sleeve bracket simultaneously Arm is by the connection of locking blind nut, it can be achieved that the disassembly of upper boom, cross bar and lower beam, is convenient for carrying.
The penetrating cable clamp includes the wire clamp body of a side opening, and bolt is equipped at the top of wire clamp body, and the bottom end of bolt connects Wired collet, the bottom surface of wire clamp head are evenly distributed with clip tooth, are also evenly distributed with clip tooth in wire clamp body inner bottom surface, wire clamp head It is interspersed between the clip tooth of bottom surface and the clip tooth of wire clamp body inner bottom surface, in this way by insulation lead wire and upper pile crown insulator pin Or lower pile crown insulator pin is clamped between wire clamp head and wire clamp body inner bottom surface, then by rotating bolt, so that wire clamp head It moves downward and tightens, and punctured the insulating layer of upper pile crown insulator pin or lower pile crown insulator pin by upper layer and lower layer clip tooth, Realize the conducting between insulation lead wire and upper pile crown insulator pin or lower pile crown insulator pin, penetrating cable clamp avoid simultaneously because The case where swing causes insulation lead wire to slide.
The outer wall of vertical bar is equipped with anti-skid chequer, skids when placing hand-held vertical bar operation.
The cross bar has stretching structure, and cross bar alongst can extend or shorten, can be according to operation ring Border carries out the flexible modulation of cross bar length, and the specific structure that wherein elongation+positioning or shortening+positioning are realized is the prior art, Therefore it is not specifically described in this application.
Compared with prior art, the present invention having the following advantages and benefits:
1, on-load replacement fuse switch of the present invention bypasses drainage device, and insulation lead wire is built in insulation sleeve Pipe forms double insulation protection, avoids carrying out a large amount of insulation masking to neighbouring electrical body or grounding body in operation process, reduce Operation is time-consuming, also reduces operating personnel's labor intensity;
2, on-load replacement fuse switch of the present invention bypasses drainage device, upper and lower with fuse using penetrating cable clamp The connection of pile crown insulator pin, eliminates lead wire insulation layer and strips link, and then improve operating efficiency, while also solving because of pendulum It is dynamic to may cause the problem of insulation lead wire slides, compared with using conventional insulator drainage thread, reduce operating risk;
3, on-load replacement fuse switch of the present invention bypasses drainage device, and insulating sleeve bracket is using multi-joint activity Arm locks blind nut connection, detachably, is convenient for carrying, and 3 artis can 360 ° of rotations adjustings, guarantee working space and operation road Diameter, the operation field suitable for device layout complexity electrical on more bars.
Detailed description of the invention
Attached drawing described herein is used to provide to further understand the embodiment of the present invention, constitutes one of the application Point, do not constitute the restriction to the embodiment of the present invention.In the accompanying drawings:
Fig. 1 is schematic structural view of the invention;
Fig. 2 is penetrating cable clamp structural schematic diagram of the present invention.
Label and corresponding parts title in attached drawing:
1- insulation lead wire, 2- vertical bar, 3- lower beam, 4- upper boom, 5- cross bar, 6- cross-arm fixed hook, 7-90 ° of connector, 8- 45 ° of connectors, 9- plum blossom connector, 10- wire clamp body, 11- bolt, 12- wire clamp head.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention clearer, below with reference to embodiment and attached drawing, to this Invention is described in further detail, and exemplary embodiment of the invention and its explanation for explaining only the invention, are not made For limitation of the invention.
Embodiment 1
As shown in Figure 1, on-load of the present invention replacement fuse switch bypasses drainage device, including insulating sleeve bracket and It is set in the insulation lead wire 1 of insulating sleeve internal stent, the insulating sleeve bracket includes the vertical bar 2 being vertically arranged, vertical bar 2 Lower end be vertically connected with lower beam 3, the upper end of vertical bar 2 be vertically connected be in vertical bar 3 setting of 135 ° of angles upper boom 4, vertical bar 2, under Bar 3 and upper boom 4 are hollow shape structure and are interconnected, and the middle part of vertical bar 2 is vertically connected with cross bar 5, separate vertical bar 2 on cross bar 5 One end end on be connected with cross-arm fixed hook 6, cross-arm fixed hook is equipped with clamping screw, and the insulation lead wire 1 is to roll up The upper boom 4, vertical bar 2 and lower beam 3 of insulating sleeve bracket are each passed through around mode, the both ends of insulation lead wire 1 are connected with penetrating cable clamp.
Insulation lead wire is built in insulating sleeve by bypass drainage device of the invention, is formed double insulation protection, is avoided A large amount of insulation masking is carried out to neighbouring electrical body or grounding body in operation process, reduces operation time-consuming, also reduces operation Personnel labor intensity.Meanwhile insulating sleeve bracket also acts supporting role to soft insulating drainage thread, can effectively solve the problem that soft Matter insulation lead wire is difficult to the problem of being reliably fixed, and ensure that operation safety distance, has connection, fixed reliable, simplified operation The advantages of process reduces operating risk, reduces operation time-consuming, improves working efficiency.Insulation lead wire is realized using penetrating cable clamp With the connection of the upper and lower pile crown insulator pin of fuse, eliminates lead wire insulation layer and strip link, and then improve operating efficiency; It also solves the problems, such as to may cause insulation lead wire landing because of swing simultaneously, compared with using conventional insulator drainage thread, reduce Operating risk.
In use, livewire work personnel pass through cross-arm fixed hook first hangs over installation fuse switch for package unit Cross-arm on, the clamping screw of cross-arm fixed hook is tightened after adjusting job position, keeps device fixed reliable, from insulation sleeve Pull out the both ends of the insulation lead wire of winding in pipe holder at upper boom and lower rod port respectively, installation penetrating cable clamp will insulation drainage The both ends of line are connected with upper and lower pile crown insulator pin respectively, and the insulating layer of insulator pin outer wall is clipped broken by penetrating cable clamp, thus The conducting between insulation lead wire and upper and lower pile crown insulator pin is fast implemented, lead wire insulation layer is eliminated and strips link, in turn Improve operating efficiency;Then it just detects through-flow whether good, and sets insulation masking;Fuse switch replacement finishes Afterwards, it removes penetrating cable clamp and the insulation lead wire of pull-out winding is placed in insulating sleeve bracket, loosen cross-arm fixed hook Clamping screw removes package unit and insulation masking, terminates operation.
Embodiment 2
As shown in Figure 1, on-load replacement fuse switch of the present invention bypasses drainage device, on the basis of embodiment 1 Using 90 ° of connectors 7 and locking blind nut connection between vertical bar and lower beam, using 45 ° of connectors 8 and locking blind nut between vertical bar and upper boom Connection is connected between the side wall of vertical bar and the end of cross bar using plum blossom connector 9.
Three tie points i.e. on vertical bar using can be achieved rotation 3 artis (respectively 90 ° of connectors, 45 ° of connectors, Plum blossom connector), upper boom, cross bar and lower beam can be made to realize that 360 ° of rotation is adjusted by rotating this 3 artis in this way, from And enough working spaces and courses of action can be obtained, the operation for being applicable to electrical device layout complexity on a variety of bars is existing ?;The multi-joint lever arm of insulating sleeve bracket is by the connection of locking blind nut, it can be achieved that upper boom, cross bar and lower beam are torn open simultaneously It unloads, is convenient for carrying.
As shown in Fig. 2, the penetrating cable clamp includes the wire clamp body 10 of a side opening, bolt is equipped at the top of wire clamp body 11, the bottom end of bolt 11 is connected with wire clamp head 12, and the bottom surface of wire clamp head is evenly distributed with clip tooth, in wire clamp body inner bottom surface also uniformly Clip tooth is distributed with, is interspersed between the clip tooth of the bottom surface of wire clamp head and the clip tooth of wire clamp body inner bottom surface, in this way draws insulation Streamline and upper pile crown insulator pin or lower pile crown insulator pin are clamped between wire clamp head and wire clamp body inner bottom surface, then pass through Rotating bolt is tightened so that wire clamp head moves downward, and by upper layer and lower layer clip tooth that upper pile crown insulator pin or lower pile crown is exhausted The insulating layer of edge lead punctures, and realizes the conducting between insulation lead wire and upper pile crown insulator pin or lower pile crown insulator pin, Penetrating cable clamp avoids the case where causing insulation lead wire to slide because of swing simultaneously.
Preferably, the outer wall of vertical bar is equipped with anti-skid chequer, skids when placing hand-held vertical bar operation.
Preferably, the cross bar has stretching structure, and cross bar alongst can extend or shorten, being capable of basis Operating environment carries out the flexible modulation of cross bar length, and the specific structure that wherein elongation+positioning or shortening+positioning are realized is existing Technology, therefore be not specifically described in this application.
Above-described specific embodiment has carried out further the purpose of the present invention, technical scheme and beneficial effects It is described in detail, it should be understood that being not intended to limit the present invention the foregoing is merely a specific embodiment of the invention Protection scope, all within the spirits and principles of the present invention, any modification, equivalent substitution, improvement and etc. done should all include Within protection scope of the present invention.

Claims (5)

1. on-load replaces fuse switch and bypasses drainage device, which is characterized in that including insulating sleeve bracket and be set in The insulation lead wire (1) of insulating sleeve internal stent, the insulating sleeve bracket include the vertical bar (2) being vertically arranged, vertical bar (2) Lower end be vertically connected with lower beam (3), the upper end of vertical bar (2) be vertically connected with vertical bar (3) be in 135 ° of angles setting upper boom (4), Vertical bar (2), lower beam (3) and upper boom (4) are hollow shape structure and are interconnected, and the middle part of vertical bar (2) is vertically connected with cross bar (5), it is connected with cross-arm fixed hook (6) on one end end on cross bar (5) far from vertical bar (2), cross-arm fixed hook is equipped with lock Tight bolt, the insulation lead wire (1) are each passed through the upper boom (4), vertical bar (2) and lower beam of insulating sleeve bracket with winding method (3), the both ends of insulation lead wire (1) are connected with penetrating cable clamp.
2. on-load replacement fuse switch according to claim 1 bypasses drainage device, which is characterized in that vertical bar (2) it is connect between lower beam (3) using 90 ° of connectors (7) and locking blind nut, 45 ° of connectors is used between vertical bar (2) and upper boom (4) (8) it connects with locking blind nut, is connect between the side wall and the end of cross bar (5) of vertical bar (2) using plum blossom connector (9).
3. on-load replacement fuse switch according to claim 1 bypasses drainage device, which is characterized in that described to wear Thorn wire clamp includes the wire clamp body (10) of a side opening, is equipped with bolt (11) at the top of wire clamp body (10), the bottom end of bolt (11) It is connected with wire clamp head (12), the bottom surface of wire clamp head (12) is evenly distributed with clip tooth, is also uniformly distributed in wire clamp body (10) inner bottom surface There is clip tooth.
4. on-load replacement fuse switch according to claim 1 bypasses drainage device, which is characterized in that vertical bar (2) outer wall is equipped with anti-skid chequer.
5. on-load replacement fuse switch according to claim 1 bypasses drainage device, which is characterized in that the cross Bar (5) has stretching structure, and cross bar (5) alongst can extend or shorten.
CN201811286911.XA 2018-10-31 2018-10-31 On-load replaces fuse switch and bypasses drainage device Pending CN109193464A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811286911.XA CN109193464A (en) 2018-10-31 2018-10-31 On-load replaces fuse switch and bypasses drainage device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811286911.XA CN109193464A (en) 2018-10-31 2018-10-31 On-load replaces fuse switch and bypasses drainage device

Publications (1)

Publication Number Publication Date
CN109193464A true CN109193464A (en) 2019-01-11

Family

ID=64941057

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811286911.XA Pending CN109193464A (en) 2018-10-31 2018-10-31 On-load replaces fuse switch and bypasses drainage device

Country Status (1)

Country Link
CN (1) CN109193464A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110086123A (en) * 2019-06-18 2019-08-02 国网四川省电力公司乐山供电公司 A kind of power transmission lines overhauling replacement auxiliary device
CN111884123A (en) * 2020-07-09 2020-11-03 国网天津市电力公司 Load replacement protection device for drop-out fuse and live replacement method thereof
CN112466727A (en) * 2020-11-24 2021-03-09 国网宁夏电力有限公司中卫供电公司 Adjustable fixing device mounted on cross arm
CN113488915A (en) * 2021-08-12 2021-10-08 国网上海市电力公司 Pole top transition lead temporary support for live replacement of 10kV pole-mounted contact breaker
CN113675770A (en) * 2021-08-18 2021-11-19 贵州电网有限责任公司 Distribution network hot-line work quick replacement isolating switch, link control auxiliary device and method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203339640U (en) * 2013-06-20 2013-12-11 国家电网公司 10kV charged drainage wire supporting device
CN204067618U (en) * 2014-08-13 2014-12-31 国家电网公司 Novel charged early warning earth connection
JP2016015827A (en) * 2014-07-02 2016-01-28 東日本旅客鉄道株式会社 Insulation measurement tool of transformer
CN206211061U (en) * 2016-11-29 2017-05-31 国网陕西省电力公司榆林供电公司 A kind of telescopic grounding wire device
CN107546646A (en) * 2017-09-29 2018-01-05 国网湖南省电力公司 On-load changes the specific purpose tool and method of fuse switch
CN207183201U (en) * 2017-05-16 2018-04-03 国家电网公司 Livewire work fuse switch part flow arrangement
CN108565748A (en) * 2018-04-17 2018-09-21 国网浙江桐庐县供电有限公司 A kind of insulating mast assembly device for replacing fuse switch

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203339640U (en) * 2013-06-20 2013-12-11 国家电网公司 10kV charged drainage wire supporting device
JP2016015827A (en) * 2014-07-02 2016-01-28 東日本旅客鉄道株式会社 Insulation measurement tool of transformer
CN204067618U (en) * 2014-08-13 2014-12-31 国家电网公司 Novel charged early warning earth connection
CN206211061U (en) * 2016-11-29 2017-05-31 国网陕西省电力公司榆林供电公司 A kind of telescopic grounding wire device
CN207183201U (en) * 2017-05-16 2018-04-03 国家电网公司 Livewire work fuse switch part flow arrangement
CN107546646A (en) * 2017-09-29 2018-01-05 国网湖南省电力公司 On-load changes the specific purpose tool and method of fuse switch
CN108565748A (en) * 2018-04-17 2018-09-21 国网浙江桐庐县供电有限公司 A kind of insulating mast assembly device for replacing fuse switch

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110086123A (en) * 2019-06-18 2019-08-02 国网四川省电力公司乐山供电公司 A kind of power transmission lines overhauling replacement auxiliary device
CN111884123A (en) * 2020-07-09 2020-11-03 国网天津市电力公司 Load replacement protection device for drop-out fuse and live replacement method thereof
CN112466727A (en) * 2020-11-24 2021-03-09 国网宁夏电力有限公司中卫供电公司 Adjustable fixing device mounted on cross arm
CN113488915A (en) * 2021-08-12 2021-10-08 国网上海市电力公司 Pole top transition lead temporary support for live replacement of 10kV pole-mounted contact breaker
CN113675770A (en) * 2021-08-18 2021-11-19 贵州电网有限责任公司 Distribution network hot-line work quick replacement isolating switch, link control auxiliary device and method

Similar Documents

Publication Publication Date Title
CN109193464A (en) On-load replaces fuse switch and bypasses drainage device
CN101719640A (en) Operation method of connecting charged lead with by-pass jumper for 10 kV wire multi-loop on same tower
CN107370079A (en) It is a kind of to connect and hook the livewire work method of clip lead
CN205049690U (en) Cable terminal partial discharge test auxiliary device
CN103746315A (en) Quick hot-line by-pass jumper overlapping operation method for 10kV insulated power distribution line
CN102856838B (en) Tubular bus support insulator changing tool and method
CN110120643B (en) Uninterrupted power operation method for power line of ground potential distribution network
CN215772467U (en) Auxiliary support insulating fixture for bypass flexible cable lap joint overhead line
CN206211061U (en) A kind of telescopic grounding wire device
CN103311844B (en) Alpine terrain crosses over the stringing method of live high voltage circuit
CN2912028Y (en) Live replacing device for compact six-line insulator string
CN103746314A (en) Quick hot-line by-pass jumper removing operation method for 10kV insulated power distribution line
CN104143786A (en) Multi-purpose 10 kV drainage wire insulation fixer and work method with same
CN103001142A (en) Operation method for on-load replacing of 10kV pole-mounted disconnector
CN203260950U (en) 10kV power distribution rack live-replacement drop-out type fuse device
CN104659710B (en) A kind of 500kV power transmission lines roadside phase conductor aerial lift device with insulated arm livewire work method
CN106356758A (en) Operating method for replacing pole-mounted switch live on indirect bypass of 10 KV line insulating pole
CN203289006U (en) Insulation adjustable yoke plate
CN211183189U (en) Multifunctional high-altitude wiring clamp
CN218732775U (en) Ground potential cable jacking mechanism for insulator replacement operation
CN110676607A (en) Parallel groove lapping device capable of live working and operation method thereof
CN202917892U (en) Replacing tool for supporting insulator of tubular busbar
CN211701243U (en) Electrified defect eliminating device for jumper spacer
CN205646197U (en) Novel high pressure bonding device
CN208514484U (en) A kind of Steel Tube Special shaft tower earth potential live operation folding platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190111

RJ01 Rejection of invention patent application after publication