CN104659710B - A kind of 500kV power transmission lines roadside phase conductor aerial lift device with insulated arm livewire work method - Google Patents
A kind of 500kV power transmission lines roadside phase conductor aerial lift device with insulated arm livewire work method Download PDFInfo
- Publication number
- CN104659710B CN104659710B CN201510061506.8A CN201510061506A CN104659710B CN 104659710 B CN104659710 B CN 104659710B CN 201510061506 A CN201510061506 A CN 201510061506A CN 104659710 B CN104659710 B CN 104659710B
- Authority
- CN
- China
- Prior art keywords
- lift device
- bucket
- aerial lift
- insulated arm
- wire
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000004020 conductor Substances 0.000 title claims abstract description 18
- 230000005540 biological transmission Effects 0.000 title claims abstract description 14
- RYGMFSIKBFXOCR-UHFFFAOYSA-N copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 claims abstract description 8
- 229910052802 copper Inorganic materials 0.000 claims abstract description 8
- 239000010949 copper Substances 0.000 claims abstract description 8
- 238000009413 insulation Methods 0.000 claims description 7
- 239000012212 insulator Substances 0.000 claims description 3
- 239000007769 metal material Substances 0.000 claims description 3
- 230000005684 electric field Effects 0.000 claims description 2
- 238000004140 cleaning Methods 0.000 claims 1
- 238000000034 method Methods 0.000 abstract description 2
- 230000002493 climbing Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000005611 electricity Effects 0.000 description 2
- 230000001174 ascending Effects 0.000 description 1
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510061506.8A CN104659710B (en) | 2015-02-06 | 2015-02-06 | A kind of 500kV power transmission lines roadside phase conductor aerial lift device with insulated arm livewire work method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510061506.8A CN104659710B (en) | 2015-02-06 | 2015-02-06 | A kind of 500kV power transmission lines roadside phase conductor aerial lift device with insulated arm livewire work method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104659710A CN104659710A (en) | 2015-05-27 |
CN104659710B true CN104659710B (en) | 2017-09-15 |
Family
ID=53250542
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510061506.8A Active CN104659710B (en) | 2015-02-06 | 2015-02-06 | A kind of 500kV power transmission lines roadside phase conductor aerial lift device with insulated arm livewire work method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104659710B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106781924B (en) * | 2017-01-23 | 2021-01-29 | 中国电力科学研究院 | Live working training device for extra-high voltage line |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0624694A (en) * | 1992-07-08 | 1994-02-01 | Yaskawa Electric Corp | Method of installing manipulator on bucket of power distribution work vehicle |
JP2003189433A (en) * | 2001-12-19 | 2003-07-04 | Kyushu Electric Power Co Inc | Distribution line construction method and tool used therefor |
CN101227068B (en) * | 2007-12-27 | 2010-06-02 | 国网电力科学研究院 | electric potential transferring stick for AC super or ultra high voltage line live working |
CN103474903A (en) * | 2013-09-09 | 2013-12-25 | 国家电网公司 | Method for entering 500kV common-tower double-circuit vertically-arranged compact transmission line equipotential |
CN103683105A (en) * | 2013-12-17 | 2014-03-26 | 国家电网公司 | Live working method of phase conductor insulating arm aerial platform truck under 66kV electric transmission line |
-
2015
- 2015-02-06 CN CN201510061506.8A patent/CN104659710B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN104659710A (en) | 2015-05-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106505471B (en) | A kind of handgrip adjustable high-voltage pylon removes bird's nest device | |
CN105449392B (en) | A kind of 10kV circuits band electrical bonding and dismounting drainage thread apparatus for work and method | |
CN101567530B (en) | Safe method for entering tangent tower equal potentials for live-wire operation in 660kV direct current lines | |
CN102623926A (en) | Distant equipotential tackle and method for realizing charged equipotential access by using same | |
CN101277002B (en) | Method for construction of charged assembling 10kV bi-gyrus distribution line concrete lever | |
CN101640391A (en) | Live-wire operation method for replacing insulator for 35kV distribution circuit | |
CN102136693A (en) | Method and device for realizing long-distance equal electric potential access of winch hanging basket guide rail | |
CN104505763B (en) | UHVDC Transmission Lines charged for replacement duplex V string composite insulator operational methods | |
CN104925711A (en) | Liftable auxiliary apparatus for power system | |
CN104659710B (en) | A kind of 500kV power transmission lines roadside phase conductor aerial lift device with insulated arm livewire work method | |
CN204068050U (en) | Electrical lead live line working insulated shielding cover | |
CN104979776A (en) | Method for entering equipotential level for tension support of UHV transmission line | |
CN103683105A (en) | Live working method of phase conductor insulating arm aerial platform truck under 66kV electric transmission line | |
CN104659504B (en) | Grounding method | |
CN106129912A (en) | A kind of drainage plate electric transmission line hot-line defect elimination power tool | |
CN106786146B (en) | Tri- identical tower window list back transmission line compact linear towers of 500kV enter equipotential operational method | |
CN202550399U (en) | Distant equipotential tackle | |
CN104659709B (en) | A kind of aerial lift device with insulated arm livewire work method and instrument for strain insulator string | |
CN203983920U (en) | Ultra-high-tension power transmission line mechanical deicing device | |
CN106437280A (en) | Live pole erecting method for 10 kV common-tower double-circuit and vertically arranged power distribution line | |
CN213071962U (en) | Insulating operating rod for power distribution network | |
CN207649610U (en) | A kind of intelligence overhead power detecting pincers | |
CN206022675U (en) | Universal shaped cable clamp earth lead | |
CN205543956U (en) | Can prolong formula three -phase short circuit grounding | |
CN104882823A (en) | Column switch nest removing apparatus based on insulating rod |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 210000, Jiangsu, Jiangning Development Zone, Nanjing, the source of the road, No. 58, -5 Co-patentee after: China Electric Power Research Institute Patentee after: National network Jiangsu Electric Power Co., Ltd. maintenance branch Co-patentee after: Wuxi Power Supply Co., Ltd, Jiangsu Electric Power Co. Address before: 210000, Jiangsu, Jiangning Development Zone, Nanjing, the source of the road, No. 58, -5 Co-patentee before: China Electric Power Research Institute Patentee before: State Grid Jiangsu Electric Power Company Maintenance Branch Company Co-patentee before: Wuxi Power Supply Co., Ltd, Jiangsu Electric Power Co. Address after: 210000, Jiangsu, Jiangning Development Zone, Nanjing, the source of the road, No. 58, -5 Co-patentee after: China Electric Power Research Institute Patentee after: State Grid Jiangsu Electric Power Company Maintenance Branch Company Co-patentee after: Wuxi Power Supply Co., Ltd, Jiangsu Electric Power Co. Address before: 210000, Jiangsu, Jiangning Development Zone, Nanjing, the source of the road, No. 58, -5 Co-patentee before: China Electric Power Research Institute Patentee before: Maintenance Branch of Jiangsu Electric Power Company Co-patentee before: Wuxi Power Supply Co., Ltd, Jiangsu Electric Power Co. |
|
CP01 | Change in the name or title of a patent holder |