CN203339640U - 10kV charged drainage wire supporting device - Google Patents
10kV charged drainage wire supporting device Download PDFInfo
- Publication number
- CN203339640U CN203339640U CN2013203562497U CN201320356249U CN203339640U CN 203339640 U CN203339640 U CN 203339640U CN 2013203562497 U CN2013203562497 U CN 2013203562497U CN 201320356249 U CN201320356249 U CN 201320356249U CN 203339640 U CN203339640 U CN 203339640U
- Authority
- CN
- China
- Prior art keywords
- drainage thread
- resin material
- screw rod
- drainage wire
- thread bracing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Sink And Installation For Waste Water (AREA)
Abstract
Description
技术领域 technical field
本实用新型涉及一种10kV带电引流线支撑装置。 The utility model relates to a support device for a 10kV electrified drain wire.
背景技术 Background technique
随着电力事业的发展,用电可靠率以及优质服务显得越来越重要,带电作业在电力生产中的比重日渐增加,特别是事故抢修和电力设备的更换维护,利用带电作业可以有效地减少不必要的停电时间,提高用电可靠率,保障人民生活用电。然而由于电气设备的自然老化以及不可抗拒外力的影响,日常工作中常常遇见避雷器和跌落式熔断器故障或损坏,因此需要班组进行日常维护,对设备进行更换。而更换避雷器和跌落式熔断器作业流程繁琐,绝缘措施必须设置到位,为保障人身安全需将连接在主导线上的引流线拆除。 With the development of the electric power industry, the reliability of power consumption and high-quality service are becoming more and more important. The proportion of live work in electric power production is increasing day by day, especially in emergency repairs and replacement and maintenance of power equipment. The use of live work can effectively reduce the Necessary power outage time, improve the reliability of power consumption, and ensure the power consumption of people's lives. However, due to the natural aging of electrical equipment and the influence of irresistible external forces, lightning arresters and dropout fuses are often faulty or damaged in daily work, so the team needs to perform daily maintenance and replace the equipment. However, the operation process of replacing lightning arresters and dropout fuses is cumbersome, and insulation measures must be set in place. In order to ensure personal safety, the drain wires connected to the main wires must be removed.
在以往的作业过程中,更换避雷器和跌落式熔断器时需将连接在主导线上的引流线拆下,然后再对避雷器和跌落式熔断器进行检查和更换。在操作过程中存在着安全距离不足等危险因素,并且操作步骤繁琐,耗时耗力,大大危害到人身安全,导致更换避雷器和跌落式熔断器困难重重,有以下几个原因:1、操作人员利用绝缘斗臂车在作业点与主导线之间上下来回作业既增加了工作强度又重复操作,容易引起主导线和引流线的损伤。2、因地形条件特殊与工作点本身高度已经到达最大负荷率,加上引流线长度造成斗臂车闭锁引起无法完成工作。3、由于作业空间狭小在提取引流线时可能与相间(或线对地)之间引起二次事故。因此如何有效得解决换避雷器和跌落式熔断器问题,将大大有效提高工作效率。 In the past work process, when replacing the arrester and drop-out fuse, it is necessary to remove the drain wire connected to the main line, and then check and replace the arrester and drop-out fuse. In the process of operation, there are dangerous factors such as insufficient safety distance, and the operation steps are cumbersome, time-consuming and labor-intensive, which greatly endangers personal safety and makes it difficult to replace lightning arresters and drop-out fuses. There are several reasons: 1. Operators Utilizing the insulated arm truck to work up and down between the operating point and the main conductor not only increases the work intensity but also repeats the operation, which may easily cause damage to the main conductor and the drain wire. 2. Due to the special terrain conditions and the height of the working point itself has reached the maximum load rate, plus the length of the drainage line, the bucket arm truck is blocked and cannot complete the work. 3. Due to the narrow working space, secondary accidents may be caused between phase-to-phase (or line-to-ground) when extracting the drainage line. Therefore, how to effectively solve the problem of replacing lightning arresters and dropout fuses will greatly improve work efficiency.
实用新型内容 Utility model content
本实用新型的目的在于提供了一种10kV带电引流线支撑装置,解决了目前避雷器和跌落式熔断器时工序复杂,更换效率低和无法满足安全距离等问题,具有简化了工作工序,既缩短了更换的工作时间,又保证了安全工作距离的条件的特点。 The purpose of this utility model is to provide a 10kV electrified drain line support device, which solves the problems of complex procedures, low replacement efficiency and inability to meet the safety distance for current lightning arresters and drop-out fuses. Replacing the working hours and ensuring the conditions of the safe working distance are characteristic.
为了达到上述目的,本实用新型的技术方案是: In order to achieve the above object, the technical scheme of the utility model is:
一种10kV带电引流线支撑装置,包括凹形块、活动机构、环氧树脂材料制成的引流线支撑架和引流线固定机构;其中所述的凹形块上安装有上弹性片和下弹性片,所述的上弹性片和下弹性片之间通过活动机构安装有环氧树脂材料制成的引流线支撑架;所述的环氧树脂材料制成的引流线支撑架通过弹性圈与引流线固定机构相连。 A 10kV live drain wire support device, including a concave block, a movable mechanism, a drain wire support frame made of epoxy resin material, and a drain wire fixing mechanism; wherein the concave block is equipped with an upper elastic piece and a lower elastic sheet, and a drainage wire support frame made of epoxy resin material is installed between the upper elastic sheet and the lower elastic sheet through a movable mechanism; the drainage wire support frame made of epoxy resin material passes through the elastic ring and drainage The line fixing mechanism is connected.
所述的活动机构包括扳手,插销、第一螺杆和螺母;所述的扳手上部设有凸块,且扳手的下部呈半椭圆,所述的扳手的下部和第一螺杆的上端开设有通孔;所述的插销依次穿过扳手的下部和第一螺杆的上端的通孔,所述的第一螺杆依次穿过上弹性片、环氧树脂材料制成的引流线支撑架和下弹性片后与螺母固连。 The movable mechanism includes a wrench, a latch, a first screw and a nut; the upper part of the wrench is provided with a bump, and the lower part of the wrench is semi-elliptical, and the lower part of the wrench and the upper end of the first screw are provided with a through hole ; The bolts pass through the bottom of the wrench and the through hole on the upper end of the first screw in turn, and the first screw passes through the upper elastic sheet, the drainage wire support frame made of epoxy resin material and the lower elastic sheet successively Fastened with nuts.
所述的引流线固定机构包括固定架、第二螺杆、活动块、第三螺杆和辅助杆,所述的固定架下端固定安装有第二螺杆,所述的第二螺杆穿过套装在环氧树脂材料制成的引流线支撑架上的弹性圈与环氧树脂材料制成的引流线支撑架固连;所述的固定架上安装有第三螺杆,所述的第三螺杆一端安装有活动块,且第三螺杆的另一端安装有辅助杆。 The drain wire fixing mechanism includes a fixed frame, a second screw, a movable block, a third screw and an auxiliary rod. The lower end of the fixed frame is fixedly equipped with a second screw, and the second screw passes through the epoxy The elastic ring on the drainage wire support frame made of resin material is fixedly connected with the drainage wire support frame made of epoxy resin material; a third screw is installed on the fixed frame, and a movable screw is installed at one end of the third screw. block, and the other end of the third screw is equipped with an auxiliary rod.
所述的上弹性片和下弹性片之间安装有2个螺栓。 Two bolts are installed between the upper elastic sheet and the lower elastic sheet.
所述的环氧树脂材料制成的引流线支撑架为长80cm的环氧树脂材料制成的引流线支撑架。 The drainage wire support frame made of epoxy resin material is a drainage wire support frame made of epoxy resin material with a length of 80 cm.
本实用新型的有益效果:本实用新型提供的一种10kV带电引流线支撑装置,解决了在更换避雷器和跌落式熔断器的操作过程中存在3个重要原因:1、操作人员利用绝缘斗臂车在作业点与主导线之间上下来回作业既增加了工作强度又重复操作,容易引起主导线和引流线的损伤。2、因地形条件特殊与工作点本身高度已经到达最大负荷率,加上引流线长度造成斗臂车闭锁引起无法完成工作。3、由于作业空间狭小在提取引流线时可能与相间(或线对地)之间引起二次事故。具有简化了工作工序,既缩短了更换的工作时间,提高工作效率,又保证了安全工作距离的条件的特点。 Beneficial effects of the utility model: the utility model provides a 10kV electrified drain line support device, which solves three important reasons in the operation process of replacing the lightning arrester and the drop-out fuse: 1. The operator uses the insulated bucket arm truck Working up and down between the operating point and the main guide wire not only increases the work intensity but also repeats the operation, which easily causes damage to the main guide wire and the drainage wire. 2. Due to the special terrain conditions and the height of the working point itself has reached the maximum load rate, plus the length of the drainage line, the bucket arm truck is blocked and cannot complete the work. 3. Due to the narrow working space, secondary accidents may be caused between phase-to-phase (or line-to-ground) when extracting the drainage line. It has the characteristics of simplifying the working procedure, not only shortening the working time for replacement, improving working efficiency, but also ensuring the condition of safe working distance.
附图说明 Description of drawings
图1是本实用新型的结构示意图; Fig. 1 is a structural representation of the utility model;
图2是本实用新型的活动机构的放大示意图; Fig. 2 is the enlarged schematic view of the movable mechanism of the present utility model;
图3是图2的右视图; Fig. 3 is the right view of Fig. 2;
图4是本实用新型的引流线固定机构的放大示意图; Fig. 4 is an enlarged schematic view of the drainage wire fixing mechanism of the present invention;
图5是本实用新型的第二螺杆与环氧树脂材料制成的引流线支撑架固定的放大示意图; Fig. 5 is an enlarged schematic diagram of fixing the second screw rod of the present invention to the drainage wire support frame made of epoxy resin material;
图6是本实用新型在更换跌落式熔断器时的使用状态的结构示意图; Fig. 6 is a schematic structural view of the utility model in use when replacing a drop-out fuse;
图7是本实用新型在更换避雷器时的使用状态的结构示意图。 Fig. 7 is a structural schematic diagram of the utility model in use when the lightning arrester is replaced.
具体实施方式 Detailed ways
实施例1 Example 1
如图1-5所示,本实施例的一种10kV带电引流线支撑装置,包括凹形块1、活动机构2、长为80cm的环氧树脂材料制成的引流线支撑架3和引流线固定机构4.其中所述的凹形块1上安装有上弹性片5和下弹性片6,所述的上弹性片5和下弹性片6之间通过活动机构2安装有长为80cm的环氧树脂材料制成的引流线支撑架3,所述的上弹性片5和下弹性片6之间安装有2个螺栓18,用来限制长为80cm的环氧树脂材料制成的引流线支撑架活动范围。所述的长为80cm的环氧树脂材料制成的引流线支撑架3通过弹性圈7与引流线固定机构4相连。
As shown in Figures 1-5, a 10kV live drain wire support device in this embodiment includes a
所述的活动机构2包括扳手8,插销9、第一螺杆10和螺母11。所述的扳手8上部设有凸块81,所述的凸块81为了方便扳动扳手8,且扳手8的下部呈半椭圆,所述的扳手8的下部和第一螺杆10的上端开设有通孔;所述的插销9依次穿过扳手8的下部和第一螺杆10的上端的通孔,所述的第一螺杆10依次穿过上弹性片5、长为80cm环氧树脂材料制成的引流线支撑架3和下弹性片6后与螺母11固定安装。利用椭圆的2个直径长短不一的特点,当往上扳动扳手8至扳手8与第一螺杆10在同一直线上位置时,使得上弹性片5和下弹性片6都往长为80cm的环氧树脂材料制成的引流线支撑架3紧贴,达到固定长为80cm的环氧树脂材料制成的引流线支撑架3的目的。当往下扳动扳手8过程中,使得上弹性片5和下弹性片6都往长为80cm的环氧树脂材料制成的引流线支撑架3松掉,那么长为80cm的环氧树脂材料制成的引流线支撑架3可以根据工作需要转动相应的角度。
The
所述的引流线固定机构4包括固定架13、第二螺杆14、活动块15、第三螺杆16和辅助杆17,所述的固定架13下端固定安装有第二螺杆14,所述的第二螺杆14穿过套装在长为80cm的环氧树脂材料制成的引流线支撑架3上的弹性圈7与长为80cm的环氧树脂材料制成的引流线支撑架3固连;所述的固定架13上安装有第三螺杆16,所述的第三螺杆16一端安装有活动块15,且所述的第三螺杆16的另一端安装有辅助杆17。通过移动弹性圈7可以调整固定架13在长为80cm的环氧树脂材料制成的引流线支撑架3上的位置,确保安全的工作距离,当固定架13调整到所需工作位置时,通过旋转第二螺杆14,使得弹性圈7变形紧贴长为80cm的环氧树脂材料制成的引流线支撑架3管壁,到达固定固定架13的目的。所述的固定架13上安装有第三螺杆16,所述的第三螺杆16内侧端安装有活动块15,且所述的第三螺杆16的外侧端安装有辅助杆17,通过辅助杆17绕第三螺杆16做360度圆周运动,可以使第三螺杆16在固定架13上旋进旋出,使得安装在第三螺杆16上的活动块15在固定架13上在来回移动,可以固定和松开位于活动块15和固定架13之间的上引线23或下引线24。
The drain
如图6所示,本实施例在使用过程中,当需要更换跌落式熔断器22时,先把10kV带电引流线支撑装置上的凹形块1通过螺栓20固定安装在电线杆12上的角铁21上且使其得满足与电线杆的距离达到40cm的安全工作距离,通过弹性圈7在长为80cm的环氧树脂材料制成的引流线支撑架3上下移动,来调整引流线固定机构4在长为80cm的环氧树脂材料制成的引流线支撑架3上的位置,使其满足引流线固定机构4与主线上的连接的角铁27的距离达到40cm的安全工作距离,将原先固定在跌落式熔断器22上的上引线23拆装到引流线固定机构4上的活动块15和固定架13之间,通过顺时针旋转辅助杆17使第三螺杆16上的活动块15往固定架13上靠拢,来夹紧位于活动块15和固定架13之间的上引线23。随后即可进行更新的换跌落式熔断器22,更换好后,通过顺时针旋转辅助杆17使第三螺杆16上的活动块15往固定架13上远离,来松开位于活动块15和固定架13之间的上引线23,将上引流线23安装到新的换跌落式熔断器22,最后拆下10kV带电引流线支撑装置,完成工作。
As shown in Figure 6, during use of this embodiment, when the drop-out fuse 22 needs to be replaced, the
如图7所示,当需要更换避雷器25时,先把10kV带电引流线支撑装置上的凹形块1通过螺栓20固定安装在电线杆12上的角铁21上,且使其满足与电线杆12的距离达到40cm的安全工作距离,通过弹性圈7在长为80cm的环氧树脂材料制成的引流线支撑架3上下移动,来调整引流线固定机构4在长为80cm的环氧树脂材料制成的引流线支撑架3上的位置,使得满足引流线固定机构4与固定跌落式熔断器22的架子26的距离达到40cm的安全工作距离,安装好之后。将原先固定在避雷器25上的下引线24拆装到引流线固定机构4上的活动块15和固定架13之间,通过旋转辅助杆17使第三螺杆16上的活动块15往固定架13上靠拢,来夹紧位于活动块15和固定架13之间的下引线24,随后即可进行更换避雷器25,更换好后,通过逆时针旋转辅助杆17使第三螺杆16上的活动块15往固定架13上远离,来松开位于活动块15和固定架13之间的下引线24,将下引流线24安装到新的避雷器5,最后拆下引流线支撑装置,完成工作。
As shown in Figure 7, when the lightning arrester 25 needs to be replaced, the
通过上述实施例,本实用新型提供的一种10kV带电引流线支撑装置,解决了在更换避雷器和跌落式熔断器的操作过程中存在着安全距离不足,并且操作步骤繁琐,耗时耗力,严重危害到人身安全等因素,具有简化了工作工序,既缩短了更换的工作时间,提高工作效率,又保证了安全工作距离的条件的特点。 Through the above-mentioned embodiments, the utility model provides a 10kV electrified drain line support device, which solves the problem of insufficient safety distance in the operation process of replacing lightning arresters and drop-out fuses, and the operation steps are cumbersome, time-consuming and labor-intensive, and serious Factors such as endangering personal safety have the characteristics of simplifying the working procedure, shortening the working time of replacement, improving work efficiency, and ensuring the conditions of a safe working distance.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2013203562497U CN203339640U (en) | 2013-06-20 | 2013-06-20 | 10kV charged drainage wire supporting device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2013203562497U CN203339640U (en) | 2013-06-20 | 2013-06-20 | 10kV charged drainage wire supporting device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN203339640U true CN203339640U (en) | 2013-12-11 |
Family
ID=49708297
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2013203562497U Expired - Lifetime CN203339640U (en) | 2013-06-20 | 2013-06-20 | 10kV charged drainage wire supporting device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN203339640U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103326304A (en) * | 2013-06-20 | 2013-09-25 | 国家电网公司 | 10kV charged drainage wire supporting device |
| CN108306216A (en) * | 2018-02-09 | 2018-07-20 | 广州南方电安科技有限公司 | A kind of high-tension line drainage thread insulation fixed equipment |
| CN109193464A (en) * | 2018-10-31 | 2019-01-11 | 国网四川省电力公司绵阳供电公司 | On-load replaces fuse switch and bypasses drainage device |
-
2013
- 2013-06-20 CN CN2013203562497U patent/CN203339640U/en not_active Expired - Lifetime
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103326304A (en) * | 2013-06-20 | 2013-09-25 | 国家电网公司 | 10kV charged drainage wire supporting device |
| CN103326304B (en) * | 2013-06-20 | 2014-09-17 | 国家电网公司 | 10kV charged drainage wire supporting device |
| CN108306216A (en) * | 2018-02-09 | 2018-07-20 | 广州南方电安科技有限公司 | A kind of high-tension line drainage thread insulation fixed equipment |
| CN109193464A (en) * | 2018-10-31 | 2019-01-11 | 国网四川省电力公司绵阳供电公司 | On-load replaces fuse switch and bypasses drainage device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103326304B (en) | 10kV charged drainage wire supporting device | |
| CN205195145U (en) | Support is changed to insulator | |
| CN103066531A (en) | Supporting frame for 10 KV line live wire | |
| CN106505466A (en) | Lifting insulating cross arm for distribution network operation without power failure and its operation method | |
| CN203339640U (en) | 10kV charged drainage wire supporting device | |
| CN203481707U (en) | Upper pile head drainage wire fixing rod | |
| CN106129901A (en) | A kind of 35kV circuit single pole porcelain pole arm repairing instrument | |
| CN204045535U (en) | A kind of alternative having damaged fuse switch | |
| CN205314654U (en) | Reinforcement iron tower of power transmission sequence | |
| CN107871938A (en) | Double back, multi circuit transmission lines strain insulator yoke plate by-pass shunt bridging device | |
| CN105977860B (en) | A kind of replacement overhead transmission line composite cross-arm insulator device and method | |
| CN207490125U (en) | Double back, multi circuit transmission lines strain insulator yoke plate by-pass shunt bridging device | |
| CN103594988B (en) | 500kV transformer substation tubular busbar deflection correction method | |
| CN204144800U (en) | The special cross-arm card of a kind of ZML type tower | |
| CN205544113U (en) | Cross arm for transmission tower | |
| CN203352055U (en) | Electric pole grounding downlead lifting apparatus | |
| CN102358593A (en) | Iron tower gap propping device and preparation method thereof | |
| CN204011787U (en) | High voltage substation protective device | |
| CN203589426U (en) | Lifting device for mounting grounding wire hanging hook | |
| CN207234284U (en) | Pillar insulator replaces instrument | |
| CN201312079Y (en) | Clamping apparatus for live line replacement of suspended insulator in middle of 500KV untypical tangent tower via splicing method | |
| CN201674161U (en) | SZ type double-circuit straight line tower live replacement suspension insulator suspension wire fixture assembly | |
| CN207053023U (en) | Adjustable anti-disconnecting switch misses conjunction instrument | |
| CN202550447U (en) | Lightning arrester for 10kv distribution line | |
| CN207234282U (en) | On-load replaces the specific purpose tool of fuse switch |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20131211 |