CN102856838B - Replacement tools and replacement methods for tubular busbar post insulators - Google Patents
Replacement tools and replacement methods for tubular busbar post insulators Download PDFInfo
- Publication number
- CN102856838B CN102856838B CN201210320043.9A CN201210320043A CN102856838B CN 102856838 B CN102856838 B CN 102856838B CN 201210320043 A CN201210320043 A CN 201210320043A CN 102856838 B CN102856838 B CN 102856838B
- Authority
- CN
- China
- Prior art keywords
- pole
- tubular busbar
- hoop
- tubular
- insulator
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Insulators (AREA)
- Electric Cable Installation (AREA)
Abstract
Description
技术领域 technical field
本发明涉及一种管形母线支柱绝缘子更换设备,特别是一种管型母线支柱绝缘子更换工具及更换方法。 The present invention relates to a replacement device for tubular busbar post insulators, in particular to a replacement tool and replacement method for tubular busbar post insulators.
背景技术 Background technique
在很多变电所存在着管型母线,这种管型母线的支柱绝缘子绝缘爬距不能满足防污要求,且由于运行时间较长,近几来常发现支柱绝缘子有破裂等缺陷,因此需要对管形母线支柱绝缘子进行更换,但由于目前没有管型母线更换方面所需的作业工具和作业操作方法,管形母线支柱绝缘子更换工作一直未能得以实施。 There are tubular bus bars in many substations. The insulation creepage distance of post insulators of this tubular bus bar cannot meet the anti-pollution requirements, and due to the long running time, defects such as cracks in post insulators are often found in recent years. Therefore, it is necessary to The post insulators of tubular busbars should be replaced, but due to the lack of working tools and operation methods required for the replacement of tubular busbars, the replacement of post insulators of tubular busbars has not been implemented.
发明内容 Contents of the invention
本发明的目的在于克服现有技术的不足之处,而提供一种可实现管型母线支柱绝缘子更换的更换工具。 The object of the present invention is to overcome the disadvantages of the prior art, and provide a replacement tool capable of replacing tubular busbar post insulators.
本发明的另一目的还在于提供一种管型母线支柱绝缘子更换的更换方法。 Another object of the present invention is to provide a method for replacing tubular busbar post insulators.
一种管型母线支柱绝缘子更换工具,其结构要点在于:其包括有抱杆,在抱杆的底部连接有抱箍,抱箍与抱杆之间为可拆卸式的连接,连接时抱箍与抱杆之间铰接在一起,抱杆与抱箍横断面之间的夹角在0~360之间变化,在抱杆的中上部还设置有将抱杆固定在管型母线构架横梁上的夹具,在抱杆的顶端设置有两组以上的滑轮组,滑轮组与抱杆之间为活动拆卸式的连接,所述的滑轮组以抱杆的轴为转轴可围绕抱杆转动,所述的管型母线支柱绝缘子更换工具还包括有一根用于支撑管型母线的绝缘绳及一根用于吊装置绝缘子的绝缘绳。 A tool for replacing tubular busbar post insulators. The key points of its structure are: it includes a holding bar, and a holding hoop is connected to the bottom of the holding bar. The hoop and the holding bar are detachably connected. The poles are hinged together, and the angle between the pole and the cross section of the hoop varies from 0 to 360°, and there is also a fixture at the middle and upper part of the pole to fix the pole on the beam of the tubular busbar frame , more than two groups of pulleys are arranged on the top of the pole. The pulleys and the pole are connected in a detachable manner. The pulleys can rotate around the pole with the axis of the pole as the rotation axis. The tubular bus The Post Insulator Replacement Kit also includes an insulating rope for supporting the tubular busbar and an insulating rope for the hoisting insulator.
在使用时,管型母线支柱绝缘子更换工具的抱箍与滑轮组分别安装于抱杆的两端,而后将抱箍连接到管形母线的构架砼杆上部,将夹具连接到管型母线构架的横梁上,而后将两绝缘绳之一一端连接于管型母线上,另一端绕过滑轮组之一后与地面或构架横梁上的紧线器或葫芦相连,另一绳索则连接于绝缘子上,其同样绕杆抱杆顶端滑轮组中的另一组滑轮后与地面或横梁上的紧线器或葫芦相连从而实现绝缘子的更换。 When in use, the hoop and the pulley block of the tubular busbar post insulator replacement tool are respectively installed on both ends of the pole, and then the hoop is connected to the upper part of the concrete bar of the tubular busbar frame, and the clamp is connected to the beam of the tubular busbar frame Then connect one end of the two insulating ropes to the tubular busbar, and the other end goes around one of the pulley blocks and connects to the wire tensioner or hoist on the ground or the frame beam, and the other rope is connected to the insulator. Similarly, another set of pulleys in the top pulley set around the pole is connected with the wire tightener or hoist on the ground or the beam to realize the replacement of the insulator.
所述的滑轮组为羊角式的滑轮组,在两个羊角上分别并列设置有两组以上的滑轮。 The block of pulleys is a goat's horn type pulley block, and more than two groups of pulleys are arranged side by side on the two goat's horns. the
采用羊角式的滑轮组,可提高滑轮组的支撑力度,同时也可避免绕过滑轮组上的绳子发生打结缠绕现象。 The claw-type pulley block can increase the support strength of the pulley block, and at the same time, it can avoid the phenomenon of knotting and entanglement of the rope that goes around the pulley block.
所述的夹具包括两个U形的支架及连接两U形支架对应边的两连接片,在连接片的上下部设置有供U形支架的边穿过的沿着连接片长度方向延伸的长孔,在U形支架的端部设置有螺纹,两连接片分别穿过两U形支架的对应边后用螺母锁紧即可实现U形支架在管形母线构造横梁上的定位。 The clamp includes two U-shaped brackets and two connecting pieces connecting the corresponding sides of the two U-shaped brackets, and the upper and lower parts of the connecting piece are provided with a long length extending along the length direction of the connecting piece for the sides of the U-shaped bracket to pass through. The holes are provided with threads at the end of the U-shaped bracket, and the two connecting pieces respectively pass through the corresponding sides of the two U-shaped brackets and are locked with nuts to realize the positioning of the U-shaped bracket on the tubular busbar construction crossbeam.
在使用时,将U型支架呈上下位置的卡于抱杆上,而后再将上下支架分别由构架横梁的上、下表面穿过后,将两片的连接片分别连接上下U型支架的对应边后锁紧,即可实现将抱杆通过支架固定于构架的横梁上。 When in use, the U-shaped bracket is clamped on the pole in the up and down position, and then the upper and lower brackets are respectively passed through the upper and lower surfaces of the frame beam, and the two connecting pieces are respectively connected to the corresponding sides of the upper and lower U-shaped brackets. After locking, the pole can be fixed on the beam of the frame through the bracket.
当然所述的夹具也可以采用抱箍、或U形锁具等。 Of course, the clamp may also be a hoop or a U-shaped lock.
在抱杆上段的两侧间隔错位排列有两排的脚钉。 There are two rows of foot spikes arranged at intervals on both sides of the upper section of the pole.
在抱杆上段的两侧间隔错位排列脚钉方便作业人员由管形母线构造横梁处沿着该脚钉爬到抱杆的顶端。 The foot nails are arranged at intervals on both sides of the upper section of the pole so that the operator can climb to the top of the pole along the foot nails from the structural beam of the tubular bus bar.
所述的抱杆为长度可调节的抱杆。 The holding rod is a length-adjustable holding rod.
抱杆长度的调节为将抱杆由两段以上的杆件构成,各段之间或采用法兰加连接件进行连接,或相互旋接在一起。 The adjustment of the length of the holding pole is that the holding pole is composed of more than two sections of rods, and the sections are connected by flanges and connectors, or are screwed together.
用于支撑管型母线的绝缘绳为迪尼玛高强度绳索。 The insulating ropes used to support the tubular busbars are Dyneema high-strength ropes.
一种管型母线支柱绝缘子更换方法,其具体步骤为: A method for replacing tubular busbar post insulators, the specific steps of which are:
(1)将滑轮组安装于抱杆的顶端并组装好抱杆,将抱杆吊升到合适的位置; (1) Install the pulley block on the top of the pole and assemble the pole, and lift the pole to a suitable position;
(2) 将抱箍安装在管型母线构架砼杆顶部以下2~3米处安装好抱箍,并和抱杆连接好; (2) Install the hoop at 2 to 3 meters below the top of the concrete pole of the tubular busbar frame, install the hoop, and connect it to the pole;
(3) 调整好抱杆角度,将夹具在构架横梁上安装好; (3) Adjust the angle of the pole, and install the fixture on the frame beam;
(4)而后将一绝缘绳一端连接于管型母线上,将另一端绕过滑轮组中的一组后与地面或管型母线构架横梁上的紧线器或葫芦相连,将另一绝缘绳一端连接于绝缘子上,并将另一端绕过滑轮组另一组后另一端与地面或管型母线构架横染上的紧线器或葫芦相连; (4) Then connect one end of an insulating rope to the tubular busbar, bypass the other end of one of the pulley blocks and connect it to the ground or the wire tightener or hoist on the beam of the tubular busbar frame, and connect the other end of the insulating rope Connect to the insulator, and connect the other end to the ground or the wire tensioner or hoist on the horizontal dyeing of the tubular busbar frame after bypassing the other group of the pulley block;
(5) 后收紧葫芦或紧线器收紧支撑管形母线的绝缘绳,使支柱绝缘子支撑力向绳索转移,从而实现绝缘子的更换。 (5) Finally, tighten the hoist or wire tightener to tighten the insulating rope supporting the tubular busbar, so that the supporting force of the post insulator is transferred to the rope, thereby realizing the replacement of the insulator.
所述的滑轮组为羊角式滑轮组。 Described pulley block is a claw type pulley block.
综上所述的,本发明相比现有技术如下优点: In summary, compared with the prior art, the present invention has the following advantages:
本发明的管型母线支柱绝缘子更换工具及更换方法,利用变电站管形母线构架本身的结构特点,采用带万向连接器的抱箍作为抱杆支撑点将抱杆的一端固定于构架的砼杆上,并使用夹具与构架的横梁进行钢性固定,克服了变电所管形母线支柱绝缘子更换时管形母线无支撑点、绝缘子吊装困难等难题,可实现周围设备不停电更换管形母线支柱绝缘子,最大化地减小停电范围,填补了管形母线支柱绝缘子更换技术空白。 The replacement tool and replacement method for the tubular busbar pillar insulators of the present invention utilize the structural characteristics of the tubular busbar frame itself in the substation, and use the hoop with the universal connector as the pole support point to fix one end of the pole to the concrete pole of the frame The fixture and the beam of the frame are used for rigid fixation, which overcomes the problems of no support point for the tubular busbar and the difficulty in hoisting the insulator when the tubular busbar post insulator is replaced in the substation, and can realize the replacement of the tubular busbar post insulator for surrounding equipment without power failure , to minimize the scope of power outages, and to fill in the gap in the replacement technology of tubular busbar post insulators.
附图说明 Description of drawings
图1是本发明的抱箍结构示意图。 Figure 1 is a schematic diagram of the hoop structure of the present invention.
图2是羊角式滑轮组的结构示意图。 Fig. 2 is the structure schematic diagram of claw type pulley block.
图3是夹具的结构示意图。 Fig. 3 is a schematic diagram of the structure of the clamp.
图4是本发明的抱杆上段的结构示意图。 Figure 4 is a schematic structural view of the upper section of the pole of the present invention.
图5是本发明的管形母线支柱绝缘子更换工具的使用状态图。 Fig. 5 is a view of the use state of the tool for replacing tubular busbar post insulators of the present invention.
标号说明 1抱杆 11脚钉2抱箍3夹具31U形支架32连接片4羊角式滑轮组41滑轮。 Explanation of reference numerals 1 pole 11 foot nail 2 hoop 3 clamp 31 U-shaped bracket 32 connecting piece 4 claw-type pulley block 41 pulley.
具体实施方式 Detailed ways
下面结合实施例对本发明进行更详细的描述。 The present invention will be described in more detail below in conjunction with examples.
实施例1 Example 1
一种管型母线支柱绝缘子更换工具,其包括有抱杆1,在抱杆的底部连接有抱箍2,抱箍与抱杆之间为可拆卸式的连接,连接时抱箍与抱杆之间铰接在一起,抱杆与抱箍横断面之间的夹角在0~360之间变化,在抱杆的中上部还设置有将抱杆固定在管型母线构架横梁上的夹具3,在抱杆的顶端设置羊角式滑轮组,在两个羊角上分别并列设置有两组以上的滑轮41,羊角式滑轮组与抱杆之间为活动拆卸式的连接,所述的羊角式滑轮组以抱杆的轴为转轴可围绕抱杆转动,所述的管型母线支柱绝缘子更换工具还包括有一根用于支撑管型母线的绝缘绳及一根用于吊装置绝缘子的绝缘绳。所述的夹具为包括两个U形的支架及连接两U形支架31对应边的两连接片32,在连接片的上下部设置有供U形支架的边穿过的沿着连接片长度方向延伸的长孔,在U形支架的端部设置有螺纹,两连接片分别穿过两U形支架的对应边后用螺母锁紧即可实现U形支架在管形母线构造横梁上的定位。在抱杆上段的两侧间隔错位排列有两排的脚钉11。所述的抱杆为由两段构成,两段之间采用法兰进行连接。用于支撑管型母线的绝缘绳为迪尼玛高强度绳索。 A tubular busbar post insulator replacement tool, which includes a holding rod 1, and a holding hoop 2 is connected to the bottom of the holding rod. The connection between the holding hoop and the holding rod is detachable. They are hinged together, and the included angle between the pole and the cross section of the hoop varies between 0 and 360°. A clamp 3 for fixing the pole to the beam of the tubular busbar frame is also provided at the middle and upper part of the pole. The top of the pole is provided with a horn-type pulley block, and two or more sets of pulleys 41 are arranged side by side on the two horns. The shaft is a rotating shaft and can rotate around the pole. The tubular busbar support insulator replacement tool also includes an insulating rope for supporting the tubular busbar and an insulating rope for lifting the insulator. Described clamp is to comprise two U-shaped brackets and two connecting piece 32 that connects two U-shaped brackets 31 corresponding sides, is provided with for the limit of U-shaped bracket to pass through along the connecting piece length direction at the upper and lower parts of connecting piece. The extended long hole is provided with threads at the end of the U-shaped bracket, and the two connecting pieces respectively pass through the corresponding sides of the two U-shaped brackets and are locked with nuts to realize the positioning of the U-shaped bracket on the structural beam of the tubular busbar. Two rows of foot nails 11 are arranged at intervals on both sides of the upper section of the pole. The holding rod is composed of two sections, and the flanges are used to connect the two sections. The insulating ropes used to support the tubular busbars are Dyneema high-strength ropes.
本实施例未述部分与现有技术相同。 The parts not described in this embodiment are the same as the prior art.
实施例2 Example 2
一种管型母线支柱绝缘子更换方法,其具体步骤为: A method for replacing tubular busbar post insulators, the specific steps of which are:
(1) 将羊角式滑轮组安装于抱杆的顶端并组装好抱杆,将抱杆吊升到合适的位置; (1) Install the horn-type pulley block on the top of the pole and assemble the pole, and lift the pole to a suitable position;
(2)将抱箍安装在管型母线构架砼杆顶部以下2~3米处安装好抱箍,并和抱杆连接好; (2) Install the hoop at 2 to 3 meters below the top of the concrete pole of the tubular busbar frame, install the hoop, and connect it to the pole;
(3) 调整好抱杆角度,将夹具在构架横梁上安装好; (3) Adjust the angle of the pole, and install the fixture on the frame beam;
(4) 而后将一绝缘绳一端连接于管型母线上,将另一端绕过羊角式滑轮组中的一组后与地面或管型母线构架横梁上的紧线器或葫芦相连,将另一绝缘绳一端连接于绝缘子上,并将另一端绕过羊角式滑轮组另一组后另一端与地面或管型母线构架横染上的紧线器或葫芦相连; (4) Then connect one end of an insulating rope to the tubular busbar, and the other end goes around one of the claw-type pulley blocks, and then connects it to the ground or the wire tensioner or hoist on the beam of the tubular busbar frame, and then insulates the other end. One end of the rope is connected to the insulator, and the other end is passed around the other set of claw-type pulley blocks, and the other end is connected to the ground or the wire tensioner or hoist on the transverse dyeing of the tubular busbar frame;
(5)后收紧葫芦或紧线器收紧支撑管形母线的绝缘绳,使支柱绝缘子支撑力向绳索转移,从而实现绝缘子的更换。 (5) Finally, tighten the hoist or wire tensioner to tighten the insulating rope supporting the tubular busbar, so that the supporting force of the post insulator is transferred to the rope, thereby realizing the replacement of the insulator.
本实施例未述部分与实施例1相同。 The parts not described in this embodiment are the same as those in Embodiment 1.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201210320043.9A CN102856838B (en) | 2012-08-31 | 2012-08-31 | Replacement tools and replacement methods for tubular busbar post insulators |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201210320043.9A CN102856838B (en) | 2012-08-31 | 2012-08-31 | Replacement tools and replacement methods for tubular busbar post insulators |
Related Child Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201510095081.2A Division CN104682251A (en) | 2012-08-31 | 2012-08-31 | Replacement method of post insulators for tubular busbars |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN102856838A CN102856838A (en) | 2013-01-02 |
| CN102856838B true CN102856838B (en) | 2015-06-03 |
Family
ID=47403156
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201210320043.9A Active CN102856838B (en) | 2012-08-31 | 2012-08-31 | Replacement tools and replacement methods for tubular busbar post insulators |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN102856838B (en) |
Families Citing this family (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103779802B (en) * | 2014-01-07 | 2017-01-18 | 国网辽宁省电力有限公司本溪供电公司 | Handle structure of lever hoist |
| CN104201617B (en) * | 2014-08-13 | 2017-03-01 | 国家电网公司 | ± 800kV UHVDC Transmission Lines livewire work strain insulator hard tube mother's lift system |
| CN105672743A (en) * | 2016-03-22 | 2016-06-15 | 贵州电网有限责任公司输电运行检修分公司 | Light holding pole for assembling and disassembling of rush-repair tower assmebly |
| CN106410660A (en) * | 2016-08-09 | 2017-02-15 | 国网上海市电力公司 | Whole string tension insulator separation and recovery device at cross arm side of ultra-high voltage transmission line |
| CN106207855A (en) * | 2016-08-09 | 2016-12-07 | 国网上海市电力公司 | A kind of UHV transmission line whole string strain insulator exchange method |
| CN106169715A (en) * | 2016-08-09 | 2016-11-30 | 国网上海市电力公司 | A kind of UHV transmission line cross-arm side whole string strain insulator departs from and restoration methods |
| CN110635398B (en) * | 2019-09-04 | 2020-11-13 | 国网浙江省电力有限公司金华供电公司 | Installation device and installation method of air gap arrester |
| CN111262163B (en) * | 2020-02-28 | 2024-03-26 | 广东电网有限责任公司 | Special tool for overhauling isolating switch and overhauling method for replacing anchor ear without power failure |
| CN114552482B (en) * | 2022-03-18 | 2024-07-26 | 广东电网有限责任公司 | Insulator replacement tool |
| CN115621902B (en) * | 2022-11-03 | 2025-06-10 | 广东电网有限责任公司 | A ground wire suspension device |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201260050Y (en) * | 2008-08-08 | 2009-06-17 | 济宁供电公司 | 220KV bracket for replacing bus bar column insulator |
| CN101577401A (en) * | 2009-01-22 | 2009-11-11 | 维依埃龙源电工研究院有限公司 | Common tank type gas-insulated transmission line |
| CN102185269A (en) * | 2011-05-25 | 2011-09-14 | 安徽省电力公司池州供电公司 | Bracket for hoisting and fixing tubular bus and application thereof |
| CN202917892U (en) * | 2012-08-31 | 2013-05-01 | 国家电网公司 | Replacing tool for supporting insulator of tubular busbar |
-
2012
- 2012-08-31 CN CN201210320043.9A patent/CN102856838B/en active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201260050Y (en) * | 2008-08-08 | 2009-06-17 | 济宁供电公司 | 220KV bracket for replacing bus bar column insulator |
| CN101577401A (en) * | 2009-01-22 | 2009-11-11 | 维依埃龙源电工研究院有限公司 | Common tank type gas-insulated transmission line |
| CN102185269A (en) * | 2011-05-25 | 2011-09-14 | 安徽省电力公司池州供电公司 | Bracket for hoisting and fixing tubular bus and application thereof |
| CN202917892U (en) * | 2012-08-31 | 2013-05-01 | 国家电网公司 | Replacing tool for supporting insulator of tubular busbar |
Also Published As
| Publication number | Publication date |
|---|---|
| CN102856838A (en) | 2013-01-02 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102856838A (en) | Replacement tools and replacement methods for tubular busbar post insulators | |
| KR101579183B1 (en) | Apparatus for exchanging distribution line applied to the processing of distribution line replacement | |
| CN104505766B (en) | The instrument and method of a kind of charged for replacement transformer station 500kV strain insulator strings | |
| CN102231492A (en) | Multifunctional suspension insulator string cross arm side hardware fitting replacement fixture | |
| CN105071296A (en) | Structurally-improved high-voltage distribution line rod pole-mounted line hoisting device | |
| CN102661057B (en) | Power angle tower pull leg main material changing method and special main material clamp | |
| CN204663121U (en) | Packaged type insulating supporting line bar | |
| CN202917892U (en) | Replacing tool for supporting insulator of tubular busbar | |
| CN102664377B (en) | Double-cross arm assembler for single lever and double-cross arm mounting method | |
| CN103594976B (en) | Combination stringing instrument for line conductor stringing | |
| CN102946065B (en) | Employing electric substation pipe bus bar column insulator more changing device realizes the method for post insulator replacing | |
| CN101931195B (en) | Turn buckle typed steplessly adjustable phase-to-phase spacer bracket | |
| CN209456003U (en) | Aerial earth wire installs lifting device | |
| CN203596547U (en) | High voltage insulator suspension device | |
| CN102916372B (en) | 10kV multi-circuit lines on the same pole mesophase spherule wire lifting instrument | |
| CN204179569U (en) | A kind of sister block wire grip of electric transmission line erection | |
| CN104682251A (en) | Replacement method of post insulators for tubular busbars | |
| CN105811316A (en) | Crossing line-passing apparatus for overhead conductor | |
| CN202749781U (en) | Three-wire respective puling type wind deflection prevention structure of power transmission line | |
| CN101232158B (en) | Equipotential operating curve ladder | |
| CN105470862A (en) | Span construction equipment of high-speed rail under operation | |
| CN202578116U (en) | Single-person on-pole assembler for dual-fan cross arm | |
| CN205137006U (en) | Portable hank mill is with installation stores pylon | |
| CN103628728B (en) | A kind of for electric tower firm support structure | |
| CN210013548U (en) | A kind of tensioning device for cable-stayed wire of power distribution network laying utility pole |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant |