CN109183805A - A kind of prefabricated foundation pit enclosure system and its construction method - Google Patents

A kind of prefabricated foundation pit enclosure system and its construction method Download PDF

Info

Publication number
CN109183805A
CN109183805A CN201811004049.9A CN201811004049A CN109183805A CN 109183805 A CN109183805 A CN 109183805A CN 201811004049 A CN201811004049 A CN 201811004049A CN 109183805 A CN109183805 A CN 109183805A
Authority
CN
China
Prior art keywords
foundation pit
prefabricated
support
construction
metal component
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811004049.9A
Other languages
Chinese (zh)
Other versions
CN109183805B (en
Inventor
杨德春
裴行凯
史海欧
农兴中
刘健美
王建
麦家儿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Metro Design and Research Institute Co Ltd
Original Assignee
Guangzhou Metro Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Metro Design and Research Institute Co Ltd filed Critical Guangzhou Metro Design and Research Institute Co Ltd
Priority to CN201811004049.9A priority Critical patent/CN109183805B/en
Publication of CN109183805A publication Critical patent/CN109183805A/en
Application granted granted Critical
Publication of CN109183805B publication Critical patent/CN109183805B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits

Abstract

The invention discloses a kind of prefabricated foundation pit enclosure systems comprising foundation pit two sides is arranged in for bearing the soil-baffling structure of foundation pit transverse load and the support construction for balancing transverse load suffered by soil-baffling structure;Soil-baffling structure includes several prefabricated metal components, and the two sides of prefabricated metal component are provided with connector, are connected by joinery and its construction between adjacent prefabricated metal component to constitute continuous wall;Support construction includes several precast support components, and the both ends of precast support component are provided with interconnecting piece, the sliding groove slided up and down for interconnecting piece is provided on prefabricated metal component, fixing piece is provided between interconnecting piece and sliding groove.The invention also discloses a kind of construction methods of prefabricated foundation pit enclosure system.For the present invention, not only design strength is high, and it is convenient to set up, and construction quality is stablized, and highly shortened duration, and efficient economizing, environmentally protective.

Description

A kind of prefabricated foundation pit enclosure system and its construction method
Technical field
The invention belongs to foundation pit enclosure structure technical fields, and in particular to a kind of prefabricated foundation pit enclosure system and its construction Method.
Background technique
Foundation pit enclosure structure is mainly made of soil-baffling structure and support construction.Wherein, soil-baffling structure receiving excavation of foundation pit unloads Lateral water pressure and soil pressure caused by lotus, and this pressure is transmitted to support system, foundation pit enclosure structure is to stablize foundation pit A kind of interim soil-baffling structure system of construction.The common form of soil-baffling structure has cement soil wall, steel sheet pile, campshed barricade, underground Diaphragm wall etc., support construction is based on bracing members, concrete support etc..Cement soil wall, steel sheet pile are primarily adapted for use in excavation of foundation pit Shallow foundation hole within depth about 6m, restricted application.Therefore, for deep-foundation pit engineering, mainly connected with campshed barricade and underground Based on continuous wall.
Campshed building enclosure and underground continuous wall-enclosure structure construction technology are both needed to first in ground grooving, then will on the ground The steel reinforcement cage processed is put in groove inlet section, is carried out underwater concrete using conduit and is poured, complete unit wall section (or Stake), subsequent wall section (or stake) of then successively constructing.Campshed building enclosure can increase waterproof between piles measure, diaphram wall knot Structure between each wall section due to utilizing specific connector to be connected with each other, and i.e. cocoa forms continuous reinforced concrete wall together for itself Therefore wall can both realize earth-retaining, water retaining function.But, continuous underground wall structure has better globality, has It preferably intercepts water, antiseepage, load-bearing, the functions such as water blocking.
After the completion of soil-baffling structure, starts to excavate downwards from ground, digs to designed elevation, need to first perform inner supporting structure, After completing inner supporting structure, it can continue to excavate downwards, if any multiple tracks inner supporting structure, then after being excavated to respective support absolute altitude, Be both needed to first set up support construction, after excavated, until be excavated to substrate absolute altitude.It has the following problems:
1, the binding construction process of soil-baffling structure and concrete inner supporting structure steel reinforcement cage is cumbersome, take a long time, manually at This height and construction quality is unstable;
2, need to be after cast-in-place concrete support and reaches design strength after concrete inner supporting structure is set up, then carry out next The excavation of layer soil body, the process take a long time;
Although 3, bracing members reach design strength after can setting up, bracing members are not so good as concrete support, Hen Duoshi It waits bracing members and is unsatisfactory for requirement of strength design;
4, main structure returns and builds the stage, and pair of interior support structure is needed successively to remove from bottom to up, and the process is time-consuming and laborious, and props up After support is removed, it may appear that soil-baffling structure and the biggish controlled load case of support construction stress.
Summary of the invention
In order to overcome the above technical defects, the first object of the present invention is there is provided a kind of prefabricated foundation pit enclosure system, By using prefabricated metal component and precast support component, not only design strength is high, and it is convenient to set up, and construction quality is stablized, greatly Ground shortens duration, and efficient economizing, environmentally protective.
To solve the above-mentioned problems, the present invention is achieved by following technical scheme:
A kind of prefabricated foundation pit enclosure system, including foundation pit two sides are arranged in for bearing the gear of the foundation pit transverse load Soil structure and support construction for balancing transverse load suffered by the soil-baffling structure;
The soil-baffling structure includes several prefabricated metal components, and the two sides of the prefabricated metal component are provided with connection Mouthful, by connecting the connector to constitute continuous wall between the adjacent prefabricated metal component;
The support construction includes several precast support components, and the both ends of the prefabricated native supporting member are provided with connection Portion is provided with the sliding groove slided up and down for the interconnecting piece, the interconnecting piece and the sliding on the prefabricated metal component Fixing piece is provided between slot.
Further, the prefabricated metal component is rectangular steel plates, and the rectangular steel plates are perpendicular towards the side of the foundation pit Directly it is provided with several sliding grooves arranged in parallel;The bottom of the foundation pit is arranged in the bottom end insertion of the rectangular steel plates Portion.
Further, connector described in the side of the prefabricated metal component is the fourth of the twelve Earthly Branches mouthful, and connector described in the other side is tenon Head, the adjacent connector are connected by joinery and its construction to constitute the continuous wall.
Further, the fixing piece includes bolt, bolt collar, and the bolt collar is preset in the prefabricated metal structure In part;Several first connecting holes are provided on the sliding groove, the interconnecting piece is provided with corresponding with first connecting hole Second connecting hole, the second connecting hole, first connecting hole described in the screw bolt passes are carried out into the bolt collar It is fixed.
Further, the precast support component is steel reinforced concrete supporting member, several steel reinforced concrete supports Component is arranged in parallel on the sliding groove.
Further, the precast support component includes support middle part, and the support middle part includes core steel part and pours The both ends of the core steel part are arranged in concrete around the core steel part, the interconnecting piece.
Further, the interconnecting piece includes fixation steel plate, type steel skeleton;The fixation steel plate passes through the type steel skeleton It is connect in the middle part of the support.
Further, the concreting is in cuboid, and the surrounding of the concrete is embedded with several stiffeners.
In order to overcome the above technical defects, there is provided a kind of prefabricated foundation pit enclosure systems for the second object of the present invention Construction method, the construction method is simple and efficient to handle, and the construction time is short.
To solve the above-mentioned problems, the present invention is achieved by following technical scheme:
A kind of construction method of prefabricated foundation pit enclosure system, comprising the following steps:
S1, the placing groove constructed for placing the prefabricated metal component, wherein the placing groove carries out mud after excavation Slurry pours, and to form mud off, or does not excavate the placing groove, directlys adopt and applies the mode of mixing pile and carry out stirring for the soil body Reinforcing is mixed, the insertion prefabricated metal component before soil mass consolidation initial set;
S2, the prefabricated metal lifting component is entered in the placing groove, concreting is carried out in the placing groove, Then the adjacent placing groove is excavated, the adjacent prefabricated metal component is transferred, passes through between the adjacent prefabricated metal component The connector is attached, then carries out concreting in the adjacent placing groove, and gradually construction forms described continuous Wall;
The soil body in S3, excavation pit is to first of support construction absolute altitude, by the interconnecting piece edge of the precast support component The sliding groove slid at first of support construction absolute altitude from top to bottom, and fixed by the fixing piece;
S4, continue to excavate the soil body in the foundation pit to second support construction absolute altitude, described first is supported The precast support member slide in structural elevation is consolidated at the second support construction absolute altitude, and through the fixing piece It is fixed, then the precast support component is newly slid at first of support construction absolute altitude on the sliding groove, and passes through institute Fixing piece is stated to fix;
S5, step S3 and step S4, the prefabricated branch successively constructed on each road support construction absolute altitude from top to bottom are repeated Component is supportted, then proceedes to excavate the soil body in the foundation pit, until substrate absolute altitude;
S6, main structure bottom plate is performed, main structure of successively constructing from bottom to up, the precast support component is with described The layer-by-layer construction of main structure is gradually jacked up upwards, until the main structure construction is completed.
Further, the precast support component is risen or fallen by jack, and the jack is arranged in institute State the over and under of interconnecting piece.
Compared with prior art, the beneficial effects of the present invention are:
(1) a kind of prefabricated foundation pit enclosure system provided by the invention, including setting are used to bear foundation pit in foundation pit two sides The soil-baffling structure of transverse load and support construction for balancing transverse load suffered by soil-baffling structure;By using several prefabricated Metal component forms soil-baffling structure, can be segmented prefabricated processing in the factory, reduce welding at the construction field (site), can effectively solve The steel reinforcement cage construction process of certainly traditional diaphram wall is complicated, take a long time, high labor cost and construction quality are unstable etc. lacks Point;By using precast support component form support construction, have compared with high bearing capacity and with support with the characteristics of;By Sliding groove, fixing piece are set on prefabricated metal component, so that precast support component can arbitrarily adjust height in sliding groove, And remove conveniently, it is reusable.Not only design strength is high for the prefabricated foundation pit enclosure system, and it is convenient to set up, and construction quality is steady It is fixed, it highly shortened duration, and efficient economizing, it is environmentally protective.
(2) construction method of prefabricated foundation pit enclosure system of the present invention, the construction method is simple and efficient to handle, applies It is short between working hour.
Detailed description of the invention
Technical solution in order to illustrate the embodiments of the present invention more clearly, below will be to needed in embodiment description Attached drawing is briefly described, it should be apparent that, drawings in the following description are some embodiments of the invention, general for this field For logical technical staff, without creative efforts, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is the preferred structure schematic diagram of prefabricated foundation pit enclosure system of the present invention;
Fig. 2 is the structural schematic diagram of prefabricated metal component of the present invention;
Fig. 3 is the top view of prefabricated metal component of the present invention;
Fig. 4 is the structural schematic diagram of precast support component of the present invention;
Fig. 5 is the cross-sectional view of interconnecting piece of the present invention;
Fig. 6 is the cross-sectional view in the middle part of support of the present invention.
Description of symbols:
1, soil-baffling structure;11, prefabricated metal component;111, sliding groove;1111, the first connecting hole;112, bolt collar; 113, tenon;114, the fourth of the twelve Earthly Branches mouthful;2, support construction;21, precast support component;211, interconnecting piece;2111, the second connecting hole;2112 Fixation steel plate;2113, type steel skeleton;212, support middle part;2121, core steel part;2122, stiffener;2123, concrete; 3, main structure bottom plate;4, the soil body;5, placing groove.
Specific embodiment
Hereinafter, preferred embodiments of the present invention will be described with reference to the accompanying drawings, it should be understood that preferred reality described herein Apply example only for the purpose of illustrating and explaining the present invention and is not intended to limit the present invention.
Embodiment 1
Present embodiment discloses a kind of prefabricated foundation pit enclosure systems, and as shown in figures 1 to 6, including setting is used in foundation pit two sides In the soil-baffling structure 1 and support construction 2 for balancing transverse load suffered by soil-baffling structure 1 that bear foundation pit transverse load;
Soil-baffling structure 1 includes several prefabricated metal components 11, and the two sides of prefabricated metal component 11 are provided with connector, phase By connection connector to constitute continuous wall between adjacent prefabricated metal component 11;
Support construction 2 includes several precast support components 21, and the both ends of precast support component 21 are provided with interconnecting piece 211, the sliding groove 111 slided up and down for interconnecting piece 211, interconnecting piece 211 and sliding groove 111 are provided on prefabricated metal component 11 Between be provided with fixing piece.
In the present embodiment, prefabricated metal component 11 is rectangular steel plates, and the side of rectangular steel plates towards foundation pit is vertically arranged There are several sliding grooves 111 arranged in parallel;The bottom of foundation pit is arranged in the bottom end insertion of rectangular steel plates;Prefabricated metal component 11 use rectangular steel plates, reduce welding at the construction field (site), and it is quick that construction is more convenient.
In the present embodiment, the side connector of prefabricated metal component 11 is the fourth of the twelve Earthly Branches mouthful 114, and other side connector is tenon 113, adjacent connector is connected by joinery and its construction to constitute continuous wall;The structure of connector designs, and reduces scene to pre- The welding of metal component 11 processed, more saves the time.
In the present embodiment, fixing piece includes bolt, bolt collar 112, and several first connections are provided on sliding groove 111 Hole 1111, interconnecting piece 211 are provided with second connecting hole 2111 corresponding with the first connecting hole 1111, and screw bolt passes second connect Connect hole 2111, the first connecting hole 1111 is fixed into bolt collar 112;First connecting hole 1111, the second connecting hole 2111, The design of the structure of bolt and bolt collar 112, is more conducive between precast support component 21 and prefabricated metal component 11 Connection, and facilitate the dismounting of precast support component 21, it is reusable after dismounting to arrive other engineerings, cost is both reduced, Also building waste is not generated, it is environmentally protective.
In the present embodiment, precast support component 21 is steel reinforced concrete supporting member, and several steel reinforced concretes support structure Part is arranged in parallel on sliding groove 111;The structure of sliding groove 111 and steel reinforced concrete supporting member design, so that fashioned iron Concrete support component can be moved up and down in the vertical direction of sliding groove 111, and large carrying capacity.
In the present embodiment, precast support component 21 includes support middle part 212, and support middle part 212 includes core steel part 2121 and the concrete 2123 that is cast in around core steel part 2121, interconnecting piece 211 both ends of core steel part 2121 are set;Even The structure design of socket part 211 and support middle part 212, forms the two whole, can bear the institute of precast support component 21 jointly Have internal force, and have the characteristics that concrete support compared with high bearing capacity and bracing members with support with.
In the present embodiment, interconnecting piece 211 includes fixation steel plate 2112, type steel skeleton 2113;Fixation steel plate 2112 passes through It is connect in the middle part of type steel skeleton 2113 and the support;Fixation steel plate 2112 and type steel skeleton 2113 are welded into an entirety, can Realize the transmitting between internal force.
In the present embodiment, concrete 2123 is poured in cuboid, and the surrounding of concrete 2123 is embedded with several reinforcement steel Muscle 2122;The design of stiffener 2122 is capable of increasing the bearing capacity at support middle part 212.
It is designed based on above-mentioned structure, the specific step of the construction method of prefabricated foundation pit enclosure system described in the present embodiment It is rapid as follows:
S1, the placing groove 5 constructed for placing prefabricated metal component 11, wherein placing groove 5 is to excavate paragraph by paragraph, placing groove 5 It carries out mud after excavation to pour, to form mud off;
S2, prefabricated metal component 11 is lifted in placing groove 5, concreting is carried out in placing groove 5, is then excavated It is placed adjacent slot 5, adjacent prefabricated metal component 11 is transferred, is attached between adjacent prefabricated metal component 11 by connector, Concreting is carried out being placed adjacent in slot 5 again, and gradually construction forms continuous wall;
Specifically, prefabricated metal component 11 is rectangular steel plates, pass through the vertical insertion fourth of the twelve Earthly Branches of tenon 113 between adjacent rectangle steel plate Mouth 114 is attached, then forms steel reinforced concrete structure diaphram wall after carrying out concreting in placing groove 5;
4 to first support construction absolute altitude of the soil body in S3, excavation pit, by the interconnecting piece 211 of precast support component 21 It slides at first of support construction absolute altitude along sliding groove 111, and is fixed by fixing piece from top to bottom;
Specifically, precast support component 21 is steel reinforced concrete supporting member, in the connection of steel reinforced concrete supporting member The over and under in portion 211 is mounted on hydraulic jack, and steel reinforced concrete supporting member can be carried out by hydraulic jack It rises or falls;The built-in bolt sleeve 112 in prefabricated metal component 11, the second connecting hole of screw bolt passes 2111, first Connecting hole 1111 is fixed into bolt collar 112;
The soil body 4 in S4, continuation excavation pit, will be on first of support construction absolute altitude to second support construction absolute altitude Precast support component 21 slides at second support construction absolute altitude, and is fixed by fixing piece, then newly slides on sliding groove 111 Enter at 21 to first support construction absolute altitude of precast support component, and is fixed by fixing piece;
S5, step S3 and step S4, the precast support structure successively constructed on each road support construction absolute altitude from top to bottom are repeated Part 21 then proceedes to the soil body 4 in excavation pit, until substrate absolute altitude;
S6, main structure bottom plate 3 is performed, main structure of successively constructing from bottom to up, precast support component 21 is with main body The layer-by-layer construction of structure is gradually jacked up upwards, until main structure construction is completed.
Embodiment 2
Present embodiment discloses a kind of prefabricated foundation pit enclosure system, structure is same as Example 1.
The construction method of prefabricated foundation pit enclosure system described in the present embodiment the difference from embodiment 1 is that:
In step sl, do not excavate placing groove 5, directly adopt apply mixing pile mode carry out the soil body stirring reinforce, Prefabricated metal component 11 is inserted into before soil mass consolidation initial set.
Remaining step is same as Example 1.
The above described is only a preferred embodiment of the present invention, be not intended to limit the present invention in any form, therefore Without departing from the technical solutions of the present invention, according to the technical essence of the invention it is to the above embodiments it is any modification, Equivalent variations and modification, all of which are still within the scope of the technical scheme of the invention.

Claims (10)

1. a kind of prefabricated foundation pit enclosure system, it is characterised in that:
Including foundation pit two sides are arranged in for bearing the soil-baffling structure of the foundation pit transverse load and for balancing the earth-retaining knot The support construction of transverse load suffered by structure;
The soil-baffling structure includes several prefabricated metal components, and the two sides of the prefabricated metal component are provided with connector, phase By connecting the connector to constitute continuous wall between the adjacent prefabricated metal component;
The support construction includes several precast support components, and the both ends of the prefabricated native supporting member are provided with interconnecting piece, Be provided with the sliding groove slided up and down for the interconnecting piece on the prefabricated metal component, the interconnecting piece and the sliding groove it Between be provided with fixing piece.
2. prefabricated foundation pit enclosure system according to claim 1, it is characterised in that: the prefabricated metal component is rectangle Steel plate, the side of the rectangular steel plates towards the foundation pit are vertically arranged with several sliding grooves arranged in parallel;Institute The bottom of the foundation pit is arranged in the bottom end insertion for stating rectangular steel plates.
3. prefabricated foundation pit enclosure system according to claim 1, it is characterised in that: the side of the prefabricated metal component The connector is the fourth of the twelve Earthly Branches mouthful, and connector described in the other side is tenon, and the adjacent connector is connected by joinery and its construction to constitute The continuous wall.
4. described in any item prefabricated foundation pit enclosure systems according to claim 1~3, it is characterised in that: the fixing piece packet Bolt, bolt collar are included, the bolt collar is preset in the prefabricated metal component;Several are provided on the sliding groove One connecting hole, the interconnecting piece are provided with the second connecting hole corresponding with first connecting hole, the screw bolt passes institute State the second connecting hole, first connecting hole enters the bolt collar and is fixed.
5. described in any item prefabricated foundation pit enclosure systems according to claim 1~3, it is characterised in that: the precast support Component is steel reinforced concrete supporting member, and several steel reinforced concrete supporting members are arranged in parallel in the sliding groove On.
6. described in any item prefabricated foundation pit enclosure systems according to claim 1~3, it is characterised in that: the precast support Component includes support middle part, and the support middle part includes core steel part and the concrete being cast in around the core steel part, institute State the both ends that the core steel part is arranged in interconnecting piece.
7. prefabricated foundation pit enclosure system according to claim 6, it is characterised in that: the interconnecting piece includes fixed steel Plate, type steel skeleton;The fixation steel plate in the middle part of the type steel skeleton and the support by connecting.
8. prefabricated foundation pit enclosure system according to claim 6, it is characterised in that: the concreting is in rectangle Body, the surrounding of the concrete are embedded with several stiffeners.
9. a kind of construction method of prefabricated foundation pit enclosure systems described in any item according to claim 1~8, feature exist In, comprising the following steps:
S1, the placing groove constructed for placing the prefabricated metal component, wherein the placing groove carries out mud after excavation and pours It builds, to form mud off, or does not excavate the placing groove, directly adopt and apply the mode of mixing pile and carry out the stirring of the soil body and add Gu the insertion prefabricated metal component before soil mass consolidation initial set;
S2, the prefabricated metal lifting component is entered in the placing groove, concreting is carried out in the placing groove, then The adjacent placing groove is excavated, the adjacent prefabricated metal component is transferred, passes through between the adjacent prefabricated metal component described Connector is attached, then carries out concreting in the adjacent placing groove, and gradually construction forms the continuous wall;
The soil body in S3, excavation pit is to first of support construction absolute altitude, by the interconnecting piece of the precast support component along institute It states sliding groove to slide into from top to bottom at first of support construction absolute altitude, and is fixed by the fixing piece;
S4, continue to excavate the soil body in the foundation pit to second support construction absolute altitude, by first of support construction The precast support member slide on absolute altitude is fixed at the second support construction absolute altitude, and through the fixing piece, The precast support component is newly slid on the sliding groove again at first of support construction absolute altitude, and by described solid Determine part to fix;
S5, step S3 and step S4, the precast support structure successively constructed on each road support construction absolute altitude from top to bottom are repeated Part then proceedes to excavate the soil body in the foundation pit, until substrate absolute altitude;
S6, main structure bottom plate is performed, main structure of successively constructing from bottom to up, the precast support component is with the main body The layer-by-layer construction of structure is gradually jacked up upwards, until the main structure construction is completed.
10. the construction method of prefabricated foundation pit enclosure system according to claim 9, it is characterised in that: the prefabricated branch Support component is risen or fallen by jack, and the over and under of the interconnecting piece is arranged in the jack.
CN201811004049.9A 2018-08-30 2018-08-30 Prefabricated foundation pit bracing system and construction method thereof Active CN109183805B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811004049.9A CN109183805B (en) 2018-08-30 2018-08-30 Prefabricated foundation pit bracing system and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811004049.9A CN109183805B (en) 2018-08-30 2018-08-30 Prefabricated foundation pit bracing system and construction method thereof

Publications (2)

Publication Number Publication Date
CN109183805A true CN109183805A (en) 2019-01-11
CN109183805B CN109183805B (en) 2023-11-24

Family

ID=64917503

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811004049.9A Active CN109183805B (en) 2018-08-30 2018-08-30 Prefabricated foundation pit bracing system and construction method thereof

Country Status (1)

Country Link
CN (1) CN109183805B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111206592A (en) * 2020-01-15 2020-05-29 天津大学 Construction method of prefabricated steel-concrete combined support foundation pit supporting structure
CN114411760A (en) * 2022-02-21 2022-04-29 中国建筑第八工程局有限公司 Ground wall pre-buried slideway type steel support foundation pit supporting system and construction method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101418572A (en) * 2008-10-17 2009-04-29 上海隧道工程股份有限公司 Pit construction method employing precast support
CN102330430A (en) * 2011-07-18 2012-01-25 上海市隧道工程轨道交通设计研究院 Construction method for prefabricated building enclosure of deep foundation pit in low-temperature environment construction
CN202559375U (en) * 2012-04-12 2012-11-28 东南大学 H-shaped steel underground diaphragm wall base pit support structure
CN104631433A (en) * 2015-01-13 2015-05-20 金天德 Box-shaped steel plate meshing continuous wall structure system and construction technology
CN107654079A (en) * 2017-09-28 2018-02-02 成都科创城科技有限公司 A kind of Combined barrier
KR101862208B1 (en) * 2017-11-13 2018-05-29 윤택규 Earth retaining wall structure and constructuon mothod thereof
CN209293036U (en) * 2018-08-30 2019-08-23 广州地铁设计研究院股份有限公司 A kind of prefabricated foundation pit enclosure system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101418572A (en) * 2008-10-17 2009-04-29 上海隧道工程股份有限公司 Pit construction method employing precast support
CN102330430A (en) * 2011-07-18 2012-01-25 上海市隧道工程轨道交通设计研究院 Construction method for prefabricated building enclosure of deep foundation pit in low-temperature environment construction
CN202559375U (en) * 2012-04-12 2012-11-28 东南大学 H-shaped steel underground diaphragm wall base pit support structure
CN104631433A (en) * 2015-01-13 2015-05-20 金天德 Box-shaped steel plate meshing continuous wall structure system and construction technology
CN107654079A (en) * 2017-09-28 2018-02-02 成都科创城科技有限公司 A kind of Combined barrier
KR101862208B1 (en) * 2017-11-13 2018-05-29 윤택규 Earth retaining wall structure and constructuon mothod thereof
CN209293036U (en) * 2018-08-30 2019-08-23 广州地铁设计研究院股份有限公司 A kind of prefabricated foundation pit enclosure system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111206592A (en) * 2020-01-15 2020-05-29 天津大学 Construction method of prefabricated steel-concrete combined support foundation pit supporting structure
CN114411760A (en) * 2022-02-21 2022-04-29 中国建筑第八工程局有限公司 Ground wall pre-buried slideway type steel support foundation pit supporting system and construction method thereof

Also Published As

Publication number Publication date
CN109183805B (en) 2023-11-24

Similar Documents

Publication Publication Date Title
CN105756091B (en) A kind of Metro station excavation construction method of control adjacent building composition deformation
CN105863042A (en) All-steel structure building and construction method thereof
CN105545323A (en) Construction method for open cut tunnel lining
CN208251372U (en) A kind of assembled steel reinforced concrete shear force wall
CN109183805A (en) A kind of prefabricated foundation pit enclosure system and its construction method
CN108517883A (en) Opening locked steel tube pilecofferdam and its construction method
CN108086341A (en) Assembled is adjustable basis
CN108643219A (en) A kind of assembled transmission line of electricity anchor rod static pressure Minitype pile foundation and its construction method
CN209293036U (en) A kind of prefabricated foundation pit enclosure system
CN103122642B (en) Construction method of vertical post support change
CN107443550A (en) Prefabricated cushion cap template and its installation method
CN109826224A (en) A kind of sinking well protection wall digging foundation and its construction method for desert region iron tower of power transmission line
CN111350187A (en) Template system suitable for large-diameter manual hole digging annular foundation pile and construction method
CN205399397U (en) A vertical support structure of variable cross section wall formula for reverse construction method
US20080006003A1 (en) Method of Constructing Strip Foundations with Longitudinal Socket
CN109736295B (en) Vertical supporting system of building structure and construction method thereof
CN104060616B (en) A kind of construction formwork of retaining engineering and construction method
WO2023173676A1 (en) Space truss support platform, system and method for super-deep slurry wall
CN110004942A (en) A kind of large span integral supporting structure and its construction method
CN113266038B (en) Construction method for excavating underground building in foundation pit
JPS62288269A (en) Method for extending underground stair of building
CN209723014U (en) A kind of sinking well protection wall digging foundation for desert region iron tower of power transmission line
CN210459229U (en) Support assembled in deep basal pit and trade and prop construction frock
CN110093945A (en) A kind of installation elevator steel construction pit
DK152442B (en) PROCEDURE FOR MAKING FOUNDATIONS FOR A CONSTRUCTION AND FOUNDATION BLOCK FOR USING THE PROCEDURE

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant