CN110093945A - A kind of installation elevator steel construction pit - Google Patents

A kind of installation elevator steel construction pit Download PDF

Info

Publication number
CN110093945A
CN110093945A CN201910420643.4A CN201910420643A CN110093945A CN 110093945 A CN110093945 A CN 110093945A CN 201910420643 A CN201910420643 A CN 201910420643A CN 110093945 A CN110093945 A CN 110093945A
Authority
CN
China
Prior art keywords
frame body
pit
construction
outer frame
civil engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910420643.4A
Other languages
Chinese (zh)
Other versions
CN110093945B (en
Inventor
牟堂轩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING FUJI ELEVATOR Co Ltd
Original Assignee
CHONGQING FUJI ELEVATOR Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING FUJI ELEVATOR Co Ltd filed Critical CHONGQING FUJI ELEVATOR Co Ltd
Priority to CN201910420643.4A priority Critical patent/CN110093945B/en
Publication of CN110093945A publication Critical patent/CN110093945A/en
Application granted granted Critical
Publication of CN110093945B publication Critical patent/CN110093945B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/44Foundations for machines, engines or ordnance

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a kind of installation elevator steel construction pits, it is characterized in that, including ground of constructing, foundation pile, metalling, steel bar layer, steel construction frame, first concrete layer, second concrete layer and filling soil layer, ground of constructing has civil engineering pit, civil engineering pit is located on construction ground, the quantity of foundation pile is multiple, foundation pile insertion construction ground, and it is at least partially disposed at the lower section of civil engineering pit, metalling is laid on the bottom of civil engineering pit, steel bar layer is laid on the top of metalling, and it is located in civil engineering pit, steel construction frame and steel bar layer are welded, and it is located in civil engineering pit, steel construction frame includes outer frame body and internal frame body, internal frame body is located at the inside of outer frame body, first concrete layer is filled between outer frame body and internal frame body, second concrete layer is cast in steel bar layer, filling soil layer is filled between civil engineering pit and outer frame body.The installation elevator steel construction pit construction efficiency is high, the construction time is short.

Description

A kind of installation elevator steel construction pit
Technical field
The present invention relates to the technical fields more particularly to a kind of installation elevator steel construction pit of elevator pit construction.
Background technique
Present market aging blocks install the well pit of elevator additional, and most of is after choosing position, and earth excavation, excavation reaches one After fixed depth, according to geological conditions, piling or directly pouring reinforcement mixed mud pit are determined.This just needs first to pour mixed mud Native bottom plate, then carpenter do template, then pour pit wallboard again, cause construction efficiency low.
Summary of the invention
The purpose of the present invention is to provide a kind of installation elevator steel construction pits, it is intended to solve aging blocks in the prior art and install additional Elevator pit construction efficiency is low, construction time too long technical problem.
To achieve the above object, the present invention provides a kind of installation elevator steel construction pits, including construction ground, basis Stake, metalling, steel bar layer, steel construction frame, the first concrete layer, the second concrete layer and filling soil layer, the construction ground tool There is civil engineering pit, the civil engineering pit is located on construction ground, and the quantity of the foundation pile is multiple, foundation pile insertion institute Construction ground is stated, and is at least partially disposed at the lower section of the civil engineering pit, the metalling is laid on the bottom of the civil engineering pit Portion, the steel bar layer is laid on the top of the metalling, and is located in the civil engineering pit, the steel construction frame and the steel The welding of muscle layer, and be located in the civil engineering pit, the steel construction frame includes outer frame body and internal frame body, and the internal frame body is located at institute The inside of outer frame body is stated, first concrete layer is filled between the outer frame body and the internal frame body, second coagulation Soil layer is cast in the steel bar layer, and the filling soil layer is filled between the civil engineering pit and the outer frame body.
Wherein, the metalling with a thickness of 150mm.
Wherein, the steel bar layer is made of two layers of steel ring being arranged successively.
Wherein, the outer frame body has the first male and fomale(M&F), and first male and fomale(M&F) is located at the inner circumferential side of the outer frame body, institute Internal frame body is stated with the second male and fomale(M&F), second male and fomale(M&F) is located at the peripheral side of the internal frame body.
Wherein, the steel construction frame further includes built-in fitting, and the built-in fitting is supported in the outer frame body and the internal frame body Between.
Wherein, corresponding base angle is fixedly connected by the built-in fitting to the internal frame body at the base angle of the outer frame body.
Wherein, the installation elevator steel knot pit further includes hanging ring, and the hanging ring is fixedly connected with the outer frame body, and position In the side of the outer frame body.
A kind of installation elevator steel construction pit of the invention, the civil engineering pit is by construction personnel at the construction field (site) according to electricity Terraced construction requirement excavates, and after the civil engineering pit excavates, according to geology survey data and suggestion, determines the kind of the foundation pile Class and quantity, and the foundation pile is squeezed into from the bottom of the civil engineering pit, keep the foundation pile at least partially embedded described Construction ground after the completion of piling, the metalling being made of multiple rubbles is laid in the bottom of the civil engineering pit, makes the civil engineering The levelness of pit reaches construction requirement, and reinforcing bar or steel ring are laid on the metalling, forms the steel bar layer, institute State after steel bar layer formed, the steel construction frame be placed into the civil engineering pit, make steel construction frame top surface it is horizontal accidentally Within one thousandth, the outer frame body and the internal frame body are welded in the steel bar layer difference by construction personnel, to be welded complete Bi Hou pours coagulation to the space between the steel bar layer and the outer frame body and the internal frame body respectively by two pump lines The steel bar layer is completely covered for soil, concrete, forms the second concrete layer, and concrete is by the outer frame body and the internal frame body Between space fill up, form the first concrete layer, the concrete of first concrete layer and second concrete layer exists The bottom of the steel construction framework mixes, and after concrete receives sweat, the steel construction frame and second concrete layer are close It links together, can fully ensure that the bonding strength of steel construction framework, the soil that will finally dig out with concreting by welding Side is filled between the outer frame body and the civil engineering pit.Installation elevator steel construction pit and prior art phase of the invention Than structure is simple, is easily installed, and occupies little space, and the steel construction frame can be produced in batches in workshop, transport to scene It is installed, short construction period, construction efficiency are high, carry out standardized production on elevator suitable for installing additional in various aging blocks, solve It is existing to install the low technical problem of elevator steel construction pit long construction period, construction efficiency additional.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with It obtains other drawings based on these drawings.
Fig. 1 is the structural schematic diagram that the present invention installs elevator steel construction pit additional.
Fig. 2 is the structural schematic diagram of steel construction frame of the present invention.
Fig. 3 is the structural schematic diagram of built-in fitting of the present invention.
Fig. 4 is the structural schematic diagram of steel construction frame of the present invention.
100- installs elevator steel construction pit, 10- construction ground, 20- foundation pile, 30- metalling, 40- steel bar layer, 50- additional Steel construction frame, the first concrete layer of 60-, the second concrete layer of 70-, 80- filling soil layer, 11- civil engineering pit, 51- outer frame body, 52- internal frame body, the first male and fomale(M&F) of 511-, the second male and fomale(M&F) of 522-, 53- built-in fitting, 90- hanging ring.
Specific embodiment
The embodiment of the present invention is described below in detail, examples of the embodiments are shown in the accompanying drawings, wherein from beginning to end Same or similar label indicates same or similar element or element with the same or similar functions.Below with reference to attached The embodiment of figure description is exemplary, it is intended to is used to explain the present invention, and is not considered as limiting the invention.
In the description of the present invention, it is to be understood that, term " length ", " width ", "upper", "lower", "front", "rear", The orientation or positional relationship of the instructions such as "left", "right", "vertical", "horizontal", "top", "bottom" "inner", "outside" is based on attached drawing institute The orientation or positional relationship shown, is merely for convenience of description of the present invention and simplification of the description, rather than the dress of indication or suggestion meaning It sets or element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as to limit of the invention System.In addition, in the description of the present invention, the meaning of " plurality " is two or more, unless otherwise specifically defined.
The present invention provides a kind of installation elevator steel construction pit 100, including construction ground 10, base referring to FIG. 1 to FIG. 4, Plinth stake 20, metalling 30, steel bar layer 40, steel construction frame 50, the first concrete layer 60, the second concrete layer 70 and filling soil layer 80, the construction ground 10 has civil engineering pit 11, and the civil engineering pit 11 is located on construction ground 10, the foundation pile 20 Quantity be it is multiple, the foundation pile 20 is embedded in the construction ground 10, and is at least partially disposed at the lower section of the civil engineering pit 11, The metalling 30 is laid on the bottom of the civil engineering pit 11, and the steel bar layer 40 is laid on the top of the metalling 30, And be located in the civil engineering pit 11, the steel construction frame 50 is welded with the steel bar layer 40, and is located at the civil engineering pit 11 Interior, the steel construction frame 50 includes outer frame body 51 and internal frame body 52, and the internal frame body 52 is located at the inside of the outer frame body 51, institute It states the first concrete layer 60 to be filled between the outer frame body 51 and the internal frame body 52, second concrete layer 70 covers institute Steel bar layer 40 is stated, the filling soil layer 80 is filled between the civil engineering pit 11 and the outer frame body 51.
In the present embodiment, the civil engineering pit 11 is opened according to elevator construction requirement at the construction field (site) by construction personnel It digs, after the civil engineering pit 11 excavates, according to geology survey data and suggestion, determines the type sum number of the foundation pile 20 Amount, and the foundation pile 20 is squeezed into from the bottom of the civil engineering pit 11, keep the foundation pile 20 at least partially embedded described Construction ground 10 after the completion of piling, the metalling 30 being made of multiple rubbles is laid in the bottom of the civil engineering pit 11, makes institute The levelness for stating civil engineering pit 11 reaches construction requirement, and reinforcing bar or steel ring are laid on the metalling 30, forms institute Steel bar layer 40 is stated the steel construction frame 50 is placed into the civil engineering pit 11, makes the steel after the steel bar layer 40 is formed For the horizontal error of 50 top surface of structural frames within one thousandth, construction personnel welds the outer frame body 51 and the internal frame body 52 Onto the steel bar layer 40, after to be welded, by two pump lines respectively to the steel bar layer 40 and the outer frame body 51 with The steel bar layer 40 is completely covered for space casting concrete between the internal frame body 52, concrete, forms the second concrete Layer 70, concrete fills up the space between the outer frame body 51 and the internal frame body 52, forms the first concrete layer 60, described First concrete layer 60 is mixed with the concrete of second concrete layer 70 in the bottom of 50 body of steel construction frame, to coagulation After soil receives sweat, the steel construction frame 50 closely links together with second concrete layer 70, passes through welding and concrete Pour the bonding strength that can fully ensure that 50 body of steel construction frame, finally by the earthwork dug out be filled into the outer frame body 51 with it is described Between civil engineering pit 11.Compared with prior art, structure is simple, is easily installed for installation elevator steel construction pit 100 of the invention, And occupy little space, the steel construction frame 50 can be produced in batches in workshop, be installed transporting to scene, construction period It is short, construction efficiency is high, suitable for various aging blocks install additional elevator on carry out standardized production.Preferential, the internal frame body 52 is adopted With on the two-sided reinforcing bar or steel ring being continuously welded in the steel bar layer 40, the outer frame body 51 is arrived using single side connecting welding On reinforcing bar or steel ring in the steel bar layer 40, the infiltration energy for installing elevator steel construction pit 100 additional can be improved.
Further, the metalling 30 with a thickness of 150mm.
In the present embodiment, when the rubble size for forming the metalling 30 is 25-30mm, the thickness of the metalling 30 When degree is 150mm, the levelness of the metalling 30 can be fully ensured that, be laid with the steel bar layer 40 and the steel construction frame is installed Sedimentation is smaller when 50, and is conducive to improve the infiltration energy of the metalling 30.
Further, the steel bar layer 40 is made of two layers of steel ring being arranged successively.
In the present embodiment, second concrete layer 70 is cast in the steel bar layer 40, forms institute's steel construction frame 50 bottom plate, the steel bar layer 40 functions as the skeleton of bottom plate, to increase the intensity of bottom plate, the steel bar layer 40 by Two layers of steel ring composition being arranged successively can further increase the intensity of bottom plate, and bottom plate is avoided to collapse.
Further, the outer frame body 51 has the first male and fomale(M&F) 511, and first male and fomale(M&F) 511 is located at the outline border The inner circumferential side of body 51, the internal frame body 52 have the second male and fomale(M&F) 522, and second male and fomale(M&F) 522 is located at the internal frame body 52 Peripheral side.
In the present embodiment, 51 body of outer frame body has first male and fomale(M&F) 511, and the internal frame body 52 has institute State the second male and fomale(M&F) 522, can increase the outer frame body 51 and 52 surface of internal frame body and the first concrete layer 60 rub Coefficient is wiped to avoid to increase the tangential stress on 51 surface of outer frame body Yu 52 surface of internal frame body and the first concrete layer 60 The outer frame body 51 is displaced with the internal frame body 52 relative to first concrete layer 60, first male and fomale(M&F) 511 and institute The camber for stating the second male and fomale(M&F) 522 is preferably between 4mm to 6mm.
Further, the steel construction frame 50 further includes built-in fitting 53, and the built-in fitting 53 is supported in the outer frame body 51 Between the internal frame body 52.
In the present embodiment, the built-in fitting 53 is just fixed on described by the steel construction frame 50 in the Workshop Production stage Between outer frame body 51 and the internal frame body 52, it is ensured that poured the flatness of built-in fitting 53 after concrete, and without construction Personnel at the construction field (site) temporarily fix by installation, improves construction quality and construction efficiency.
Further, the base angle of the outer frame body 51 is solid by the built-in fitting 53 to the corresponding base angle of the internal frame body 52 Fixed connection.
In the present embodiment, the base angle of the outer frame body 51 passes through described pre-buried to the corresponding base angle of the internal frame body 52 Part 53 is fixedly connected, so that each built-in fitting 53 is oppositely arranged, to make to have poured each built-in fitting after concrete 53 uniform forces, further increase the flatness of the built-in fitting 53, and by the built-in fitting 53 setting diagonal position can be with Worker is facilitated to operate in workshop.
Further, the installation elevator steel knot pit further includes hanging ring 90, and the hanging ring 90 and the outer frame body 51 are solid Fixed connection, and it is located at the side of the outer frame body 51.
In the present embodiment, the hanging ring 90 is fixedly connected with the outer frame body 51, and crane is facilitated to sling the steel Structural frames 50 reduce applying for construction personnel to provide convenience for the levelness that construction personnel adjusts the steel construction frame 50 Work difficulty, improves construction efficiency.
Above disclosed is only a preferred embodiment of the present invention, cannot limit the power of the present invention with this certainly Sharp range, those skilled in the art can understand all or part of the processes for realizing the above embodiment, and weighs according to the present invention Benefit requires made equivalent variations, still belongs to the scope covered by the invention.

Claims (7)

1. a kind of installation elevator steel construction pit, which is characterized in that including the ground, foundation pile, metalling, steel bar layer, steel of constructing Structural frames, the first concrete layer, the second concrete layer and filling soil layer, the construction ground have civil engineering pit, the civil engineering Pit is located on construction ground, the quantity of the foundation pile be it is multiple, the foundation pile is embedded in the construction ground, and at least portion For quartile in the lower section of the civil engineering pit, the metalling is laid on the bottom of the civil engineering pit, and the steel bar layer is laid on The top of the metalling, and be located in the civil engineering pit, the steel construction frame and the steel bar layer are welded, and are located at described In civil engineering pit, the steel construction frame includes outer frame body and internal frame body, and the internal frame body is located at the inside of the outer frame body, described First concrete layer is filled between the outer frame body and the internal frame body, and second concrete layer is cast in the reinforcing bar Layer, the filling soil layer are filled between the civil engineering pit and the outer frame body.
2. as described in claim 1 install additional elevator steel construction pit, which is characterized in that the metalling with a thickness of 150mm.
3. as claimed in claim 2 install additional elevator steel construction pit, which is characterized in that the steel bar layer by be arranged successively two Layer steel ring composition.
4. installing elevator steel construction pit additional as claimed in claim 3, which is characterized in that the outer frame body has the first bumps Face, first male and fomale(M&F) are located at the inner circumferential side of the outer frame body, and the internal frame body has the second male and fomale(M&F), and described second is concave-convex Face is located at the peripheral side of the internal frame body.
5. installing elevator steel construction pit additional as described in claim 1, which is characterized in that the steel construction frame further includes pre-buried Part, the built-in fitting support between the outer frame body and the internal frame body.
6. as claimed in claim 5 install additional elevator steel construction pit, which is characterized in that the base angle of the outer frame body with it is described interior The corresponding base angle of framework is fixedly connected by the built-in fitting.
7. installing elevator steel construction pit additional as claimed in claim 5, which is characterized in that the installation elevator steel knot pit is also wrapped Hanging ring is included, the hanging ring is fixedly connected with the outer frame body, and is located at the side of the outer frame body.
CN201910420643.4A 2019-05-20 2019-05-20 Pit with elevator steel structure Active CN110093945B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910420643.4A CN110093945B (en) 2019-05-20 2019-05-20 Pit with elevator steel structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910420643.4A CN110093945B (en) 2019-05-20 2019-05-20 Pit with elevator steel structure

Publications (2)

Publication Number Publication Date
CN110093945A true CN110093945A (en) 2019-08-06
CN110093945B CN110093945B (en) 2023-12-12

Family

ID=67448651

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910420643.4A Active CN110093945B (en) 2019-05-20 2019-05-20 Pit with elevator steel structure

Country Status (1)

Country Link
CN (1) CN110093945B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111074930A (en) * 2019-12-31 2020-04-28 广东凯兴达建筑科技有限公司 Construction method of elevator foundation structure

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05321273A (en) * 1992-03-09 1993-12-07 Ishima Riyuutai Kenkyusho:Kk Method for constructing concrete structure and fabricating method for concrete form
CN101748726A (en) * 2009-12-20 2010-06-23 高玉书 Wind driven generator base anchor pile construction technology taking rock as bearing stratum
CN211037035U (en) * 2019-05-20 2020-07-17 重庆富士电梯有限责任公司 Install elevator steel construction pit additional

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05321273A (en) * 1992-03-09 1993-12-07 Ishima Riyuutai Kenkyusho:Kk Method for constructing concrete structure and fabricating method for concrete form
CN101748726A (en) * 2009-12-20 2010-06-23 高玉书 Wind driven generator base anchor pile construction technology taking rock as bearing stratum
CN211037035U (en) * 2019-05-20 2020-07-17 重庆富士电梯有限责任公司 Install elevator steel construction pit additional

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111074930A (en) * 2019-12-31 2020-04-28 广东凯兴达建筑科技有限公司 Construction method of elevator foundation structure
CN111074930B (en) * 2019-12-31 2021-08-24 广东凯兴达建筑科技有限公司 Construction method of elevator foundation structure

Also Published As

Publication number Publication date
CN110093945B (en) 2023-12-12

Similar Documents

Publication Publication Date Title
CN102352590B (en) Method for splicing highfill roadbed by adopting pile-sheet retaining wall
CN106854873A (en) A kind of engineering method and garage parking in precast spliced sinking type garage parking
CN103195076B (en) Muddy Bottoms deep-excavation tower crane foundation construction method
CN109356173A (en) A kind of pin-connected panel anchor bolt frame girder construction and its construction method
CN206545215U (en) A kind of precast spliced sinking type garage parking
CN105863042A (en) All-steel structure building and construction method thereof
CN103696784A (en) Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure
CN110241828A (en) The outer sealing construction method for supporting of anchor in a kind of row's grating tubular pole grouting behind shaft or drift lining
CN203411993U (en) Simple and fast retaining wall
CN109281313A (en) A kind of Prefabricated composite box diaphram wall and its construction method
CN110158602A (en) A kind of Soft Clay deep foundation pit support excavation construction structure and construction method
CN109826224A (en) A kind of sinking well protection wall digging foundation and its construction method for desert region iron tower of power transmission line
CN105804101B (en) Reduce off-loading supporting and retaining system system and construction method and the application of retaining structure stress
CN108978680B (en) Mucky soil elevator foundation pit supporting construction device and method
CN110093945A (en) A kind of installation elevator steel construction pit
CN108487290A (en) It is cast-in-place to land basis and construction method with precast combined portable communication tower
CN107761759B (en) L-shaped concrete retaining wall
CN106120853B (en) A kind of inverted construction method of frame bridge
CN209723014U (en) A kind of sinking well protection wall digging foundation for desert region iron tower of power transmission line
CN105178356A (en) Setting-up construction method for vertical joint bars of columns in reverse building method
CN212582739U (en) Prefabricated grout of concrete seals assembled inspection shaft
CN109183805A (en) A kind of prefabricated foundation pit enclosure system and its construction method
CN211037035U (en) Install elevator steel construction pit additional
CN211172070U (en) Assembled type suspended wall retaining wall structure of reinforced concrete member
CN209293036U (en) A kind of prefabricated foundation pit enclosure system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant