CN109049294A - A kind of concrete prefabricated wallboard and its production technology - Google Patents

A kind of concrete prefabricated wallboard and its production technology Download PDF

Info

Publication number
CN109049294A
CN109049294A CN201810878154.9A CN201810878154A CN109049294A CN 109049294 A CN109049294 A CN 109049294A CN 201810878154 A CN201810878154 A CN 201810878154A CN 109049294 A CN109049294 A CN 109049294A
Authority
CN
China
Prior art keywords
insulation board
concrete
lining
fixed
side fascia
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810878154.9A
Other languages
Chinese (zh)
Other versions
CN109049294B (en
Inventor
汪廷秀
刘嘉
朱卫丰
胡箫箫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Life Trust Industrial Co Ltd
Original Assignee
Shanghai Life Trust Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Life Trust Industrial Co Ltd filed Critical Shanghai Life Trust Industrial Co Ltd
Priority to CN201810878154.9A priority Critical patent/CN109049294B/en
Publication of CN109049294A publication Critical patent/CN109049294A/en
Application granted granted Critical
Publication of CN109049294B publication Critical patent/CN109049294B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/22Moulds for making units for prefabricated buildings, i.e. units each comprising an important section of at least two limiting planes of a room or space, e.g. cells; Moulds for making prefabricated stair units
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • B28B23/022Means for inserting reinforcing members into the mould or for supporting them in the mould

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Panels For Use In Building Construction (AREA)

Abstract

The present invention relates to technical field of prefabricated, specifically disclose a kind of concrete prefabricated wallboard, including lining, Side fascia and the insulation board being fixed between lining and Side fascia;The two sides of the insulation board are respectively and fixedly provided with connector, and the connector of the both sides of the insulation board pours be fixed in lining and Side fascia respectively;The connector includes backing plate, dowel and reinforcing rib;Fastener inserts are further fixed in the concrete prefabricated wallboard, the fastener inserts include service sleeve and interior built-in fitting;Meanwhile the invention also discloses a kind of production technology of concrete prefabricated wallboard, including mold cleaning, mold assembling, release agent is smeared, fastener inserts are installed, lining is poured, insulation board is laid with and pours Side fascia.The present invention provides prefabricated panel thermal insulation property and structural strength can be greatly improved, and it can guarantee a kind of concrete prefabricated wallboard and its production technology of later period lifting and finishing convenience.

Description

A kind of concrete prefabricated wallboard and its production technology
Technical field
The present invention relates to technical field of prefabricated, specifically, it is related to a kind of concrete prefabricated wallboard and its production Technique.
Background technique
Assembled architecture is the important embodiment that low-carbon theory merges in China rapidly develops, and provides spirit for Urbanization Construction Construction ideas living.Assembled architecture is built using prefabricated panel, batch production, mechanized construction degree can be improved, subtract Few situ wet operation saves live recruitment, overcomes seasonal effect, shortens the construction period.
To disclose a kind of concrete pre- for the application for a patent for invention that existing Chinese patent application publication No. is CN107620422A Wallboard processed is fixed with lateral and vertically disposed reinforcing bar in concrete prefabricated wallboard, on the surface of concrete prefabricated wallboard point It is furnished with when pouring to stay and runs through concrete prefabricated wallboard before and after round tube therein, round tube, the intermediate throughholes of round tube form reserved Hole, round tube are mutually staggered with reinforcing bar.The technical solution by the way that preformed hole is arranged in prefabricated panel, avoid the later period when fitting up again It drills on prefabricated panel, reduces the risk of wallboard cracking.
But the prefabricated panel is formed by concreting completely, thermal insulation property is relatively poor, it is difficult to meet cold ground Demand of the area for wall insulation performance.It is all usually in concrete by whole meanwhile in similar prefabricated panel production process It is poured into after pouring in mold, then integrally vibrates to concrete;But when concrete is thicker, concrete vibrates Effect is often difficult to ensure, inadequate so as to cause the density of concrete, influences the structural strength of prefabricated panel.
Summary of the invention
For the problem of traditional prefabricated panel thermal insulation property deficiency, the first technical purpose of the invention is to provide a kind of coagulation Native prefabricated panel greatly improves the heat insulating ability of prefabricated panel by the insulation board being fixed between lining and Side fascia is poured Energy.
To realize above-mentioned first technical purpose, the present invention provides the following technical scheme that
A kind of concrete prefabricated wallboard includes successively from the inside to the outside lining and Side fascia, between the lining and Side fascia It pours and is fixed with insulation board;The two sides of the insulation board are respectively and fixedly provided with connector, and the connector of the both sides of the insulation board point It does not pour and is fixed in lining and Side fascia.
By using above-mentioned technical proposal, by pouring fix warming plate, insulation board energy between lining and Side fascia Enough greatly improve the thermal insulation property of the prefabricated panel;Meanwhile by the way that connector is arranged on insulation board, and ensure both sides of the insulation board Connector pour be fixed in lining and Side fascia respectively, connector can be improved insulation board and lining and Side fascia it Between bonding strength, avoid occurring obvious layering between lining, Side fascia and insulation board, help to improve the prefabricated panel Forming Quality.
The present invention is further arranged to: the connector includes two pieces of backing plates in parallel interval setting, two backing plates Insulation board side is fixed in fitting;The backing plate is equipped with dowel away from insulation board side in parallel, two backing plates with connect Reinforcing rib is welded between muscle, the reinforcing rib is in continuous bend structure.
By using above-mentioned technical proposal, the backing plate on connector is fixedly connected with insulation board, and the reinforcement on connector Muscle and dowel are fixed in the lining or Side fascia of adjacent side by pouring, and insulation board and adjacent lining is greatly improved Or the bonding strength of Side fascia.
The present invention is further arranged to: the connector is equipped with two groups along the width direction at least parallel interval of insulation board; The connector is symmetrical set in both sides of the insulation board, and is equipped in any backing plate another for being fixedly connected with insulation board Side corresponds to the bolt and nut group of backing plate, and the bolt and nut group is equipped with two groups along the length direction at least uniform intervals of backing plate.
By using above-mentioned technical proposal, both sides of the insulation board simultaneously passes through bolt and nut group in two groups of connectors being correspondingly arranged Be fixedly connected, while the connector of two sides is also poured respectively and is fixed in lining and Side fascia, thus be greatly improved lining, Globality between insulation board and Side fascia helps to improve the structural strength of prefabricated panel, guarantees the molding matter of prefabricated panel Amount.
The present invention is further arranged to: the lining is reinforced concrete wall panel, the lining with a thickness of 100~ 200mm, and poured in the lining and be fixed with framework of steel reinforcement.
By using above-mentioned technical proposal, lining is relatively thick, and pours fixed steel bars skeleton wherein, guarantees interior wall The structural strength of plate;In practical applications, lining will be used as load-bearing wall panel, be primarily subjected to upper load, and load is transmitted Give the main bodys force structure such as lower part wallboard or basis.
The present invention is further arranged to: the insulation board is extruded polystyrene board, with a thickness of 30~80mm.
By using above-mentioned technical proposal, extruded polystyrene board not only has excellent, lasting heat-insulation and heat-preservation, but also has Superior water resistant, moisture resistance, while its anticorrosive property and durability are more prominent;Therefore, fixation is poured in prefabricated panel The insulation board of extruded polystyrene board material can effectively ensure that prefabricated panel has abundant and lasting thermal insulation property;Meanwhile according to Area and power conservation requirement, user can suitably adjust the thickness of insulation board within the scope of 30~80mm.
The present invention is further arranged to: the Side fascia is reinforced concrete wall panel, the Side fascia with a thickness of 50~ 60mm。
By using above-mentioned technical proposal, Side fascia can protect insulation board and the decorative base as wall.
The present invention is further arranged to: it is also poured in the concrete prefabricated wallboard and is fixed with fastener inserts, it is described pre-buried Component includes service sleeve and interior built-in fitting, and the service sleeve, which pours, to be fixed in concrete prefabricated wallboard, described interior pre-buried Part, which pours, to be fixed in service sleeve;The interior built-in fitting is lifting accessory or cable sleeve.
By using above-mentioned technical proposal, during actual construction, first service sleeve can be poured and be fixed in prefabricated panel, Then lifting accessory and cable sleeve are cast in service sleeve again, can be effectively reduced extraneous factor to lifting accessory and electricity The influence of cable sleeve position accuracy guarantees that each lifting accessory and cable sleeve can be accurately fixed on its design position.
Aiming at the problem that traditional prefabricated panel thermal insulation property deficiency and structural strength existing defects, the second skill of the invention Art purpose is to provide a kind of production technology of concrete prefabricated wallboard, and the operation mode vibrated using insulation board and layering is improved The thermal insulation property of prefabricated panel, and guarantee the structural strength of prefabricated panel.
To realize above-mentioned second technical purpose, the present invention provides the following technical scheme that a kind of concrete prefabricated wallboard Production technology, comprising the following steps:
S1, mold cleaning: correspondence is selected to pour mold according to design requirement, and it is clean to pour mold cleaning;
S2, mold assembling: will pour mold and assemble and be fixed in steel platform, and carry out ruler to the mold that pours after being completed Very little inspection, it is ensured that its size meets design requirement;
S3, release agent is smeared on pouring mold;
S4, die inside installation fastener inserts and framework of steel reinforcement are being poured;
S5, lining is poured: according to the design requirement of lining to the concrete for pouring theoretical cube of amount of casting in mold, and Its surface is smoothed out after being vibrated repeatedly to concrete;Then, multimetering is carried out to concrete, it is thick in real time according to concrete The difference of degree and lining design thickness, supplements or scrapes off part concrete to pouring, and smooth out its surface in mold;
S6, it is laid with insulation board: each connector being fixed on to the two sides of insulation board according to design requirement for bolt and nut group, and will Insulation board level is layed on concrete, so that in each connector insertion concrete;
S7, Side fascia is poured: the concrete according to the design requirement of Side fascia to theoretical cube of amount of insulation board upper, and right Its surface is smoothed out after concrete is vibrated repeatedly on insulation board;Then, multimetering is carried out to concrete, according to concrete The difference of real-time thickness and Side fascia design thickness is supplemented or is scraped off part concrete to pouring, and smoothes out its surface in mold;
S8, it each lifting accessory and cable sleeve is poured respectively using concrete is fixed in corresponding service sleeve;
Steam curing is carried out after S9, plastering press polish;
Storage maintenance is carried out after S10, demoulding.
By using above-mentioned technical proposal, insulation board is set between lining and Side fascia, insulation board can be mentioned greatly The thermal insulation property of high prefabricated panel;Meanwhile that insulation board can be greatly improved is steady in prefabricated panel for the connector on insulation board It is qualitative.In addition, separating lining and Side fascia by insulation board, and lining and Side fascia are carried out respectively to repeat vibration It smashes, reduces the blocked up influence for effect of vibrating of wallboard, guarantee the density of inside concrete in prefabricated panel, to mention significantly The structural strength of the high prefabricated panel, guarantees the Forming Quality of prefabricated panel.
The present invention is further arranged to: when installing fastener inserts, is first fixed vertically with machine frame pouring die inside Embedded sleeve barrel;After the completion of step S7, accessory and cable sleeve will be lifted using concrete and pours that be fixed on correspondence pre-buried respectively In casing.
By using above-mentioned technical proposal, in process of production, fixed service sleeve is first poured, then in lining and outside Pour fixed lifting accessory and cable sleeve after wallboard pouring molding respectively into each service sleeve again, reduce extraneous factor for Lift the influence of accessory and cable sleeve location accuracy.
The present invention is further arranged to: when pouring lining and Side fascia, the measurement thickness of lining and Side fascia with The error of corresponding design thickness is at most 3mm.
By using above-mentioned technical proposal, strict control lining and Side fascia real-time thickness and design thickness when pouring Error, guarantee that the molding thickness of lining and Side fascia within the scope of design error, improves the molding matter of prefabricated panel indirectly Amount.
In conclusion the invention has the following advantages:
1, by pouring fix warming plate between lining and Side fascia, the thermal insulation property of prefabricated panel is greatly improved, is met Cold district improves user satisfaction for the demand of building heat preservation performance;
2, it is symmetrical arranged multiple groups connector by being arranged in both sides of the insulation board, improves the connection of insulation board and lining, Side fascia Intensity;Meanwhile the thickness of strict control lining and Side fascia, and vibrate respectively to lining and Side fascia, effectively protect The density for demonstrate,proving prefabricated panel inner concrete, is greatly improved prefabricated panel overall structural strength;
3, insulation board is made by extruded polystyrene board, using excellent performance possessed by extruded polystyrene board, guarantees that this is prefabricated indirectly Wallboard can persistently be kept the temperature;
4, when constructing, fixed service sleeve is first poured in prefabricated panel, is then poured fixed lifting in service sleeve again and is matched Part and cable sleeve improve lifting accessory and cable sleeve in dry wall while meeting lifting and later period finishing convenience The accuracy of position in plate, further increases the Forming Quality of prefabricated panel.
Detailed description of the invention
Fig. 1 is primarily used for embodying the integrally-built axonometric schematic diagram of embodiment 1;
Fig. 2 is the whole configuration schematic diagram of embodiment 1;
Fig. 3 is that embodiment 1 is mainly used for embodying the axonometric schematic diagram of insulation board and connector;
Fig. 4 is that embodiment 1 is mainly used for embodying the side view of connector and insulation board connection type;
Fig. 5 is that embodiment 1 is mainly used for embodying the axonometric schematic diagram of lining;
Fig. 6 is the partial enlarged view of part A in Fig. 5, is mainly used for embodying fastener inserts.
Appended drawing reference: 1, lining;2, Side fascia;3, insulation board;4, connector;41, backing plate;42, dowel;43, add Strengthening tendons;5, framework of steel reinforcement;6, bolt and nut group;7, fastener inserts;71, service sleeve;72, interior built-in fitting.
Specific embodiment
With reference to the accompanying drawings and examples, the present invention is described in detail.
Embodiment 1:
Referring to attached drawing 1, a kind of concrete prefabricated wallboard, including lining 1 and Side fascia 2, lining 1 and Side fascia 2 are steel Reinforced concrete wallboard, and pour be fixed with insulation board 3 therebetween.Wherein, lining 1 will be used as load-bearing wall panel;To guarantee it Structural strength, pouring with a thickness of 100~200mm, and inside it for lining 1 are fixed with framework of steel reinforcement 5;In practical applications, Lining 1 is primarily subjected to upper load, and the main bodys force structure such as deliver load to lower part wallboard or basis.Side fascia 2 With a thickness of 50~60mm, it can protect insulation board 3 and the decorative base as wall.
Above-mentioned insulation board 3 is made of extruded polystyrene board, and extruded polystyrene board not only has excellent and lasting heat-insulation and heat-preservation Property, superior water resistant moisture resistance, while also have anticorrosive property outstanding and durability;Therefore, it is poured in prefabricated panel solid The insulation board 3 for determining extruded polystyrene board material can effectively improve the thermal insulation property of the prefabricated panel.In actual production, base area The thickness of area and power conservation requirement, insulation board 3 can make the appropriate adjustments, usually 30~80mm.
Referring to attached drawing 2, to further increase the bonding strength between insulation board 3 and lining 1, Side fascia 2, insulation board 3 Two sides be symmetrically arranged with connector 4.In conjunction with attached drawing 3-4, connector 4 is equipped with along the width direction at least parallel interval of insulation board 3 Two groups.Connector 4 includes two pieces of backing plates 41 in parallel interval setting, and two backing plates 41 are bonded the adjacent side surface of insulation board 3; Backing plate 41 is equipped with dowel 42 away from the side of insulation board 3, and dowel 42 and the length direction of insulation board 3 are set in parallel, and Projection of the dowel 42 on insulation board 3 is located exactly on the middle position of two backing plates 41.Meanwhile with any in a connection piece 4 It backing plate 41 and is correspondingly connected between muscle 42 and is welded with reinforcing rib 43, reinforcing rib 43 is in continuous bend structure, and same company Two reinforcing ribs 43 are symmetrical set in fitting 4.In actual assembled, it is equipped on any backing plate 41 for being fixedly connected with heat preservation 3 other side of plate corresponds to the bolt and nut group 6 of backing plate 41, and the bolt and nut group 6 along backing plate 41 length direction at least uniformly between Every equipped with two groups.Insulation board 3 and its connector of two sides 4 can be integrally fixed by bolt and nut group 6,3 two sides of insulation board Connector 4 loosens;In actual production, the connector 4 of 3 two sides of insulation board pours respectively is fixed on lining 1 and exterior wall In plate 2, the bonding strength of insulation board 3 and lining 1 and Side fascia 2 can be greatly improved, so guarantee the prefabricated panel at Type quality.
It referring to attached drawing 5-6, is also poured in the prefabricated panel and is fixed with fastener inserts 7, fastener inserts 7 include service sleeve 71 And it is set to the interior built-in fitting 72 in service sleeve 71;Wherein, service sleeve 71 is equipped with multiple groups, and each service sleeve 71 pours respectively It builds and is fixed in lining 1.Interior built-in fitting 72 is in be arranged in a one-to-one correspondence, and each interior built-in fitting 72 pours respectively with service sleeve 71 It is fixed in corresponding service sleeve 71.Interior built-in fitting 72 is to lift accessory or cable sleeve simultaneously, according to lifting accessory and cable The difference that sleeve design requires, there is also differences for corresponding service sleeve 71 mode pre-buried in prefabricated panel;Wherein, for hanging Assembly parts, by taking threaded sleeve as an example, corresponding service sleeve 71, which vertically pours, to be fixed in lining 1, and keeps it away from exterior wall 2 one side opening of plate is unimpeded;For cable sleeve, it is contemplated that the later period wears the demand of cable, and corresponding service sleeve 71 extends vertically through Entire prefabricated panel.After service sleeve 71 is poured and fixed, each accessory and cable sleeve of lifting is consolidated by concreting respectively It is scheduled in corresponding service sleeve 71.
The working principle of the present embodiment is:
By pouring the insulation board 3 of fixed extruded polystyrene board material between lining 1 and Side fascia 2, it is greatly improved traditional pre- The thermal insulation property of wallboard processed;Meanwhile by the way that connector 4 is arranged in 3 two sides of insulation board, insulation board 3 is greatly improved by connector 4 With the bonding strength between lining 1, Side fascia 2;In addition, improving should by pouring fixed fastener inserts 7 in prefabricated panel The convenience of prefabricated panel lifting and finishing.
Embodiment 2:
Referring to attached drawing 2, a kind of production technology of concrete prefabricated wallboard, comprising the following steps:
S1, mold cleaning: correspondence is selected to pour mold according to design requirement, and it is clean to pour mold cleaning.
S2, mold assembling: mold will be poured and assemble and be fixed in steel platform, and to after being completed pour mold into Row dimensional gaughing, it is ensured that its size meets design requirement.
S3, release agent is smeared on pouring mold.
S4, die inside installation service sleeve 71 and framework of steel reinforcement 5 are being poured.
S5, lining 1 is poured: according to the design requirement of lining 1 to pouring the coagulation for being poured theoretical cube of amount in mold Soil, and smooth out its surface after being vibrated repeatedly to concrete;Then, multimetering is carried out to concrete, according to coagulation The difference of native real-time thickness and 1 design thickness of lining is supplemented or is scraped off part concrete to pouring, and smoothes out its table in mold Face.
S6, it is laid with insulation board 3: each connector 4 being fixed on insulation board 3 for bolt and nut group 6 according to design requirement Two sides, and 3 level of insulation board is layed on concrete, so that each connector 4 is embedded in concrete.
S7, Side fascia 2 is poured: the coagulation according to the design requirement of Side fascia 2 to theoretical cube of amount of 3 upper of insulation board Soil, and smooth out its surface after concrete is vibrated repeatedly on to insulation board 3;Then, multimetering is carried out to concrete, According to the difference of concrete real-time thickness and 2 design thickness of Side fascia, part concrete is supplemented or scraped off in mold to pouring, and Smooth out its surface.
S8, it each lifting accessory and cable sleeve is poured respectively using concrete is fixed in corresponding service sleeve 71.
Steam curing is carried out after S9, plastering press polish.
Storage maintenance is carried out after S10, demoulding.
It is outer to reduce in practical operation although fastener inserts 7 include service sleeve 71, lifting accessory and cable sleeve Influence of boundary's factor for lifting accessory and cable sleeve installation accuracy should first pass through machine frame for pre-buried set in step s 4 Pipe 71 is fixed on the inside for pouring mold vertically, and each service sleeve 71 is made to be located exactly at corresponding lifting accessory and cable sleeve Design position on;After the completion of step S7, each service sleeve 71 is poured and is fixed in the prefabricated panel.At this point, people again Each lifting accessory and cable sleeve are inserted into corresponding service sleeve 71 by work, and are poured concrete into its gap;In concrete Before condensation, artificially adjusts and confirm that lifting accessory and cable sleeve are positioned exactly on its design position;Until concrete is completely solidifying Knot, lifts accessory and cable sleeve is cast and is fixed in corresponding service sleeve 71.In this way, it can be greatly improved and hang The accuracy of assembly parts and cable sleeve installation site.
It, should be by multimetering come in real time to guarantee pouring quality in carrying out lining 1 and 2 casting process of Side fascia The thickness of concrete is detected, and ensures the real-time thickness of concrete with the error of corresponding design thickness within 3mm.Preferably, Thickness of the concrete before condensation should be made slightly larger than its design thickness;In this way, after concrete coagulation, lining 1 and exterior wall The thickness of plate 2 can reduce slightly, so that its actual (real) thickness be made to be substantially equal to corresponding design thickness.
In the actual production process, it after the completion of lining 1 pours, before Side fascia 2 pours beginning, needs first in lining 1 Upper laying insulation board 3;At this point, pouring influence of the operation to insulation board 3 to reduce Side fascia 2, first by insulation board 3 and mould can be poured Tool is fixedly connected, and guarantees the accuracy of 3 paving location of insulation board.Also, in this way, by insulation board 3 by lining 1 It pours operation and pours job separation with Side fascia 2 and come, and lining 1 and Side fascia 2 are carried out respectively to repeat to vibrate, reduce wall The blocked up influence to effect of vibrating of plate guarantees the density of inside concrete in prefabricated panel, so that it is prefabricated to help to improve this The structural strength of wallboard.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, those skilled in the art Member can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but as long as at this All by the protection of Patent Law in the scope of the claims of invention.

Claims (10)

1. a kind of concrete prefabricated wallboard successively includes lining (1) and Side fascia (2), which is characterized in that described from the inside to the outside It is poured between lining (1) and Side fascia (2) and is fixed with insulation board (3);The two sides of the insulation board (3) are respectively and fixedly provided with connection Part (4), and the connector (4) of the insulation board (3) two sides pours be fixed in lining (1) and Side fascia (2) respectively.
2. a kind of concrete prefabricated wallboard according to claim 1, which is characterized in that the connector (4) includes two pieces In the backing plate (41) that parallel interval is arranged, two backing plates (41), which are bonded, is fixed on insulation board (3) side;The backing plate (41) It is equipped with dowel (42) away from insulation board (3) side, is welded and fixed between two backing plates (41) and dowel (42) in parallel Have reinforcing rib (43), the reinforcing rib (43) is in continuous bend structure.
3. a kind of concrete prefabricated wallboard according to claim 2, which is characterized in that the connector (4) is along insulation board (3) width direction at least parallel interval is equipped with two groups;The connector (4) is symmetrical set in insulation board (3) two sides, and appoints The bolt and nut group that backing plate (41) is corresponded to for being fixedly connected with insulation board (3) other side is equipped in one backing plate (41) (6), the bolt and nut group (6) is equipped with two groups along the length direction at least uniform intervals of backing plate (41).
4. a kind of concrete prefabricated wallboard according to claim 1, which is characterized in that the lining (1) is mixed for reinforcing bar Solidifying cob wall plate, the lining (1) with a thickness of 100~200mm, and poured in the lining (1) and be fixed with framework of steel reinforcement (5).
5. a kind of concrete prefabricated wallboard according to claim 1 and its production technology, which is characterized in that the insulation board It (3) is extruded polystyrene board, with a thickness of 30~80mm.
6. a kind of concrete prefabricated wallboard according to claim 1 and its production technology, which is characterized in that the Side fascia (2) be reinforced concrete wall panel, the Side fascia (2) with a thickness of 50~60mm.
7. a kind of concrete prefabricated wallboard according to claim 1 and its production technology, which is characterized in that the concrete It also pours and is fixed with fastener inserts (7) in prefabricated panel, the fastener inserts (7) include service sleeve (71) and interior built-in fitting (72), the service sleeve (71), which pours, is fixed in concrete prefabricated wallboard, the interior built-in fitting (72) pour be fixed on it is pre- In bushing burying (71);The interior built-in fitting (72) is lifting accessory or cable sleeve.
8. a kind of production technology of concrete prefabricated wallboard, which comprises the following steps:
S1, mold cleaning: correspondence is selected to pour mold according to design requirement, and it is clean to pour mold cleaning;
S2, mold assembling: will pour mold and assemble and be fixed in steel platform, and carry out ruler to the mold that pours after being completed Very little inspection, it is ensured that its size meets design requirement;
S3, release agent is smeared on pouring mold;
S4, die inside installation fastener inserts (7) and framework of steel reinforcement (5) are being poured;
S5, lining (1) is poured: according to the design requirement of lining (1) to pouring the coagulation for being poured theoretical cube of amount in mold Soil, and smooth out its surface after being vibrated repeatedly to concrete;Then, multimetering is carried out to concrete, according to coagulation The difference of native real-time thickness and lining (1) design thickness, supplements or scrapes off part concrete to pouring, and smooth out it in mold Surface;
S6, insulation board (3) are laid with: each connector (4) is fixed on insulation board for bolt and nut group (6) according to design requirement (3) two sides, and insulation board (3) level is layed on concrete, so that in each connector (4) insertion concrete;
S7, Side fascia (2) are poured: the coagulation according to the design requirement of Side fascia (2) to theoretical cube of amount of insulation board (3) upper Soil, and smooth out its surface after concrete is vibrated repeatedly on to insulation board (3);Then, multiple spot survey is carried out to concrete Amount, according to the difference of concrete real-time thickness and Side fascia (2) design thickness, supplements or scrapes off part coagulation to pouring in mold Soil, and smooth out its surface;
S8, it each lifting accessory and cable sleeve is poured respectively using concrete is fixed in corresponding service sleeve (71);
Steam curing is carried out after S9, plastering press polish;
Storage maintenance is carried out after S10, demoulding.
9. a kind of production technology of concrete prefabricated wallboard according to claim 8, which is characterized in that in pre-buried group of installation When part (7), die inside fixed embedded sleeve barrel vertically first is being poured with machine frame;It, will using concrete after the completion of step S7 Lifting accessory and cable sleeve pour be fixed in corresponding service sleeve (71) respectively.
10. a kind of production technology of concrete prefabricated wallboard according to claim 8, which is characterized in that pouring interior wall When plate (1) and Side fascia (2), the measurement thickness of lining (1) and Side fascia (2) is at most with the error of corresponding design thickness 3mm。
CN201810878154.9A 2018-08-03 2018-08-03 Concrete prefabricated wallboard and production process thereof Active CN109049294B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810878154.9A CN109049294B (en) 2018-08-03 2018-08-03 Concrete prefabricated wallboard and production process thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810878154.9A CN109049294B (en) 2018-08-03 2018-08-03 Concrete prefabricated wallboard and production process thereof

Publications (2)

Publication Number Publication Date
CN109049294A true CN109049294A (en) 2018-12-21
CN109049294B CN109049294B (en) 2020-09-15

Family

ID=64831505

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810878154.9A Active CN109049294B (en) 2018-08-03 2018-08-03 Concrete prefabricated wallboard and production process thereof

Country Status (1)

Country Link
CN (1) CN109049294B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110629928A (en) * 2019-07-03 2019-12-31 辽宁煜梽新型建材有限公司 Site construction method of external wall panel
CN111497003A (en) * 2020-04-20 2020-08-07 建华建材交通科技(湖北)有限公司 Production process of prefabricated overhaul small stand column
CN112976284A (en) * 2021-02-03 2021-06-18 中核(江苏)绿色建筑产业发展有限公司 Preparation method of external wall prefabricated slab
CN113059681A (en) * 2021-02-23 2021-07-02 薄永强 Production method of thermal insulation external wall panel
CN113374209A (en) * 2021-06-23 2021-09-10 上海建工建材科技集团股份有限公司 Method for connecting UHPC external wall panel and back-attached steel frame
CN113958024A (en) * 2021-10-12 2022-01-21 山东邦得绿建建材科技有限公司 Built-in hoisting structure's assembled heat preservation integration externally hung wallboard
CN113997389A (en) * 2021-11-16 2022-02-01 苏州华昇建筑科技有限公司 Prefabricated part forming die and prefabricated part processing method
CN114135021A (en) * 2021-12-03 2022-03-04 郑州大学 Fiber-recycled concrete prefabricated wallboard, and preparation device and preparation method thereof
CN114856196A (en) * 2022-06-15 2022-08-05 上海宝冶集团有限公司 Floor construction method and concrete prefabricated part

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008274548A (en) * 2007-04-25 2008-11-13 Misawa Homes Co Ltd Support structure of floor part and girth panel
CN102650152A (en) * 2012-05-14 2012-08-29 中国十七冶集团有限公司 Prefabricated sandwich heat-preservation heat insulation concrete external wall panel and fabrication method
CN106760158A (en) * 2017-01-23 2017-05-31 中国建筑第八工程局有限公司 External hanging type precast concrete sandwich heat preservation wallboard and its assembly system and construction method
CN207130960U (en) * 2017-04-11 2018-03-23 杨昌现 A kind of antidetonation hollow insulation wallboard and its metal securing member
CN108149814A (en) * 2017-11-24 2018-06-12 上海建工集团股份有限公司 Load-bearing, heat insulation integrated novel prefabricated assembled shear wall and construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008274548A (en) * 2007-04-25 2008-11-13 Misawa Homes Co Ltd Support structure of floor part and girth panel
CN102650152A (en) * 2012-05-14 2012-08-29 中国十七冶集团有限公司 Prefabricated sandwich heat-preservation heat insulation concrete external wall panel and fabrication method
CN106760158A (en) * 2017-01-23 2017-05-31 中国建筑第八工程局有限公司 External hanging type precast concrete sandwich heat preservation wallboard and its assembly system and construction method
CN207130960U (en) * 2017-04-11 2018-03-23 杨昌现 A kind of antidetonation hollow insulation wallboard and its metal securing member
CN108149814A (en) * 2017-11-24 2018-06-12 上海建工集团股份有限公司 Load-bearing, heat insulation integrated novel prefabricated assembled shear wall and construction method

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110629928A (en) * 2019-07-03 2019-12-31 辽宁煜梽新型建材有限公司 Site construction method of external wall panel
CN111497003A (en) * 2020-04-20 2020-08-07 建华建材交通科技(湖北)有限公司 Production process of prefabricated overhaul small stand column
CN112976284A (en) * 2021-02-03 2021-06-18 中核(江苏)绿色建筑产业发展有限公司 Preparation method of external wall prefabricated slab
CN113059681A (en) * 2021-02-23 2021-07-02 薄永强 Production method of thermal insulation external wall panel
CN113374209A (en) * 2021-06-23 2021-09-10 上海建工建材科技集团股份有限公司 Method for connecting UHPC external wall panel and back-attached steel frame
CN113374209B (en) * 2021-06-23 2024-03-08 上海建工建材科技集团股份有限公司 UHPC external wall panel and back attached steel frame connection method
CN113958024A (en) * 2021-10-12 2022-01-21 山东邦得绿建建材科技有限公司 Built-in hoisting structure's assembled heat preservation integration externally hung wallboard
CN113997389A (en) * 2021-11-16 2022-02-01 苏州华昇建筑科技有限公司 Prefabricated part forming die and prefabricated part processing method
CN114135021A (en) * 2021-12-03 2022-03-04 郑州大学 Fiber-recycled concrete prefabricated wallboard, and preparation device and preparation method thereof
CN114135021B (en) * 2021-12-03 2023-02-24 郑州大学 Fiber-recycled concrete prefabricated wallboard, and preparation device and preparation method thereof
CN114856196A (en) * 2022-06-15 2022-08-05 上海宝冶集团有限公司 Floor construction method and concrete prefabricated part

Also Published As

Publication number Publication date
CN109049294B (en) 2020-09-15

Similar Documents

Publication Publication Date Title
CN109049294A (en) A kind of concrete prefabricated wallboard and its production technology
CN105317137B (en) Precast wall body, wallboard and its construction method and prefabricated panel production method
RU2465415C1 (en) Wall unit (versions), material for manufacturing of wall units, mould to manufacture wall units (versions), method to make wall units and flow line to manufacture wall units
KR101182536B1 (en) Prefabricated double wall precast concrete pannel having surface material, reinforcing rod according to the purpose
CN106968378B (en) Reinforced fiber woven mesh concrete floor and manufacturing method and mounting method thereof
CN105672562B (en) Steam-pressing aero-concrete integral heat insulation wallboard and its production technology
CN112459291A (en) Prefabricated heat insulation structure integrated wall structure and construction process thereof
CN106522359A (en) Total-prefabricated rural residential class composite wall structure system and construction method thereof
CN105696744A (en) Integral autoclaved aerated concrete wallboard and production process thereof
CN108842944A (en) A kind of assembled light composite thermo-insulating wall board and preparation method thereof and installation method
CN112324017A (en) Light concrete reinforcing steel bar net frame composite heat-insulation wall plate and mounting method thereof
CN105507452B (en) A kind of light concrete built-in heat insulation decorating integrative wall and its construction method
CN208168032U (en) Assembled built-in heat insulation layer concrete composite wall-light steel frame-floor connecting node
CN208105502U (en) Assembled built-in heat insulation layer concrete composite wall-light steel frame connecting node
CN113771202A (en) Production method of heat-preservation sound-insulation composite floor slab
CN218911883U (en) Assembled wall
CN203080796U (en) Reinforced concrete sandwich thermal insulating wallboard of prefabricated house
CN206337672U (en) A kind of useless brick facing prefabricated thermal insulation exterior wall plate
CN210263491U (en) Assembly type heat-insulating wall structure free of mold disassembly
CN108457427A (en) A kind of sealing sizing cushion block and production method for building concrete formwork erection
CN113585579A (en) Few-support steel wire mesh reinforced microporous concrete disassembly-free bottom formwork and construction method thereof
CN109385977B (en) Anti-cracking concrete panel and construction method thereof
CN106245828A (en) The method of construction of heat insulation integrated body of wall
CN207484827U (en) A kind of efficiently measuring body roof truss beam precast concrete
CN206245606U (en) A kind of EPS composite heat-insulation roofs

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A kind of precast concrete wallboard and its production process

Effective date of registration: 20220922

Granted publication date: 20200915

Pledgee: Shanghai Jiading Minsheng Rural Bank Co.,Ltd.

Pledgor: SHANGHAI ZHUXIN DWELLING HOUSE INDUSTRIAL Co.,Ltd.

Registration number: Y2022310000257

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20230920

Granted publication date: 20200915

Pledgee: Shanghai Jiading Minsheng Rural Bank Co.,Ltd.

Pledgor: SHANGHAI ZHUXIN DWELLING HOUSE INDUSTRIAL Co.,Ltd.

Registration number: Y2022310000257

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A precast concrete wall panel and its production process

Effective date of registration: 20230925

Granted publication date: 20200915

Pledgee: Shanghai Jiading Minsheng Rural Bank Co.,Ltd.

Pledgor: SHANGHAI ZHUXIN DWELLING HOUSE INDUSTRIAL Co.,Ltd.

Registration number: Y2023310000596

PE01 Entry into force of the registration of the contract for pledge of patent right