CN108915217B - A device of plastering a wall for building intelligent installation engineering - Google Patents

A device of plastering a wall for building intelligent installation engineering Download PDF

Info

Publication number
CN108915217B
CN108915217B CN201810757715.XA CN201810757715A CN108915217B CN 108915217 B CN108915217 B CN 108915217B CN 201810757715 A CN201810757715 A CN 201810757715A CN 108915217 B CN108915217 B CN 108915217B
Authority
CN
China
Prior art keywords
wall
side wall
fixedly connected
sleeve
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810757715.XA
Other languages
Chinese (zh)
Other versions
CN108915217A (en
Inventor
俞克波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Zhongtuo Decoration Electromechanical Engineering Co ltd
Original Assignee
Hefei Huizhixin Machinery Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei Huizhixin Machinery Technology Co ltd filed Critical Hefei Huizhixin Machinery Technology Co ltd
Priority to CN201810757715.XA priority Critical patent/CN108915217B/en
Publication of CN108915217A publication Critical patent/CN108915217A/en
Application granted granted Critical
Publication of CN108915217B publication Critical patent/CN108915217B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/02Implements for finishing work on buildings for applying plasticised masses to surfaces, e.g. plastering walls
    • E04F21/06Implements for applying plaster, insulating material, or the like
    • E04F21/08Mechanical implements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Transmission Devices (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a wall plastering device for building intelligent installation engineering, which comprises a base and a motor in a power mechanism, wherein the motor is fixedly connected to the upper end of the base; power unit still includes the pivot, first belt pulley and belt, the one end fixed connection of pivot is at the output of motor, first belt pulley is fixed to be cup jointed on one section lateral wall of pivot, through going into second nut and scraper blade, under the cooperation of circular gear and rack, make the scraper blade will be and put the cement of incasement and scrape totally, be convenient for wash after the construction is ended like this, and simultaneously, can not use the people to come to be and to fall down the cement of putting the incasement outward, use manpower sparingly like this, the steel wire brush hair in the sleeve pipe also is convenient for two nuts and just can be fine drive the scraper blade motion simultaneously, the air current that the air pump came out adjusts the gradient of wiping the board on the one hand, on the other hand can weather the wall, in order to accelerate the efficiency of.

Description

A device of plastering a wall for building intelligent installation engineering
Technical Field
The invention relates to the technical field of building equipment, in particular to a wall plastering device for building intelligent installation engineering.
Background
The device of plastering a wall is a machine that can wall plaster specially, install the hoist engine of vertical portal frame and subtend scraper blade frame through the higher authority on chassis, install the hopper that just is connected with the chassis more than scraping the coexistence post inboard of scraper blade frame, the hopper can depend on the coexistence post through the hoist engine with sliding from top to bottom, one side of portal frame is equipped with the discharge gate on hopper one end facade upper portion, the scraper blade is installed to the lower part of discharge gate, in the hopper, there is the roller of dialling in the same direction as its width direction supporting, the motor passes through the speed reducer and is connected with the roller of dialling, the other end of hopper is equipped with the feed inlet.
The invention discloses a wall plastering device for intelligent building installation engineering, which is disclosed by the publication number CN108104439A, realizes the functions of containing and pushing plastering cement, has a good containing effect, uniformly pushes and plasters the cement, avoids the cement from falling off, but has the problems that the cement in a box filled with cement is difficult to clean, and the cement is conveyed non-uniformly when plastering the wall, so that pits can be generated when plastering the wall, and therefore, the wall plastering device for the intelligent building installation engineering is provided.
Disclosure of Invention
The invention aims to provide a wall plastering device for building intelligent installation engineering, which aims to solve the problems in the background technology.
In order to achieve the purpose, the invention provides the following technical scheme:
a wall plastering device for building intelligent installation engineering comprises a base and a motor in a power mechanism, wherein the motor is fixedly connected to the upper end of the base;
the power mechanism further comprises a rotating shaft, a first belt pulley and a belt, one end of the rotating shaft is fixedly connected to the output end of the motor, the first belt pulley is fixedly sleeved on one section of outer side wall of the rotating shaft, the first belt pulley is connected with a second belt pulley through the belt, a first rotating rod is fixedly inserted into the second belt pulley, one end of the first rotating rod is rotatably connected onto a fixing plate, the fixing plate is fixedly connected to the upper end of the base, the other ends of the first rotating rod and the rotating shaft respectively penetrate through the corresponding side wall of the hollow upright column and reach the inside of the hollow upright column, and a first bevel gear is fixedly sleeved on each of the first rotating rod and one end of the rotating shaft, which are located in the corresponding hollow upright column;
the lower ends of the two hollow upright columns are symmetrically connected to the upper end of the base, the two hollow upright columns are movably connected with the same box placing structure, the inner top wall and the inner bottom wall of each hollow upright column are rotatably connected with the same second rotating rod, a second bevel gear is fixedly sleeved on the broken outer side wall of the lower end of the second rotating rod and is meshed with the corresponding first bevel gear, the box placing structure comprises a box placing structure, a partition plate and a first nut, the two hollow upright columns are respectively movably inserted into two movable holes formed in the box placing structure, the first nut is movably sleeved on one section of outer side wall of the second rotating rod, one end of each connecting rod is fixedly connected to the side wall of the corresponding first nut, two strip-shaped holes are symmetrically formed in the side wall of each hollow upright column, and the other end of one connecting rod penetrates through the corresponding strip-shaped hole and is fixedly connected to the inner side wall of the box placing structure, the other end of the other connecting rod penetrates through the corresponding strip-shaped hole and is fixedly connected to a partition plate, and the partition plate is fixedly connected to the inner side wall of the box;
the lower end of the display box is connected with a wall plastering mechanism which comprises a fixed pipe, a connecting pipe and a plastering plate, the fixed pipe is fixedly connected with the lower end of the present discharge box, one end of the connecting pipe is connected with the side wall of the fixed pipe in a penetrating way, the other end of the connecting pipe is hinged with the side wall of the plastering plate, two sleeves are symmetrically connected on the side wall of the connecting pipe, the sleeve is connected on the side wall of the fixed pipe through an air duct, the air duct is connected with a gas flow control valve, one end of two piston rods is hinged on the side wall of the smearing plate, the other end of each piston rod penetrates through the side wall of the sleeve and reaches the inside of the sleeve, one end of the piston rod, which is positioned in the sleeve, is fixedly connected with one end of the piston, the side wall of the piston is connected to the inner side wall of the sleeve in a sliding manner, and the side wall of the piston is connected to the inner side wall of the sleeve through a tension spring;
an air pump is fixedly connected to the base, an air outlet end of the air pump is connected with one end of a wire tube in the air tube winding mechanism in a penetrating mode, and the other end of the wire tube is connected to the side wall of the fixed tube in a penetrating mode;
the improved multifunctional box is characterized in that a rack is movably inserted on the box, the lower end of the rack is fixedly connected to the upper end of the base, one section of the rack located in the box is meshed with a circular gear, one end of a third rotating rod is fixedly inserted on the circular gear, the other end of the third rotating rod penetrates through the partition plate and is rotatably connected to the inner side wall of the box, the third rotating rod is located on one section of the inner side wall of the box and is in threaded connection with a second nut, a scraper is fixedly connected to the side wall of the second nut, and the scraper is movably sleeved on the third rotating rod.
Preferably, a sleeve is movably sleeved on the third rotating rod, the sleeve is fixedly connected to the side wall of the second nut, and steel wire bristles are fixedly connected to the inner side wall of the sleeve.
Preferably, a sliding groove is formed in the base, a steel ruler is connected in the sliding groove in a sliding mode, and a screw hole formed in the upper end of the base is connected with a screw in an internal thread mode.
Preferably, the side wall of the lower end of the connecting pipe is provided with a plurality of air blowing holes.
Preferably, the lower end of the trowel is of an arc structure.
Preferably, trachea wire winding mechanism is including fixed case, line roller and wire winding pole, fixed case fixed connection is on the lateral wall of air pump, the wire winding pole rotates to be connected on the inside wall of fixed case, the fixed cup joint of line roller is on the wire winding pole, the both ends of wire winding pole overlap respectively has the coil spring one end fixed connection in the coil spring is on the lateral wall of wire winding pole, the outer one end fixed connection of coil spring is on the lateral wall of line roller.
Preferably, the lower end of the base is rotatably connected with a roller.
Preferably, the scraper edge is of a bent structure.
Preferably, the third rotating rod is movably sleeved with a scraping frame, the front side and the rear side of the scraping frame are not provided with side walls, and the scraping frame is fixedly connected to the outer side wall of the sleeve.
Compared with the prior art, the invention has the beneficial effects that:
1. through going into second nut and scraper blade, under the cooperation of circular gear and rack for the scraper blade will be and put the cement of incasement and scrape totally, be convenient for wash after the construction is ended like this, simultaneously, can will not use the people to come to be and to fall down the cement of putting the case outward, uses manpower sparingly like this, and the steel brush hair in the sleeve pipe also can be disposed the cement on the third bull stick simultaneously, and the drive scraper blade that the second nut just can be fine moves like this.
2. Through adding the air pump, can adjust the gradient of wiping the board through the air current on the one hand, on the other hand can weather the wall through the gas that the air pump produced, just so can accelerate the efficiency of construction, reduction of construction period.
3. The position is adjusted by adding the roller in the aspects of transportation and construction on the construction site.
4. Through adding the steel ruler, make like this when plastering a wall for the thickness of plastering a wall is more accurate.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a rear view of the present invention;
FIG. 3 is a schematic cross-sectional view A-A of the present invention;
FIG. 4 is a schematic cross-sectional view of the present invention B-B;
FIG. 5 is a schematic view of a wall plastering mechanism according to the present invention;
FIG. 6 is a schematic view of the windpipe winding mechanism of the present invention;
FIG. 7 is a schematic cross-sectional view of the present invention at C-C.
In the figure: the device comprises a base 1, a roller 2, a power mechanism 3, a motor 301, a rotating shaft 302, a first belt pulley 303, a belt 304, a second belt pulley 305, a first rotating rod 306, a first bevel gear 307, a fixing plate 308, a hollow upright post 4, a second rotating rod 5, a second bevel gear 6, a box-shaped placing structure 7, a box-shaped placing box 701, a partition plate 702, a first nut 703, a connecting rod 704, a third rotating rod 705, a circular gear 706, a second nut 707, a scraper 708, a limiting rod 709, a rack 8, a screw 9, a steel rule 10, a wall plastering mechanism 11, a fixing pipe 1101, a connecting pipe 1102, a plastering plate 1103, an air flow control valve 1104, a sleeve 1105, a tension spring 1106, a piston 1017, a piston rod 1108, a 1109, an air pump 12, an air pipe winding mechanism 13, a fixing box 1301, a wire roller 1302, a winding rod, a coil spring 1303 and.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-7, the present invention provides a technical solution:
a wall plastering device for building intelligent installation engineering comprises a base 1 and a motor 301 in a power mechanism 3, wherein the motor 301, a button switch and an external power supply jointly form a series loop, the motor 301 is fixedly connected to the upper end of the base 1, a sliding groove is formed in the base 1, a steel ruler 10 is slidably connected in the sliding groove, a screw hole formed in the upper end of the base 1 is internally threaded with a screw 9, and a roller 2 is rotatably connected to the lower end of the base 1; the power mechanism 3 further comprises a rotating shaft 302, a first belt pulley 303 and a belt 304, one end of the rotating shaft 302 is fixedly connected to the output end of the motor 301, the first belt pulley 303 is fixedly sleeved on one section of outer side wall of the rotating shaft 302, the first belt pulley 303 is connected with a second belt pulley 305 through the belt 304, a first rotating rod 306 is fixedly inserted on the second belt pulley 305, one end of the first rotating rod 306 is rotatably connected to a fixing plate 308, the fixing plate 308 is fixedly connected to the upper end of the base 1, the other ends of the first rotating rod 306 and the rotating shaft 302 respectively penetrate through the side wall of the corresponding hollow upright post 4 and reach the hollow upright post 4, the first rotating rod 306 and one end of the rotating shaft 302 located in the corresponding hollow upright post 4 are fixedly sleeved with a first bevel gear 307, and the power mechanism 3 drives the vertical movement of the box 701 and the movement of the scraper 708, so that.
The lower ends of two hollow upright posts 4 are symmetrically connected to the upper end of the base 1, the two hollow upright posts 4 are movably connected with a same box body placing structure 7, the inner top wall and the inner bottom wall of the hollow upright posts 4 are rotatably connected with a same second rotating rod 5, a second bevel gear 6 is fixedly sleeved on the broken outer side wall of the lower end of the second rotating rod 5, the second bevel gear 6 is meshed with a corresponding first bevel gear 307, the box body placing structure 7 comprises a box body placing 701, a partition plate 702 and a first nut 703, the two hollow upright posts 4 are respectively movably inserted into two movable holes formed in the box body placing 701, a first nut 703 is movably sleeved on one section of outer side wall of the second rotating rod 5, one end of two connecting rods 704 is fixedly connected to the side wall of the first nut 703, two strip-shaped holes are symmetrically formed in the side wall of the hollow upright post 704, the other end of one connecting rod penetrates through the corresponding strip-shaped hole and is fixedly connected to, the other end of the other connecting rod 704 penetrates through the corresponding strip-shaped hole and is fixedly connected to the partition plate 702, and the partition plate 702 is fixedly connected to the inner side wall of the presenting box 701;
a rack 8 is movably inserted on the placing box 701, the lower end of the rack 8 is fixedly connected to the upper end of the base 1, a section of the rack 8 positioned in the placing box 701 is engaged and connected with a circular gear 706, one end of a third rotating rod 705 is fixedly inserted on the circular gear 706, the other end of the third rotating rod 705 penetrates through the partition plate 702 and is rotatably connected to the inner side wall of the placing box 701, a second nut 707 is connected to a section of the inner side wall of the placing box 701 in a threaded manner by the third rotating rod 705, a scraping plate 708 is fixedly connected to the side wall of the second nut 707, the edge of the scraping plate 708 is of a bent structure, the scraping plate 708 is movably sleeved on the third rotating rod 705, a sleeve is movably sleeved on the third rotating rod 705, the sleeve is fixedly connected to the side wall of the second nut 707, steel wire bristles are fixedly connected to the inner side wall of the sleeve, a scraping frame is movably sleeved on the third rotating rod 705, the front side wall and the rear side wall of, this advantageously removes the cement from the third rotating rod 705 during operation of the scraper 708, ensuring proper movement of the second nut 707.
The lower end of the discharge box 701 is connected with a plastering mechanism 11, the plastering mechanism 11 comprises a fixed pipe 1101, a connecting pipe 1102 and a plastering plate 1103, the fixed pipe 1101 is fixedly connected with the lower end of the discharge box 701, one end of the connecting pipe 1102 is connected with the side wall of the fixed pipe 1101 in a penetrating way, the other end of the connecting pipe 1102 is hinged with the side wall of the plastering plate 1103, the lower end of the plastering plate 1103 is of an arc structure, so that the flatness of plastering wall is better facilitated, the side wall of the lower end of the connecting pipe 1102 is provided with a plurality of air blowing holes, so that the wall surface can be quickly dried, two sleeves 1105 are symmetrically connected with the side wall of the connecting pipe 1102, the sleeves 1105 are connected with the side wall of the fixed pipe 1101 in a penetrating way through an air duct 1109, an air flow control valve 1104 is connected with the air duct 1109, the air flow control valve 1104, the control switch, the other end of the piston rod 1108 penetrates through the side wall of the sleeve 1105 and reaches the sleeve 1105, one end of the piston rod 1108, which is positioned in the sleeve 1105, is fixedly connected with one end of the piston 1017, the movement condition of the piston 1017 is controlled by controlling the inflow amount of gas through the gas flow control valve 1104, the side wall of the piston 1017 is slidably connected on the inner side wall of the sleeve 1105, and the side wall of the piston 1017 is connected on the inner side wall of the sleeve 1105 through the tension spring 1106;
fixedly connected with air pump 12 on base 1, air pump 12, key switch and external power supply constitute a series circuit jointly, the end 1305 one end of spool 1305 that gives vent to anger of air pump 12 has among the trachea wire winding mechanism 13, the other end through connection of spool 1305 is on the lateral wall of fixed pipe 1101, trachea wire winding mechanism 13 includes stationary box 1301, line roller 1302 and wire winding pole 1303, stationary box 1301 fixed connection is on the lateral wall of air pump 12, wire winding pole 1303 rotates to be connected on the inside wall of stationary box 1301, the fixed cup joint of line roller 1302 is on wire winding pole 1303, the both ends of wire winding pole 1303 overlap respectively has coil spring 1304, one end fixed connection in coil spring 1304 is on the lateral wall of wire winding pole 1303, the one end fixed connection outside coil spring 1304 is on the lateral wall of line roller 1305, so not only can guarantee that the spool can be tensile, can also guarantee that spool 1305 can not.
In the present case: after being debugged by technicians, the blended cement is placed in the placing box 701, the distance from the steel ruler 10 to the wall surface is adjusted according to the required wall plastering thickness, then the screw 9 is screwed down to press the steel ruler 10, so that the wall plastering thickness can be ensured, the key switch is turned on, the air pump 12 starts working continuously, then the air flow enters the fixed pipe 1101, the control switch is turned on according to the requirement, the two air flow control valves 1104 are opened to adjust the air flow, and then the air flow control valves 1104 are turned off when the plastering plate 1103 is adjusted to the proper inclination;
then, the button switch is turned on, at the moment, the motor 301 starts to rotate, then the motor 301 starts to rotate, at the moment, the motor 301 drives the two first bevel gears 307 to rotate, so that the second bevel gear 6 is arranged, so that the second rotating rod 5 is driven to rotate, so that the first nut 703 is lifted, so that the placing box 701 is formed, in the lifting process of the placing box 701, the circular gear 706 rotates, so that the second nut 707 moves leftwards, at the moment, the scraper 708 pushes the cement in the placing box 701 leftwards, so that the cement is discharged from a discharge hole in the placing box 701, at the moment, the trowelling plate 1103 can continuously wipe the running cement on the wall, so that the trowelling is very fast, and meanwhile, the cement does not pile up in the placing box 701, so that the placing box 701 is difficult to clean;
when the wall is plastered, the air flow is blown out from the air blowing holes, so that the wall which is plastered can be quickly dried, the working efficiency can be accelerated, and the construction period is shortened.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (9)

1. A wall plastering device for building intelligent installation engineering comprises a base (1) and a motor (301) in a power mechanism (3), wherein the motor (301) is fixedly connected to the upper end of the base (1);
the method is characterized in that: the power mechanism (3) also comprises a rotating shaft (302), a first belt pulley (303) and a belt (304), one end of the rotating shaft (302) is fixedly connected with the output end of the motor (301), the first belt pulley (303) is fixedly sleeved on one section of outer side wall of the rotating shaft (302), the first belt pulley (303) is connected with a second belt pulley (305) through a belt (304), a first rotating rod (306) is fixedly inserted on the second belt pulley (305), one end of the first rotating rod (306) is rotatably connected on the fixed plate (308), the fixed plate (308) is fixedly connected with the upper end of the base (1), the other ends of the first rotating rod (306) and the rotating shaft (302) respectively penetrate through the side wall of the corresponding hollow upright post (4) and reach the inside of the hollow upright post (4), one ends of the first rotating rod (306) and the rotating shaft (302) which are positioned in the corresponding hollow upright posts (4) are fixedly sleeved with first bevel gears (307);
the lower ends of the two hollow upright columns (4) are symmetrically connected to the upper end of the base (1), the two hollow upright columns (4) are movably connected with a same box body placing structure (7), the inner top wall and the inner bottom wall of each hollow upright column (4) are rotatably connected with a same second rotating rod (5), a second bevel gear (6) is fixedly sleeved on one broken outer side wall of the lower end of the second rotating rod (5), the second bevel gear (6) is meshed with a corresponding first bevel gear (307), the box body placing structure (7) comprises a box body placing structure (701), a partition plate (702) and a first nut (703), the two hollow upright columns (4) are movably inserted into two movable holes formed in the box body placing structure (701) respectively, a first nut (703) is movably sleeved on one section of outer side wall of the second rotating rod (5), and one end of two connecting rods (704) is fixedly connected to the side wall of the first nut (703), two strip-shaped holes are symmetrically formed in the side wall of the hollow upright post (4), the other end of one connecting rod (704) penetrates through the corresponding strip-shaped hole and is fixedly connected to the inner side wall of the box (701), the other end of the other connecting rod (704) penetrates through the corresponding strip-shaped hole and is fixedly connected to a partition plate (702), and the partition plate (702) is fixedly connected to the inner side wall of the box (701);
the lower end that is case (701) is connected with plastering mechanism (11), plastering mechanism (11) including fixed pipe (1101), connecting pipe (1102) and board (1103), fixed pipe (1101) fixed connection is in the lower extreme that is case (701), the one end through connection of connecting pipe (1102) is on the lateral wall of fixed pipe (1101), the other end of connecting pipe (1102) is articulated with the lateral wall of board (1103), the symmetric connection has two sleeves (1105) on the lateral wall of connecting pipe (1102), sleeve (1105) through air duct (1109) through connection on the lateral wall of fixed pipe (1101), be connected with gas flow control valve (1104) on air duct (1109), it has the one end of two piston rods (1108) to articulate on the lateral wall of board (1103), the other end of piston rod (1108) runs through the lateral wall of sleeve (1105) and arrives in sleeve (1105), one end of the piston rod (1108) positioned in the sleeve (1105) is fixedly connected with one end of the piston (1017), the side wall of the piston (1017) is connected to the inner side wall of the sleeve (1105) in a sliding manner, and the side wall of the piston (1017) is connected to the inner side wall of the sleeve (1105) through a tension spring (1106);
an air pump (12) is fixedly connected to the base (1), an air outlet end of the air pump (12) is connected with one end of a line pipe (1305) in the air pipe winding mechanism (13) in a penetrating manner, and the other end of the line pipe (1305) is connected to the side wall of the fixed pipe (1101) in a penetrating manner;
the utility model discloses a case (701) is put to being, be and be movable pegging graft on case (701) have rack (8), the lower extreme fixed connection of rack (8) is in the upper end of base (1), rack (8) are located to be and are put one section meshing connection in case (701) and are connected with circular gear (706), the one end that is pegged graft fixedly on circular gear (706) and has third bull stick (705), the other end of third bull stick (705) runs through baffle (702) and rotate the connection on being the inside wall of putting case (701), threaded connection has second nut (707) on third bull stick (705) are located to be and are to put one section inside wall in case (701), fixedly connected with scraper blade (708) on the lateral wall of second nut (707), scraper blade (708) activity cup joints on third bull stick (705).
2. The wall plastering device for the intelligent building installation project of claim 1, wherein: a sleeve is movably sleeved on the third rotating rod (705), the sleeve is fixedly connected to the side wall of the second nut (707), and steel wire bristles are fixedly connected to the inner side wall of the sleeve.
3. The wall plastering device for the intelligent building installation project of claim 1, wherein: the steel ruler is characterized in that a sliding groove is formed in the base (1), a steel ruler (10) is connected in the sliding groove in a sliding mode, and a screw hole is formed in the upper end of the base (1) and is connected with a screw (9) in an inner thread mode.
4. The wall plastering device for the intelligent building installation project of claim 1, wherein: the side wall of the lower end of the connecting pipe (1102) is provided with a plurality of air blowing holes.
5. The wall plastering device for the intelligent building installation project of claim 1, wherein: the lower end of the trowelling plate (1103) is of an arc-shaped structure.
6. The wall plastering device for the intelligent building installation project of claim 1, wherein: trachea wire winding mechanism (13) are including fixed case (1301), line roller (1302) and wire winding pole (1303), fixed case (1301) fixed connection is on the lateral wall of air pump (12), wire winding pole (1303) rotate to be connected on the inside wall of fixed case (1301), line roller (1302) is fixed to be cup jointed on wire winding pole (1303), the both ends of wire winding pole (1303) overlap respectively and have coil spring (1304) one end fixed connection in coil spring (1304) is on the lateral wall of wire winding pole (1303), the outer one end fixed connection of coil spring (1304) is on the lateral wall of line roller (1302).
7. The wall plastering device for the intelligent building installation project of claim 1, wherein: the lower end of the base (1) is rotatably connected with a roller (2).
8. The wall plastering device for the intelligent building installation project of claim 1, wherein: the edge of the scraper (708) is of a bent structure.
9. The wall plastering device for the intelligent building installation project of claim 2, wherein: the third bull stick (705) activity has cup jointed scrapes the frame, scrape the front and back both sides of frame and do not have the lateral wall, scrape frame fixed connection on sheathed tube lateral wall.
CN201810757715.XA 2018-07-11 2018-07-11 A device of plastering a wall for building intelligent installation engineering Active CN108915217B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810757715.XA CN108915217B (en) 2018-07-11 2018-07-11 A device of plastering a wall for building intelligent installation engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810757715.XA CN108915217B (en) 2018-07-11 2018-07-11 A device of plastering a wall for building intelligent installation engineering

Publications (2)

Publication Number Publication Date
CN108915217A CN108915217A (en) 2018-11-30
CN108915217B true CN108915217B (en) 2020-06-12

Family

ID=64412174

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810757715.XA Active CN108915217B (en) 2018-07-11 2018-07-11 A device of plastering a wall for building intelligent installation engineering

Country Status (1)

Country Link
CN (1) CN108915217B (en)

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2374601Y (en) * 1999-07-05 2000-04-19 庞兴华 Multifunctional automatic whitewashing machine
CN205577367U (en) * 2015-12-02 2016-09-14 郁祥兴 Full -automatic bionical white washed wall machine
CN205617744U (en) * 2016-04-13 2016-10-05 林洁 Automatic wash mortar flush coater
CN206571118U (en) * 2017-03-09 2017-10-20 仇小睿 A kind of construction apparatus of plastering
CN207003955U (en) * 2017-06-12 2018-02-13 青岛财经创展信息技术有限公司 A kind of construction wall plastering equipment with reciprocal erasing function
CN207513115U (en) * 2017-08-31 2018-06-19 张能力 A kind of white washed wall device
CN108204115A (en) * 2018-01-16 2018-06-26 深圳市晟腾企业管理有限公司 It is a kind of to automate the building machinery for painting metope

Also Published As

Publication number Publication date
CN108915217A (en) 2018-11-30

Similar Documents

Publication Publication Date Title
CN112030682B (en) Be applied to reducible labour's of construction laying device
CN109914758B (en) Automatic plastering robot for building
CN101144325B (en) Pasting machine
CN111833722A (en) Automatic equipment of clean outdoor display screen
CN114687541B (en) Construction spraying device
CN108915217B (en) A device of plastering a wall for building intelligent installation engineering
CN109914753A (en) Grey all-in-one machine on ceramic tile mixing
CN207988441U (en) A kind of mortar gypsum automatic rendering device
CN111255250B (en) Building cement device of building a wall
CN209742402U (en) Electric tile mortar smearing machine
CN209724159U (en) Sunshading and thermal insulating window with automatic cleaning apparatus
CN209832068U (en) Glazing device for firing shell porcelain
CN212589938U (en) Pancake processing device
CN212078582U (en) Plastering device for building construction
CN211622494U (en) Mechanical cement feeding device for laying floor tiles
CN108532979B (en) Building glass curtain wall equipment
CN220590398U (en) Powder spraying device
CN206882049U (en) A kind of scraper for decorative panel production
CN221031230U (en) Plastering device for building construction
CN206482524U (en) The building surface cleaning device automatically controlled
CN219509085U (en) Environment-friendly mortar spraying device for outdoor building house construction
CN215564616U (en) Concrete building sprays curing means
CN115126193A (en) Machine wall whitewashing machine that adjustability is strong
CN220757285U (en) Cleaning device for curtain wall engineering
CN216440531U (en) Stirring device capable of stirring regularly for architectural coatings

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20200511

Address after: 231200 building 301, Shuijing City, middle street, SHANGPAI Town, Feixi County, Hefei City, Anhui Province

Applicant after: HEFEI HUIZHIXIN MACHINERY TECHNOLOGY Co.,Ltd.

Address before: 230000 room 4, building 1011, Furong Pearl Road, Hefei economic and Technological Development Zone, Anhui, China

Applicant before: HEFEI SHANGHAN DECORATION ENGINEERING Co.,Ltd.

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240131

Address after: No. 502, No. 27 Yanglongxin Village, Taoyuan Community, Dalang Street, Longhua District, Shenzhen City, Guangdong Province, 518000

Patentee after: Shenzhen Zhongtuo Decoration Electromechanical Engineering Co.,Ltd.

Country or region after: China

Address before: 231200 Building 301, No. 27, Shuijingcheng, Middle Street, Shangpai Town, Feixi County, Hefei City, Anhui Province

Patentee before: HEFEI HUIZHIXIN MACHINERY TECHNOLOGY Co.,Ltd.

Country or region before: China