CN108915217A - A kind of device of plastering a wall for building intellectualization installing engineering - Google Patents

A kind of device of plastering a wall for building intellectualization installing engineering Download PDF

Info

Publication number
CN108915217A
CN108915217A CN201810757715.XA CN201810757715A CN108915217A CN 108915217 A CN108915217 A CN 108915217A CN 201810757715 A CN201810757715 A CN 201810757715A CN 108915217 A CN108915217 A CN 108915217A
Authority
CN
China
Prior art keywords
case
bull stick
plastering
sleeve
pedestal
Prior art date
Application number
CN201810757715.XA
Other languages
Chinese (zh)
Other versions
CN108915217B (en
Inventor
俞克波
Original Assignee
合肥尚涵装饰工程有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 合肥尚涵装饰工程有限公司 filed Critical 合肥尚涵装饰工程有限公司
Priority to CN201810757715.XA priority Critical patent/CN108915217B/en
Publication of CN108915217A publication Critical patent/CN108915217A/en
Application granted granted Critical
Publication of CN108915217B publication Critical patent/CN108915217B/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/02Implements for finishing work on buildings for applying plasticised masses to surfaces, e.g. plastering walls
    • E04F21/06Implements for applying plaster, insulating material, or the like
    • E04F21/08Mechanical implements

Abstract

The invention discloses a kind of devices of plastering a wall for building intellectualization installing engineering, and including the motor in pedestal and power mechanism, the motor is fixedly connected on the upper end of pedestal;The power mechanism further includes shaft, first belt pulley and belt, one end of the shaft is fixedly connected on the output end of motor, first belt pulley is fixedly attached on one section of lateral wall of shaft, by the way that the second nut and scraper plate will be entered, under the cooperation of circular gear and rack gear, so that scraper plate will be in put the cement in case to scrape completely, convenient for cleaning after constructing in this way, simultaneously, can not employment will pour in putting the cement in case, manpower is saved in this way, the steel wire bristle in casing, which is also convenient for two nuts just, simultaneously can be good at driving scraper plate movement, on the one hand the air-flow that air pump comes out adjusts the gradient of patter, on the other hand metope can be dried up, to accelerate construction efficiency, shorten the construction period.

Description

A kind of device of plastering a wall for building intellectualization installing engineering

Technical field

The present invention relates to Architectural Equipment technical field, specially a kind of dress of plastering a wall for building intellectualization installing engineering It sets.

Background technique

Device of plastering a wall be it is a kind of specially can with the machine of wall plastering, by the upper surface of chassis be equipped with vertical portal frame and The hoist engine of opposite blade holder, the hopper for being equipped with more than chassis on the inside of two columns of blade holder and being connect with chassis, material Bucket can be slided up and down to by hoist engine to be attached on two columns, and the side of portal frame is equipped on one end facade top of hopper The lower part of material mouth, discharge port is equipped with scraper plate, in hopper, along its width direction be supported with dial roller, motor via reducer with Roller connection is dialled, the other end of hopper is equipped with feed inlet.

A kind of device of plastering a wall for building intellectualization installing engineering of Publication No. CN108104439A, realizes this hair It bright splendid attire to cement and pushes away and smears function, and it is good to contain effect, push away that smear cement uniform, avoid cement and fall, but deposit The cement difficulty cleaning in the chest in the mud that discharges water, and when plastering a wall, the non-uniform problem of cement transportation will lead to smear It is cheated when wall, for this purpose, proposing a kind of device of plastering a wall for building intellectualization installing engineering.

Summary of the invention

The purpose of the present invention is to provide a kind of devices of plastering a wall for building intellectualization installing engineering, to solve above-mentioned back The problem of being proposed in scape technology.

To achieve the above object, the present invention provides the following technical solutions:

A kind of device of plastering a wall for building intellectualization installing engineering, it is described including the motor in pedestal and power mechanism Motor is fixedly connected on the upper end of pedestal;

The power mechanism further includes shaft, the first belt pulley and belt, and one end of the shaft is fixedly connected on motor Output end, first belt pulley is fixedly attached on one section of lateral wall of shaft, and first belt pulley passes through belt and connects It is connected to the second belt pulley, is fixed on second belt pulley and is plugged with the first bull stick, one end rotation connection of first bull stick In fixed plate, the fixed plate is fixedly connected on the upper end of pedestal, and the other end of first bull stick and shaft extends through Corresponding hollow pillar stand side wall simultaneously reaches in hollow pillar stand, and first bull stick and shaft are located in corresponding hollow pillar stand The equal fixing sleeve in one end be connected to the first angular wheel;

The lower end of two hollow pillar stands is symmetrically connected to the upper end of pedestal, and two hollow pillar stands are connected with It is same that the hollow pillar stand inner roof wall and inner bottom wall are rotatably connected to same second bull stick in putting body structure, and described the The lower end one of the two bull sticks fixing sleeve on lateral wall that breaks is connected to the second angular wheel, second angular wheel and corresponding first Angular wheel engagement connection, described is in put body structure including being in put case, partition and the first nut, two hollow pillar stands point Activity is not plugged in putting in two movable spans opened up on case, and movable sleeve is connected to the on one section of lateral wall of second bull stick One nut, the side wall of first nut are fixedly connected with one end there are two connecting rod, symmetrical on the side wall of the hollow pillar stand It opens up there are two strip-shaped hole, it is in put that the other end of one of them connecting rod, which runs through corresponding strip-shaped hole and is fixedly connected on, On the inner sidewall of case, the other end of another connecting rod through corresponding strip-shaped hole and is fixedly connected on partition, institute Stating partition and being fixedly connected on is in put on the inner sidewall of case;

Described to be connected with the mechanism that plasters a wall in the lower end for putting case, the mechanism that plasters a wall includes fixing pipe, connecting tube and patter, institute It states fixing pipe to be fixedly connected in the lower end for putting case, one end perforation of the connecting tube is connected on the side wall of fixing pipe, described The other end of connecting tube and patter it is side walls hinged, two sleeves, the sleeve are symmetrically connected on the side wall of the connecting tube It is connected on the side wall of fixing pipe by gas-guide tube perforation, gas flow control valve, the patter is connected on the gas-guide tube Side wall on it is hinged there are two one end of piston rod, the other end of the piston rod through sleeve side wall and reach in sleeve, One end that the piston rod is located in sleeve is fixedly connected with one end of piston, and the side walls of the piston are connected to sleeve On inner sidewall, it is connected on the inner sidewall of sleeve on the side wall of the piston by tension spring;

Air pump is fixedly connected on the pedestal, the outlet side of the air pump penetrates through the line being connected in tracheae winding mechanism The other end perforation of pipe one end, the spool is connected on the side wall of fixing pipe.

Preferably, described is in put activity on case to be plugged with rack gear, and the lower end of the rack gear is fixedly connected on the upper end of pedestal, The rack gear, which is located at, is connected with circular gear in the one section of engagement put in case, and fixation is plugged with third bull stick on the circular gear One end, the other end of the third bull stick is through partition and is rotatably connected in putting on the inner sidewall of case, the third bull stick It is threaded with the second nut in the one section of inner sidewall put in case, is fixedly connected with and scrapes on the side wall of second nut Plate, the scraper plate are actively socketed on third bull stick.

Preferably, movable sleeve is connected to casing on the third bull stick, and described sleeve pipe is fixedly connected on the side wall of the second nut On, steel wire bristle is fixedly connected on the inner sidewall of described sleeve pipe.

Preferably, sliding groove is offered on the pedestal, slidably connects steel ruler in the sliding groove, the pedestal it is upper The screw hole internal screw thread opened up is held to be connected with screw.

Preferably, the bottom side of the wall of the connecting tube offers several gas holes.

Preferably, the lower end of the patter is arcuate structure.

Preferably, the tracheae winding mechanism includes fixed case, line roller and wire winding pole, and the fixed case is fixedly connected on gas On the side wall of pump, the wire winding pole is rotatably connected on the inner sidewall of fixed case, and the line roller is fixedly attached on wire winding pole, institute It states one end that the both ends of wire winding pole are cased with respectively in wind spring described in wind spring to be fixedly connected on the lateral wall of wire winding pole, the wind spring Outer one end is fixedly connected on the side wall of online roller.

Preferably, the idler wheel is rotatably connected on the lower end of pedestal.

Preferably, the scraper plate edge is warp architecture.

Preferably, the third rotarod activity, which is socketed with, scrapes frame, and the front and rear sides for scraping frame are consolidated without side wall, the frame of scraping Surely it is connected on the lateral wall of casing.

Compared with prior art, the beneficial effects of the invention are as follows:

1, by the way that the second nut and scraper plate will be entered, under the cooperation of circular gear and rack gear, so that scraper plate will be in put in case Cement scrape completely, convenient for cleaning after constructing in this way, meanwhile, can not employment will be in putting cement in case outward , manpower is saved in this way, while the steel wire bristle in casing can also dispose the cement on third bull stick, such second spiral shell Mother just can be good at driving scraper plate movement.

2, by the way that air pump is added, the gradient of patter on the one hand can be adjusted by air-flow, on the other hand can be passed through The gas that air pump generates dries up metope, this makes it possible to accelerate construction efficiency, shortens construction period.

3, by the way that idler wheel is added, aspect transport and adjusting position of constructing on-site in this way.

4, by the way that steel ruler is added, so that when plastering a wall, so that the thickness plastered a wall is more accurate.

Detailed description of the invention

Fig. 1 is schematic structural view of the invention;

Fig. 2 is backsight structural representation of the present invention;

Fig. 3 is Section A-A schematic diagram of the present invention;

Fig. 4 is section B-B schematic diagram of the present invention;

Fig. 5 is that the present invention plasters a wall structural scheme of mechanism;

Fig. 6 is tracheae winding mechanism schematic diagram of the present invention;

Fig. 7 is C-C schematic cross-section of the present invention.

In figure:Pedestal 1, idler wheel 2, power mechanism 3, motor 301, shaft 302, the first belt pulley 303, belt 304, second Belt pulley 305, the first bull stick 306, the first angular wheel 307, fixed plate 308, hollow pillar stand 4, the second bull stick 5, the second taper Gear 6, in put body structure 7, in putting case 701, partition 702, the first nut 703, connecting rod 704, third bull stick 705, round Gear 706, the second nut 707, scraper plate 708, gag lever post 709, rack gear 8, screw 9, steel ruler 10, the mechanism that plasters a wall 11, fixing pipe 1101, connecting tube 1102, patter 1103, gas flow control valve 1104, sleeve 1105, tension spring 1106, piston 1017, piston rod 1108, gas-guide tube 1109, air pump 12, tracheae winding mechanism 13, fixed case 1301, line roller 1302, wire winding pole 1303, wind spring 1304, spool 1305.

Specific embodiment

Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.

Fig. 1-7 is please referred to, the present invention provides a kind of technical solution:

A kind of device of plastering a wall for building intellectualization installing engineering, including the motor 301 in pedestal 1 and power mechanism 3, Motor 301, button switch and extraneous power supply collectively constitute a series loop, and motor 301 is fixedly connected on the upper end of pedestal 1, Sliding groove is offered on pedestal 1, and steel ruler 10 is slidably connected in sliding groove, the screw hole internal screw thread connection that the upper end of pedestal 1 opens up There is screw 9, idler wheel 2 is rotatably connected on the lower end of pedestal 1;Power mechanism 3 further includes shaft 302, the first belt pulley 303 and belt 304, one end of shaft 302 is fixedly connected on the output end of motor 301, and the first belt pulley 303 is fixedly attached to the one of shaft 302 On section lateral wall, the first belt pulley 303 is connected with the second belt pulley 305 by belt 304, fixes and inserts on the second belt pulley 305 It is connected to the first bull stick 306, one end of the first bull stick 306 is rotatably connected in fixed plate 308, and fixed plate 308 is fixedly connected on bottom The other end of the upper end of seat 1, the first bull stick 306 and shaft 302 extends through corresponding 4 side wall of hollow pillar stand and reaches hollow In column 4, the equal fixing sleeve in one end that the first bull stick 306 and shaft 302 are located in corresponding hollow pillar stand 4 is connected to the first taper Gear 307 is driven by power mechanism (3) in the up and down motion of case 701 and the movement of scraper plate 708 is put, so that entirely plastering a wall Cheng Feichang is smooth.

The lower end of two hollow pillar stands 4 is symmetrically connected to the upper end of pedestal 1, and two hollow pillar stands 4 are connected with same A is in put body structure 7, and 4 inner roof wall of hollow pillar stand and inner bottom wall are rotatably connected to same second bull stick 5, the second bull stick 5 The fixing sleeve on lateral wall that breaks of lower end one is connected to the second angular wheel 6, the second angular wheel 6 and corresponding first angular wheel 307 engagement connections are in put case 701, partition 702 and the first nut 703 in putting body structure 7 to include, and two hollow pillar stands 4 are distinguished Activity is plugged in putting in two movable spans opened up on case 701, and movable sleeve is connected to first on one section of lateral wall of the second bull stick 5 Nut 703, the side wall of the first nut 703 are fixedly connected with one end there are two connecting rod 704, symmetrical on the side wall of hollow pillar stand 4 It opens up there are two strip-shaped hole, it is in put that the other end of one of connecting rod 704, which runs through corresponding strip-shaped hole and is fixedly connected on, On the inner sidewall of case 701, the other end of another connecting rod 704 through corresponding strip-shaped hole and is fixedly connected on partition 702 On, it is in put on the inner sidewall of case 701 that partition 702, which is fixedly connected on,;

It is plugged with rack gear 8 in activity on case 701 of putting, the lower end of rack gear 8 is fixedly connected on the upper end of pedestal 1, and rack gear 8 is located at It is connected with circular gear 706 in the one section of engagement put in case 701, fixation is plugged with the one of third bull stick 705 on circular gear 706 End, it is in put on the inner sidewall of case 701 that the other end of third bull stick 705, which runs through partition 702 and is rotatably connected on, third bull stick 705 The second nut 707, fixed company on the side wall of the second nut 707 are threaded in the one section of inner sidewall put in case 701 It is connected to scraper plate 708,708 edge of scraper plate is warp architecture, and scraper plate 708 is actively socketed on third bull stick 705, third bull stick 705 Upper movable sleeve is connected to casing, and casing is fixedly connected on the side wall of the second nut 707, is fixedly connected with steel on the inner sidewall of casing Wire brush hair, 705 movable sleeve of third bull stick, which is connected to, scrapes frame, and the front and rear sides for scraping frame scrape frame and be fixedly connected on casing without side wall Lateral wall on, in this way scraper plate 708 run when the cement on third bull stick 705 can be removed well, guarantee Second nut, 707 proper motion.

It is connected with the mechanism 11 that plasters a wall in the lower end for putting case 701, the mechanism that plasters a wall 11 includes fixing pipe 1101,1102 and of connecting tube Patter 1103, fixing pipe 1101 are fixedly connected in the lower end for putting case 701, and one end perforation of connecting tube 1102 is connected to fixation On the side wall of pipe 1101, the other end of connecting tube 1102 is side walls hinged with patter 1103, and the lower end of patter 1103 is arc knot Structure, is more advantageous to the flatness plastered a wall in this way, and the bottom side of the wall of connecting tube 1102 offers several gas holes, thus may be used Quickly to dry up metope, two sleeves 1105 are symmetrically connected on the side wall of connecting tube 1102, sleeve 1105 passes through air guide The perforation of pipe 1109 is connected on the side wall of fixing pipe 1101, and gas flow control valve 1104, gas are connected on gas-guide tube 1109 Flow control valve 1104, control switch and extraneous power supply collectively constitute a series loop, are hinged on the side wall of patter 1103 One end of two piston rods 1108, the other end of piston rod 1108 runs through the side wall of sleeve 1105 and reaches in sleeve 1105, living One end that stopper rod 1108 is located in sleeve 1105 is fixedly connected with one end of piston 1017, passes through gas flow control valve 1104 The amount that gas flows into is controlled to control the motion conditions of piston 1017, the side walls of piston 1017 are connected to the interior of sleeve 1105 On side wall, it is connected on the inner sidewall of sleeve 1105 on the side wall of piston 1017 by tension spring 1106;

Air pump 12 is fixedly connected on pedestal 1, air pump 12, key switch and extraneous power supply collectively constitute one and connect back Road, the outlet side of air pump 12 penetrate through 1305 one end of spool being connected in tracheae winding mechanism 13, and the other end of spool 1305 passes through Logical to be connected on the side wall of fixing pipe 1101, tracheae winding mechanism 13 includes fixed case 1301, line roller 1302 and wire winding pole 1303, Fixed case 1301 is fixedly connected on the side wall of air pump 12, and wire winding pole 1303 is rotatably connected on the inner sidewall of fixed case 1301, Line roller 1302 is fixedly attached on wire winding pole 1303, and the both ends of wire winding pole 1303 are cased with wind spring 1304 respectively, in wind spring 1304 One end is fixedly connected on the lateral wall of wire winding pole 1303, and one end outside wind spring 1304 is fixedly connected with the side wall of online roller 1302 On, it not only can guarantee that spool 1305 can stretch, additionally it is possible to guarantee that spool 1305 will not be entangled.

In this case:It is in put in case 701 by being placed on good cement after technical staff debugs, the thickness plastered a wall as needed Degree, adjustment steel ruler 10 arrive the distance of metope, tighten screw 9 then to compress steel ruler 10, ensure that the thickness plastered a wall in this way , key switch is opened, air pump 12 is also continuous at this time starts to work, and then air-flow enters in fixing pipe 1101, then basis Need to open control switch, two gas flow control valves 1104 are opened, then adjusting gas flow is adjusted patter 1103 When to suitable gradient, gas flow control valve 1104 is closed at this time;

Then button switch is opened, motor 301 starts turning at this time, and then motor 301 starts turning, at this time motor 301 Two the first angular wheel 307 rotations are driven, so that the second angular wheel 6, so that the rotation of the second bull stick 5 is driven, thus First nut 703 rises, so that during in the rising of case 701 is put, circular gear 706 is rotated in case 701 is put, from And the second nut 707 is moved downward, scraper plate 708 will be being in put the cement in case 701 to push away to the left, so that cement at this time From coming out in putting the discharge port on case 701, patter 1103 can constantly be smeared the cement flow down to going on wall at this time, That smears in this way is very fast, while there will not be cement accumulation in case 701 in putting, so that in the difficult cleaning of case 701 is put;

While plastering a wall, air-flow is produced by boasting from gas hole, so that the wall just smeared can dry up quickly, in this way It can accelerate working efficiency, shorten the construction period.

It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (10)

1. a kind of device of plastering a wall for building intellectualization installing engineering, including the motor in pedestal (1) and power mechanism (3) (301), the motor (301) is fixedly connected on the upper end of pedestal (1);
It is characterized in that:The power mechanism (3) further includes shaft (302), the first belt pulley (303) and belt (304), described One end of shaft (302) is fixedly connected on the output end of motor (301), and first belt pulley (303) is fixedly attached to shaft (302) on one section of lateral wall, first belt pulley (303) is connected with the second belt pulley (305), institute by belt (304) It states fixation on the second belt pulley (305) to be plugged with the first bull stick (306), one end of first bull stick (306) is rotatably connected on In fixed plate (308), the fixed plate (308) is fixedly connected on the upper end of pedestal (1), first bull stick (306) and shaft (302) the other end extends through corresponding hollow pillar stand (4) side wall and reaches in hollow pillar stand (4), first bull stick (306) and the equal fixing sleeve in one end that is located in corresponding hollow pillar stand (4) of shaft (302) is connected to the first angular wheel (307);
The lower end of two hollow pillar stands (4) is symmetrically connected to the upper end of pedestal (1), two hollow pillar stand (4) activities Being connected with same is in put body structure (7), and hollow pillar stand (4) inner roof wall and inner bottom wall are rotatably connected to same second Bull stick (5), the lower end one of second bull stick (5) fixing sleeve on lateral wall that breaks are connected to the second angular wheel (6), second cone Shape gear (6) is engaged with corresponding first angular wheel (307) and is connected, and described is in put body structure (7) including being in put case (701), partition (702) and the first nut (703), activity is plugged in putting on case (701) two hollow pillar stands (4) respectively In two movable spans opened up, movable sleeve is connected to the first nut (703) on one section of lateral wall of second bull stick (5), described The side wall of first nut (703) is fixedly connected with one end there are two connecting rod (704), right on the side wall of the hollow pillar stand (4) Title is opened up there are two strip-shaped hole, and the other end of one of them connecting rod (704) runs through corresponding strip-shaped hole and fixed company It connects in the inner sidewall for putting case (701), the other end of another connecting rod (704) through corresponding strip-shaped hole and is consolidated Surely it is connected on partition (702), it is in put on the inner sidewall of case (701) that the partition (702), which is fixedly connected on,;
It is described to be connected with the mechanism that plasters a wall (11) in the lower end for putting case (701), the mechanism that plasters a wall (11) include fixing pipe (1101), Connecting tube (1102) and patter (1103), the fixing pipe (1101) are fixedly connected in the lower end for putting case (701), the connection One end perforation of pipe (1102) is connected on the side wall of fixing pipe (1101), the other end and patter of the connecting tube (1102) (1103) side walls hinged, is symmetrically connected with two sleeves (1105), the sleeve on the side wall of the connecting tube (1102) (1105) it is connected on the side wall of fixing pipe (1101) by gas-guide tube (1109) perforation, is connected on the gas-guide tube (1109) Gas flow control valve (1104), it is hinged there are two the one end of piston rod (1108) on the side wall of the patter (1103), it is described The other end of piston rod (1108) runs through the side wall of sleeve (1105) and reaches in sleeve (1105), piston rod (1108) position It is fixedly connected with one end of piston (1017) in one end in sleeve (1105), the side walls of the piston (1017) are connected to On the inner sidewall of sleeve (1105), the interior of sleeve (1105) is connected to by tension spring (1106) on the side wall of the piston (1017) On side wall;
It is fixedly connected with air pump (12) on the pedestal (1), the outlet side perforation of the air pump (12) is connected with tracheae coil winding machine Spool (1305) one end in structure (13), the other end perforation of the spool (1305) are connected to the side wall of fixing pipe (1101) On.
2. a kind of device of plastering a wall for building intellectualization installing engineering according to claim 1, it is characterised in that:It is described It is plugged with rack gear (8) in activity on case (701) of putting, the lower end of the rack gear (8) is fixedly connected on the upper end of pedestal (1), described Rack gear (8) is located to be connected with circular gear (706) in the one section of engagement put in case (701), fixed on the circular gear (706) It is plugged with one end of third bull stick (705), the other end of the third bull stick (705) through partition (702) and is rotatably connected on Connect on the inner sidewall for putting case (701), the third bull stick (705) is located in screw thread on the one section of inner sidewall put in case (701) It is connected to the second nut (707), is fixedly connected with scraper plate (708) on the side wall of second nut (707), the scraper plate (708) It is actively socketed on third bull stick (705).
3. a kind of device of plastering a wall for building intellectualization installing engineering according to claim 2, it is characterised in that:It is described Movable sleeve is connected to casing on third bull stick (705), and described sleeve pipe is fixedly connected on the side wall of the second nut (707), the set Steel wire bristle is fixedly connected on the inner sidewall of pipe.
4. a kind of device of plastering a wall for building intellectualization installing engineering according to claim 1, it is characterised in that:It is described Sliding groove is offered on pedestal (1), is slidably connected in the sliding groove steel ruler (10), what the upper end of the pedestal (1) opened up Screw hole internal screw thread is connected with screw (9).
5. a kind of device of plastering a wall for building intellectualization installing engineering according to claim 1, it is characterised in that:It is described The bottom side of the wall of connecting tube (1102) offers several gas holes.
6. a kind of device of plastering a wall for building intellectualization installing engineering according to claim 1, it is characterised in that:It is described The lower end of patter (1103) is arcuate structure.
7. a kind of device of plastering a wall for building intellectualization installing engineering according to claim 1, it is characterised in that:It is described Tracheae winding mechanism (13) includes fixed case (1301), line roller (1302) and wire winding pole (1303), and the fixed case (1301) is solid Surely it is connected on the side wall of air pump (12), the wire winding pole (1303) is rotatably connected on the inner sidewall of fixed case (1301), institute It states line roller (1302) to be fixedly attached on wire winding pole (1303), the both ends of the wire winding pole (1303) are cased with wind spring (1304) respectively One end in the wind spring (1304) is fixedly connected on the lateral wall of wire winding pole (1303), the one end of the wind spring (1304) outside It is fixedly connected on the side wall of online roller (1302).
8. a kind of device of plastering a wall for building intellectualization installing engineering according to claim 1, it is characterised in that:It is described Idler wheel (2) is rotatably connected on the lower end of pedestal (1).
9. a kind of device of plastering a wall for building intellectualization installing engineering according to claim 2, it is characterised in that:It is described Scraper plate (708) edge is warp architecture.
10. a kind of device of plastering a wall for building intellectualization installing engineering according to claim 3, it is characterised in that:Institute It states third bull stick (705) movable sleeve and is connected to and scrape frame, the front and rear sides for scraping frame are fixedly connected on casing without side wall, the frame of scraping Lateral wall on.
CN201810757715.XA 2018-07-11 2018-07-11 A device of plastering a wall for building intelligent installation engineering CN108915217B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810757715.XA CN108915217B (en) 2018-07-11 2018-07-11 A device of plastering a wall for building intelligent installation engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810757715.XA CN108915217B (en) 2018-07-11 2018-07-11 A device of plastering a wall for building intelligent installation engineering

Publications (2)

Publication Number Publication Date
CN108915217A true CN108915217A (en) 2018-11-30
CN108915217B CN108915217B (en) 2020-06-12

Family

ID=64412174

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810757715.XA CN108915217B (en) 2018-07-11 2018-07-11 A device of plastering a wall for building intelligent installation engineering

Country Status (1)

Country Link
CN (1) CN108915217B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2374601Y (en) * 1999-07-05 2000-04-19 庞兴华 Multifunctional automatic whitewashing machine
CN205577367U (en) * 2015-12-02 2016-09-14 郁祥兴 Full -automatic bionical white washed wall machine
CN205617744U (en) * 2016-04-13 2016-10-05 林洁 Automatic wash mortar flush coater
CN206571118U (en) * 2017-03-09 2017-10-20 仇小睿 A kind of construction apparatus of plastering
CN207003955U (en) * 2017-06-12 2018-02-13 青岛财经创展信息技术有限公司 A kind of construction wall plastering equipment with reciprocal erasing function
CN207513115U (en) * 2017-08-31 2018-06-19 张能力 A kind of white washed wall device
CN108204115A (en) * 2018-01-16 2018-06-26 深圳市晟腾企业管理有限公司 It is a kind of to automate the building machinery for painting metope

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2374601Y (en) * 1999-07-05 2000-04-19 庞兴华 Multifunctional automatic whitewashing machine
CN205577367U (en) * 2015-12-02 2016-09-14 郁祥兴 Full -automatic bionical white washed wall machine
CN205617744U (en) * 2016-04-13 2016-10-05 林洁 Automatic wash mortar flush coater
CN206571118U (en) * 2017-03-09 2017-10-20 仇小睿 A kind of construction apparatus of plastering
CN207003955U (en) * 2017-06-12 2018-02-13 青岛财经创展信息技术有限公司 A kind of construction wall plastering equipment with reciprocal erasing function
CN207513115U (en) * 2017-08-31 2018-06-19 张能力 A kind of white washed wall device
CN108204115A (en) * 2018-01-16 2018-06-26 深圳市晟腾企业管理有限公司 It is a kind of to automate the building machinery for painting metope

Also Published As

Publication number Publication date
CN108915217B (en) 2020-06-12

Similar Documents

Publication Publication Date Title
CN204199640U (en) A kind of Novel powder wall telephone
CN107414651A (en) A kind of building steel tube inside and outside wall polishing derusting device
CN104191513B (en) Automatic production line of small plastic-concrete components
CN204295678U (en) A kind of robot
CN205997168U (en) A kind of construction mortar-mixing plant being easy to clean
CN204544924U (en) A kind of clinical laboratory test tube cleaning device
CN203735424U (en) Peanut cleaning machine
CN103728890B (en) A kind of control method of concrete wall surface auto spraying showering curing and system
CN205056581U (en) Test tube self - cleaning of clinical laboratory device
CN107866180A (en) A kind of special mixing apparatus of construction
CN105798006B (en) A kind of building guardrail cleaning robot based on six-degree-of-freedom parallel connection mechanism
CN204081408U (en) Indoor top wall troweling machine
CN207519832U (en) It is a kind of that there is the white washing brush for building of quantitative tear drop
CN104675091A (en) Full-automatic high-efficiency spray coating machine and spray coating method thereof
CN104047416B (en) A kind of module combined type metope canopy floating sanding apparatus of topcoating cloth
CN208380025U (en) A kind of construction mortar spraying device
CN106194082B (en) A kind of building pile foundation construction slurry processing unit
CN107300351A (en) One kind building monitoring plank rapid size detection device
CN108301220A (en) Build the processing technology of paulin room membrane material
CN107201823A (en) A kind of building wall is with exempting from type plastering machine of plastering
CN205079969U (en) A buoy type segmentation sampler for water quality monitoring
CN108162159B (en) A kind of high-efficiency vertical cement pipe making machine for presetting reinforcing bar and heating
CN108118871A (en) A kind of cement paving device of architectural engineering
CN205063355U (en) Novel concrete pour fast device
CN108756159A (en) A kind of working method of building wall waterproof construction device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20200511

Address after: 231200 building 301, Shuijing City, middle street, SHANGPAI Town, Feixi County, Hefei City, Anhui Province

Applicant after: HEFEI HUIZHIXIN MACHINERY TECHNOLOGY Co.,Ltd.

Address before: 230000 room 4, building 1011, Furong Pearl Road, Hefei economic and Technological Development Zone, Anhui, China

Applicant before: HEFEI SHANGHAN DECORATION ENGINEERING Co.,Ltd.

GR01 Patent grant
GR01 Patent grant